Amendment 0006 - NP-BLRI 2D17.pdf

PDF 541 KB Posted

Attached to
Blue Ridge Parkway Federal contract opportunity
Solicitation number
693C73-22-R-000008
Issued by
Department of Transportation Federal Highway Administration

About this file

This is a solicitation for the Blue Ridge Parkway Project NP-BLRI 2D17. The project consists of replacing the Laurel Fork Bridge on the Blue Ridge Parkway in Ashe County, North Carolina, and includes precast segmental concrete work, structural concrete, post-tensioning systems, reinforcing steel, drilled shafts, temporary bridges, mechanically stabilized earth walls, bridge railings, bridge removal, stone masonry, and other miscellaneous work. The project value is estimated to be over $10 million. Interested parties can access the request for proposal documents on SAM.gov beginning on or around October 21, 2021, with proposals due on the date specified in Block 13a of the solicitation. Requirements include experience with precast post-tensioned concrete box girder segmental bridges, drilled shafts, stone masonry, and project management. The solicitation will use a lowest price technically acceptable evaluation method.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway, newest first.
File Type Posted
Amendment 0005 - NP-BLRI 2D17.pdf PDF
Amendment 0004 - NP-BLRI 2D17.pdf PDF
Amendment 0003 - NP-BLRI 2D17.pdf PDF
Amendment 0002 - NP-BLRI 2D17.pdf PDF
Amendment 0001 - NP-BLRI 2D17.pdf PDF
Plans - NP-BLRI 2D17.pdf PDF
NP BLRI 2D17 Final Geotech Report.pdf PDF
RFP Solicitation - NP-BLRI 2D17.pdf PDF
FP14_Eng.pdf PDF
VETS-4212 Form.pdf PDF
5140-159P-2021 insp rep_Redacted.pdf PDF
ADV_Subcontracting Plan - NP-BLRI 2D17.doc DOC document
ADV_Offerors Qualifications Form.doc DOC document
Laurel Fork Bridge -As Built Plans.pdf PDF
NPS BLRI 2D17 2A16 FONSI.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7322R000008 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: CONSTRUCTION

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: ACQUISITIONS

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1401/07/20220006

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/21/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project NP-BLRI 2D17

The purpose of this Amendment is to:

1) Revise plan sheet to include a biological monitor.

2) Revise B-Pages to add a biological monitor pay item.

3) Revise Special Contract Requirements (SCR)s (J-pages) to add biological monitoring requirements:

a) Revise Subsection 107.12;

b) Revise Subsection 108.01(f);

c) Add Section 623.

4) Respond to offeror questions.

5) The proposal due date remains January 18, 2022, at 2:00 pm EST.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0006

Info Page 1 of 4

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0006

Project NP-BLRI 2D17

Laurel Fork Bridge Replacement

Solicitation: 693C73-22-R-000008

The purpose of this Amendment is to:

1) Revise plan sheet to include a biological monitor.

2) Revise B-Pages to add a biological monitor pay item.

3) Revise Special Contract Requirements (SCR)s (J-pages) to add biological monitoring requirements:

a) Revise Subsection 107.12;

b) Revise Subsection 108.01(f);

c) Add Section 623.

4) Respond to offeror questions.

5) The proposal due date remains January 18, 2022, at 2:00 pm EST.

Request for Proposal Changes

1) Replace plan sheet C02 with the attached plan sheet.

2) Replace B-Pages (B-1 through B-7) pages.

3) a) Add the following to Subsection 107.12 of the SCRs, page J-5:

In addition, protect bat species and their habitat as follows (these requirements are subject to Fish and Wildlife Service (FWS) approval):

(a) Do not cut trees from April 1 to November 1, unless cleared by qualified wildlife biologist. If tree removal cannot occur between October 31 and March 31, flag all trees larger than 3 inches in Diameter at Breast Height (DBH) needing removal after the

Preconstruction Conference.

(b) Provide a qualified wildlife biologist with expertise in bats to check trees for evidence of bats if a tree removal needs to occur between October 31 and March 31, when bats could be present. The qualified wildlife biologist with expertise in bats will check trees for evidence of

Info Page 2 of 4 bats and will complete the following determinations:

(1) Perform tree inspections within two days before starting tree removal activities.

(2) Document the survey using a tree assessment form approved by the National Park

Service (NPS) in consultation with FWS. When the form is finalized by NPS and approved by FWS, a copy of the most recent form will be provided to the Contractor by the CO prior to the survey.

(3) Check all flagged trees.

(4) Contact the CO if evidence of bats is seen. CO will coordinate with the FWS immediately to discuss appropriate avoidance measures. Do not start tree removal until discussions with FWS have concluded.

(c) If evidence of bats is not found during the tree inspections, but evidence or bat sightings are unexpectedly made during tree cutting, halt all work. Tree cutting work will not resume until approved by the CO.

(d) The preferred avoidance method is to wait for bats to leave for the season and conduct tree removal work between October 31 and March 31. If this cannot occur, the CO will reinitiate consultation with FWS to assess impacts of the proposed activity and determine additional conservation measures. A more detailed survey and implementation plan may be required. This could include potential night work after bats leave for the evening, hand removal of bats, or other techniques as appropriate.

(e) Send the “Tree Assessment Survey Form” documenting pre-tree removal checks to the

CO monthly or within one business day of encountering evidence of bats. NPS will provide a compilation of the reports to FWS every 90 days, or whenever bats are documented, whichever is sooner.

b) Delete Subsection 108.01(f) of the SCRs, page J-6 and substitute the following:

(f) No tree removal will be permitted during the active bat season from April 1 to November 1, unless approved by the biological monitor.

c) Add the following to page J-114 the SCRs:

Section 623. — GENERAL LABOR

Add the following after Subsection 623.02:

623.02A Biological Monitoring. Provide a qualified professional to perform the survey and monitoring outlined in Subsection 107.12.

Info Page 3 of 4

623.04. Add the following:

Biological monitoring will be evaluated under Subsection 106.02.

623.05. Add the following:

Progress payments for biological monitoring will be paid as follows:

(a) 10 percent of the pay item amount will be paid upon approval of the biologist.

(b) An additional 75 percent of the pay item amount will be prorated based on work completed on the schedule.

(c) The remaining portion of the pay item amount will be paid after final acceptance.

4) Respond to offeror questions:

Question: The ADV Offeror’s Qualifications Form, on Page 3, Question 8.b. states: "Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following:...-Amount and type of highway construction experience, including position, responsibility, and a brief project description of each period of employment." But the RFP, in section 1.B.a Key Personnel (PDF pages 16-17), asks for segmental bridge construction experience. The requirement on the Qualification form is not the same as what’s required in the RFP, therefore, please clarify what is specifically required.

Response: These are two separate requirements that are needed for this project not dependent on each other. The ADV Offeror’s Qualifications Form includes requirements that are needed on all our projects. The RFP includes additional specific requirements for this project that are included in the technical proposal and will be judged as pass or fail on this project as part of the Lowest

Price Technically Acceptable (LPTA) criteria as outlined Bid Schedule Instructions of the RFP.

Question: With respect to pre-existing hazardous materials/hazardous waste or hazardous materials/hazardous waste not brought onto the site by the Contractor, will EFLHD be considered the “generator” of such hazardous materials/hazardous waste and sign any necessary generator manifests?

Response: All EPA regulations regarding hazardous material must be followed. If preexisting hazardous material is encountered, FHWA will coordinate to have the owning agency (NPS) sign as the generator. Please be advised that there are some circumstances in which the contractor may be considered a co-generator and would also be required to sign the manifests.

Question: Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-14, Section 107. - Legal Relations and Responsibility to the Public, 107.06

Contractor’s Responsibility for Work requires the Contractor to assume the responsibility for all work until final acceptance. Builder’s risk coverage ends upon Substantial Completion or when the Work is put to its intended use, whichever occurs earlier. It is not equitable to give the

Info Page 4 of 4

Contractor the risk for loss it cannot insure. Contractor’s risk of loss should end upon Substantial

Completion or at the point the Work is put to its intended use by the Owner, whichever is earlier. Please consider amending to: “107.06 Contractor's Responsibility for Work. Assume responsibility for all work until final acceptance Substantial Completion, except as provided in

Subsection 106.07.”

Response: Section 107.06 will not be changed.

Question: Page J-112 states “use new masonry from Elberton, Georgia, for the mechanically-stabilized earth wall facing and capstones”. Is it possible to use suitable stone salvaged from the existing bridge for the MSE walls if a quantity is left over after construction the required headwalls, waterways, and parapets?

Response: There will not be sufficient stone left over after constructing the parapets and guard walls to completely construct the MSE wall facing. Mixing salvaged stone and existing stone is not acceptable. Please note that all salvaged stone must be used on parapets and guard walls before using any salvaged stone on headwalls or waterways.

Question: If there is left over existing stone that is still salvageable after the project is complete does the owner require the stone to be delivered to a certain location, and if so where?

Response: Deliver salvaged stone masonry to the NPS Cherry Hill Maintenance Yard at

Milepost (MP) 256.9.

Sheet 2 of 2

AMD #6 - Added new pay item

AMD #4 - Revised quantity

NO. DATE BY REVISIONS

01/06/22

12/06/21

Siou

Siou

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

TABULATION OF QUANTITIES

BLUE RIDGE PARKWAY

1AMENDMENT #4

2AMENDMENT #6

:3

A

M

J a n u a r y

C

C f h f l1 f il e s e r v e .f lh d

.f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S \b lr i\ d

\P r o j_ D e v

\C A

D D

\O p e n

R o a d

\A m e n d m e n t

\C

B

L R

I

D ta b

A

M D

.d g n

STATE PROJECT

NUMBER

SHEET

NC NP-BLRI 2D17 C02

NPS Drwg. No. 601/152750 NPS PMIS No. 186570

B - 1

Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0060 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0080 15702-5000 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM (BYPASS

PUMPING)

ALL LPSM $___LPSM_____ $____________

0004 A0100 15705-0100 SOIL EROSION CONTROL, SILT FENCE

3,150 LNFT $____________ $____________

A0120 15705-0300 SOIL EROSION CONTROL, SLOPE DRAINS

320 LNFT $____________ $____________

A0140 15705-0500 SOIL EROSION CONTROL, TEMPORARY CULVERT PIPE (18-INCH

EQUIVALENT DIAMETER ARCH)

165 LNFT $____________ $____________

A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

140 LNFT $____________ $____________

A0180 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION

2 EACH $____________ $____________

A0200 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

1 EACH $____________ $____________

A0220 15706-2200 SOIL EROSION CONTROL, FILTER BAG

1 EACH $____________ $____________

A0240 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

ALL LPSM $___LPSM_____ $____________

A0260 20101-0000 CLEARING AND GRUBBING

3.1 ACRE $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:NP-BLRI 2D17

Project Name:Blue Ridge Parkway Laurel Fork Bridge Replacement

B - 2

A0280 20301-1400 REMOVAL OF INLET

1 EACH $____________ $____________

A0300 20302-0800 REMOVAL OF FENCE, BARBED WIRE

170 LNFT $____________ $____________

A0320 20302-2100 REMOVAL OF PIPE CULVERT

35 LNFT $____________ $____________

A0340 20303-1500 REMOVAL OF PAVED WATERWAY, STONE

110 SQYD $____________ $____________

A0360 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

1,470 SQYD $____________ $____________

A0380 20304-2000 REMOVAL OF BRIDGE

ALL LPSM $___LPSM_____ $____________

A0400 20401-0000 ROADWAY EXCAVATION

300 CUYD $____________ $____________

A0420 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E

1,840 SQYD $____________ $____________

A0440 20801-0000 STRUCTURE EXCAVATION

1,700 CUYD $____________ $____________

A0460 25102-0200 PLACED RIPRAP, METHOD A, CLASS 2

12 TON $____________ $____________

A0480 25102-0300 PLACED RIPRAP, METHOD A, CLASS 3

62 TON $____________ $____________

A0500 25501-0000 MECHANICALLY STABILIZED EARTH WALL (MODULAR BLOCK WITH

STONE MASONRY FACING)

3,220 SQFT $____________ $____________

A0520 25701-0200 CONTRACTOR FURNISHED MECHANICALLY STABILIZED EARTH WALL

DESIGN (MODULAR BLOCK WITH STONE MASONRY FACING)

ALL LPSM $___LPSM_____ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:NP-BLRI 2D17

B - 3

A0540 30101-4000 AGGREGATE BASE GRADING C OR D

1,750 TON $____________ $____________

A0560 31302-0000 AGGREGATE-TOPSOIL COURSE (VARIABLE DEPTH)

2,900 SQYD $____________ $____________

A0580 31302-0400 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH

410 SQYD $____________ $____________

A0600 40101-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL

MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL , PG 64-22, TYPE IV

PAVEMENT ROUGHNESS

460 TON $____________ $____________

A0620 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL

MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL , PG 64-22

205 TON $____________ $____________

A0640 41202-0000 TACK COAT

310 GAL $____________ $____________

A0660 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1

490 SQYD $____________ $____________

A0680 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (ABUTMENT BACKWALLS,

WINGWALLS)

195 CUYD $____________ $____________

A0700 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (PIER CAPS, BRACES)

230 CUYD $____________ $____________

A0720 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (PIER FOOTINGS)

410 CUYD $____________ $____________

A0740 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (ABUTMENT STEMS)

240 CUYD $____________ $____________

A0760 55202-2000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 2

135 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:NP-BLRI 2D17

B - 4

A0780 55235-0000 EXPANSION JOINTS (WINGWALL/MSE WALL)

97 LNFT $____________ $____________

A0800 55235-0000 EXPANSION JOINTS (MODULAR)

59 LNFT $____________ $____________

A0820 55401-1000 REINFORCING STEEL

158,000 LB $____________ $____________

A0840 55601-0500 BRIDGE RAILING, CONCRETE

1,090 LNFT $____________ $____________

A0860 55901-0000 MEMBRANE WATERPROOFING

1,580 SQYD $____________ $____________

A0880 56401-4000 BEARING DEVICE, DISK

8 EACH $____________ $____________

A0900 56501-0600 DRILLED SHAFT, 48-INCH DIAMETER (ROCK SOCKET)

170 LNFT $____________ $____________

A0920 56501-0600 DRILLED SHAFT, 48-INCH DIAMETER

63 LNFT $____________ $____________

A0940 56501-0900 DRILLED SHAFT, 72-INCH DIAMETER

120 LNFT $____________ $____________

A0960 56501-0900 DRILLED SHAFT, 72-INCH DIAMETER (ROCK SOCKET)

45 LNFT $____________ $____________

A0980 57502-0000 TEMPORARY BRIDGE (105 FEET BY 30 FEET)

ALL LPSM $___LPSM_____ $____________

A1000 57502-0000 TEMPORARY BRIDGE (85 FEET BY 30 FEET, OPTIONAL)

ALL LPSM $___LPSM_____ $____________

A1020 58601-0000 PRECAST SEGMENTAL CONCRETE (SUPERSTRUCTURE CASTING AND

TRANSPORT)

1,530 CUYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:NP-BLRI 2D17

B - 5

A1040 58601-0000 PRECAST SEGMENTAL CONCRETE (PIER CASTING, TRANSPORT, AND

ERECTION)

325 CUYD $____________ $____________

A1060 58602-0000 PRECAST SEGMENTAL CONCRETE (SUPERSTRUCTURE ERECTION)

ALL LPSM $___LPSM_____ $____________

0004 A1080 58701-0000 POST-TENSIONING SYSTEM (PIERS)

ALL LPSM $___LPSM_____ $____________

A1100 58701-0000 POST-TENSIONING SYSTEM (SUPERSTRUCTURE)

ALL LPSM $___LPSM_____ $____________

A1120 60201-0600 18-INCH PIPE CULVERT (CONCRETE)

8 LNFT $____________ $____________

A1140 60201-1000 36-INCH PIPE CULVERT

26 LNFT $____________ $____________

A1160 60403-0900 INLET, FLH TYPE 4B

1 EACH $____________ $____________

A1180 60801-0300 PAVED WATERWAY, TYPE 3

155 SQYD $____________ $____________

A1200 61701-4000 GUARDRAIL SYSTEM SBTB

20 LNFT $____________ $____________

A1220 61702-0100 TERMINAL SECTION, TYPE SBT-BAT

2 EACH $____________ $____________

A1240 61707-2000 STRUCTURE TRANSITION RAILING, SBT SYSTEM

48 LNFT $____________ $____________

A1260 61901-1600 FENCE, CHAIN LINK, 48-INCH HEIGHT

65 LNFT $____________ $____________

A1280 61901-2100 FENCE, CHAIN LINK, 96-INCH HEIGHT

130 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:NP-BLRI 2D17

B - 6

A1300 61902-0500 GATE, WOOD, 16 FEET WIDTH

1 EACH $____________ $____________

A1320 61902-3800 GATE, CHAIN LINK, 22 FEET WIDTH

2 EACH $____________ $____________

A1340 62002-0000 STONE MASONRY (ABUTMENT)

290 SQYD $____________ $____________

A1360 62010-1000 STONE MASONRY GUARDWALL

134 LNFT $____________ $____________

A1380 62010-7000 STONE MASONRY PARAPET (APPROACH SLAB PARAPET)

86 LNFT $____________ $____________

A1400 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT

2 EACH $____________ $____________

0006 A1410 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGICAL

MONITORING)

ALL LPSM $___LPSM_____ $____________

A1420 62402-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH

3.1 ACRE $____________ $____________

A1440 62501-0000 TURF ESTABLISHMENT

3.1 ACRE $____________ $____________

A1460 62902-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D

3.1 ACRE $____________ $____________

A1480 63316-1000 REMOVE AND RESET SIGN (AND MILE MARKER)

2 EACH $____________ $____________

A1500 63401-2300 PAVEMENT MARKINGS, TYPE L, SOLID

2,850 LNFT $____________ $____________

A1520 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

24 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:NP-BLRI 2D17

B - 7

A1540 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

2 EACH $____________ $____________

A1560 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

70 LNFT $____________ $____________

0004 A1580 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

1,800 LNFT $____________ $____________

A1600 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

1,100 SQFT $____________ $____________

A1620 63701-0000 FIELD OFFICE

1 EACH $____________ $____________

0004 A1640 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (TEMPORARY ACCESS ROADS)

ALL LPSM $___LPSM_____ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:NP-BLRI 2D17

File details come from the government source that posted it. Updated .