Amendment 0005 - NP-BLRI 2D17.pdf
PDF 239 KB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-22-R-000008
About this file
This document provides information on a federal contract opportunity for the Blue Ridge Parkway Project NP-BLRI 2D17. The project involves replacing the Laurel Fork Bridge on the Blue Ridge Parkway at milepost 248.85 and includes precast segmental concrete work, structural concrete, post-tensioning systems, reinforcing steel, drilled shafts, temporary bridges, mechanically stabilized earth walls, bridge railings, bridge removal, stone masonry and other miscellaneous work. The estimated price range is over $10 million. The solicitation number is 693C73-22-R-000008 and proposals are due in January 2022 as specified in the request for proposal. A pre-bid meeting and site visit will be scheduled. Offerors must demonstrate experience with precast post-tensioned bridges, drilled shafts, stone masonry and project management. This will be a lowest price technically acceptable solicitation conducted in two steps - a technical proposal and price proposal. The project is being completed by the Federal Highway Administration Eastern Federal Lands Highway Division and all eligible contractors are invited to participate.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0006 - NP-BLRI 2D17.pdf | ||
| Amendment 0004 - NP-BLRI 2D17.pdf | ||
| Amendment 0003 - NP-BLRI 2D17.pdf | ||
| Amendment 0002 - NP-BLRI 2D17.pdf | ||
| Amendment 0001 - NP-BLRI 2D17.pdf | ||
| FP14_Eng.pdf | ||
| VETS-4212 Form.pdf | ||
| 5140-159P-2021 insp rep_Redacted.pdf | ||
| ADV_Subcontracting Plan - NP-BLRI 2D17.doc | DOC document | |
| ADV_Offerors Qualifications Form.doc | DOC document | |
| Laurel Fork Bridge -As Built Plans.pdf | ||
| NPS BLRI 2D17 2A16 FONSI.pdf | ||
| Plans - NP-BLRI 2D17.pdf | ||
| NP BLRI 2D17 Final Geotech Report.pdf | ||
| RFP Solicitation - NP-BLRI 2D17.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7322R000008 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1412/20/20210005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/21/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project NP-BLRI 2D17
The purpose of this Amendment is to:
1) Revise B-Pages Proposal Instructions to make required changes.
2) Revise Special Contract Requirements (SCR)s (J-pages) to make required changes.
3) Respond to offeror questions.
4) The proposal due date remains January 18, 2022, at 2:00 pm EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0005
Info Page 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0005
Project NP-BLRI 2D17
Laurel Fork Bridge Replacement
Solicitation: 693C73-22-R-000008
The purpose of this Amendment is to:
1) Revise B-Pages Proposal Instructions to make required changes.
2) Revise Special Contract Requirements (SCR)s (J-pages) to make required changes.
3) Respond to offeror questions.
4) The proposal due date remains January 18, 2022, at 2:00 pm EST.
Request for Proposal Changes
1) Delete Subsection 1.B.(d)(2) of the B-Pages Proposal Instructions (Page 4) and substitute the following:
(1) Proposed Quality Control Plan for construction in order to deliver a quality construction project (see Section 153). Describe how you will approach construction quality control.
2) Delete Subsections 108.01(c) through 108.01(e) of the SCRs, pages J-5 through J-6 and substitute the following:
(c) Do not perform work in the Unnamed Tributary of Laurel Fork Creek or the 25-foot trout buffer associated with the unnamed creek from October 15 to April 15.
(d) Do not perform in-stream work in Laurel Fork Creek at any time of the year.
(e) Do not perform any ground-disturbing work within the 25-foot buffer zone on either side of Laurel Fork creek at any time of the year”.
3) Respond to offeror questions:
Question: Language in Section 104 of the RFP allows delivery equipment hauling the pre-cast bridge segments to exceed the load restrictions stated in Table 104-1 on National Park Service roads. In the last sentence on page J-4 it also states: “hauling will be permitted from the nearest point of public access to the work site”. There are two points of public access to the Blue Ridge
Parkway located on either side of the Laurel Fork Bridge, the closest point is with the South
Laurel Fork Road intersection, and the other is located at State Route 18 and Blue Ridge
Info Page 2 of 3
Parkway on/off ramps which is not the closest. Will pre-cast segment delivery be allowed on the
Blue Ridge Parkway from both public access locations? Is PC segment delivery allowed to occur using the temporary construction access entrance/road located on South Laurel Fork
Road?
Response: No hauling is allowed on South Laurel Fork Road between the temporary access road and the Blue Ridge Parkway due to load limits on the South Laurel Fork Road structure over
Laurel Fork. Hauling from State Route 18 along the Blue Ridge Parkway and from State Route
18 along South Laurel Fork Road is allowed.
Question: Plan sheet D03, Temporary Construction Access Roads, has been revised with AMD
(Amendment) #4. A buffer has been added around the Unnamed Creek and is extended into and around the temporary access road and culvert work areas. The language in Section 108 of the
RFP, Pages J-5 & 6, states; Item (c) “Do not perform work in the Unnamed Tributary of Laurel
Fork Creek from October 15 to April 15” and Item (e) “Do not perform any ground-disturbing work within the 25-foot buffer zone on either side of the creek at any time of the year”. Originally, the culvert construction and creek diversion work was restricted to the time frame as allowed in Item (c) and now that the area has a buffer around it Item (e) restricts the work from occurring at all. Is this correct, how and when will the culvert, diversion, and access road occur?
Response: Please see future Amendment #5 (this amendment). Section 108 will be revised to:
“(c) Do not perform work in the Unnamed Tributary of Laurel Fork Creek or the 25-foot trout buffer associated with the unnamed creek from October 15 to April 15” and Item (e) to: “Do not perform any ground-disturbing work within the 25-foot buffer zone on either side of Laurel
Fork creek at any time of the year”.
Question: Note # 4 on plan sheet D03 requires access to the temporary access road to be maintained at all times. The 36” culvert and diversion requires several items of work to occur in a small area. Can the temporary access road be closed for a short duration to allow complete construction or is phased construction expected to occur there?
Response: The contractor would need to coordinate with the Right Of Way (ROW) holder directly for periods where full closure of the temporary access road is required. The contact information for the ROW holder will be provided at the Preconstruction Conference.
Question: Notes 2 & 3 on plan sheet number D03 show a 105 FT temporary bridge and an optional 85 FT Temporary bridge. If the contractor’s overall means and methods allow, can the
85 FT bridge to become the primary creek crossing then can the 105 FT bridge become optional or even eliminated? Can the two bid items be reduced to just one bid item for any and/or all the temporary bridge cost?
Response: It is acceptable to use only one temporary bridge instead of two if that is sufficient for the contractor’s access. However, the bid items will not be changed due to this request. A minimum amount with unit price of $0.01 should be bid for the bridge that is not required (the
Government will not accept a bid amount of $0.00).
Info Page 3 of 3
Question: The earthwork required for this project will generate approximately 2,500 CY of excess soil material. Can this material be left within the project limits or must it be hauled offsite? Potential onsite locations include fattening abutment slopes and utilizing the prescribed staging areas.
Response: The Government does not have use for this quantity of material. Any material not used to restore existing contours after removing the access roads would need to be hauled off site in accordance with the “Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects” (FP-14), Subsection 203.05(a). We do not have environmental clearance to create new earth work features on site.
Question: Item 1.B. (d) (1) on Page 4 of the RFP Bid Schedule Instructions states “Proposed
Quality Assurance & Quality Control plans for construction in order to deliver a quality construction project (see Section 153). Describe how you will approach construction quality control.” Section 153 of the FP-14 Standard Specifications identifies requirements for
Contractor Quality Control. Please confirm that Quality Assurance is not required by the
Contractor and consider removing Quality Assurance from the sentence in Item 1.8. (d) (1).
Response: The contractor is required to perform quality control, not quality assurance.
References to Quality Assurance will be deleted, please see future Amendment #5 (this amendment).
Question: Items (c) & (f) on Pages J-5 & 6 in Section 108 of the RFP limits time of work for within the Unnamed Tributary (from October 16 to Aril 14) and for Tree Removal (from
November 2 through March 31). Page 2 of the RFP anticipates award of Contract in January
2022 which has not changed since the original solicitation was advertised and containing a
November bid date. What is the revised contract award date? At this time, it appears that notice to proceed may not occur until late March. The window to remove trees will be nearly over by then and will delay start of any significant work on the project site until November 2022. In addition, segment erecting time frame will likely be pushed into less desirable weather months. Has this been taken into account with the original completion date of September 30, 2024 provided? Will the completion date be extended or can the tree removal dates be adjusted?
Response: Trees must be felled on/or before March 31. The cut trees can be moved at any time. Based on the current expected award date (late February 2022), the contractor has 1/2 months (after the bid bonds are due) to get the felling completed and must be ready to work on that. If the award is delayed past February, there will be other accommodations made. The
Government will not be extending the completion date of September 30, 2024, at this time.