About this file
Amendment of Solicitation Summary
This is Amendment 0002 to Solicitation 6923G226Q000005, issued by the Maritime Administration (USMMA Procurement) on April 9, 2026, with an effective date of April 29, 2026. The amendment extends the quotation deadline and provides additional clarification on requirements. The new bid submission deadline is May 1, 2026, at 0900 hours (previously April 29, 2026, at 1500 hours). All offerors must acknowledge receipt of this amendment prior to submission; failure to do so may result in offer rejection.
The amendment addresses seven technical questions and provides clarifications on the Statement of Work requirements for a commencement event. Key clarifications include: two flag holder boxes approximately 5 feet by 3 feet by 2 feet; approximately 200 diplomas to be moved from Wiley to the field and back; a 5-foot diameter Government seal weighing approximately 125 pounds constructed of plastic signboard; main PA speaker specifications of 12-15 inch speakers rated 1200-2000 watts with stage monitors of 8-inch speakers rated 500-1000 watts; audio requirements for Dante and AES feeds from stagebox to front of house and press box; audio delay speakers at two different field depths to prevent muffled speech; equivalent tent sizes acceptable if meeting minimum requirements; one tent with at least 40 chairs for the band; and contractor responsibility for cleaning the turf field and areas impacted by contractor activities. The amendment confirms no other changes to solicitation terms and conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 6 - Revised SOW.pdf | ||
| Amendment 3 - Final.pdf | ||
| Amendment 1 - Responses.pdf | ||
| Attachment 1 - Solicitation.pdf | ||
| Attachment 5 - DOL Wage Determination.pdf | ||
| Attachment 2 - Statement of Work.pdf | ||
| Attachment 3 - Pricing Sheet.xlsx | XLSX spreadsheet | |
| Attachment 4 - QA Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
6923G226Q000005 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
6923G2
KINGS POINT NY 11024-1699
300 STEAMBOAT ROAD
USMMA PROCUREMENT
MARITIME ADMINISTRATION
6923G226Q00000504/29/20260002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/09/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purposes of this Amendment is to extend the quotation and provide additional clarity.
A. Quotes new deadline is May 1, 2026, at 0900-hours.
B. To provide RFI clarification with pictures, see below
C. No other changes to the terms of this solicitation.
NOTE: Offerors must sign/acknowledge all posted amendments.
LIST OF CHANGES:
Bids due date : 29-APR-26 changed to 01-MAY-26
Solicitation due time : 15:00 PM changed to 09:00A
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
AMIT NARINE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Section Question
(KTR to fill-out) (KTR to fill-out)
1 SOW Section 10.9 Flag Holder
Can an image of the flag holder be provided?
Yes, an image is provided. There are two flag holders about 5ft by 3ft by 2ft.
SOW Section 10.9 has been revised to reflect the dimensions of the flag holders.
Technical
2 SOW Section 10.1
With respect to Section 10 (Diploma Handling), the Statement of Work outlines required tasks but does not specify the number of personnel or estimated labor hours expected for these activities.
Please clarify.
There are approximately 200 diplomas. Pictures of holders that need to be moved from Wiley to the field and back are provided as attachment via Amendment 2 to the SOW. The contractor will need determine the number of staff required to complete the task based on their proposed technical approach.
SOW Section 10.10.1 a. has been revised to reflect the number of diploma holders.
Technical
3 SOW Section 10 (General) Is there an ideal staging plan and/or field layout for commencement and the BBQ?
Yes, there is a desired stage layout; however there is some flexibility. Please use the video as reference on the previous Q20 and attached images.
None. Technical
4 SOW Section 10.11
Please supply dimensions of the Gov’t Seals to include estimate weight and material?
Seal is 5-ft in diameter weighing approx 125 lbs. contructed of plastic signboard.
SOW Section 10.11 has been revised to relect the dimensions of the Government seal.
Technical
5 SOW Section 10.13
What are the recommended requirement for the speakers (i.e. specs)?
Main PA:12-15 inch speakers of approximately 1200-2000 Watts with full range frequency drivers; main PA will all need to be capable of setting delays based on the distance from the stage level PA to the audience seating PA; stage monitors (3) 8-inch speakers of approximately 500-1000 W; audience level PA must be capable of angling to point directly at the middle of stadium seating.
SOW Section 10.13 has been revised to add the speaker specifications.
Technical
SOW Section 10.18 Broadcast/Media Feed Management
How many discreet channels of audio over ethernet (Dante) and AES will be needed and where should those feeds to be run to?
Primary run of dante is from stagebox to FoH; Secondary run of dante (Cat-5e) will be from FoH to press box atop stadium seating. A stagebox/mult box will be needed to be in the pressbox so FoH can send a post-fader mix to media crew. An audio monitor for the Department of Transportation (DOT) media team directing the broadcast.
SOW Section 10.18 has been revised to add the specific audio requirements.
Technical
7 SOW
Audio delays – the statement of work mentions delay speakers in several places, are these a requirement or will main speaker stacks (line arrays) be sufficient if coverage and SPL level across the seating areas are determined to meet acceptable standards?
Our SOW and provided floor plan have speakers at two different depths on the field; one set at stage level and one set placed on the track facing the stadium seating. To prevent muffled speech, the stadium-depth placed speakers need to be delayed according to their distance from the stage speakers. Increasing SPL will not improve clarity—only closer proximity to the listener can do that.
None. Technical
# Government’s Response Change to the Solicitation:
Technical/ Contractual
8 SOW Section 10.7
Can we propose and price similar/equal tent sizes or configurations if our standard inventory matches or exceeds the required footprint and function, or must dimensions be identical?
Equivalent tent sizes are fine as long as they meet the minimum requirement. Gov't reserves the right to reject a quote if the tents offered are too small or overly large.
None. Contractual/Technical
9 SOW
Do you want to have a video wall for the Awards Ceremony?
No. All quotes should include all base & option requirements as updated on SAM.gov.
Recommendations should be submitted as a separate offer.
None. Technical
10 SOW/SOLICIATION
Can we make a 8’ to 15’ blow up of the Merchant Marine logo for the back of the stage; it would look much better and the forty year old heavy permanent logos in the Ackerman theater will not get damaged?
No. All quotes should include all base & option requirements as updated on SAM.gov.
Recommendations should be submitted as a separate offer.
None. Technical
11 SOW Section 10
Does the band tent need chairs and how many?
In accordance with SOW Section 10.7 & 10.8, there should be one tent with at least 40 chairs.
SOW Section 10.8 has been revised to clarify the specific chair requirements for the band.
Technical
12 SOW Section 8 What does clean up include? Do you have janitors to clean your field where the public is?
Contractor is responsible to clean turf field and areas impacted by contractor activities in accordance with SOW Section 8.
None. Technical
13 SOW/SOLICIATION
As opposed to a main tent would you consider a covered truss system-see pics below?
It looks ten times better than the tent system you had last year.
No. All quotes should include all base & option requirements as updated on SAM.gov.
Recommendations should be submitted as a separate offer.
None. Technical
In reference to Q5 of the RFI, Tents Layout. Please see below from the previous event:
In reference to Q2 of the RFI, Diploma Holders & tubes, please see below:
Standard Diplomas tubes to moved and placed in the holders:
In reference to Q1 of the RFI, Flag holder boxes, please see below: