BidTab_MT PRAIRIE 2016(3).pdf
PDF 581 KB Posted
- Solicitation number
- 69056726B000003
About this file
This is a Bid Tabulation Report for Federal Highway Administration (FHWA) Project MT PRAIRIE 2016(3), a Milwaukee Bridge Resurfacing and Rehabilitation project located in Prairie County, Montana on federal land in the Terry Badlands Wilderness. The solicitation number is 69056726B000003, with bids opened on August 6, 2026. Nine contractors submitted bids ranging from $8,540,870.00 (Cekra, Inc., the lowest bid) to $11,319,396.00 (Cascade Civil Corp., the highest bid), compared to the Engineer's Estimate of $6,934,790.00. The project is identified as Schedule A (Base) under the Western Federal Lands division, with Joshua Christopher as the Lead Designer. The bid tabulation was generated on August 7, 2026, and was certified by Angy Lee Liljeedahl on August 7, 2026.
The report details line-item bids from all nine contractors across numerous pay items, including mobilization, construction survey and staking, contractor quality control and testing, soil erosion control, clearing and grubbing, removal of bridge components, excavation and subexcavation, cofferdam installation, riprap placement, structural steel fabrication and erection, bridge railing installation, temporary support structures, containment systems, fence removal and reset, equipment rentals (dump trucks, loaders, excavators, motor graders, chain saws), general labor, topsoil and turf establishment, signage, object markers, delineators, and temporary traffic control measures. Unit prices vary significantly across contractors for individual line items, reflecting different methodologies and cost structures. The report does not indicate contract award details or award date, as those fields remain blank in the certification section.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_MT PRAIRIE 2016(3).pdf | ||
| QandA_08-04-2026.pdf | ||
| Amendment A004.pdf | ||
| QandA_07-30-2026.pdf | ||
| Amendment A003.pdf | ||
| QandA_07-29-2026.pdf | ||
| QandA_07-28-2026_updated.pdf | ||
| QandA_07-28-2026.pdf | ||
| QandA_07-22-2026.pdf | ||
| QandA_07-21-2026.pdf | ||
| QandA_07-20-2026.pdf | ||
| Amendment A002.pdf | ||
| QandA_07-17-2026.pdf | ||
| QandA_07-16-2026.pdf | ||
| QandA_07-13-2026.pdf | ||
| Amendment A001.pdf | ||
| QandA_07-07-2026.pdf | ||
| QandA_07-02-2026.pdf | ||
| Physical Data_mta-prairie2016-3.zip | ZIP file | |
| mta-prairie2016-3_plans_IFB.pdf | ||
| IFB_69056726B000003.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : MT PRAIRIE 2016(3) Project Name: Milwaukee Bridge Resurfacing and Rehabilitation
Contractor Responsive? Base Schedule A Cascade Civil Corp $11,319,396.00
YOUNG GUN CONSTRUCTION LLC $10,903,646.43
Battle Ridge Builders LLC $10,058,262.00
SLETTEN CONSTRUCTION
COMPANY $9,894,928.08
MJ Hughes Construction $9,547,881.00 Missouri River Contractors LLC $8,928,997.00 Kovilic Construction Company Inc $8,902,700.00 Hamilton Construction Co. $8,866,190.00 Cekra, Inc. $8,540,870.00 Engineer's Estimate $6,934,790.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Haydar Mohammad
Project No. : MT PRAIRIE 2016(3) Project Name: Milwaukee Bridge Resurfacing and Rehabilitation
Division: Western Federal Lands
Schedule: A Schedule Type: Base Lead Designer: Joshua Christopher Solicitation No. : 69056726B000003 Opened at: FHWA Opened by: Marino Chea State: MT County: Prairie Federal Land: Terry Badlands
Wilderness Bid Open Date and Time: 08/06/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Cascade Civil Corp, 255 SE Black Butte Blvd., Redmond, OR, 97756
$11,319,396.00
YOUNG GUN CONSTRUCTION
LLC,
10609 S Cave RD, Ludlow, SD, 57755
$10,903,646.43
Battle Ridge Builders LLC, 354 Countryside LN, Belgrade, MT, 59714
$10,058,262.00
SLETTEN CONSTRUCTION
COMPANY,
PO Box 2467, Great Falls, MT, 59403
$9,894,928.08
MJ Hughes Construction, 11510 NE 87th Ave, Vancouver, WA, 98662
$9,547,881.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Missouri River Contractors LLC, 2385 McClellan Creek Road, East Helena, MT, 59635
$8,928,997.00
Kovilic Construction Company Inc, 3721 N Carnation Street, Franklin Park, IL, 60131
$8,902,700.00
Hamilton Construction Co., PO BOX 659, Springfield, OR, 97477
$8,866,190.00
Cekra, Inc., 6316 Marywood Drive, Wilmington, NC, 28409-2107
$8,540,870.00
Engineer's Estimate $6,934,790.00
Project No. : MT PRAIRIE 2016(3) Project Name: Milwaukee Bridge Resurfacing and Rehabilitation
Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION SLETTEN
CONSTRUCTION
COMPANY
$1,931,305.64
Cascade Civil Corp $1,130,000.00
YOUNG GUN
CONSTRUCTION LLC $997,000.00
Battle Ridge Builders
LLC $950,000.00
MJ Hughes Construction $950,000.00
Missouri River Contractors LLC $890,000.00
Hamilton Construction Co. $880,000.00
Cekra, Inc. $840,000.00 Kovilic Construction Company Inc $300,000.00
Engineer's Estimate ALL LPSM LPSM $607,000.00
A0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Battle Ridge Builders
LLC $70,000.00
Cascade Civil Corp $60,000.00 Cekra, Inc. $50,000.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Kovilic Construction Company Inc $50,000.00
YOUNG GUN
CONSTRUCTION LLC $42,000.00
SLETTEN
CONSTRUCTION
COMPANY
$35,000.00
MJ Hughes Construction $30,000.00
Hamilton Construction Co. $25,000.00
Missouri River Contractors LLC $20,000.00
Engineer's Estimate ALL LPSM LPSM $31,000.00
A0060 15301-0000 CONTRACTOR
QUALITY CONTROL
SLETTEN
CONSTRUCTION
COMPANY
$537,800.00
MJ Hughes Construction $510,000.00
YOUNG GUN
CONSTRUCTION LLC $358,000.00
Missouri River Contractors LLC $350,000.00
Hamilton Construction Co. $300,000.00
Kovilic Construction Company Inc $300,000.00
Cascade Civil Corp $250,000.00 Battle Ridge Builders
LLC $55,000.00
Cekra, Inc. $50,000.00 Engineer's Estimate ALL LPSM LPSM $122,000.00
A0080 15401-0000 CONTRACTOR
TESTING
Cascade Civil Corp $115,000.00 MJ Hughes Construction $85,000.00
SLETTEN
CONSTRUCTION
COMPANY
$55,600.00
Missouri River Contractors LLC $55,000.00
Cekra, Inc. $50,000.00 Battle Ridge Builders
LLC $35,000.00
Kovilic Construction Company Inc $30,000.00
YOUNG GUN
CONSTRUCTION LLC $28,000.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0080 15401-0000 CONTRACTOR
TESTING
Hamilton Construction Co. $15,000.00
Engineer's Estimate ALL LPSM LPSM $122,000.00
A0100 15501-0000 CONSTRUCTION
SCHEDULE
Battle Ridge Builders
LLC $100,000.00
YOUNG GUN
CONSTRUCTION LLC $75,000.00
Cascade Civil Corp $60,000.00 Cekra, Inc. $50,000.00 Missouri River Contractors LLC $25,000.00
SLETTEN
CONSTRUCTION
COMPANY
$20,000.00
MJ Hughes Construction $16,000.00
Kovilic Construction Company Inc $10,000.00
Hamilton Construction Co. $5,000.00
Engineer's Estimate ALL LPSM LPSM $31,000.00
A0120 15703-1500 SOIL EROSION
CONTROL,
TEMPORARY SOIL
TACKIFIER
Kovilic Construction Company Inc 0.800 $50,000.00 $40,000.00
MJ Hughes Construction 0.800 $22,000.00 $17,600.00
YOUNG GUN
CONSTRUCTION LLC 0.800 $22,000.00 $17,600.00
Battle Ridge Builders
LLC 0.800 $16,000.00 $12,800.00
Cascade Civil Corp 0.800 $10,000.00 $8,000.00
SLETTEN
CONSTRUCTION
COMPANY
0.800 $9,125.00 $7,300.00
Hamilton Construction Co. 0.800 $3,000.00 $2,400.00
Missouri River Contractors LLC 0.800 $3,000.00 $2,400.00
Cekra, Inc. 0.800 $1,000.00 $800.00 Engineer's Estimate 0.800 ACRE $4,200.00 $3,360.00
A0140 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Kovilic Construction Company Inc 1,600.000 $25.00 $40,000.00
SLETTEN
CONSTRUCTION
COMPANY
1,600.000 $20.00 $32,000.00
YOUNG GUN
CONSTRUCTION LLC 1,600.000 $14.00 $22,400.00
Missouri River Contractors LLC 1,600.000 $11.00 $17,600.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0140 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Battle Ridge Builders
LLC 1,600.000 $9.50 $15,200.00
Cascade Civil Corp 1,600.000 $9.00 $14,400.00 Hamilton Construction Co. 1,600.000 $7.00 $11,200.00
MJ Hughes Construction 1,600.000 $7.00 $11,200.00
Cekra, Inc. 1,600.000 $4.00 $6,400.00 Engineer's Estimate 1,600.000 LNFT $9.00 $14,400.00
A0160 15802-0000 WATERING FOR
DUST CONTROL
Cekra, Inc. $200,000.00 Missouri River Contractors LLC $93,000.00
Hamilton Construction Co. $85,000.00
YOUNG GUN
CONSTRUCTION LLC $58,000.00
Kovilic Construction Company Inc $50,000.00
Cascade Civil Corp $35,000.00
SLETTEN
CONSTRUCTION
COMPANY
$30,000.00
MJ Hughes Construction $10,000.00
Battle Ridge Builders
LLC $6,000.00
Engineer's Estimate ALL LPSM LPSM $95,000.00
A0180 20101-0000 CLEARING AND
GRUBBING
YOUNG GUN
CONSTRUCTION LLC 0.300 $85,000.00 $25,500.00
Cekra, Inc. 0.300 $60,000.00 $18,000.00 Battle Ridge Builders
LLC 0.300 $50,000.00 $15,000.00
Cascade Civil Corp 0.300 $30,000.00 $9,000.00 MJ Hughes Construction 0.300 $29,000.00 $8,700.00
Hamilton Construction Co. 0.300 $25,000.00 $7,500.00
Kovilic Construction Company Inc 0.300 $25,000.00 $7,500.00
SLETTEN
CONSTRUCTION
COMPANY
0.300 $21,666.67 $6,500.00
Missouri River Contractors LLC 0.300 $5,600.00 $1,680.00
Engineer's Estimate 0.300 ACRE $29,000.00 $8,700.00
A0200 20301-2300 REMOVAL OF
SIGN/MARKER Cekra, Inc. 4.000 $500.00 $2,000.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0200 20301-2300 REMOVAL OF
SIGN/MARKER
Battle Ridge Builders
LLC 4.000 $400.00 $1,600.00
Kovilic Construction Company Inc 4.000 $300.00 $1,200.00
MJ Hughes Construction 4.000 $300.00 $1,200.00
SLETTEN
CONSTRUCTION
COMPANY
4.000 $225.00 $900.00
YOUNG GUN
CONSTRUCTION LLC 4.000 $135.00 $540.00
Hamilton Construction Co. 4.000 $100.00 $400.00
Missouri River Contractors LLC 4.000 $100.00 $400.00
Cascade Civil Corp 4.000 $55.00 $220.00 Engineer's Estimate 4.000 EACH $190.00 $760.00
A0220 20301-2400 REMOVAL OF SIGN Battle Ridge Builders
LLC 2.000 $600.00 $1,200.00
Cekra, Inc. 2.000 $500.00 $1,000.00 Kovilic Construction Company Inc 2.000 $300.00 $600.00
MJ Hughes Construction 2.000 $300.00 $600.00
SLETTEN
CONSTRUCTION
COMPANY
2.000 $225.00 $450.00
YOUNG GUN
CONSTRUCTION LLC 2.000 $135.00 $270.00
Hamilton Construction Co. 2.000 $100.00 $200.00
Missouri River Contractors LLC 2.000 $100.00 $200.00
Cascade Civil Corp 2.000 $55.00 $110.00 Engineer's Estimate 2.000 EACH $250.00 $500.00
A0240 20302-0150 REMOVAL OF
BRIDGE RAILING
YOUNG GUN
CONSTRUCTION LLC 2,160.000 $85.00 $183,600.00
Battle Ridge Builders
LLC 2,160.000 $60.00 $129,600.00
Missouri River Contractors LLC 2,160.000 $55.00 $118,800.00
Kovilic Construction Company Inc 2,160.000 $50.00 $108,000.00
MJ Hughes Construction 2,160.000 $22.00 $47,520.00
Cascade Civil Corp 2,160.000 $20.00 $43,200.00 Cekra, Inc. 2,160.000 $15.00 $32,400.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0240 20302-0150 REMOVAL OF
BRIDGE RAILING
Hamilton Construction Co. 2,160.000 $6.25 $13,500.00
SLETTEN
CONSTRUCTION
COMPANY
2,160.000 $4.59 $9,914.40
Engineer's Estimate 2,160.000 LNFT $50.00 $108,000.00
A0260 20303-0200 REMOVAL OF
BRIDGE DECK
SLETTEN
CONSTRUCTION
COMPANY
1,520.000 $394.44 $599,548.80
YOUNG GUN
CONSTRUCTION LLC 1,520.000 $305.00 $463,600.00
Cascade Civil Corp 1,520.000 $250.00 $380,000.00 Battle Ridge Builders
LLC 1,520.000 $247.35 $375,972.00
Kovilic Construction Company Inc 1,520.000 $220.00 $334,400.00
Cekra, Inc. 1,520.000 $200.00 $304,000.00 Missouri River Contractors LLC 1,520.000 $190.00 $288,800.00
Hamilton Construction Co. 1,520.000 $150.00 $228,000.00
MJ Hughes Construction 1,520.000 $130.00 $197,600.00
Engineer's Estimate 1,520.000 SQYD $325.00 $494,000.00
A0280 20401-0000 ROADWAY
EXCAVATION
Cekra, Inc. 250.000 $300.00 $75,000.00 Hamilton Construction Co. 250.000 $200.00 $50,000.00
Kovilic Construction Company Inc 250.000 $150.00 $37,500.00
Battle Ridge Builders
LLC 250.000 $90.00 $22,500.00
MJ Hughes Construction 250.000 $65.00 $16,250.00
SLETTEN
CONSTRUCTION
COMPANY
250.000 $48.00 $12,000.00
Cascade Civil Corp 250.000 $40.00 $10,000.00
YOUNG GUN
CONSTRUCTION LLC 250.000 $23.50 $5,875.00
Missouri River Contractors LLC 250.000 $23.00 $5,750.00
Engineer's Estimate 250.000 CUYD $51.00 $12,750.00 A0300 20402-0000 SUBEXCAVATION Cekra, Inc. 1,600.000 $400.00 $640,000.00
Kovilic Construction Company Inc 1,600.000 $250.00 $400,000.00
Hamilton Construction Co. 1,600.000 $150.00 $240,000.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0300 20402-0000 SUBEXCAVATION Battle Ridge Builders
LLC 1,600.000 $140.00 $224,000.00
Missouri River Contractors LLC 1,600.000 $135.00 $216,000.00
MJ Hughes Construction 1,600.000 $100.00 $160,000.00
Cascade Civil Corp 1,600.000 $75.00 $120,000.00
SLETTEN
CONSTRUCTION
COMPANY
1,600.000 $45.00 $72,000.00
YOUNG GUN
CONSTRUCTION LLC 1,600.000 $23.50 $37,600.00
Engineer's Estimate 1,600.000 CUYD $50.00 $80,000.00
A0320 20403-0000 UNCLASSIFIED
BORROW
Hamilton Construction Co. 500.000 $190.00 $95,000.00
Kovilic Construction Company Inc 500.000 $150.00 $75,000.00
Cekra, Inc. 500.000 $100.00 $50,000.00 Battle Ridge Builders
LLC 500.000 $85.00 $42,500.00
YOUNG GUN
CONSTRUCTION LLC 500.000 $85.00 $42,500.00
Cascade Civil Corp 500.000 $65.00 $32,500.00
SLETTEN
CONSTRUCTION
COMPANY
500.000 $55.00 $27,500.00
MJ Hughes Construction 500.000 $25.00 $12,500.00
Missouri River Contractors LLC 500.000 $23.00 $11,500.00
Engineer's Estimate 500.000 CUYD $56.00 $28,000.00 A0340 20815-0000 COFFERDAMS MJ Hughes
Construction $1,850,000.00
Battle Ridge Builders
LLC $1,630,000.00
SLETTEN
CONSTRUCTION
COMPANY
$1,311,256.98
Cascade Civil Corp $1,200,000.00 Missouri River Contractors LLC $700,000.00
Hamilton Construction Co. $640,000.00
Kovilic Construction Company Inc $600,000.00
YOUNG GUN
CONSTRUCTION LLC $479,000.00
Cekra, Inc. $350,000.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0340 20815-0000 COFFERDAMS Engineer's Estimate ALL LPSM LPSM $90,000.00
A0360 25101-0500 PLACED RIPRAP,
METHOD A, CLASS
Battle Ridge Builders
LLC 1,600.000 $560.00 $896,000.00
YOUNG GUN
CONSTRUCTION LLC 1,600.000 $405.00 $648,000.00
Cekra, Inc. 1,600.000 $400.00 $640,000.00 Hamilton Construction Co. 1,600.000 $370.00 $592,000.00
Kovilic Construction Company Inc 1,600.000 $350.00 $560,000.00
MJ Hughes Construction 1,600.000 $300.00 $480,000.00
Cascade Civil Corp 1,600.000 $245.00 $392,000.00 Missouri River Contractors LLC 1,600.000 $230.00 $368,000.00
SLETTEN
CONSTRUCTION
COMPANY
1,600.000 $225.00 $360,000.00
Engineer's Estimate 1,600.000 CUYD $350.00 $560,000.00
A0380 30201-2000 ROADWAY
AGGREGATE,
METHOD 2
Cekra, Inc. 500.000 $375.00 $187,500.00 Hamilton Construction Co. 500.000 $190.00 $95,000.00
MJ Hughes Construction 500.000 $160.00 $80,000.00
Kovilic Construction Company Inc 500.000 $150.00 $75,000.00
SLETTEN
CONSTRUCTION
COMPANY
500.000 $125.00 $62,500.00
Battle Ridge Builders
LLC 500.000 $120.00 $60,000.00
Missouri River Contractors LLC 500.000 $115.00 $57,500.00
YOUNG GUN
CONSTRUCTION LLC 500.000 $92.00 $46,000.00
Cascade Civil Corp 500.000 $75.00 $37,500.00 Engineer's Estimate 500.000 CUYD $72.00 $36,000.00
A0400 55222-0000 REPAIR CONCRETE
(BENT
IMPROVEMENT)
YOUNG GUN
CONSTRUCTION LLC $425,000.00
Cekra, Inc. $310,000.00 Kovilic Construction Company Inc $133,000.00
Battle Ridge Builders
LLC $80,000.00
Hamilton Construction Co. $60,000.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0400 55222-0000 REPAIR CONCRETE
(BENT
IMPROVEMENT)
MJ Hughes Construction $60,000.00
SLETTEN
CONSTRUCTION
COMPANY
$32,024.90
Cascade Civil Corp $30,000.00 Missouri River Contractors LLC $15,000.00
Engineer's Estimate ALL LPSM LPSM $50,000.00
A0420 55502-0000 STRUCTURAL
STEEL, FURNISHED,
FABRICATED, AND
ERECTED
(FLOORBEAMS,
OPEN GRATE STEEL
DECK,
MISCELLANEOUS
STEEL)
YOUNG GUN
CONSTRUCTION LLC 440,000.000 $10.25 $4,510,000.00
Kovilic Construction Company Inc 440,000.000 $10.00 $4,400,000.00
Cascade Civil Corp 440,000.000 $9.50 $4,180,000.00 Missouri River Contractors LLC 440,000.000 $8.75 $3,850,000.00
Battle Ridge Builders
LLC 440,000.000 $8.30 $3,652,000.00
Cekra, Inc. 440,000.000 $8.25 $3,630,000.00 Hamilton Construction Co. 440,000.000 $8.00 $3,520,000.00
MJ Hughes Construction 440,000.000 $8.00 $3,520,000.00
SLETTEN
CONSTRUCTION
COMPANY
440,000.000 $7.34 $3,229,600.00
Engineer's Estimate 440,000.000 LB $6.00 $2,640,000.00
A0440 55601-0900 BRIDGE RAILING,
STEEL
Battle Ridge Builders
LLC 2,152.000 $295.00 $634,840.00
Cascade Civil Corp 2,152.000 $250.00 $538,000.00 Kovilic Construction Company Inc 2,152.000 $250.00 $538,000.00
YOUNG GUN
CONSTRUCTION LLC 2,152.000 $250.00 $538,000.00
Hamilton Construction Co. 2,152.000 $225.00 $484,200.00
Missouri River Contractors LLC 2,152.000 $210.00 $451,920.00
MJ Hughes Construction 2,152.000 $200.00 $430,400.00
Cekra, Inc. 2,152.000 $180.00 $387,360.00
SLETTEN
CONSTRUCTION
COMPANY
2,152.000 $152.81 $328,847.12
Engineer's Estimate 2,152.000 LNFT $300.00 $645,600.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0460 56202-0000 TEMPORARY
SUPPORT
STRUCTURE (WORK
PLATFORM)
Cascade Civil Corp $2,200,000.00
YOUNG GUN
CONSTRUCTION LLC $1,658,100.00
Missouri River Contractors LLC $1,048,552.00
Hamilton Construction Co. $1,000,000.00
Battle Ridge Builders
LLC $860,000.00
SLETTEN
CONSTRUCTION
COMPANY
$523,546.43
Cekra, Inc. $500,000.00 Kovilic Construction Company Inc $400,000.00
MJ Hughes Construction $1.00
Engineer's Estimate ALL LPSM LPSM $750,000.00
A0480 56320-0000 CONTAINMENT
SYSTEM AND
WORKER
PROTECTION PLAN
MJ Hughes Construction $950,000.00
SLETTEN
CONSTRUCTION
COMPANY
$545,963.00
Hamilton Construction Co. $400,275.00
Cascade Civil Corp $380,000.00 Kovilic Construction Company Inc $300,000.00
Missouri River Contractors LLC $210,000.00
Cekra, Inc. $100,000.00
YOUNG GUN
CONSTRUCTION LLC $95,000.00
Battle Ridge Builders
LLC $35,000.00
Engineer's Estimate ALL LPSM LPSM $300,000.00
A0500 61921-1000 REMOVE AND
RESET FENCE
Cascade Civil Corp 15.000 $300.00 $4,500.00
SLETTEN
CONSTRUCTION
COMPANY
15.000 $120.00 $1,800.00
MJ Hughes Construction 15.000 $110.00 $1,650.00
Battle Ridge Builders
LLC 15.000 $100.00 $1,500.00
Kovilic Construction Company Inc 15.000 $100.00 $1,500.00
Hamilton Construction Co. 15.000 $45.00 $675.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0500 61921-1000 REMOVE AND
RESET FENCE
Missouri River Contractors LLC 15.000 $35.00 $525.00
YOUNG GUN
CONSTRUCTION LLC 15.000 $14.85 $222.75
Cekra, Inc. 15.000 $4.00 $60.00 Engineer's Estimate 15.000 LNFT $18.00 $270.00
A0520 62201-0250 DUMP TRUCK, 10
CUBIC YARD
MINIMUM
CAPACITY
YOUNG GUN
CONSTRUCTION LLC 40.000 $275.00 $11,000.00
Hamilton Construction Co. 40.000 $200.00 $8,000.00
Missouri River Contractors LLC 40.000 $165.00 $6,600.00
Cascade Civil Corp 40.000 $160.00 $6,400.00 Cekra, Inc. 40.000 $160.00 $6,400.00 Battle Ridge Builders
LLC 40.000 $150.00 $6,000.00
MJ Hughes Construction 40.000 $150.00 $6,000.00
Kovilic Construction Company Inc 40.000 $125.00 $5,000.00
SLETTEN
CONSTRUCTION
COMPANY
40.000 $110.00 $4,400.00
Engineer's Estimate 40.000 HOUR $190.00 $7,600.00
A0540 62201-0600 BACKHOE LOADER,
8 CUBIC FOOT
MINIMUM RATED
CAPACITY BUCKET,
30-INCH WIDTH
YOUNG GUN
CONSTRUCTION LLC 20.000 $275.00 $5,500.00
Kovilic Construction Company Inc 20.000 $200.00 $4,000.00
Hamilton Construction Co. 20.000 $186.00 $3,720.00
Missouri River Contractors LLC 20.000 $175.00 $3,500.00
SLETTEN
CONSTRUCTION
COMPANY
20.000 $175.00 $3,500.00
Cascade Civil Corp 20.000 $160.00 $3,200.00 Battle Ridge Builders
LLC 20.000 $150.00 $3,000.00
MJ Hughes Construction 20.000 $150.00 $3,000.00
Cekra, Inc. 20.000 $100.00 $2,000.00 Engineer's Estimate 20.000 HOUR $240.00 $4,800.00
A0560 62201-0850 WHEEL LOADER, 1
CUBIC YARD
MINIMUM RATED
CAPACITY
YOUNG GUN
CONSTRUCTION LLC 20.000 $275.00 $5,500.00
Hamilton Construction Co. 20.000 $200.00 $4,000.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0560 62201-0850 WHEEL LOADER, 1
CUBIC YARD
MINIMUM RATED
CAPACITY
Kovilic Construction Company Inc 20.000 $200.00 $4,000.00
Missouri River Contractors LLC 20.000 $200.00 $4,000.00
Cascade Civil Corp 20.000 $190.00 $3,800.00
SLETTEN
CONSTRUCTION
COMPANY
20.000 $165.00 $3,300.00
Battle Ridge Builders
LLC 20.000 $150.00 $3,000.00
MJ Hughes Construction 20.000 $150.00 $3,000.00
Cekra, Inc. 20.000 $140.00 $2,800.00 Engineer's Estimate 20.000 HOUR $240.00 $4,800.00
A0580 62201-2800 MOTOR GRADER, 8
FOOT MINIMUM
BLADE
YOUNG GUN
CONSTRUCTION LLC 20.000 $275.00 $5,500.00
Battle Ridge Builders
LLC 20.000 $250.00 $5,000.00
Cascade Civil Corp 20.000 $240.00 $4,800.00 Missouri River Contractors LLC 20.000 $225.00 $4,500.00
Hamilton Construction Co. 20.000 $200.00 $4,000.00
Kovilic Construction Company Inc 20.000 $200.00 $4,000.00
Cekra, Inc. 20.000 $165.00 $3,300.00 MJ Hughes Construction 20.000 $150.00 $3,000.00
SLETTEN
CONSTRUCTION
COMPANY
20.000 $135.00 $2,700.00
Engineer's Estimate 20.000 HOUR $250.00 $5,000.00
A0600 62201-3400 HYDRAULIC
EXCAVATOR, 1
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
YOUNG GUN
CONSTRUCTION LLC 40.000 $275.00 $11,000.00
Hamilton Construction Co. 40.000 $250.00 $10,000.00
Cekra, Inc. 40.000 $200.00 $8,000.00 Kovilic Construction Company Inc 40.000 $200.00 $8,000.00
SLETTEN
CONSTRUCTION
COMPANY
40.000 $190.00 $7,600.00
Missouri River Contractors LLC 40.000 $175.00 $7,000.00
Cascade Civil Corp 40.000 $170.00 $6,800.00 Battle Ridge Builders
LLC 40.000 $150.00 $6,000.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0600 62201-3400 HYDRAULIC
EXCAVATOR, 1
CUBIC YARD
MINIMUM
CAPACITY WITH
THUMB
ATTACHMENT
MJ Hughes Construction 40.000 $150.00 $6,000.00
Engineer's Estimate 40.000 HOUR $235.00 $9,400.00
A0620 62201-3750 CHAIN SAW YOUNG GUN
CONSTRUCTION LLC 10.000 $205.00 $2,050.00
Cascade Civil Corp 10.000 $115.00 $1,150.00 Battle Ridge Builders
LLC 10.000 $100.00 $1,000.00
Missouri River Contractors LLC 10.000 $100.00 $1,000.00
Hamilton Construction Co. 10.000 $85.00 $850.00
SLETTEN
CONSTRUCTION
COMPANY
10.000 $75.00 $750.00
Kovilic Construction Company Inc 10.000 $50.00 $500.00
Cekra, Inc. 10.000 $40.00 $400.00 MJ Hughes Construction 10.000 $25.00 $250.00
Engineer's Estimate 10.000 HOUR $130.00 $1,300.00 A0640 62301-0000 GENERAL LABOR MJ Hughes
Construction 80.000 $150.00 $12,000.00
Hamilton Construction Co. 80.000 $125.00 $10,000.00
Kovilic Construction Company Inc 80.000 $125.00 $10,000.00
Cascade Civil Corp 80.000 $110.00 $8,800.00 Missouri River Contractors LLC 80.000 $100.00 $8,000.00
Battle Ridge Builders
LLC 80.000 $90.00 $7,200.00
SLETTEN
CONSTRUCTION
COMPANY
80.000 $69.87 $5,589.60
YOUNG GUN
CONSTRUCTION LLC 80.000 $65.00 $5,200.00
Cekra, Inc. 80.000 $63.00 $5,040.00 Engineer's Estimate 80.000 HOUR $100.00 $8,000.00
A0660 62402-0300 FURNISHING AND
PLACING TOPSOIL,
4-INCH DEPTH
SLETTEN
CONSTRUCTION
COMPANY
0.300 $99,966.67 $29,990.00
Cascade Civil Corp 0.300 $95,000.00 $28,500.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0660 62402-0300 FURNISHING AND
PLACING TOPSOIL,
4-INCH DEPTH
MJ Hughes Construction 0.300 $91,000.00 $27,300.00
Hamilton Construction Co. 0.300 $85,000.00 $25,500.00
YOUNG GUN
CONSTRUCTION LLC 0.300 $72,450.45 $21,735.14
Missouri River Contractors LLC 0.300 $62,000.00 $18,600.00
Kovilic Construction Company Inc 0.300 $50,000.00 $15,000.00
Battle Ridge Builders
LLC 0.300 $35,000.00 $10,500.00
Cekra, Inc. 0.300 $10,000.00 $3,000.00 Engineer's Estimate 0.300 ACRE $47,000.00 $14,100.00
A0680 62501-0000 TURF
ESTABLISHMENT
Battle Ridge Builders
LLC 0.400 $70,000.00 $28,000.00
YOUNG GUN
CONSTRUCTION LLC 0.400 $60,750.00 $24,300.00
Kovilic Construction Company Inc 0.400 $25,000.00 $10,000.00
SLETTEN
CONSTRUCTION
COMPANY
0.400 $21,250.00 $8,500.00
MJ Hughes Construction 0.400 $20,000.00 $8,000.00
Missouri River Contractors LLC 0.400 $18,500.00 $7,400.00
Cascade Civil Corp 0.400 $15,000.00 $6,000.00 Cekra, Inc. 0.400 $10,000.00 $4,000.00 Hamilton Construction Co. 0.400 $10,000.00 $4,000.00
Engineer's Estimate 0.400 ACRE $9,000.00 $3,600.00
A0700 63302-0000 SIGN SYSTEM YOUNG GUN
CONSTRUCTION LLC 50.000 $317.25 $15,862.50
MJ Hughes Construction 50.000 $275.00 $13,750.00
Battle Ridge Builders
LLC 50.000 $200.00 $10,000.00
SLETTEN
CONSTRUCTION
COMPANY
50.000 $190.00 $9,500.00
Hamilton Construction Co. 50.000 $175.00 $8,750.00
Missouri River Contractors LLC 50.000 $175.00 $8,750.00
Kovilic Construction Company Inc 50.000 $100.00 $5,000.00
Cascade Civil Corp 50.000 $45.00 $2,250.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0700 63302-0000 SIGN SYSTEM Cekra, Inc. 50.000 $14.00 $700.00 Engineer's Estimate 50.000 SQFT $275.00 $13,750.00
A0720 63308-0000 OBJECT MARKER Kovilic Construction Company Inc 4.000 $1,000.00 $4,000.00
Battle Ridge Builders
LLC 4.000 $500.00 $2,000.00
SLETTEN
CONSTRUCTION
COMPANY
4.000 $400.00 $1,600.00
Cascade Civil Corp 4.000 $330.00 $1,320.00
YOUNG GUN
CONSTRUCTION LLC 4.000 $303.75 $1,215.00
Cekra, Inc. 4.000 $250.00 $1,000.00 Hamilton Construction Co. 4.000 $225.00 $900.00
Missouri River Contractors LLC 4.000 $225.00 $900.00
MJ Hughes Construction 4.000 $150.00 $600.00
Engineer's Estimate 4.000 EACH $375.00 $1,500.00 A0740 63309-0000 DELINEATOR Kovilic Construction
Company Inc 2.000 $500.00 $1,000.00
YOUNG GUN
CONSTRUCTION LLC 2.000 $303.75 $607.50
MJ Hughes Construction 2.000 $250.00 $500.00
Cascade Civil Corp 2.000 $240.00 $480.00 Hamilton Construction Co. 2.000 $225.00 $450.00
Missouri River Contractors LLC 2.000 $225.00 $450.00
Cekra, Inc. 2.000 $110.00 $220.00
SLETTEN
CONSTRUCTION
COMPANY
2.000 $85.00 $170.00
Battle Ridge Builders
LLC 2.000 $75.00 $150.00
Engineer's Estimate 2.000 EACH $150.00 $300.00
A0760 63501-0000 TEMPORARY
TRAFFIC CONTROL
(RIVER TRAFFIC)
Battle Ridge Builders
LLC $45,000.00
Missouri River Contractors LLC $45,000.00
Cekra, Inc. $25,000.00
SLETTEN
CONSTRUCTION
COMPANY
$22,431.21
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0760 63501-0000 TEMPORARY
TRAFFIC CONTROL
(RIVER TRAFFIC)
Hamilton Construction Co. $20,000.00
YOUNG GUN
CONSTRUCTION LLC $10,125.00
Cascade Civil Corp $10,000.00 Kovilic Construction Company Inc $10,000.00
MJ Hughes Construction $6,500.00
Engineer's Estimate ALL LPSM LPSM $20,000.00
A0780 63502-0600 TEMPORARY
TRAFFIC CONTROL,
BARRICADE TYPE 3
Battle Ridge Builders
LLC 7.000 $1,400.00 $9,800.00
Kovilic Construction Company Inc 7.000 $1,000.00 $7,000.00
YOUNG GUN
CONSTRUCTION LLC 7.000 $985.50 $6,898.50
SLETTEN
CONSTRUCTION
COMPANY
7.000 $480.00 $3,360.00
Hamilton Construction Co. 7.000 $300.00 $2,100.00
Missouri River Contractors LLC 7.000 $300.00 $2,100.00
Cekra, Inc. 7.000 $250.00 $1,750.00 MJ Hughes Construction 7.000 $250.00 $1,750.00
Cascade Civil Corp 7.000 $140.00 $980.00 Engineer's Estimate 7.000 EACH $260.00 $1,820.00
A0800 63502-1300 TEMPORARY
TRAFFIC CONTROL,
DRUM
Kovilic Construction Company Inc 22.000 $250.00 $5,500.00
YOUNG GUN
CONSTRUCTION LLC 22.000 $206.82 $4,550.04
Battle Ridge Builders
LLC 22.000 $150.00 $3,300.00
SLETTEN
CONSTRUCTION
COMPANY
22.000 $90.00 $1,980.00
Hamilton Construction Co. 22.000 $85.00 $1,870.00
Missouri River Contractors LLC 22.000 $85.00 $1,870.00
Cascade Civil Corp 22.000 $53.00 $1,166.00 Cekra, Inc. 22.000 $10.00 $220.00 MJ Hughes Construction 22.000 $5.00 $110.00
Engineer's Estimate 22.000 EACH $50.00 $1,100.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0820 63504-1000 TEMPORARY
TRAFFIC CONTROL,
CONSTRUCTION
SIGN
Kovilic Construction Company Inc 180.000 $100.00 $18,000.00
SLETTEN
CONSTRUCTION
COMPANY
180.000 $90.00 $16,200.00
YOUNG GUN
CONSTRUCTION LLC 180.000 $87.75 $15,795.00
Battle Ridge Builders
LLC 180.000 $70.00 $12,600.00
Hamilton Construction Co. 180.000 $65.00 $11,700.00
Missouri River Contractors LLC 180.000 $65.00 $11,700.00
MJ Hughes Construction 180.000 $55.00 $9,900.00
Cascade Civil Corp 180.000 $24.00 $4,320.00 Cekra, Inc. 180.000 $14.00 $2,520.00 Engineer's Estimate 180.000 SQFT $41.00 $7,380.00
Report Generated on 08/07/2026 4:19 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
| 2026-08-07T13:28:03-0700 | |
| ANGY LEE LILJEDAHL |
File details come from the government source that posted it. Updated .