About this file

This document is a Questions and Answers (Q&A) file for a Pavement Preservation project in Texas, involving multiple National Parks. The Q&A covers technical specifications and clarifications for pavement maintenance operations, including chip sealing, micro surfacing, crack sealing, and traffic control across various park locations. Key topics addressed include weather limitations for construction activities, equipment requirements, aggregate types, working conditions, and specific operational constraints at sites like Padre Island National Seashore and Amistad National Recreation Area. Responses were provided by representatives from Doolittle and VSS, with most answers dated 10/22/25 to 11/4/25, indicating that amendments will be forthcoming to clarify certain technical specifications. The document suggests the project involves multiple parks with varying surface conditions and environmental challenges, requiring precise construction methods and potential modifications to original specifications.

View the file

Other files for this federal contract opportunity

Other files attached to TX NP MULTI PMS(1) Pavement Preservation Texas, newest first.
File Type Posted
QA_11_10_2025.pdf PDF
Amendment A002.pdf PDF
QA_10_31_2025.pdf PDF
Amendment A001.pdf PDF
QA_10_28_2025.pdf PDF
txp-multi-pms1_BITH_C6_Final_Report.pdf PDF
txp-multi-pms1_SAAN_C6_Final_Report.pdf PDF
txp-multi-pms1_plans_Flattened.pdf PDF
txp-multi-pms1_CHAM_C6_Final_Report.pdf PDF
txp-multi-pms1_GUMO_C6_Final_Report.pdf PDF
txp-multi-pms1_PAIS_C6_Final_Report.pdf PDF
RFP 69056725R000006_TX NP MULTI PMS(1).pdf PDF
txp-multi-pms1_AMIS_C6_Final_Report.pdf PDF
txp-multi-pms1_FODA_C6_Final_Report.pdf PDF
txp-multi-pms1_LYJO_C6_Final_Report.pdf PDF
FLH Bridge oversized or overload vehicle permit request form August 2023.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TX NP MULTI PMS(1),

Pavement Preservation Texas

# General Technical Question Answer Date Firm Address Phone email

1 X

If working in more than two parks includes one or more of the above operations will a QCM be required for the final sweeping or pavement marking installation?

No, provided contractor is complying with approved Quality Control Plans per 153.03.

10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98065

775.691.7232 mthoreson@doolittlellc.co m

2 X

If performing the above operations results in working at more than two parks are items such as item 63506-0500 Temporary Traffic Control, Flagger, Item 63506-0600 Temporary Traffic Control, Pilot Car, and item 63507-0700 Temporary Traffic Control, Traffic Control Supervisor paid for at the contract unit price?

Yes, see 635.24. 10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98066

775.691.7233 mthoreson@doolittlellc.co m

3 X Per Section 108.01 (c) will stockpiling of material be allowed at more than two parks at a time?

Yes. 10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98067

775.691.7234 mthoreson@doolittlellc.co m

4 X

Per Section 107.10 (c) Will an equipment inspection be required at entry to each park location even when the equipment is coming from another park where it was already inspected?

Yes, an amendment will address this. 10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98068

775.691.7235 mthoreson@doolittlellc.co m

5 X

Per Section 107.10 (e)(12) Will only one orientation season for the project be required or will an orientation be required at each park location?

Only one, an amendment will address this. 10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98069

775.691.7236 mthoreson@doolittlellc.co m

6 X

Per Section 407.10 the following was added to the project specification for precoated aggregate. Please provide what route the precoated aggregate is to be used on the project?

Per the 2nd paragraph of 407.10, precoated aggregate is only required where asphalt binder is used by the contractor.

Contractor option.

10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98070

775.691.7237 mthoreson@doolittlellc.co m

7 X

Per Section 407.07 (e) Weather limitations how will anticipated rain or temperatures below 40 degrees for at least 24 hours after application be measured by the FHWA. How will the “anticipated” be measured by the FHWA

FHWA will rely on the nearest NOAA National Weather Service station for forecast information: National Weather Service

10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98071

775.691.7238 mthoreson@doolittlellc.co m

8 X

Per Section 407.10 required the use of a vacuum sweeper will the use of a mechanical broom typically used in chip seal operations be allowed on the project.

No. Bid as specified. 10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98072

775.691.7239 mthoreson@doolittlellc.co m

Check General or Technical

9 X

Per Section 409.07 (d) Weather limitations how will anticipated rain or temperatures below 32 degrees for at least 24 hours after application be measured by the FHWA. How will the “anticipated” be measured by the FHWA.

FHWA will rely on the nearest NOAA National Weather Service station for forecast information: National Weather Service

10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98073

775.691.7240 mthoreson@doolittlellc.co m

10 X Per Section 409.05 (C) Will the use of a mechanical broom be allowed in addition to a vacuum sweeper.

No. Bid as specified. 10/22/25 Doolittle PO Box 1819, Snoqualmie

WA 98074

775.691.7241 mthoreson@doolittlellc.co m

11 X

In most of the parks there is an abundance of overgrowth on the edge line, who will be responsible for clearing the native growth to expose the edge of the pavement?

The park’s maintenance crews are responsible for removing overgrown vegetation.

10/30/25 VSS

3785 Channel Drive, West Sacremento

916.373.2426 nicholas.corcoran@slurry.

com

12 X In the campgrounds at San Padre Island NP who will be responsible for moving the concrete benches to place Micro Surfacing under?

The park’s maintenance crew will be responsible for moving concrete benches.

Or, surfacing will not occur in the immediate areas of the obstructions.

10/30/25 VSS

3786 Channel Drive, West Sacremento

916.373.2427 nicholas.corcoran@slurry.

com

13 X

What are the restrictions to chip sealing in regards to the wind? More specifically a chip seal was specified in Padre Island, however the wind almost never dies down. See Section 407.07.

10/30/25 VSS

3787 Channel Drive, West Sacremento

916.373.2428 nicholas.corcoran@slurry.

com

14 X

Per Section 407.07 (e) Weather limitations how will anticipated rain or temperatures below 40 degrees for at least 24 hours after application be measured by the FHWA. How will the “anticipated” be measured by the FHWA using NOAA. NOAA only gives chance of precipitation. Anticipated would indicate a certainty of rain should we use a chance of precipitation at 75% per NOAA. If the FHWA is not in agreement with 75% what percent chance of precipitation should be used?

Bid as advertised, Contractor is responsible for determining weather and must base their operations based upon contractor judgment.

11/4/25 Doolittle PO Box 1819, Snoqualmie

WA 98073

775.373.2426 mthoreson@doolittlellc.co m

15 X

Per Section 409.10 Application requires the surface to be fog with water in front of the spreader. To require the surface to be fogged with water in front of the spreader could have an adverse effect on the material and not necessary in certain applications. I would suggest changing the wording to when needed.

Language will be updated through Amendment A002

11/4/25 Doolittle PO Box 1819, Snoqualmie

WA 98074

775.373.2427 mthoreson@doolittlellc.co m

16 X

Amistad National Recreation Area has several locations on Map 6 & 8 that are requiring a scrub seal. These locations are primarily parking lots with multiple variable widths, islands to work around and dead ends. This is not conducive for chip seal especially for scrub seal which requires a broom to be drug behind the distributor. Other locations on this project and past projects these locations would be surfaced with a Type 2 micro surfacing. Would the FHWA look at changing these locations to a Type 2 micro surfacing.

Language will be updated through Amendment A002

11/4/25 Doolittle PO Box 1819, Snoqualmie

WA 98075

775.373.2428 mthoreson@doolittlellc.co m

17 X

Per Section 407.07 (f) and Section 406.05 (e) Weather limitations require sustained winds are less than or equal to 10 miles per hour.

Padre Island National Seashore has an average daily wind speed of 11.1 MPH falling outside the maximum range for chip seal placement. This would not allow placement of the chip seal to be performed per specifications. Would the FHWA allow the maximum wind speed allowed to be adjusted to allow placement to a maximum of 20 mph measured at the spreader bar height?

Bid as advertised 11/4/25 Doolittle PO Box 1819, Snoqualmie

WA 98076

775.373.2429 mthoreson@doolittlellc.co m

18 X

Previous bid results (total project value only, not bid tabulations) for this MATOC have been emailed to contractors that have submitted bids within the same day as bid opening. Will this be the case for this project after the bid opening?

Yes, if not, please allow 1-2 Business days. 11/4/25 ISS

19 X

Section 414 of the SCR’s 414.06, states sealing (routed cracks or cracks averaging 1 /4” to 1”). FP-14 standard specifications state route cracks1/4” to1/2”. Please clarify that cracks less than ¼" are not required to be routed or sealed and cracks over 1/2" are required to be routed and sealed.

Cracks less than ¼” are not required to be routed and sealed. Cracks averaging ¼ to 1-inch are required to be routed and sealed.

11/4/25 ISS

20 X

The contract contains bid item A0280 – Cracks, Cleaning, and Sealing. This includes all cracks between ¼” and 1”. The plans include a detail for crack filling of cracks larger than 1”.

Typically, the contract will include a separate bid item for “Crack Filling” to include cracks larger than 1”. If cracks exist that are larger than 1”, will a change order be issued to pay for this scope of work?

If cracks averaging more than 1inch are encountered and require filling, a change order will be processed with a separate Pay Item 414-3000, CRACK, CLEANING AND FILLING, paid by Linear Foot (LNFT).

11/4/25 ISS

21 X

Section 108 prosecution and progress page E-25-

(h) PAIS (2) perform no work involving heavy equipment or that generates ground vibrations above current traffic conditions. Please clarify what is meant by “the current traffic conditions.” What is the intent of this requirement? If using a vibratory roller to compact the asphalt to specified density is not allowed during current traffic conditions, is the density specification going to be relaxed due to not being able to use a vibratory roller?

The limitations are intended to limit noise, light and vibrations around incubation facility for endangered turtles and provide turtle incubation the greatest chance of success. See Amendment A002

11/4/25 ISS

22 X

SCR Section 703 Aggregate states use only one type of aggregate for the chip seal surface treatment. Please clarify this reference to using FHWA type 1C or TxDOT grade 4 on the entire project. Is the contractor required to use one or the other at all locations in this contract?

Use only one type of aggregate on the surface treatment at each park. Do not switch between TxDOT Material specifications and following within one park; See Amendment A002

11/4/25 ISS

23 X

The primary aggregate used in Texas for micro surfacing is TxDOT grade 2, not ISSA type II as specified in this contract. If the contractor can use TxDOT grade 4 aggregate for the chip seal in lieu of type 1C, will WFL allow the contractor to use TxDOT grade 2 aggregate for micro surfacing rather than ISSA type II?

Yes, See Amendment A002. 11/4/25 ISS

24 X

Micro surfacing Item 409 the two weeks to one month after completion of micro surfacing application, before application of paint, is it only required in parking areas or all routes that receive micro surfacing, other than parking lots?

The specification applies to all routes that receive micro surfacing.

11/4/25 ISS