QA_12-10-2025.pdf
PDF 59 KB Posted
- Solicitation number
- 69056725B000016
About this file
This document is a Questions and Answers (Q&A) file for the Olympic FS ERFO Repairs 2022 project (Project No.: WA ERFO FS OLYMP609 2022-1(1)). The file contains four technical questions and their corresponding answers, covering specifications for drainage pipe materials, headwall systems, file accessibility, and Buy American Act requirements. Key details include a revision to allow aluminized steel pipe as an acceptable material, a clarification that metal headwalls are not permissible, guidance on accessing HTML files through XML viewers, and confirmation that the project is subject to Buy American Act requirements under 23 U.S.C. 125 for Emergency Relief for Federally Owned Roads. The questions were submitted and answered between 12/2/2025 and 12/10/2025, with some responses being revised to provide additional clarity or information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tab_WA ERFO FS OLYMP609 2022-1(1).pdf | ||
| Bid Summary_WA ERFO FS OLYMP609 2022-1(1).pdf | ||
| QA_12-30-2025.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| QA_12-03-2025.pdf | ||
| QA_12-02-2025.pdf | ||
| wa-ef-olymp2022-1-1_Control_Points.xlsx | XLSX spreadsheet | |
| wa-ef-olymp2022-1-1_HYD_Reconnaissance_Memo.pdf | ||
| wa-ef-olymp2022-1-1_Cross_Sections.pdf | ||
| Site 2900-7.55.zip | ZIP file | |
| Site 2900-2.8.zip | ZIP file | |
| wa-ef-olymp2022-1-1_SWPPP.pdf | ||
| wa-ef-olymp2022-1-1_GEO_GM1424.pdf | ||
| USDA-USFS Bridge Use Application and Permit.pdf | ||
| Site 2900-3.1.zip | ZIP file | |
| Site 2922-5.1.zip | ZIP file | |
| Site 2900-33.9.zip | ZIP file | |
| wa-ef-olymp2022-1-1_plans_IFB.pdf | ||
| Site 2922-3.1.zip | ZIP file | |
| Site 2900-11.1.zip | ZIP file | |
| IFB_WA ERFO FS OLYMP609 2022-1(1)_69056725B000016.pdf | ||
| WFLHD Construction Contract Administration_FY 23 V2.pdf | ||
| Site 2900-30.3.zip | ZIP file | |
| Site 2900-7.5.zip | ZIP file |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: WA ERFO FS OLYMP609 2022-1(1) Project: Olympic FS ERFO Repairs 2022
# General Technical Question Answer Date
1 X
Tabulation of drainage quantities sheet is calling for Aluminum pipe:
Please confirm Aluminum (A) or Aluminized (AZ) – Either is available but the 120” would require 8gage where Aluminized can be 12 or 10 gage. Aluminized is typically in this region.
Aluminized steel pipe is not permissible.
See the Tabulation of Drainage Quantities, Sheet L.1.
Revised Response: Aluminized steel has been added as an allowable pipe material.
An updated Tabulation of Drainage Quantities Sheet will be provided by Amendment A001.
12/2/2025 Revised 12/10/2025
2 X Will a metal headwall system be acceptable given the cost and availability of concrete in this location could be prohibitive?
A metal headwall system would not be permissible. 12/2/25
3 X
In each of the 9 zip files posted on SAM.gov, there is one PDF file, one DXF file, and several HTML files. Unfortunately, we are unable to open any of the HTML files, they display as shown in the attached screenshot. If these files are important/necessary for our understanding of the project at this stage, could you please provide them in PDF format?
Refer to the Special Contract Requirement, Section 102.02A, for descriptions of the physical data files. Refer to an open-source XML viewer or similar software for the XML files.
12/3/25
4 X Please confirm if domestic Aluminum falls under the Buy American requirement.
The project is funded under 23 U.S.C. 125, Emergency Relief for Federally Owned Roads and the project is subject to Buy American Act (BAA) requirements.
12/10/25