Amendment A001.pdf

PDF 137 KB Posted

Attached to
WA ERFO FS OLYMP609 2022-1(1), Olympic FS ERFO Repairs 2022
Solicitation number
69056725B000016
Issued by

About this file

This document is an Amendment of Solicitation for the Olympic FS ERFO Repairs 2022 project, issued by the Department of Transportation's Federal Highway Administration. The amendment (No. A001), dated 12/10/2025, modifies Solicitation No. 69056725B000016 for Project No. WA ERFO FS OLYMP609 2022-1(1), specifically revising the Plan sheet L.1 Tabulation of Drainage Quantities. The detailed drainage quantities table outlines various construction activities across multiple sites, including structural excavation, riprap placement, ditch reconditioning, and culvert installations using different pipe materials such as aluminum, aluminized steel, concrete, galvanized steel, and plastic. The project involves drainage improvements at several sites, with total quantities spanning structural excavation, riprap classes, pipe culverts of various sizes, and other infrastructure elements, with careful specification of allowable pipe materials and installation requirements.

View the file

Other files

File Type Posted
Bid Tab_WA ERFO FS OLYMP609 2022-1(1).pdf PDF
Bid Summary_WA ERFO FS OLYMP609 2022-1(1).pdf PDF
QA_12-30-2025.pdf PDF
Amendment A002.pdf PDF
QA_12-10-2025.pdf PDF
QA_12-03-2025.pdf PDF
QA_12-02-2025.pdf PDF
wa-ef-olymp2022-1-1_Control_Points.xlsx XLSX spreadsheet
wa-ef-olymp2022-1-1_HYD_Reconnaissance_Memo.pdf PDF
wa-ef-olymp2022-1-1_Cross_Sections.pdf PDF
Site 2900-7.55.zip ZIP file
Site 2900-2.8.zip ZIP file
wa-ef-olymp2022-1-1_SWPPP.pdf PDF
wa-ef-olymp2022-1-1_GEO_GM1424.pdf PDF
USDA-USFS Bridge Use Application and Permit.pdf PDF
Site 2900-3.1.zip ZIP file
Site 2922-5.1.zip ZIP file
Site 2900-33.9.zip ZIP file
wa-ef-olymp2022-1-1_plans_IFB.pdf PDF
Site 2922-3.1.zip ZIP file
Site 2900-11.1.zip ZIP file
IFB_WA ERFO FS OLYMP609 2022-1(1)_69056725B000016.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
Site 2900-30.3.zip ZIP file
Site 2900-7.5.zip ZIP file
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 12/10/2025 N/A WA ERFO FS OLYMP609 2022-1(1)

Olympic FS ERFO Repairs 2022

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056725B000016

9B. DATED (SEE ITEM 11)

11/20/2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: WA ERFO FS OLYMP609 2022-1(1), Olympic FS ERFO Repairs 2022

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 12/10/2025 Project No: WA ERFO FS OLYMP609 2022-1(1)

Solicitation No. 69056725B000016 Project Name: Olympic FS ERFO Repairs 2022

REVISIONS ARE AS FOLLOWS:

PLANS

Plan sheet L.1 Revises Tabulation of Drainage Quantities

Plan Sheets:

L.1

10.4 x 16 25101 -0300

25101 -0400

30302 -1000

60103 -0420

60201 -0800

60201 -1000

60201 -1200

60201 -2300

60202 -0800

60202 -1000

60210 -1200

60501 -0000

Station

ES

TI

M A

TE

D M

A X

IM

U M

C O

V

ER

S

TR

U C

TU

R A L

EX

C A V A

TI

O N

PL

A C

ED

R

IP

R A P, C

LA

S S

PL

A C

ED

R

IP

R A P, C

LA

S S

D

IT

C H

R

EC

O N

D

IT

IO

N

IN

G

C O

N C R

ET

E, H

EA

D

W A

LL

F O

R

IN

C H

P

IP

E C U

LV

ER

T

-I

N C H

P

IP

E C U

LV

ER

T

-I

N C H

P

IP

E C U

LV

ER

T

-I

N C H

P

IP

E C U

LV

ER

T

0-

IN

C

H P

IP

E

C U

LV

ER

T

-I

N C

H E

Q U

IV

A

LE

N T

D

IA

M

ET

ER

A

R C H

O R E

LL

IP

TI

C A L

PI

PE

C U

LV

ER

T

-I N

C H

E Q

U

IV

A

LE

N T

D

IA

M

ET

ER

A

R C H

O R E

LL

IP

TI

C A L

PI

PE

C U

LV

ER

T

EN

D

S

EC

TI

O

N F

O R

8-

IN

C H

PI

PE

C

U

LV

ER

T

S

TA

N D

A R D

U N

D

ER

D R A

IN

S

YS

TE

M

S K

EW

A N

G

LE

A llo w ab le P ip e

M at er ia l (S ee k ey b el ow

B

EV

EL

S

1V :n

H

B

EV

EL

S

1V :n

H

REMARKS

See below for numbered notes

FEET CUYD CUYD CUYD LNFT EACH LNFT LNFT LNFT LNFT LNFT LNFT EACH LNFT Lt Rt

SITE 2900-2.8

101+97 6 399 209 1 78 13O A, AS See note 3 for Lt & Rt

SITE 2900-3.1

211+09 2 70 12 44 1 23O A, AS, P

SITE 2900-7.5

300+37 2 60 34 50 13O A, AS

SITE 2900-7.55

305+34 7 15 5 46 14O A, AS, P

SITE 2900-11.1

400+95 7 360 29 102 19O A, AS See note 3 for Lt

SITE 2900-30.3

600+18 to 600+48 30

600+33 - 74 28 50 A, AS, P

601+03 to 603+03 82 203

603+09 - 74 28 50 A, AS, P

SITE 2900-33.9

701+34 27 48 111 130 4O A, AS See note 3 for Lt & Rt

SITE 2922-3.1

801+20 to 802+94 150 168

802+47 3 1 8 39 A, AS, P

SITE 2922-5.1

900+81 3 4 11 30 A, AS, P

PROJECT TOTAL 1337 135 340 30 1 115 100 44 78 102 180 1 371

Allowable Pipe Material 1

NOTE: A Aluminum

1. Aluminum pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table. AS Aluminized steel

2. Structural excavation quantity based on material excavated inside the vertical planes located 18 inches C Concrete outside and parallel to the limits of footings or foundations. GS Galvanized steel

3. See Sheet L.10 for Bevel details P Plastic

(blank) Any appropriate material

4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for 1 x/__ Any appropriate material all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. 1 Revised by Amendment 001 except __

PAY ITEM NUMBER

9- D ec -2

3:

P M c:

\p w -w or k\ d0 w a-ef

-o ly m p2

2-

1- 1_ dr ai na ge t ab ul at io n

(F P-xl sx

]S he et

TABULATION OF DRAINAGE QUANTITIES

PROJECT

L.1WA ERFO FS OLYMP609 2022-1(1)

SHEET

NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.

File details come from the government source that posted it. Updated .