QA_12-02-2025.pdf
PDF 94 KB Posted
- Solicitation number
- 69056725B000016
About this file
This document is a Questions and Answers (Q&A) file for the Olympic FS ERFO Repairs 2022 project, with project number WA ERFO FS OLYMP609 2022-1(1). The file contains two technical questions related to specific construction material specifications. The first question seeks clarification on pipe material, with the response explicitly stating that aluminized steel pipe is not permissible, and referencing the Tabulation of Drainage Quantities on Sheet L.1. The second question inquires about using a metal headwall system, which is also definitively rejected, with the answer indicating that a metal headwall system would not be acceptable. Both questions were responded to on 12/2/25, suggesting this is part of the pre-solicitation or clarification phase of the federal contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tab_WA ERFO FS OLYMP609 2022-1(1).pdf | ||
| Bid Summary_WA ERFO FS OLYMP609 2022-1(1).pdf | ||
| QA_12-30-2025.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| QA_12-10-2025.pdf | ||
| QA_12-03-2025.pdf | ||
| wa-ef-olymp2022-1-1_Control_Points.xlsx | XLSX spreadsheet | |
| wa-ef-olymp2022-1-1_HYD_Reconnaissance_Memo.pdf | ||
| wa-ef-olymp2022-1-1_Cross_Sections.pdf | ||
| Site 2900-7.55.zip | ZIP file | |
| Site 2900-2.8.zip | ZIP file | |
| wa-ef-olymp2022-1-1_SWPPP.pdf | ||
| wa-ef-olymp2022-1-1_GEO_GM1424.pdf | ||
| USDA-USFS Bridge Use Application and Permit.pdf | ||
| Site 2900-3.1.zip | ZIP file | |
| Site 2922-5.1.zip | ZIP file | |
| Site 2900-33.9.zip | ZIP file | |
| wa-ef-olymp2022-1-1_plans_IFB.pdf | ||
| Site 2922-3.1.zip | ZIP file | |
| Site 2900-11.1.zip | ZIP file | |
| IFB_WA ERFO FS OLYMP609 2022-1(1)_69056725B000016.pdf | ||
| WFLHD Construction Contract Administration_FY 23 V2.pdf | ||
| Site 2900-30.3.zip | ZIP file | |
| Site 2900-7.5.zip | ZIP file |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.: WA ERFO FS OLYMP609 2022-1(1)
Project: Olympic FS ERFO Repairs 2022
# General Technical Question Answer Date
1 X
Tabulation of drainage quantities sheet is calling for Aluminum pipe:
Please confirm Aluminum (A) or Aluminized (AZ)
– Either is available but the 120” would require
8gage where Aluminized can be 12 or 10 gage.
Aluminized is typically in this region.
Aluminized steel pipe is not permissible. See the Tabulation of Drainage Quantities, Sheet L.1.
12/2/25
2 X
Will a metal headwall system be acceptable given the cost and availability of concrete in this location could be prohibitive?
A metal headwall system would not be permissible.
12/2/25