This tabulation of bids report summarizes bids received for the Invitation for Bid (IFB) number 69056722B000025 to rehabilitate Valley of 10,000 Smokes Road Phase IV in Alaska. The low bid was submitted by L&M Equipment of Naknek, Alaska for $3,202,292. Four bids were received by the May 16th bid opening date, ranging from $3,202,292 by L&M Equipment to $8,672,610.29 by Ahtna Infrastructure & Technologies LLC. The engineer's estimate for the project was $2,377,925. The report provides unit pricing and totals for each of the 56 line items for all four bidders as well as the engineer's estimate. The contract is anticipated to be awarded by the Department of Transportation Federal Highway Administration, though no actual award date is included in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_AK NPS KATM 10(4).pdf | ||
| 5_12_23 QA.PDF | ||
| 5_11_23 QA.PDF | ||
| Amendment A004.pdf | ||
| 5_10_23 QA.PDF | ||
| Amendment A003.pdf | ||
| 5_09_23 QA.PDF | ||
| Amendment A002.pdf | ||
| 5_08_23 QA.PDF | ||
| 5_03_23 QA.PDF | ||
| Amendment A001.pdf | ||
| 4_26_23 QA.PDF | ||
| 4_25_23 QA.PDF | ||
| WFLHD Construction Contract Administration_2.2.2023.pdf | ||
| katm01004_existing-ground-surface.zip | ZIP file | |
| AK NPS KATM 10(4)_Katmai_Compiled SWPPP.pdf | ||
| katm01004_plans.pdf | ||
| IFB_69056722B000025_AK NPS KATM 10(4).pdf | ||
| Geo Rpt 06-96 Valley of 10000 Smokes.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 05/17/23
1 out of 6
Project No: AK NPS KATM 10(4)
Project Name: Rehabilitate Valley of 10,000 Smokes Road, Phase IV
Schedule: A
Schedule Type: Base
Solcitation No: 69056722B000025
Division: Western Federal Lands
State: AK County: Lake And Peninsula
Federal Land: NPS Opened at: FHWA Vancouver, WA Office
Opened by: Robert Kolln
Date: 05/16/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
L&M Equipment $3,202,292.00 241 Frontier Drive Naknek, AK 99633
Bristol Prime Contractors, LLC $4,635,191.69 111 W. 16th Avenue, Third Floor Anchorage , AK 99501
Doyon Management Services, LLC ( $7,223,514.20 ) no 3450 South 344th Way Federal Way, WA 98001
Ahtna Infrastructure & Technologies LLC $8,672,610.29 110 W 38th Ave Anchorage, AK 99503
Engineer's Estimate $2,377,925.00
2 out of 6
Project No: AK NPS KATM 10(4)
Project Name: Rehabilitate Valley of 10,000 Smokes Road, Phase IV
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
L&M Equipment Lump Sum $501,892.00 Bristol Prime Contractors, LLC Lump Sum $1,860,061.46 Doyon Management Services, LLC Lump Sum $3,735,088.00 Ahtna Infrastructure & Technologies LLC Lump Sum $3,318,378.45 Engineer's Estimate ALL LPSM Lump Sum $339,000.00
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
L&M Equipment Lump Sum $145,000.00 Bristol Prime Contractors, LLC Lump Sum $147,643.31 Doyon Management Services, LLC Lump Sum $58,413.00 Ahtna Infrastructure & Technologies LLC Lump Sum $125,756.51 Engineer's Estimate ALL LPSM Lump Sum $45,000.00
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
L&M Equipment Lump Sum $56,000.00 Bristol Prime Contractors, LLC Lump Sum $217,801.03 Doyon Management Services, LLC Lump Sum $150,000.00 Ahtna Infrastructure & Technologies LLC Lump Sum $210,898.64 Engineer's Estimate ALL LPSM Lump Sum $35,400.00
A0080 15401-0000 CONTRACTOR TESTING
L&M Equipment Lump Sum $40,000.00 Bristol Prime Contractors, LLC Lump Sum $118,349.22 Doyon Management Services, LLC Lump Sum $194,018.00 Ahtna Infrastructure & Technologies LLC Lump Sum $160,643.29 Engineer's Estimate ALL LPSM Lump Sum $22,100.00
A0100 15501-0000 CONSTRUCTION SCHEDULE
L&M Equipment Lump Sum $20,000.00 Bristol Prime Contractors, LLC Lump Sum $78,870.29 Doyon Management Services, LLC Lump Sum $52,692.00 Ahtna Infrastructure & Technologies LLC Lump Sum $26,149.73 Engineer's Estimate ALL LPSM Lump Sum $8,900.00
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
L&M Equipment Lump Sum $20,000.00 Bristol Prime Contractors, LLC Lump Sum $39,620.96 Doyon Management Services, LLC Lump Sum $143,020.00 Ahtna Infrastructure & Technologies LLC Lump Sum $192,538.71 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
3 out of 6
Project No: AK NPS KATM 10(4)
Project Name: Rehabilitate Valley of 10,000 Smokes Road, Phase IV
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE
L&M Equipment $75.00 $172,500.00 Bristol Prime Contractors, LLC $20.44 $47,012.00 Doyon Management Services, LLC $7.53 $17,319.00 Ahtna Infrastructure & Technologies LLC $32.64 $75,072.00 Engineer's Estimate 2,300 LNFT $15.00 $34,500.00
A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
L&M Equipment $12.00 $156,000.00 Bristol Prime Contractors, LLC $7.41 $96,330.00 Doyon Management Services, LLC $3.76 $48,880.00 Ahtna Infrastructure & Technologies LLC $15.43 $200,590.00 Engineer's Estimate 13,000 LNFT $15.00 $195,000.00
A0180 15802-0000 WATERING FOR DUST CONTROL
L&M Equipment Lump Sum $20,000.00 Bristol Prime Contractors, LLC Lump Sum $60,414.31 Doyon Management Services, LLC Lump Sum $112,911.00 Ahtna Infrastructure & Technologies LLC Lump Sum $77,046.58 Engineer's Estimate ALL LPSM Lump Sum $1,000.00
A0200 20101-0000 CLEARING AND GRUBBING
L&M Equipment $55,000.00 $138,600.00 Bristol Prime Contractors, LLC $9,809.96 $24,721.10 Doyon Management Services, LLC $30,110.00 $75,877.20 Ahtna Infrastructure & Technologies LLC $12,708.67 $32,025.85 Engineer's Estimate 2.52 ACRE $15,000.00 $37,800.00
A0220 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A (NON-WOVEN)
L&M Equipment $3.00 $69,900.00 Bristol Prime Contractors, LLC $3.67 $85,511.00 Doyon Management Services, LLC $4.51 $105,083.00 Ahtna Infrastructure & Technologies LLC $1.61 $37,513.00 Engineer's Estimate 23,300 SQYD $10.00 $233,000.00
A0240 25101-0000 PLACED RIPRAP, METHOD A (CLASS 0)
L&M Equipment $95.00 $375,250.00 Bristol Prime Contractors, LLC $197.46 $779,967.00 Doyon Management Services, LLC $196.00 $774,200.00 Ahtna Infrastructure & Technologies LLC $28.46 $112,417.00 Engineer's Estimate 3,950 CUYD $120.00 $474,000.00
4 out of 6
Project No: AK NPS KATM 10(4)
Project Name: Rehabilitate Valley of 10,000 Smokes Road, Phase IV
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 30201-2000 ROADWAY AGGREGATE, METHOD 2
L&M Equipment $100.00 $257,000.00 Bristol Prime Contractors, LLC $70.85 $182,084.50 Doyon Management Services, LLC $271.00 $696,470.00 Ahtna Infrastructure & Technologies LLC $52.25 $134,282.50 Engineer's Estimate 2,570 CUYD $90.00 $231,300.00
A0280 30302-1000 DITCH RECONDITIONING
L&M Equipment $20.00 $5,300.00 Bristol Prime Contractors, LLC $63.44 $16,811.60 Doyon Management Services, LLC $23.00 $6,095.00 Ahtna Infrastructure & Technologies LLC $106.98 $28,349.70 Engineer's Estimate 265 LNFT $15.00 $3,975.00
A0300 30302-6000 ROADWAY RECONDITIONING
L&M Equipment $6.00 $36,000.00 Bristol Prime Contractors, LLC $21.98 $131,880.00 Doyon Management Services, LLC $15.10 $90,600.00 Ahtna Infrastructure & Technologies LLC $14.22 $85,320.00 Engineer's Estimate 6,000 LNFT $35.00 $210,000.00
A0320 31402-0000 STOCKPILED AGGREGATE
L&M Equipment $90.00 $945,000.00 Bristol Prime Contractors, LLC $48.58 $510,090.00 Doyon Management Services, LLC $52.70 $553,350.00 Ahtna Infrastructure & Technologies LLC $320.92 $3,369,660.00 Engineer's Estimate 10,500 CUYD $30.00 $315,000.00
A0340 60201-0400 12-INCH PIPE CULVERT
L&M Equipment $300.00 $42,000.00 Bristol Prime Contractors, LLC $95.29 $13,340.60 Doyon Management Services, LLC $226.00 $31,640.00 Ahtna Infrastructure & Technologies LLC $316.37 $44,291.80 Engineer's Estimate 140 LNFT $150.00 $21,000.00
A0360 60201-0600 18-INCH PIPE CULVERT
L&M Equipment $350.00 $17,500.00 Bristol Prime Contractors, LLC $138.72 $6,936.00 Doyon Management Services, LLC $301.00 $15,050.00 Ahtna Infrastructure & Technologies LLC $452.83 $22,641.50 Engineer's Estimate 50 LNFT $200.00 $10,000.00
5 out of 6
Project No: AK NPS KATM 10(4)
Project Name: Rehabilitate Valley of 10,000 Smokes Road, Phase IV
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0380 60201-0800 24-INCH PIPE CULVERT
L&M Equipment $400.00 $50,000.00 Bristol Prime Contractors, LLC $132.24 $16,530.00 Doyon Management Services, LLC $301.00 $37,625.00 Ahtna Infrastructure & Technologies LLC $374.39 $46,798.75 Engineer's Estimate 125 LNFT $250.00 $31,250.00
A0400 60201-1000 36-INCH PIPE CULVERT
L&M Equipment $450.00 $24,750.00 Bristol Prime Contractors, LLC $199.64 $10,980.20 Doyon Management Services, LLC $753.00 $41,415.00 Ahtna Infrastructure & Technologies LLC $440.25 $24,213.75 Engineer's Estimate 55 LNFT $300.00 $16,500.00
A0420 60704-0000 CLEANING CULVERT IN PLACE
L&M Equipment $1,200.00 $24,000.00 Bristol Prime Contractors, LLC $5,956.58 $119,131.60 Doyon Management Services, LLC $3,011.00 $60,220.00 Ahtna Infrastructure & Technologies LLC $2,916.28 $58,325.60 Engineer's Estimate 20 EACH $1,500.00 $30,000.00
A0440 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY
L&M Equipment $200.00 $14,000.00 Bristol Prime Contractors, LLC $230.82 $16,157.40 Doyon Management Services, LLC $301.00 $21,070.00 Ahtna Infrastructure & Technologies LLC $830.91 $58,163.70 Engineer's Estimate 70 HOUR $180.00 $12,600.00
A0460 62201-1050 WHEEL LOADER, 5 CUBIC YARD MINIMUM RATED CAPACITY
L&M Equipment $200.00 $2,000.00 Bristol Prime Contractors, LLC $246.47 $2,464.70 Doyon Management Services, LLC $452.00 $4,520.00 Ahtna Infrastructure & Technologies LLC $1,640.52 $16,405.20 Engineer's Estimate 10 HOUR $250.00 $2,500.00
A0480 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
L&M Equipment $300.00 $12,000.00 Bristol Prime Contractors, LLC $287.21 $11,488.40 Doyon Management Services, LLC $602.00 $24,080.00 Ahtna Infrastructure & Technologies LLC $640.84 $25,633.60 Engineer's Estimate 40 HOUR $250.00 $10,000.00
6 out of 6
Project No: AK NPS KATM 10(4)
Project Name: Rehabilitate Valley of 10,000 Smokes Road, Phase IV
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
L&M Equipment $200.00 $8,000.00 Bristol Prime Contractors, LLC $232.35 $9,294.00 Doyon Management Services, LLC $376.00 $15,040.00 Ahtna Infrastructure & Technologies LLC $621.33 $24,853.20 Engineer's Estimate 40 HOUR $330.00 $13,200.00
A0520 62301-0000 GENERAL LABOR
L&M Equipment $230.00 $4,600.00 Bristol Prime Contractors, LLC $122.49 $2,449.80 Doyon Management Services, LLC $226.00 $4,520.00 Ahtna Infrastructure & Technologies LLC $766.41 $15,328.20 Engineer's Estimate 20 HOUR $120.00 $2,400.00
A0540 63309-0900 DELINEATOR, TYPE FLEXIBLE
L&M Equipment $1,000.00 $25,000.00 Bristol Prime Contractors, LLC $777.18 $19,429.50 Doyon Management Services, LLC $753.00 $18,825.00 Ahtna Infrastructure & Technologies LLC $552.88 $13,822.00 Engineer's Estimate 25 EACH $100.00 $2,500.00
A0560 63501-0000 TEMPORARY TRAFFIC CONTROL
L&M Equipment Lump Sum $20,000.00 Bristol Prime Contractors, LLC Lump Sum $9,821.71 Doyon Management Services, LLC Lump Sum $135,493.00 Ahtna Infrastructure & Technologies LLC Lump Sum $135,491.03 Engineer's Estimate ALL LPSM Lump Sum $30,000.00
Total Schedule - All Items
L&M Equipment $3,202,292.00 Bristol Prime Contractors, LLC $4,635,191.69 Doyon Management Services, LLC $7,223,514.20 Ahtna Infrastructure & Technologies LLC $8,672,610.29 Engineer's Estimate $2,377,925.00