This amendment modifies a solicitation for the project AK NPS KATM 10(4), Rehabilitate Valley of 10,000 Smokes Road Phase IV. The amendment revises special contract requirements to add parameters for contractor construction of temporary housing at an existing camp area. Utilities including electricity, water, sewer, and toilet facilities will be provided by the National Park Service at no cost until winter shutdown from October 1 to May 1, after which the contractor must provide diesel to power generators. The contractor must submit a plan detailing the housing, offices, and communications installations and connect to existing utility hookups, taking precautions to avoid system contamination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tab_AK NPS KATM 10(4).pdf | ||
| BidSum_AK NPS KATM 10(4).pdf | ||
| 5_12_23 QA.PDF | ||
| 5_11_23 QA.PDF | ||
| Amendment A004.pdf | ||
| 5_10_23 QA.PDF | ||
| Amendment A003.pdf | ||
| 5_09_23 QA.PDF | ||
| Amendment A002.pdf | ||
| 5_08_23 QA.PDF | ||
| 5_03_23 QA.PDF | ||
| 4_26_23 QA.PDF | ||
| 4_25_23 QA.PDF | ||
| WFLHD Construction Contract Administration_2.2.2023.pdf | ||
| katm01004_existing-ground-surface.zip | ZIP file | |
| AK NPS KATM 10(4)_Katmai_Compiled SWPPP.pdf | ||
| katm01004_plans.pdf | ||
| IFB_69056722B000025_AK NPS KATM 10(4).pdf | ||
| Geo Rpt 06-96 Valley of 10000 Smokes.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 04/27/2023 N/A AK NPS KATM 10(4)
Rehabilitate Valley of 10,000 Smokes
Phase IV
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056722B000025
9B. DATED (SEE ITEM 11)
04/13/2023
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK NPS KATM 10(4), Rehabilitate Valley of 10,000 Smokes Phase IV Amendment A001 is issued to revise the following:
SPECIAL CONTRACT REQUIREMENTS
Page E-14, Subsection 107.08A, Residential housing. Adds parameters of contractor construction camp at
Brook Camp designated housing area
Enclosures:
E-14
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
E-14 DIVISION 100
Special Contract Requirements Project: AK NPS KATM 10(4), Rehabilitate Valley of 10,000 Smokes Road Phase IV
107.08 Sanitation, Health, and Safety. Add the following after the first paragraph:
Submit an accident prevention plan for implementing safety and health standards at the Preconstruction Conference. Use the Government furnished Form WFLHD-28, Guide Outline of Contractor's Accident Prevention Plan.
107.08A Residential housing. (Added Subsection).
Provide a Contractor construction camp at Brook Camp designated housing area, at the location shown on the plans. The contractor camp is approximately 100-feet by 150-feet at the VRRA housing loop. The location will be identified by the CO. Tie into existing NPS utilities (water, sewer, and power) at the construction camp location. Install and maintain all connections to existing NPS utilities.
Construction of “soft-sided” housing is allowed if also protected at all times by temporary electric fencing. Temporary electric fencing is not required for “hard-sided” housing which incorporates walls of 8-foot minimum height. All construction camp kitchen and food storage facilities (including food, beverage, packaging, garbage, harvested fish, cooking equipment, and food storage containers) shall be in “hard-sided” building structures which incorporate walls of 8-foot minimum height and constructed from rigid building materials.
Prior to construction, submit a written narrative plan detailing means, methods, equipment, and facilities to be used for housing of contractor staff, field offices, and internet/telecommunications.
Specify the data on logistics, purpose for use, connection dates, and locations of installations on plan.
Provide sketches to clarify the intent.
There will be no cost or use charges for the following Government provided services:
(1) Electrical Service. Electricity will be provided by park service for free until the park scheduled winter shutdown (October 1 to May 1). During park shutdown, pay for the diesel to run the power generator at 77 gallons a day for electricity.
(2) Water Service. Water from existing NPS water system is available for use until the park scheduled winter shutdown (October 1 to May 1). Contractor shall provide their own utility tie-in to existing hookups. Take precautions to avoid contamination and comply with NPS policies when tying into existing water system. Notify the CO of intent to perform tie-in work 48 hours prior. NPS Park Staff shall be on-site during all water service tie-in work unless otherwise approved by the Contracting Officer.
(3) Sewer and Toilet Service. Sewer service from the existing sewer system is available for use until the park scheduled winter shutdown (October 1 to May 1). Provide utility tie-in to existing hookups. NPS Valley Road Administrative Area Bathhouse will be made available for Contractor use for restroom, shower, and laundry facilities at no additional charge. NPS will provide weekly waste removal service from Contractor provided portable toilet facilities. Contractors may install portable sanitary facilities at Moraine Pit as shown in the plans.
Revised by Amendment A001