QA 19R000016 May 29.pdf

PDF 122 KB Posted

Attached to
2019 Architect/Engineer Construction Management/Inspection Support Federal contract opportunity
Solicitation number
69056719R000016
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains a request for qualifications for construction management and inspection support services and related questions and answers. The Western Federal Lands Division of the Federal Highway Administration will award up to five indefinite delivery, indefinite quantity contracts, with three reserved for small businesses. Firms must submit a completed SF 330 by June 1, 2020 demonstrating experience with construction management, inspection, and other services for highway and bridge projects in Alaska, Washington, Oregon, Idaho, Montana, Wyoming and other states. The maximum potential value of task orders is $80 million and individual task orders may range from $1,000 to $3 million with firm-fixed pricing. Proposing firms must have an approved System for Award Management registration prior to submitting a proposal.

View the file

Other files for this federal contract opportunity

Other files attached to 2019 Architect/Engineer Construction Management/Inspection Support, newest first.
File Type Posted
QA 19R000016 6_11.pdf PDF
QA 19R000016 June 5.pdf PDF
QA 19R000016 June 1.pdf PDF
69056719R000016 0002.pdf PDF
QA 19R000016 May 24.pdf PDF
QA 19R000016 May 15.pdf PDF
69056719R000016 Amd 0001.pdf PDF
2019 CI IDIQ RFQ_All states Final.pdf PDF
Draft SOW 2019 Architect Engineer Construction Management-Inspection Support Services.DOCX DOCX document
SF330-16_Section_E4.pdf PDF
SF330-16_Section_C.pdf PDF
SF330-16_Section_H2.pdf PDF
SF330-16a_Section_F2.pdf PDF
SF330.pdf PDF
WFLHD Construction Manual Supplement.pdf PDF
Draft SOW 2019 Architect Engineer Construction Management-Inspection Support Services.DOCX DOCX document
2019 CI IDIQ RFQ_All states Final.pdf PDF
SF330-16_Section_G2.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE QUESTION ANSWER

5/7/2020

In the RFQ Minimum Requirements section, please clarify subsection B. Is this asking for two projects where the consultant provided both tasks of management and inspection? Subsection A projects already require Construction Management/Inspection

Support Services projects. What would be the additional requirement in subsection B that is not already met in subsection A?

See Amendment 0001 wording changed to I will be issuing an amendment early next week but the statement will be changed to:

B. Two (2) projects from item (A) your firm must have provided Consultant Project Engineer Management

Services and Construction Inspection Services concurrently.

5/8/2020

Would it be allowable to award one of the two full and open contracts to a firm A (non‐small business) and one of the three small business contracts to B / A JV Inc., an approved All Small Mentor‐Protege Agreement Joint

Venture of firm B (a small business) and firm A?

Yes there could be two separate IDIQ awards to firm A and B.

5/8/2020

At what point in the solicitation process does a potential

Joint Venture entity need to have a JV agreement in place?

SBA must approve the mentor/protégé agreement before the offer is due

5/14/2020

Can an anticipated Joint Venture team submit and obtain a DUNS number and register in SAM after selection, or do these need to be obtained prior to submittal?

That answer is no. AN entity (no matter what type) must have an active SAM registration at the time offers are due.

5/14/2020

Can you please let me know if there is a date established for when all questions need to be received by WFL to allow time for responses?

See Amenment 0001 Submit all questions by close of business June 1, 2020 to guarantee a response.

5/18/2020

1) Under Minimum Requirements on page 2, the third sentence states “A project is considered a single awarded Contract, Task Order, Delivery Order, Blanket

Purchase Agreement (BPA) Call, Purchase Order or

Subcontract. An Indefinite Delivery Indefinite Quantity

(IDIQ) or BPA with multiple combined awards will not be considered as a single project.” Under a previous single awarded Term Contract, we were issued two separate task orders to provide CM/I personnel for the same physical project (same project name, location and federal aid number, different personnel roles).

Individually these task orders are less than $125k, but our total consulting services on the project between the two task orders was over $150k. Would this be considered an acceptable single project if listed in our

Section F?

No. As per the definition a project is a single awarded task order, not a combination of task orders for a single requirement.

Q&A 69056719R000019

Request For Qualifications 2019 Architect/Engineer Construction Management/Inspection

Support Services for the States of AK, WA, OR, ID, MT, and WY

Q&A 69056719R000019

Request For Qualifications 2019 Architect/Engineer Construction Management/Inspection

Support Services for the States of AK, WA, OR, ID, MT, and WY

5/18/2020

2) Under Minimum Requirements, Section C.ii. on page

3, we are seeking clarification on a ‘rural location.’ US

Census Bureau definitions of a rural location are murky when it comes to remote communities in Alaska, in particular Ketchikan, AK. We have a street and pedestrian improvements project we would like to list in

Section F that our firm performed CM/I services for in downtown Ketchikan, but cannot determine if downtown Ketchikan is considered a rural location.

Ketchikan has a population under 10,000 and is only accessible by plane or marine vessel, but it is one of the larger communities in Alaska. Does the Contracting

Agency believe downtown Ketchikan meets the definition of a rural location? What is the US Census

Bureau definition that will be used to evaluate minimum requirements?

The US Census Bureau defines the term “Rural” as encompasses all population, housing, and territory not included within an urban area. There are two types of

Urban areas, urbanized areas (50,000 plus) and urban clusters (2,500 to 50,000). Ketchikan would be considered an urban cluster based on its population. A project in Ketchikan would not be considered rural.

5/19/2020

What is the definition of, or requirements for, a project that is 100% completed? If the Period of Performance on the Task order has ended, no additional work is being performed and an agency acceptance letter has been submitted, does this meet the requirements of

100% complete?

Just yes your example below would be 100% complete.

100% complete means that the period of performance has ended and there is no more remaining work.

5/19/2020

Are proposing firms permitted to include additional items such as table of contents, cover letter, section cover pages/dividers, and supporting tables and/or charts?

Table of contents, cover letter, and section cover pages/dividers are permitted.

Supporting tables and/or charts would need to be included in the applicable section and count towards page counts.

5/19/2020

On Page 1 of the RFQ, we understand 3 contracts will be awarded exclusively to small businesses. Are the two full and open competed contracts required to have a small business participation goal? If there is a small business goal requirement on the two full and open contracts, can you please provide requirements?

A large business will be required to submit a subcontracting plan with goals for subcontracted work.

FHWA’s current small business goals are located here:

https://www.fhwa.dot.gov/cfo/small_business/

5/19/2020

Under item A, it is requested that all relevant experience identified shall have been performed between January

1, 2015 and submission of these qualifications with projects being 100% completed. Are multi‐season projects that were awarded prior to January 1, 2015 eligible as long as the majority of the work was completed in the subsequent years prior to this submission?

For multi season projects as long as there is a 4 month period of performance after January 1, 2015 then the project will count.

Q&A 69056719R000019

Request For Qualifications 2019 Architect/Engineer Construction Management/Inspection

Support Services for the States of AK, WA, OR, ID, MT, and WY

5/19/2020

On Page 1 of the RFQ, it states, "A/E firms meeting the requirements described in this announcement are invited to SUBMIT A COMPLETED SF 330." Can you please confirm that a completed SF 330 includes all parts of an SF 330, including Part I: Sections A through I, and Part II for all branch offices.

Yes but only complete Part II for any branch offices that will be utilized in completing performance of this requirement.

5/19/2020

In reviewing the RFQ, we did not find the requirement of a traditional Section G – Personnel Matrix. Can you please confirm a Section G is not required by this RFQ?

You should provide a completed section G. The section will be reviewed but nothing will be evaluated.

5/19/2020

On Page 6, under Evaluation Factor 5, can you please provide detail on how WFL is intending to obtain past performance and CPARS evaluations for firms having multiple office locations and multiple DUNS numbers? We will be pulling the past performance of the offeror’s

DUNS number only.

5/21/2020

In Evaluation Factor 1 – Professional Qualifications, the

RFQ says “Submit Evaluation Factor 1 information in

Section E of the SF 330. Complete one Section E for each key personnel identified. Additional supporting documentation may be included for each key personnel identified and shall not exceed two (2) pages single‐ sided, minimum acceptable text size 12‐point.

Additional pages over the two (2) page limit will not be reviewed.” Is the intent to allow the SF 330 Section E form plus two additional pages (3 pages total) or limit content to two pages total per individual? 3 pages in total per individual

5/26/2020

Alaska does not have counties, but rather ‘boroughs’. Is a borough agency considered the same as a county agency? Yes a borough in Alaska translates to a county.

5/26/2020

We are a Small Business offeror currently awaiting approval of our SAM registration. However, we do have a current DUNS number assigned. Based on the feedback we’ve received from SBA, the Federal Service

Desk, and the DLA CAGE Program website, there are longer than normal lead times and delays in processing resulting from COVID‐19 impacts. As such, would the

Contracting Agency consider revising the solicitation requirements so that SAM registration approval is required prior to Contract Award, rather than offer submittal?

There is no rule or memo specifically allowing us to deviate from FAR 4.11 requiring offerors and quoters to be registered in SAM at the time an offer or quotation is submitted because of COVID 19 and we are unable to waive that requirement.

File details come from the government source that posted it. Updated .