Station sf cy sf cy sf cy

1100 13.5 6.13 0 6.8 3

1110 19.6 8.94 0 6.8 3

1120 28.7 6.83 0.03 0 6.8 3

1130 8.2 2.30 2 2 6.8 3

1140 4.2 0.78 6.7 4 6.8 3

1150 0.00 13.6 6 6.8 3

1160 0.00 18.4 9 6.8 3

1170 0.00 27.6 12 6.8 3

1180 0.00 37.3 16 6.8 3

1190 0.00 49.9 21 6.8 3

1200 0.00 65.1 27 6.8 3

1210 0.00 80.2 33 6.8 3

1220 0.00 100 42 6.8 3

1230 0.00 126.8 67 6.8 3

1240 0.00 233.6 42 6.8 1

1244.65 249.9 51 6.8 1

1250 0.00 263.6 36 6.8 1

1254.65 0.00 151.2 14.98 9.2 1.82

1260 0.00 0 0 9.2 3

1270 0.00 0 0 9.2 2

1276.65 0.00 365.2 43.05 9.2 0.99

1280 0.00 328.8 117 6.8 3

1290 0.00 301.8 87 6.8 3

1300 0.00 169.1 46 6.8 3

1310 0.00 80.1 25 6.8 3

1320 0.00 52.5 16 6.8 3

1330 0.00 34.4 9 6.8 3

1340 0.07 15.9 4 6.8 3

1350 0.4 0.19 6.9 2 6.8 3

1360 0.6 0.33 3.9 1 6.8 3

1370 1.2 0.67 1.1 0 6.8 3

1380 2.4 1.43 0 0 6.8 3

1390 5.3 2.20 0 0 6.8 3

1400 6.6 1.84 0 0 6.8 3

1406.99 7.6 0 6.8

Total 31.71 732 80

Excavation Embankment Aggregate

Roadway quantities

Station sf cy sf cy sf cy

2182 7.5 2.69 0 6.8 3

2190 7 2.44 1.7 1 6.8 3

2200 6.2 2.22 2.5 1 6.8 3

2210 5.8 2.30 3.2 1 6.8 3

2220 6.6 10.98 1.2 0 6.8 3

2230 52.7 19.04 0 0 6.8 3

2240 50.1 17.50 1.2 1 6.8 3

2250 44.4 8.22 4.3 31 6.8 3

2260 0 0.00 161.5 75 6.8 3

2270 0 0.00 243.8 101 6.8 3

2280 0 0.00 300 116 6.8 3

2290 0 1.35 328 109 6.8 3

2300 7.3 2.24 262.5 60 6.8 3

2310 4.8 0.89 61.1 13 6.8 3

2320 0 0.00 11.2 6 6.8 3

2330 0 0.00 20.2 9 6.8 3

2340 0 0.00 30.1 13 6.8 3

2350 0 0.65 38.3 10 6.8 3

2360 3.5 3.31 18.1 4 6.8 3

2370 14.4 4.20 2.6 1 6.8 3

2380 8.3 1.54 4.2 7 6.8 3

2390 0 0.00 31.1 19 6.8 3

2400 0 0.00 69.9 41 6.8 3

2410 0 0.00 152.8 3 6.8 0

2411 0 0.00 149.2 25 6.8 2

2420 0 0.00 0 0 6.8 3

2430 0 0.00 0 1 6.8 1

2433 0 0.00 88.4 19 6.8 2

2440 0 0.00 36.9 14 6.8 3

2450 0 0.00 37.2 14 6.8 3

2460 0 0.00 40.8 14 6.8 3

2470 0 0.00 36.3 12 6.8 3

2480 0 0.00 27.6 9 6.8 3

2490 0 0.00 19.8 6 6.8 3

2500 0 0.00 11.8 3 6.8 3

2510 0 0.06 5 1 6.8 3

2520 0.3 0.85 0.4 0 6.8 3

2530 4.3 2.20 0 0 6.8 3

2540 7.6 0 0 6.8 1

Total 79.57 739 83

Roadway quantities

Excavation Embankment Aggregate sf cy sf sy lf sf sf cy sf cy sf cy sf cy

3093 0 9.3 1.32 6.9 1.02

3097 44.6 3.30 18 9.56 8 48 6.1 0.90 21.6 5.24 8.5 1.24 6.9 1.02

3101 76.7 8.99 25 12.67 16 80 6.1 0.90 49.2 9.34 8.2 1.19 6.9 1.02

3105 91.2 12.44 32 15.78 24 112 6.1 0.90 76.9 13.44 7.8 1.15 6.9 1.02

3109 95.8 13.85 39 18.67 32 144 6.1 0.90 104.6 17.55 7.7 1.14 6.9 1.02

3113 99.6 14.47 45 20.00 40 160 6.1 0.90 132.3 19.60 7.7 1.15 6.9 1.02

3117 79.6 13.27 45 20.00 40 160 6.1 0.90 132.3 19.60 7.8 1.18 6.9 1.02

3121 77.2 11.61 45 20.00 40 160 6.1 0.90 132.3 19.60 8.1 1.21 6.9 1.02

3125 88 12.24 45 20.00 40 160 6.1 0.90 132.3 19.60 8.2 1.25 6.9 1.02

3129 94.5 13.52 45 20.00 40 160 6.1 0.90 132.3 19.60 8.7 1.32 6.9 1.02

3133 111.3 15.24 45 18.67 40 144 6.1 0.90 132.3 17.55 9.1 1.36 6.9 1.02

3137 90.7 14.96 39 15.78 32 112 6.1 0.90 104.6 13.44 9.2 1.36 6.9 1.02

3141 64.4 11.49 32 14.22 24 96 6.1 0.90 76.9 11.39 9.1 1.34 6.9 1.02

3145 71.1 10.04 32 12.67 24 80 6.1 0.90 76.9 9.34 9 1.35 6.9 1.02

3149 66 10.16 25 9.56 16 48 6.1 0.90 49.2 5.24 9.2 1.33 6.9 1.02

3153 32.4 7.29 18 8 6.1 21.6 8.8 1.27 6.9 1.02

3157 0 2.40 12.65 12.65 8.4 6.9

Total 175.27 227.56 1664.00 200.55 20.14 16.36 ends 12.2

64 239.76

Station Excavation Aggregate

Roadway

Structural excavation Geotextile WWF Rock

Special rock embankment

Unclassified borrow (SRE)

Site is 95' long with SRE wall and 6' wide pvmt replacement section

AC (tons)

2.15x95/27x1.94= 15

Agg. Base (cy)

5.62x95/27= 20

Special rock embankment (cy)

135x95=12,825/27= 475‐22 = 453

Ditch reconditioning (lnft)

150+30= 180 geotextile (sy)

((40*95)+(135*2))/9= 453

Select borrow (cy)

6.23x95= 592/27= 22

Turf Establishment ‐ REMOVED

WWF (sqft)

4 @ 10' x 95 = 3800

WA FS ERFO 2016(1)-20(2)_Hand_Calculations_16.6
WA FS ERFO 2016(1)-20(2)_Hand_Calculations_63-17.2
WA FS ERFO 2016(1)-20(2)_Hand_Calculations_6066-5.89
WA FS ERFO 2016(1)-20(2)_Hand_Calculations65-2.5

File details come from the government source that posted it.