WA FS ERFO 2016(1)-20(20), Skykomish Emergency Repairs 2016.
Snohomish and King Counties, Washington.
The work consists of grading, sub excavation, embankment construction, aggregate surfacing, road reconditioning, drainage, riprap, and paving and other small items of work.
Project length: 1.25 Miles
Tentative Fixed Completion Date: Fall (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $1 million to $2 million
Location: 3 Miles North of Skykomish, Washington
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance (yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) LPSM
DIVISION 200 – Earthwork 201 Clearing & Grubbing LPSM 203 Removal of Structures & Obstructions Pipe culvert Sawcutting pavement
2 EACH
100 LNFT
204 Roadway Excavation 240 CUYD 204 Subexcavation 1760 CUYD 207 Earthwork Geosynthetics (Geotextile Filter, Class 2, Type E) 170 SQYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Method A, Class 2 Method A, Class 5
540 CUYD
80 CUYD
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate Roadway Aggregate, Method 1 1,220 CUYD
On e S ch ed ul e
303 Road Reconditioning Roadway Reconditioning Ditch Reconditioning
3130 LNFT
220 LNFT
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete Asphalt Concrete Pavement 14 TON
DIVISION 600 – Incidental Construction 602 Culverts and Drains 48-inch Pipe Culvert 60 LNFT 603 Structural Plate Structures Structural Plate Pipe Arch 80 LNFT 607 Cleaning, Relaying, & Repairing Existing Drainage Structures Cleaning Culvert In-Place 7 EACH 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 625 Turf Establishment (seeding and mulching) 4 ACRE 634 Permanent Pavement Markings Pavement Markings 1,000 LNFT 635 Temporary Traffic Control LPSM 647 Environmental Mitigation Mitigation, Streambed Material 260 CUYD
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
File details come from the government source that posted it. Updated .