Plan Sheets
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.c
QJ
u
QJ
.c u i
QJ
Ol
QJ
Project Location
WASHINGTON KEY MAP
TYPE OF CONSTRUCTION:
Grading, aggregate, asphalt paving, drainage, special rock embankment
DESIGN DESIGNATION:
ADT (2018)
ADT (2038)
V e (max)
<400 <400
20-25 MPH
0.06
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
PROJECT MANAGER
M. MILLER
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PLANS FOR PROPOSED PROJECT
WA FS ERFO 2016(1)-20(2)
SKYKOMISH EMERGENCY REPAIRS 2016
MT. BAKER-SNOQUALMIE NATIONAL FOREST
SNOHOMISH COUNTY AND KING COUNTY·
WASHINGTON
N
SEA
LENGTH 0. 733 MILES
SCALE IN MILES
0 10 20 30
PROJECT SITES
SEE SHEET A.3
FOR VICINITY MAPS
STATE PROJECT
WA FS ERFO 2016(1)-20(2)
INDEX TO SHEETS
A. GENERAL INFORMATION
A.l TITLE SHEET
A.2 PLAN SYMBOLS AND ABBREVIATIONS
A.3 VICINITY MAP
SURVEY CONTROL
B. SUMMARIES
SUMMARY OF QUANTITIES
A.4
B.1-2
C.63-16.6
C.1 FSR 63-16.6 TYPICAL SECTION
C.2 ROADWAY PLAN AND PROFILE
C.3 AOP CULVERT PLAN AND PROFILE
C.4 AOP CULVERT ELEVATIONS
D. 63-17.2
D.l FSR 63-17.2 TYPICAL SECTION
D.2 ROADWAY PLAN AND PROFILE
D.3 AOP CULVERT PLAN AND PROFILE
AOP CULVERT ELEVATIONS
AOP DETAILS
E. 63-18.1
D.4 D.5-7
E.1 FSR 63-18.1 TYPICAL SECTION
E.2 FSR 63-18.1 PLAN
F. 63-18.3
F.1 FSR 63-18.3 TYPICAL SECTION
F.2 FSR 63-18.3 PLAN
G. 63-18.8
G.1 FSR 63-18.8 TYPICAL SECTION
G.2 FSR 63-18.8 PLAN
H. 65-2.5
H.l FSR 65-2.5 TYPICAL SECTION
H.2 FSR 65-2.5 PLAN
I. 65-4.08
1.1 FSR 65-4.08 PLAN
1.2 METAL END SECTION
J. 6066-5.89
J.1 FSR 6066-5.89 TYPICAL SECTION
J.2 FSR 6066-5.89 PLAN
J.3 SPECIAL ROCK EMBANKMENT,
MECHANICALLY-PLACED
K. EROSION CONTROL PLANS
K.1-3 FSR 63-16.6 EROSION CONTROL PLANS
K.4-6 STANDARD EROSION CONTROL DRAWINGS
L. DRAINAGE
L.1 DRAINAGE SUMMARY
L.2 CULVERT RIPRAP HEADWALL DETAIL
L.3-4 STANDARD CULVERT/DRAINAGE DRAWINGS
M. TRAFFIC CONTROL PLANS
M.1-2 TRAFFIC CONTROL PLANS
M.3-4 STANDARD TRAFFIC CONTROL DRAWINGS
APPROVED:
4JAhl� Chief of Engineering, Western Federal Lands Highway Division
DATE
SHEET
NUMBER
A.1
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
P
M
F e b r u a r y
U
S C c m y fi le s p w p r o d u c ti o n d w a e f1 a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 FS ERFO 2016(1)-20(2)WA
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
SCALE IN MILES
SCALE IN MILES
S N O Q U A L M I E
N A T I O N A L
F O R E S T
NF-66
N F -6
T26N
T27N
32 33
15 14
12 7
161713 18
23 24
R
E
R
ES N O Q U A L M I E
N A T I O N A L
F O R E S T
MINERAL SPRINGS
GARLAND
T28N
T29N
11 12
R
E
R
E
1314 18
31 32
VICINITY MAPS
SNOQUALMIE COUNTY
KING COUNTY
HTUOS
KROF
HSI
MOKYYS
RIVER
BURLINGTON
N O
R T
H E R
N
B E
C K
L E
R
RIVER
NN
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D m y fi le s p w p r o d u c ti o n d w a e f1 a c .d g n
WA FS ERFO 2016(1)-20(2)
A
M a r c h
S
C h a p m a n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
6066-5.89
RR
SKYKOMISH
To Sultan
26 miles
65-4.08
65-2.5
S K
Y K
O M
IS
H
N O
R T H
R
IV
E R
B la n c a L a k e
Clacier
Columbia
Lake
Goblin
N F -6
63-18.1
63-17.2
63-16.6
63-18.8
63-18.3
To Index
17 miles site
Waste
NF-
N F -6
N F -6
N F
Material Stockpile
Jack's Pass
Material Stockpile
Beckler Pit
63 - 18.8 (47.923800, -121.283517)
63 - 18.3 (47.922817, -121.294617)
63 - 18.1 (47.921967, -121.307217)
63 - 17.2 (47.913033, -121.313317)
63 - 16.6 (47.910550, -121.313450)
FSR-MP (Latitude, Longitude)
Vicinity Map for Site:
Vicinity Map for Site:
FSR-MP (Latitude, Longitude)
65 - 2.5 (47.74398, -121.31630)
65 - 4.08 (47.76607, -121.30599)
6066 - 5.89 (47.72495, -121.28260)
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
63 Road MP 16.6-17.2
17101 4852.737 9946.400 3000.292 5/8" IR W/FHWA ALUM CAP
17102 5000.000 10000.000 3000.000 5/8" IR W/FHWA ALUM CAP
17103 5134.364 10050.148 2999.753 5/8" IR W/FHWA ALUM CAP
17104 5291.987 10070.273 2995.495 5/8" IR W/FHWA ALUM CAP
17105 5707.525 10100.283 3023.233 5/8" IR W/FHWA ALUM CAP
17106 5840.883 10174.110 3028.155 5/8" IR W/FHWA ALUM CAP
17107 5955.718 10206.629 3032.756 5/8" IR W/FHWA ALUM CAP
17108 6125.386 10289.176 3032.491 5/8" IR W/FHWA ALUM CAP
17109 6271.681 10309.750 3037.888 5/8" IR W/FHWA ALUM CAP
6066 Road MP 5.89
17101 5034.942 9878.145 3004.109 5/8" IR W/FHWA ALUM CAP
17102 5000.000 10000.000 3000.000 5/8" IR W/FHWA ALUM CAP
17103 4983.807 10105.251 2996.186 5/8" IR W/FHWA ALUM CAP
PROJECT : Skykomish ERFO 2017 DATE OF FIELD WORK : July 2017 DATE OF FINAL ADJUSTMENT :July 2017
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Assumed VERTICAL DATUM : Assumed
PROJECT COORDINATES
C
M yF ile s\
M
IS
C \P
W
W A E
R
FO
6-
(2 co nt ro l_ sh ee t1 .x ls x]
S he et
-M ar
-2
2:
P
M W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
A.4
SHEET
NUMBER
FS ERFO 2016(1)-20(2)WA
SURVEY CONTROL
Sheet and Description
FSR 63-16.6 FSR 63-17.2 FSR 63-18.1 FSR 63-18.3 FSR 63-18.8 FSR 65-2.5 FSR 65-4.08 FSR 6066-5.89 ALLOWANCE Bid Schedule
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0030 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0040 15401-0000 CONTRACTOR TESTING LPSM ALL
A0050 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0060 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL
(FSR 63-17.2) LPSM All ALL
A0070 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL
(FSR 63-16.6) LPSM All ALL
A0080 15702-2000 SOIL EROSION CONTROL,
TURBIDITY MONITORING LPSM All All ALL
A0090 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 350 350 100 50 50 900
A0100 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 1 1 12 2 2 1 1 5 25
A0110 20102-0000 CLEARING AND GRUBBING LPSM All All All All All All ALL
A0120 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 2 3
A0130 20401-0000 ROADWAY EXCAVATION CUYD 32 80 21 7 140
A0140 20403-0000 UNCLASSIFIED BORROW
(GOVERNMENT FURNISHED) CUYD 735 740 600 100 100 425 2,700
A0150 20702-0200 GEOTEXTILE FILTER, CLASS 1,
TYPE B (NON-WOVEN) SQYD 25 111 14 150
A0160 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 CUYD 25 75 100 200
A0170 25201-1000 SPECIAL ROCK EMBANKMENT,
MECHANICALLY-PLACED CUYD 475 201 24 700
A0180 30201-1000 ROADWAY AGGREGATE, METHOD 1 CUYD 80 85 376 273 151 17 98 1,080
A0190 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 20 5 25
A0200 30302-1000 DITCH RECONDITIONING LNFT 20 180 20 220
A0210 40301-0200 ASPHALT CONCRETE PAVEMENT,
TYPE 2 TON 15 2 17
A0220 60201-1200 48-INCH PIPE CULVERT LNFT 60 60
A0230 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT EACH 1 1
A0240 60220-0000 PRECAST REINFORCED CONCRETE
BOX CULVERT LNFT 20 20 40
A0250 60704-0000 CLEANING CULVERT IN PLACE EACH 6 1 3 10
MileStone: 100% Date Completed: In Progress Report Date: 09/06/18
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A 6-
S ep
-2
:2
A M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0
EE
B A C S _S
O Q
.x ls m ]S he et
STATE PROJECT
B.1FS ERFO 2016(1)-20(2)WA
SHEET
Sheet and Description
FSR 63-16.6 FSR 63-17.2 FSR 63-18.1 FSR 63-18.3 FSR 63-18.8 FSR 65-2.5 FSR 65-4.08 FSR 6066-5.89 ALLOWANCE Bid Schedule
A0260 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40 40 8 2 90
A0270 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 20 20 8 2 50
A0280 62301-0000 GENERAL LABOR HOUR 8 8 8 8 8 8 8 8 16 80
A0290 62502-0000 TURF ESTABLISHMENT SQYD 760 1,260 1,000 280 3,300
A0300 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID LNFT 95 5 100
A0310 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 2 1 3
A0320 63502-0900 TEMPORARY TRAFFIC CONTROL,
CONE, TYPE 28-INCH EACH 20 5 25
A0330 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 47 36 7 90
A0340 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 180 60 10 250
A0350 64703-6000 MITIGATION, FISH PASSAGE
BOULDER EACH 15 15 2 32
A0360 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 270 270 30 570
A0370 64704-1600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION CUYD 460 706 134 1,300
No adjustment were made for shrink/swell.
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number c:
\m yf ile s\ pw
_p ro du ct io n\ d0
EE
B
AC
S_
SO
Q .x ls m
]S he et
2)
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
6- Se p-
1:
A M
MileStone: 100% Date Completed: In Progress Report Date: 09/06/18
STATE PROJECT
B.2FS ERFO 2016(1)-20(2)WA
SHEET
11+00.00 to 14+07.00
[1] 2% [1]2%
1:3
1:2
FSR 63-16.6
TYPICAL SECTION
FSR 63-16.6
C le a r in g l im itC le a r in g l im it
CONNECTION DETAIL
1:2 [1]1:3
[1]
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c a .d g n
WA FS ERFO 2016(1)-20(2)
A p r il
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
LC
Existing ground
Turf establishment
Existing roadway
FOOTNOTE:0.25 D
D
Existing ground
C le a r in g l im it
S lo p e s ta k e
D
0.25 D
C le a r in g l im it
Existing ground
10'
B = 5'5'
5'5'
Profile grade stake
Slope
6" compacted depth
Roadway aggregate, method 1, 6" compacted depth
Roadway aggregate, method 1, ROUNDING DETAIL
CUT SLOPE
ROUNDING DETAIL
FILL SLOPE
12'-0" (min.)
Varies
See Plans
S ta k in g l im it
S ta k in g l im it
Varies
See Plans
Turf establishment
Unclassified borrow (Government furnished) front slope rounding distance proportionally to the cut height dimension and reduce the
For cut heights less than "B", reduce "B"
Construct slopes as shown in the Staking Report.[1]
CP
17103 17102
CP
17101
CP
02990
,0
.7
,0
.8
+0.2000%
101' VC
K = 18
,0
.6
5.
100' VC
K = 7
SSD = 129'
,0
.1
-7.6205%
-3.7651%
70' VC
K = 18
,9
.2
P C
.0
P T
.5
P C
.6
P T
.3
P O
T
.8
CUYD
EXC.
CUYD
EMB.
15+0014+0013+0012+0011+0010+00
2994 2994
2996 2996
2998 2998
3000 3000
3002 3002
3004 3004
3006 3006
3008 3008
N
D
Curve= C9
R= 711.57'
T= 64.93'
L= 129.50'
Curve= C10
D
R= 400.00'
T= 47.05'
L= 93.67'
FSR 63-16.6
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c b .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
BEGIN WORK
END WORK
Profile grade
Existing ground
Staking limits
Edge of gravel
NOTE:
4 5
14 13
S e e S h e e ts C .3
C o n s tr u c t b o x c u lv e r t
.7
Channel reconstruction. See Sheet C.3-4
Construct box culvert. See Sheets C.3-7
12+65.7
Clearing limits debris under Section 622
Removal of woody
Clearing limits
11+00.00
FSR 63-16.6
El= 3,000.74
E= 9,947
N= 4,879
14+07.00
FSR 63-16.6
El= 2,999.26
E= 10,047
N= 5,168 constructed
Line to be 43.18' LT
12+65.65,
78.10 LT
12+61.04, 9.88' RT
12+65.65, 43.89' RT
12+62.44, 53.33' RT
12+60.21, 62.40' RT
12+56.66, 71.25' RT
12+52.61, as approved by CO.
Clearing limits may be changed to fit field conditions 1.
Flow
N
PIPE INLET OUTLET
FISH SPECIES:
INSTREAM WORK WINDOW: 7/1- 9/15
ACTIVE CHANNEL WIDTH: 15 feet
LENGTH: 20 feet
INFILL TYPE: SBM
SPAN: 20'-0"
FLOWLINE SLOPE: 0.15 ft/ft
TYPE: Conserved
INV N/E/EL: 2988.4 INV N/E/EL: 2988.4
HYDRAULIC INFORMATION
100 100
OHW : 1.5 feet
HW : 3.0 feetQ : 349 cfs
PIPE SLOPE: 0.0 ft/ft
RISE: 16'-0"
SCALE IN FEET
0 1010 20 25
Q : 102 cfs TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
BEVEL: None BEVEL: None
LOWER BEVEL HEIGHT: None LOWER BEVEL HEIGHT: None
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 10 feet BURIAL DEPTH: 7 feet
PLAN & PROFILE
AOP CULVERT
FSR 63-16.6
C.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 c c .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
.H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y transition to existing stream channel shape and locate for smooth
New stream channel CL, 65 LNFT, LC grade contour
Existing
New culvert transition to existing stream channel shape and locate for smooth
New stream channel CL, 65 LNFT,Station 12+65.7
New channel bottom edge
Existing channel edge
New channel bottom edge
Existing channel edge
New precast wingwall (16 LNFT)
(20 LNFT)
concrete box culvert
New 20' x 16' precast
New precast wingwall (24 LNFT)
Line to be constructed
135°
10'-0"
LCExisting roadElev 3007.6'
Elev 3007.6'
Elev 2998.4'
0 10 20 30 40 50 60 7060 50 40 30 20 1070
8090100110120130140 80 90 100 110 120 130 140 150 locate as needed
Temporary flow barrier, Existing stream bottom
0.11 Ft/Ft
0.18 Ft/Ft
Match existing stream bottom
Elev 2987.4'
Elev 2985.4'
0.15 Ft/Ft
Elev 2994.4'
New precast wingwall (16 LNFT)
New precast wingwall (24 LNFT)
(20 LNFT)
concrete box culvert
New 20' x 16' precast barrier, locate as needed
Temporary flow materialConserved streambed
New stream channel Flowline
Placed riprap, method A, class 3 (typ.)
locate as needed
Temporary flow barrier locate as needed
Temporary flow barrier
100-yr Water Surface profile
ELEVATIONS
AOP CULVERT
FSR 63-16.6
C.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 c d .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b
CULVERT INLET
CULVERT OUTLET
TYPICAL CULVERT CHANNEL
Placed riprap, class 3 concrete box culvert
New 20' x 16' precast
Flowline
Elev 3005.4'
Existing grade, upstream
Floor Elev 2988.4'
Elev 2987.4'
Elev 2998.4' transition to existing stream channel shape and locate for smooth
New stream channel surface, Placed riprap, class 3 concrete box culvert
New 20' x 16' precast
Elev 3005.4'
Elev 2985.4'
Elev 2994.4' Existing grade, downstream
Channel bottom edge
Precast cutoff wall Remove existing 108" CMP
Remove existing 108" CMP
2'-6"
2'-6"
New precast wingwall (24 LNFT)
New precast wingwall (16 LNFT) materialstreambed
Conserved materialstreambed
Conserved Floor Elev 2988.4' transition to existing stream channel shape and locate for smooth
New stream channel surface, Channel bottom edge
5' see Sheets C.1-2
Roadway, 5' see Sheets C.1-2
Roadway, 15'
12'
100-yr Water Surface
2-yr Water Surface
Flowline
100-yr Water Surface
2-yr Water Surface
Top of wall Elev 3007.6'
Top of wall Elev 3007.6'
NO SCALE
21+81.77 to 25+37.62
2% [1]2%
FSR 63-17.2
TYPICAL SECTIONS
FSR 63-17.2
1:3
1:
C le a r in g l im it
C le a r in g l im it
1:
[1
1:3 [1]
CONNECTION DETAIL
[1]
[1]
[1]
[1]
S ta k in g l im it
S ta k in g li m it
See Plans See Plans
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d a .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
0.25 D
D
Existing ground
C le a r in g l im it
S lo p e s ta k e
D
0.25 D
C le a r in g l im it
Existing ground
10'
B = 5'5'
5'5' stake
Slope
LC
Existing ground
Turf establishment 12' (min.)
Profile grade
Existing roadway
6" compacted depth
Roadway aggregate, method 1, 6" compacted depth
Roadway aggregate, method 1, ROUNDING DETAIL
CUT SLOPE
ROUNDING DETAIL
FILL SLOPE
Varies Varies
Turf establishment
Unclassified borrow (Government furnished) front slope rounding distance proportionally to the cut height dimension and reduce the
For cut heights less than "B", reduce "B" have Staking Notes or Cross Sections. See Sheet H.1 for height.
Construct slopes as shown in the Staking Report. Site 65-2.5 will not[1]
17106
17107
17108
CPCPCPCP
CP
CP
El= 3,029.34
E= 10,147.96
N= 5,28.64
El= 3,032.79
E= 10,282.73
N= 6,157.99
L O
G
,0
.3
,0
.4
+4.
60' VC
K = 25
,0
.6
+2.36 39% -3.5232%
60' VC
K = 10 3 ,0
.7
SSD = 213'
P O
T
.1
P O
T
.9
N
CUYD
EXC.
CUYD
EMB.
26+0025+0024+0023+0022+00
3026 3026
3028 3028
3030 3030
3032 3032
3034 3034
FSR 63-17.2
21+00
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d b .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
BEGIN WORK END WORK
Profile grade
Existing ground
Line to be constructed
Staking limits riprap inlet and outlet protection
Install 48" pipe culvert with
22+80
NOTE:
1.
o u tl e t p r o te c ti o n w it h r ip r a p i n le t a n d
I n s ta ll p ip e c u lv e r t
S e e S h e e ts D .3
C o n s tr u c t b o x c u lv e r t
.0
See Sheets D.3-5
Construct box culvert
24+22 edge of gravel
Proposed approved by the CO.
devices may be changed to fit field conditions as
Final location of clearing limits and erosion control
4 5
14 12
24+22.00, 10' Rt
Clearing limits
Clearing limits
21+81.77
FSR 63-17.2
25+37.62
FSR 63-17.2
112' Rt.
24+33.44, 24+33.44, 112' Lt See Sheets D.3-4
Channel reconstruction.
[1]
FOOTNOTE:
Remove culvert
#13 and #14 are not shown.
Location of clearing limit points #12, Flow
N
PIPE INLET OUTLET
FISH SPECIES:
INSTREAM WORK WINDOW: 7/1- 9/15
ACTIVE CHANNEL WIDTH: 16 feet
LENGTH: 20 feet
INFILL TYPE: SBM
SPAN: 20'-0"
FLOWLINE SLOPE: 0.16 ft/ft
TYPE: Conserved
INV N/E/EL: 3018.7 INV N/E/EL: 3018.7
HYDRAULIC INFORMATION
100 100
OHW : 1.5 feet
HW : 3.5 feetQ : 413 cfs
PIPE SLOPE: 0.0 ft/ft
RISE: 16'-0"
SCALE IN FEET
0 1010 20 25
Q : 121 cfs TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
BEVEL: None BEVEL: None
LOWER BEVEL HEIGHT: None LOWER BEVEL HEIGHT: None
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 9 feet BURIAL DEPTH: 6 feet
PLAN & PROFILE
AOP CULVERT
FSR 63-17.2
D.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 d c .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b transition to existing stream channel shape and locate for smooth
New stream channel CL, 110 LNFT, LC grade contour
Existing
Placed riprap, class 3
New culvert
Placed riprap, class 3
(L-20') concrete box culvert
New 20' x 16' precast
(L-24')New precast wingwall transition to existing stream channel shape and locate for smooth
New stream channel CL, 105 LNFT, New precast wingwall (L-16')
Station 24+22.0
10'-0"
New channel bottom edge Existing channel edge
Existing channel edge
New channel bottom edge
20' x 100' x 4'
Remove channel debris, debris, 20' x 105' x 3'
Remove channel
Line to be constructed
135°
LC
locate as needed
Temporary flow barrier, Elev 3037.9'
(L=20') concrete box culvert
New 20' x 16' precast
0.16 Ft/Ft
Elev 3017.7'
Elev 3037.9'
Elev 3024.7'
Elev 3028.7'
0 10 20 30 40 50 60 7060 50 40 30 20 1070
8090100110120130140 80 90 100 110 120 130 140 150
Existing stream bottom
0.14 Ft/Ft
0.18 Ft/Ft
20' x 105' x 3'
Remove channel debris, New precast wingwall (L-16')
New precast wingwall (L-24')
Elev 3014.7'
20' x 100' x 4'
Remove channel debris, stream bottom
Match existing barrier, locate as needed
Temporary flow log from channel
Remove existing
Existing road materialstreambed
Conserved
New stream channel FL.
New stream channel FL.
section 622 from channel under
Remove existing log locate as needed
Temporary flow barrier locate as needed
Temporary flow barrier
100-yr Water Surface profile
ELEVATIONS
AOP CULVERT
FSR 63-17.2
D.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 d d .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b
CULVERT OUTLET
TYPICAL CULVERT CHANNEL
Placed riprap, class 3 concrete box culvert
New 20' x 16' precast
Flowline
Elev 3035.7'
Existing grade, upstream
Floor Elev 3018.7' Elev 3017.7'
Elev 3028.7' transition to existing stream channel shape and locate for smooth
New stream channel surface, Placed riprap, class 3 concrete box culvert
New 20' x 16' precast
Flowline
Elev 3035.7'
Floor Elev 3018.7' Elev 3014.7'
Elev 3024.7' transition to existing stream channel shape and locate for smooth
New stream channel surface, New precast wingwall (L-16')
New precast wingwall (L-24')
Existing grade, downstream
Channel bottom edge
Channel bottom edge
5'
5'
16'
13'
2'2'
Top of wall Elev 3037.9'
Top of wall Elev 3037.9' materialstreambed
Conserved materialstreambed
Conserved
Precast concrete cutoff wall see Sheet D.1
Roadway, See Sheets D.1
Roadway, 100-yr Water Surface
2-yr Water Surface
100-yr Water Surface
2-yr Water Surface
PLAN
Flow
A
A
BB
NOTE:
FOOTNOTE:
[4]
Material.
Quantities included in Item 64704-1000 Mitigation, Streambed[4] dimension.
smallest4 3 Embed fish passage boulders within active channel [3] sediment.
Construct well defined banks with bank stone and streambed[2] parabolic shape.
Slope streambed aggregate towards flowline to ensure[1]
4.
3.
2.
1.
shown. Mix 6 fish passage boulders evenly through streambed material.
Use conserved streambed material. Place 9 fish passage boulders as
Stagger in-channel fish passage boulder within the culvert span.
streambed cobble, and bank stone gradations.
See special contract requirements for streambed sediment, Mix streambed cobbles evenly throughout streambed sediment.
LOCATION
(FT)
D
(FT)
W
(IN)
GRADATION
COBBLE
STREAMBED
INFILL INFORMATIONAL QUANTITIES
(CUYD)
COBBLE
STREAMBED
(CUYD)
SEDIMENT
STREAMBED
15 Class E 25
(CUYD)
STONE
BANK
20 30
(IN +/- 4)
BOULDER DIAMETER
FISH PASSAGE
ITEM DESCRIPTION UNIT
EACH
64703-6000
64704-1000
QUANTITY
MITIGATION QUANTITIES
CUYD
90 180FSR 63 MP 16.6
360 50
FSR 63 MP 17.2 20 16 Class E 90 180 30 25
INTERIOR TREATMENT
CULVERT
SIMULATED STREAM
TOTAL
J
B u r k e through streambed material.
mix 6 fish passage boulders evenly place 9 fish passage boulders as shown.
Use conserved streambed material.
D.5
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a e f1 d e .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
H a r r is
C h e c k e d b y
D e s ig n e d b y
Mitigation, fish passage boulder
Mitigation, streambed material
SECTION A-A
Flow
D2
SECTION B-B
L C
D
D (typ.)
D (typ.)4
(typ.)
(typ.)
36" min.
or Length on plan sheet
W
Streambed sediment
Streambed cobble
Channel flowline
Box culvert wall boulder
Fish passage boulder
Fish passage
[3]Fish passage boulder
[2]Bank stone
[2]Bank stone d e p th b u r ia l b u r ia l d e p th
"top
Streambed
Channel flowline
Streambed sediment
Culvert wall
Culvert outlet
Culvert inlet
Streambed cobble sediment
Streambed wall Round pipe culvert wall Pipe arch culvert
Varies
DETAILS
BOX CULVERT RIPRAP
Flow
ITEM NO. DESCRIPTION UNIT QUANTITY
20701-0200
25101-0300
SQYD
CY
RIPRAP QUANTITIES
25SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C
PLACED RIPRAP, METHOD A, CLASS 3 25
D.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d f.
d g n
WA FS ERFO 2016(1)-20(2)
e p te m b e r
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
SECTION A-ATYPICAL CULVERT PLAN
Varies
Proposed road grade
Wingwall footing
Wingwall top
A
A
Wingwall inside faceWingwall inside face
Stream bank toe
Stream bank toe wall Box culvert
NOTE:
NO SCALE
Culvert & streamLC Culvert & streamLC transition to existing bank top and toe.
1. Place conserved streambed material over riprap as needed for method A, class 3
Placed riprap, Box culvert headwall
Placed riprap, method A, class 3
Stream bank top
Stream bank top
Placed riprap, method A, class 3
' 5
5' outside face
Wingwall class 1, type B
Geotextile filter, class 1, type B
Geotextile filter, 5'
" (min.)2 12'-6
1'-3" (min.)
ty p
STRUCTURAL DETAILS
BOX CULVERT
SECTION PROFILE
D.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 d g .d g n
WA FS ERFO 2016(1)-20(2)
A p r il
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y plate assembly
Welded connection
Headed Stud
GENERAL NOTES:
Varies
15°
Precast footing
O Ring if required over pipe joint
Do not install fastener m a x precast permitted when
Tapered holes
" (max.)2 12'-9
(ref.)
"8 11 "2 on top and sides
(outside joint) mastic joint wrap
Grout and 9" wide box culvert
Outside of box culvert
Inside of "2
14 " (ref.)8
Non-shrink grout
V a ri e s
" Gap2
1¼" Mastic rope foam gasket
Closed cell
1'-5" (max.)
WATERTIGHT BOX JOINT SECTION
CONNECTION PLATE DETAIL
SUPPLEMENTAL CONCRETE PIPE TIE
WINGWALL DETAIL
Non-shrink grout 1¼" Mastic rope foam gasket
Closed cell for 1"Ø joint tie
"Ø Hole4
Install tie rods or connector plates per manufacturer between precast sections (typ.)
along both sides (typ.)
" Bevel2 1" x 22
12" depth material, Bedding
BOX CULVERT BEDDING DETAIL
Bedding material
R is e
Span Thickness
R is e
DETAIL
HEADWALL AND CUTOFF WALL
Headwall (per precast culvert manufacturer)
Span + 4' plates (typ.)
connection
Embedded
Cutoff wall (per precast culvert manufacturer)
P e r p la n
10" spaced 2'-6" max.
No. 8 dowels
3" dia. holes with culvert manufacturer)
Cutoff wall (per precast
12" depth Bedding material, (per manufacturer)
Wire mesh (typ.)
in 6" lifts
Backfill compacted
Bearing capacity: 2 ton/sq. ft.
Unit weight: 125 lbs/cu. ft.
SOIL:
Provide 2-inch minimum concrete cover to the face of any bar.
ASTM A1064.
(ASTM, A615) grade 60, or welded wire reinforcing conforming to
Furnish reinforcing steel bars conforming to AASHTO M31, deformed
REINFORCING STEEL:
Chamfer all exposed edges 3/4-inch.
compressive strength f'c=4,500 psi.
Furnish structural concrete, class A(AE) with minimum 28-day design
CONCRETE:
HL-93.
LIVE LOAD:
Soil: 125 lb per cubic foot.
Concrete: 150 lb per cubic foot.
DEAD LOAD:
latest edition.
accordance with AASHTO LRFD Bridge Design Specifications, Design cut -off walls, headwalls, wingwalls, and footings in
Design precast culverts in accordance with Section 602.
DESIGN:
precast sections.
Install tie rods or connector plates per manufacturer between
104.
plans and provide shop drawings for review by the CO. See section walls conforming ASTM-C1577 and to the and grades shown in the
Provide precast concrete culverts, headwalls, wingwalls, and cut-off
FP-14 (U.S. Customary).
Construction of Roads and Bridges on Federal Highway Projects, Federal Highway Administration Standard Specifications for
Detail is for general information only.
CONSTRUCTION:
Typical Section
Roadway See spaced 2'-6" max.
No. 8 dowels
3" dia. holes with
R is e
Span culvert manufacturer)
Headwall (per precast
P e r p la n
12"
3% le a r in g l im it s
C le a r in g l im it s
1:3 1:3
FSR 63-18.1
TYPICAL SECTION
FSR 63-18.1
CONNECTION DETAIL
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e a .d g n
WA FS ERFO 2016(1)-20(2)
M a r c h
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
Existing roadway
Existing ground
6" compacted depth
Roadway aggregate, method 1, 6" compacted depth
Roadway aggregate, method 1, Profile grade as approved by CO
LC
12' (min.)5' 5'
Unclassified borrow (Government furnished)
30+00 to 44+35
PLAN
FSR 63-18.1
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e b .d g n
WA FS ERFO 2016(1)-20(2)
A p r il
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
3 3 4 3 5 3
3 4
42+35 Clean culvert in place directed by CO, typ.
Install check dam as
LEGEND:
NOTE:
2.
1.
30+00.00
FSR 63-18.1
BEGIN WORK
44+35.00
FSR 63-18.1
END WORK
Check dam conditions as approved by the CO.
Final location of erosion devices may be changed to fit field
Adjust to fit conditions.
Site not surveyed. Horizontal alignment is a representation.
directed by CO, (typ.)
Install check dam as
44+35 Clean culvert in place
32+50 Clean culvert in place
36+35 Clean culvert in place
37+50 Clean culvert in place
39+00 Protect existing culvert
43+35 Clean culvert in place section of culvert under section 622.
43+35 Remove damaged outlet le a r in g l im it
3%
C le a r in g l im it s
FSR 63-18.3
TYPICAL SECTION
FSR 63-18.3
CONNECTION DETAIL
1:3
1:3
50+00 to 60+50
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fa .d g n
WA FS ERFO 2016(1)-20(2)
M a r c h
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
Existing roadway
Existing ground
6" compacted depth
Roadway aggregate, method 1, 6" compacted depth
Roadway aggregate, method 1, Profile grade as approved by CO
LC
12' (min.)5' 5'
6 5 7 5 8 5
N
N
PLAN
FSR 63-18.3
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fb .d g n
WA FS ERFO 2016(1)-20(2)
M a r c h
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
NORTH FORK SKYKOMISH RIVER
LEGEND:
NOTE:
2.
1.
conditions as approved by the CO.
Final location of erosion control devices may be changed to fit field to fit field conditions.
Site not surveyed. Horizontal alignemtn is a representation. Adjust
Check dam
BEGIN WORK
50+00.00
63-18.3
END WORK
60+50.00
63-18.3 directed by CO, typ.
Install check dam as
Ditch reconditioning
50+30 - 50+50
3% le a r in g l im it s
1:3
FSR 63-18.8
C le a r in g l im it
TYPICAL SECTION
FSR 63-18.8
CONNECTION DETAIL
1:3
70+00 to 75+80
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 g a .d g n
WA FS ERFO 2016(1)-20(2)
M a r c h
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
Existing roadway
Existing ground
6" compacted depth
Roadway aggregate, method 1, 6" compacted depth
Roadway aggregate, method 1, LC
Profile grade as approved by CO.
12' (min.)5' 5'
PLAN
FSR 63-18.8
G.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 g b .d g n
WA FS ERFO 2016(1)-20(2)
M a r c h
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
NORTH FORK SKYKOMISH RIVER
LEGEND:
NOTE:
2.
1.
BEGIN WORK
N=
75+80.00
63-18.8
END WORK
conditions as approved by the CO.
Final location of erosion control devices may be changed to fit field to fit field conditions.
Site not surveyed. Horizontal alignment is a representation. Adjust
Check dam
See Sheet K.3 directed by CO, typ.
Install check dam as
70+00.00
63-18.8
1:3
FSR 65-2.5
~95'
:1
TYPICAL SECTION
FSR 65-2.5
1:2 (m ax.)
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 h a .d g n
WA FS ERFO 2016(1)-20(2)
e p te m b e r
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
Existing ground
Benching per Section 204
Existing ground
8" compacted depth
Roadway aggregate method 2, LC shldr.
2'
Existing travel lane
12'
Existing travel lane
12' shldr.
2'
6' (max.)
m a x existing Match
See Sheet J.3 mechanically-placed.
Special rock embankment, tack coat
Sawcut and
4" compacted depth placed in two-lifts
Asphalt concrete pavement, type 2
Geotextile filter, class 1, type B (non-woven)
2'Recondition ditch m in
12-inch compacted depth
NF-65
Ditch reconditioning Ditch reconditioning
PLAN
FSR 65-2.5
H.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 h b .d g n
WA FS ERFO 2016(1)-20(2)
p r il
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
30'
24" Existing pipe culvert
36" Existing pipe culvert
95'±
Existing edge of pavement pavement structure
See Sheet H.1 for
150'
Existing pavement marking
Existing toe of fill
LEGEND:
Fiber rolls
Fiber rolls
NOTE:
Pavement marking, type B, solid, 4" white
95' ± m a x
See Sheet J.3 mechanically-placed.
Special rock embankment, See Sheet D.9 for culvert bedding requirements.
conditions as approved by the CO.
Final location of erosion control devices may be changed to fit field to fit field conditions.
Site not surveyed. Horizontal alignment is a representation. Adjust
3.
2.
1.
NF-65
:1
:1
BERM REMOVAL DETAIL
PLAN
FSR 65-4.08
Check Dam
I.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ia .d g n
WA FS ERFO 2016(1)-20(2)
A p r il
H a r r is
B u r
C h e c k e d b y
D e s ig n e d b y
NOTE:
2.
1.
LEGEND:
Opening
2' end section for 24" pipe and clean catch basin
Remove damaged section of inlet, install metal
Opening
2'
Existing berm
Check dam
See berm removal detail
Existing berm field conditions as approved by the CO.
Final location of erosion control devices may be changed to fit
Adjust to fit field conditions.
Site note surveyed. Horizontal alignment is a representation.
END SECTIONS FOR ROUND PIPE CULVERT
END SECTIONS FOR PIPE ARCH CULVERT
A (min) B (max) H (min) W (max)
SLOPE
Approx.
A (min) B (max) H (min) W (max)
SLOPE
Approx.
Variations in design and dimensions are permitted to allow for manufacturer's standards.
Fabricate the diameter of the end section of Design B to match the inside diameter of the concrete pipe culvert.
Design C may be used in lieu of design A for all metal pipe culvert sizes. Coupling bands may be any acceptable type for the pipe culvert specified.
Fabricate multiple piece bodies with lap seams tightly joined
602-4
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2007
REVISED: 4/1994 6/2005
METAL END SECTIONS
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
0.060
112 × 75
103 × 71
95 × 67
87 × 63
83 × 57
81 × 59
77 × 52
73 × 55
71 × 47
66 × 51
64 × 43
60 × 46
57 × 38
49 × 33
42 × 29
35 × 24
28 × 20
24 × 18
21 × 15
17 × 13
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.109
0.079
0.079
0.064
0.064
0.064
0.064
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.105
0.075
0.075
0.060
0.060
0.060
0.060
INCHES
SPAN × RISE
PIPE SIZE METAL THICKNESS
STEEL ALUMINUM
INCHES GAGE INCHES GAGE
INCHES
DIMENSIONS
L (±2")(INCHES)
DIAM.
VALENT
EQUI-
INCHES
DIAMETER
PIPE SIZE
STEEL
METAL THICKNESS
INCHES GAGE
ALUMINUM
INCHES GAGE
INCHES
DIMENSIONS
L (±2")
STATE PROJECT
NUMBER
SHEET
I.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(2)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 ib .d g n
M a r c h
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
5.
6.
7.
8.
ROUND OR PIPE ARCH CULVERT
PIPE ARCH CULVERTROUND PIPE CULVERT
DESIGN C
CONNECTION TO METAL PIPE
OR OUTLET END OF CONCRETE PIPE
SECTION A-APLAN
ELEVATION ELEVATION
Slope
Toe plateToe plate riveted or welded connection
For all sizes of round pipe and pipe arch
A
A
DESIGN B
CONNECTION TO CONCRETE
PIPE INLET END
DESIGN A
CONNECTION TO ANNULAR
CORRUGATED METAL PIPE
diameter
Span or
B
L
AWA
End Section
SpanR is e
Di am et er
Toe plate extension
(min. width A+W)
Toe plate extension
Corner plate
(min. width A+W)
Toe plate extension
Corner plate
Reinforced edge
Pipe coupling band shop bolted to
End section
Pipe culvert
Expander lug End section steel or aluminum pipe
Smooth galvanized
Bolted or welded
Threaded rod
Rod holder connector
Flat strap Pipe culvert Pipe culvert
End section End section
Strap bolt
Pivot bolt
H H reinforcement bolted or riveted under the center panel seam.
Supplement the reinforced edges of end sections for attached with bolts or rivets.
Fabricate connector section, corner plate and toe plate extensions from the same metal thickness as the panel body.
Use toe plate extension where shown on the plans.
Warp embankment slopes to match the slope of the flared end sections.
60" and larger diameter pipe and 66" and larger
" bolts8 3spacing for
35" × 24" thru 66" × 51" pipe arch
For 30" thru 60" round pipe and
17" × 13" thru 28" × 20" pipe arch
For 12" thru 24" round pipe and m in
12" (max.) hole lap after expansion
1" Minimum
13" for 30" dia. and over.
culvert less than 30" dia.
7" for concrete pipe
" bolts8 3spacing for m in
12" (max.) hole at 6" centers (max.) or equivalent
" angle4 1" × 2
1" × 22 1equivalent pipe arch provide 2
" bolts8 3flared end section with
" rivets or bolts. Fabricate end section center panels 8 3by
On end section center panels for 66" and larger from 0.138 inch steel or 0.135 inch aluminum.
for 60" and larger diameter pipe and equivalent pipe arch
" stiffener angles 4 1" × 2
1" × 22 1equivalent pipe arch with 2
NOTE:
edge
Reinforced
Pay Limit
Pipe Culvert
FSR 6066-5.89
30+93.00 to 31+57.00
TYPICAL SECTION
FSR 6066-5.89
1:3 [1]
S ta k in g l im it s
2% [1] 2% [1]
:1
Construct slopes and superelevation according to the Staking Report.[1]
S ta k in g l im it
CONNECTION DETAIL
J.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ja .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
Existing ground
LC
Roadway aggregate, method 1, 6" compacted depth
Conserved material
12' (min.)
Toe of SRE
See Sheet J.3
Special Rock Embankment.
Unclassified borrow (Government furnished)
12-inch compacted depth
Existing roadway 6" compacted depth
Roadway aggregate, method 1, CP
17101
CP
17102
CP
17103
,9
.3
-3.6892%
,0
.8
,9
.6
-3.1038%
,9
.6
-2.4385%
,9
.0
-2.5632% +0.7969%
,9
.2
P C
.0
P R
C
.0
P R
C
.3
Curve= C6
D
R= 168.81'
T= 49.37'
L= 96.06'
Curve= C7
D
R= 134.39'
T= 47.47'
L= 91.27'
Curve= C8
D
R= 1,105.72'
T= 52.16'
L= 104.23'
N
CUYD
EXC.
CUYD
EMB.
30+00 31+00 32+00 33+00
-3.6892%
J.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 jb .d g n
WA FS ERFO 2016(1)-20(2)
p r il
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
END WORK
BEGIN WORK
See Sheet J.3 rock embankment.
Construct special
BEGIN WORK
END WORK
30+93.00
FSR 6066-5.89
31+57.00
FSR 6066-5.89
30+93.00
FSR 6066-5.89
31+57.00
FSR 6066-5.89
El. 2994.96
17.78' RT
30+97, Toe of SRE
El. 2990.59
22.00' RT
31+01
Toe of SRE
El. 2986.21
26.23' RT
31+05
Toe of SRE
El. 2981.84
30.45' RT
31+09
Toe of SRE
El. 2977.46
34.67' RT
31+13
Toe of SRE
El. 2976.73
34.72' RT
31+37
Toe of SRE
El. 2980.81
30.51' RT
31+41
Toe of SRE
El. 2984.76
26.31' RT
31+45
Toe of SRE
El. 2988.86
22.10' RT
31+49
Toe of SRE
El. 2992.97
17.90' RT
31+53
Toe of SRE
Embankment. See Sheet J.3
Construct Special Rock
El.=3000.46
E= 9,999.76
N= 5,010.37
El.= 2998.37
E= 10,059.28
N= 5,010.35
El.=3000.46
E= 9,999.76
N= 5,010.37
El.= 2998.37
E= 10,059.28
N= 5,010.35
Staking limits constructed
Line to be culvert pipe
Protect existing
NO SCALE
SPECIAL ROCK EMBANKMENT
WELDED WIRE REINFORCEMENT
MECHANICALLY PLACED
SPECIAL ROCK EMBANKMENT
SPECIAL ROCK EMBANKMENT
J.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 jc .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
[2][3]
Existing ground
Bench Width
LC Varies x x x x x x x x x x x x x x x x x x x
Finished face
[5]Short term backslope at 4' vertical spacing
Welded wire reinforcement
Rock for special rock embankment
See Sheets H.1 & J.1 for Typical Section
Geotextile filter, class 1, type B, (non-woven)
[6]
[6]
2' (min.)
x
PLAN VIEW
LC
W9.4 x W9.4 wire on 12" c-c
F a c e o f
S lo p e
Staking limits
See Sheet J.2 for details
Toe of SRE
Slope to drain
8' (min.)
Slope ratio used for designed quantity calculations.[6]
30 days.
required if the short term back slope will be open more than
(29CFR, Part 1926, Subpart P, excavation). Shoring may be
Short term back slope ratio per OSHA Safety Regulations [5]
Cut bench steps in accordance with Section 204.09.[4]
Allow 10-inch setback from finished face.[3] flatter than 1V:1.25H.
Welded wire reinforcement not required for finished slope faces[2] not have staking Notes or Cross Sections. See Sheet H.1 for height.
Construct slopes as shown in the Staking Report. Site 65-2.5 will[1]
P a y l im it s
H e ig h t v a r ie s
12" compacted depth
(Government furnished)
Unclassified borrow
B e n c h h e ig h ts v a r ie
Toe elevationVaries
4'
Special rock embankment
V a r ie s reinforcement Welded wire roadway Existing
ELEVATION VIEW
SECTION VIEW
:1 (m a x field conditions as approved by the CO.
Final location of erosion control devices may be changed to fit
29952995
301530
2 1
N
FSR 63-16.6
EROSION CONTROL PLAN
K.1
[1]
SIGN PANEL
SWPPP ALUMINUM
See Sheet M.3 for mounting instructions.
See SCR Subsection 107.01A(d) for installation requirements [1]
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 k a .d g n
WA FS ERFO 2016(1)-20(2)
A u g u s t
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
Check dam, typ.
Line to be constructed Staking limits
NOTE:
1.
Fiber rolls, typ.
edge of gravel
Proposed
LEGEND:
Flow barrier
NO SCALE
Check dam
Fiber rolls
Flow direction see Sheet D.3-4
Channel reconstruction, 3"
4"C
3"
2"C
2"
2"C
14"
"2
"B2
3'-6"
"8
3IN =
"8
5TH =
"8 1R = 1
BORDER
specific project information)
(adjust text as needed for
White Background
Black Foreground
L O
G
N
FSR 63-17.2
EROSION CONTROL PLAN
conditions as approved by the CO.
Final location of erosion control devices may be changed to fit field
K.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 k b .d g n
WA FS ERFO 2016(1)-20(2)
M a r c h
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
Line to be constructed
Staking limits
NOTE:
1.
Fiber rolls, typ.
edge of gravel
Proposed
LEGEND:
Check dam
Fiber rolls
Flow direction
Flow barrier
NO SCALE
Check dam, typ.
see Sheets D.3-4
Channel reconstruction, 303030
C
N
FSR 6066-5.89
EROSION CONTROL PLAN
conditions as approved by the CO.
Final location of erosion control devices may be changed to fit field
K.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 k c .d g n
WA FS ERFO 2016(1)-20(2)
M a r c h
K
H a r r is o n
J
B u r k e
C h e c k e d b y
D e s ig n e d b y
Line to be constructed
Fiber rolls, typ.
Check dam
NOTE:
1.
LEGEND:
Check dam
Fiber rolls
Flow direction
Special rock embankment, see Sheet J.3
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
K.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(2)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 k d .d g n p r il
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
157-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
DIVERSION CHANNELS
TEMPORARY
STATE PROJECT
NUMBER
SHEET
K.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(2)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 k e .d g n p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
Roadway embankment
Roadway embankment
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
1.
2.
3.
4.
5.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
When specified replace the portion of the diversion channel through the roadway embankment with temporary culvert. Compact temporary culvert backfill using one of the methods listed in Subsection 204.11(a).
See Erosion Control Section for temporary culvert diameter, riprap class, channel dimensions and quantities.
Use plastic liner or riprap along the entire length and width of the temporary diversion channel.
Construct channel at a minimum grade of 0.5 percent.
Do not construct with longitudinal joints if using a plastic liner. Bury the upstream edge of the liner a minimum of
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
6" deep and secure with riprap or sandbags.
2'2'
Bury plastic liner 6" deep
2'2'
NOTE:
with plastic liner or riprap
Temporary diversion channel
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
W157-15
MODERATE GRADES
CHECK DAM
6%
5%
4%
3%
2%
NO SCALE
6%
5%
4%
3%
2%
5%
4%
3%
2%
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
K.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2016(1)-20(2)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 k f.
d g n
A u g u s t
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
GRAVEL BAG
SPACING (max.)
CHECK DAM
GRADE
DITCH
SPACING (max.)
CHECK DAM
(See Note 7)
CHECK DAM SPACING
FILTER ROCK
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
SPACING (max.)
CHECK DAM
on ditch grades steeper than 5%.
Do not use fiber roll check dams
* Spacing calculated based on on ditch grades steeper than 6%.
* Do not use gravel bag check dams
Se e N ote
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Drive stakes into undisturbed soil of trench bottom.
stakes. Drive stakes at each end of the fiber roll and at
Install check dams in ditches perpendicular to the flowline.
installation.
Repair all rills or gullies and properly compact prior to functional requirements of the check dam device.
gravel bags as approved by the CO, to meet the
Construct check dams from fiber rolls, filter rock, or
(FT)
(FT)
(FT)
Trench 2" (min.)
m in
Fiber roll 9" Ø (min.)
Trench 2" (min.)
-inch wood 8 1-inch x 18
1Stake fiber rolls in place with 1
Expose stakes 2-inches (min.) above top of fiber roll.
2-foot (max.) spacing.
m in
"6 m in m in .6
9" Ø minimum fiber roll.
CROSS SECTION
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
CROSS SECTION
CROSS SECTION
STAKING DETAIL
FIBER ROLL
PLAN
are similar for flat-bottom ditches
Check dam installation details
V-ditch design shown.
Flow line
Gravel bag the ends. See Note 6 to prevent flow around
Curve ends upstream
Filter rock
Filter rock
FIBER ROLL CHECK DAM
GRAVEL BAG CHECK DAM
See Note 5
NOTE:
FILTER ROCK CHECK DAM
uphill side of fiber roll trench material on
Place excavated
Flow
F lo w
10.4 x 16 20702 -0300
25101 -0300
60201 -1200
60210 -0800
60220 -0000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
G
EO
TE
X
TI
LE
F
IL
TE
R
C
LA
S S
TY
PE
C
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C
H P
IP
E
C U
LV
ER
T
EN
D
S
EC
TI
O
N F
O R
4-
IN
H
PI
PE
C
U
LV
ER
T
PR
EC
A S T
R
EI
N
FO
R
ED
O
N C R
ET
E B O
X C
U
LV
ER
T
(2 0'
S
PA
N X
6'
R
IS
E)
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD SQYD CUYD LNFT EACH LNFT Lt Rt
FSR 63-16.6, 12+65.70 815 25 25 20 C
FSR 63-17.2, 22+80.00 6 - 86 50 58 10 Rt x/ACP 1 2 Pipe is placed in new embankment
FSR 63-17.2, 24+22.00 1160 25 25 20 C
FSR 65-4.08 - 1 See plans for location
PROJECT TOTAL 1975 136 100 58 1 40
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is listed on Std. 602-1. AS Aluminized steel
C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is listed on Std. 602-1. GS Galvanized steel
P Plastic
3. Aluminum pipe culvert minimum wall thickness is listed on Std. 602-1. (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw _p ro du ct io n\ d0
D ra in ag e- Sk yk om is h.
xl sx
]S he et 1-
M ay
-2
2:
P
M J.
B ur ke 1/
K H ar ri so n 1/
D es ig ne d by
C he ck…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.