Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE BIDDERS

RE: WA FS ERFO 2016(1)-20(2)

Skykomish Emergency Repairs 2016 Solicitation No. 69056718B000002

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After October 31st, access will be weather dependent; for current road conditions contact the USDA Forest Service Skykomish Ranger District Office at 360-677-2414. No Federal Highway Administration personnel will be available for show-me tours.

Project Location and Type of Work - All project work is located in Snohomish County and King County, Washington.

• FSR 6066 (Beckler Peak Road) o Near Milepost 5.89: Construct Special Rock Embankment and re-build failed roadway shoulder.

• FSR 63 (Index Road) o Near Milepost 16.6: Construct open-bottom culvert structure, remove channel debris, and re-construct roadway line and grade.

o Near Milepost 17.2: Construct open-bottom culvert structure, install 4’ diameter culvert, remove channel debris, and re-construct roadway line and grade.

o Near Milepost 18.1: Replace scoured roadbed material, clean culverts and inlets, and resurface aggregate roadway.

o Near Milepost 18.3: Replace scoured roadbed material, blade and shape roadway, and resurface aggregate roadway.

o Near Milepost 18.8: Replace scoured roadbed material, blade and shape roadway, and resurface aggregate roadway.

• FSR 65 (Beckler River Road) o Near Milepost 2.5: Repair embankment failures with riprap and replace washed out road base and asphalt surfacing. Re-condition ditch and repair culvert inlet.

o Near Milepost 4.08: Repair embankment failures with riprap and replace washed out road base and asphalt surfacing. Re-condition ditch and repair culvert inlet.

Technical Questions – All technical questions must be submitted by email plans-spec@dot.gov or FAX 360-619-7932

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

October 12, 2017 mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov

Preliminary Plans letter

Solicitation documents - Documents will be available during the winter of 2017/2018. Please monitor the FedBizOpps (FBO) site for actual date of solicitation release (www.fbo.gov). To receive automatic notification through FBO, select the “Watch this opportunity” feature and follow the steps as indicated.

Thank you for your interest in this project.

http://www.fbo.gov/

RE: WA FS ERFO 2016(1)-20(2)

File details come from the government source that posted it. Updated .