Pre-Ad_Plans_WA_ERFO_2106(1)-20(2).pdf

PDF 3 MB Posted

Attached to
WA FS ERFO 2016(1)-20(2), Skykomish Emergency Repairs 2016
Solicitation number
69056718B000002
Issued by

About this file

Preliminary plans (Location & description of damage).

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL HIGHWAY ADMINISTRATION

U. S. DEPARTMENT OF TRANSPORTATION

Project Location

APPROVED:

DATE

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DESIGN DESIGNATION:

SPECIFICATION:

INDEX TO SHEETS

PROJECT MANAGER

VANCOUVER, WASHINGTON

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PLANS PREPARED BY

PLANS FOR PROPOSED PROJECT

Western Federal Lands Highway Division

Chief of Engineering, R

E N

O R

A I

N

N

ST F

R

I

D

D E P A

T

NTOFT A SP

T T

O

U

TE

ATESO

AM

E R

IC

A

M

BRITISH COLUMBIA

I D

A H

O

OREGON

UNITED STATES

CANADA

P A

C I F I C

O C

A E

N tS rait ofJuan deFuca

OC

LU

MBIA R

IV

ER

A

SN

KE

R

VERI

M

COLU B

I A

V R I

E R

Lakes

Banks

Lakes

Moses

Reservoir

Potholes

OLYMPIC

NATIONAL

PARK

MOUNT

RAINIER

N.P.

MOUNT

ST. HELENS

NAT'L VOLC.

MON.

NORTH

CASCADES

NATIONAL

PARK

BELLINGHAM

Forks

Aberdeen

Chehalis

Longview

OLYMPIA

TACOMA

SEATTLE

EVERETT

Wenatchee

Lake

Moses

SPOKANE

Pullman

Pasco

RICHLAND

Kennewick Walla Walla

ANGELES

PORT

Townsend

Port Vernon

Mt.

VANCOUVER

WASHINGTON KEY MAP

YAKIMA

u n d o S t e g u

P on Federal Highway Projects, FP-14

Construction of Roads and Bridges

Standard Specifications for

WA FS ERFO 2016(1)-20(2)

SKYKOMISH EMERGENCY REPAIRS 2016

N

SCALE IN MILES

0 2010 e (max)

V

ADT (2038)

ADT (2018)

LENGTH 1.25 MILES

TYPE OF CONSTRUCTION:

N/A

20 MPH

WASHINGTON

SNOHOMISH COUNTY AND KING COUNTY

MT. BAKER-SNOQUALMIE NATIONAL FOREST

MP 5.89

FSR 6066

MP 4.08

FSR 6500

18.1, 18.3. 18.8

MP'S 16.6, 17.2,

FSR 6300

Wenatchee

East

Merritt

Thelma

Darrington

Rockport

Silverton

Grassmere

Sedro-Woolley

MP 2.5

FSR 6500

Vernon

Mount

North

Cascades

Natinal

Park

Chalen

Lake

Marblemount Winthrop

Twisp

Baring

SEATTLE

Everett

B. SUMMARIES

A. GENERAL INFORMATION

Skykomish

Index

NF-66

N F

NF-

M. MILLER

A.1

STATE PROJECT

NUMBER

SHEET

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d w a e f1 a a .d g n

WA FS ERFO 2016(1)-20(2)

A

M

S e p te m b e r

K

H a r r is o n

J

B u r k e

C h e c k e d b y

D e s ig n e d b y

Bellevue

Renton

SUMMARY OF WORK

VICINITY MAPS

PLAN SYMBOLS AND ABBREVIATIONS

TITLE SHEET

B.1

A.3

A.2

A.1 drainage, and embankment

Grading, aggregate, asphalt paving, P re lim in ar y

- N ot fo r C on st ru ct io n

WESTERN FEDERAL LANDS HIGHWAY DIVISION

DETAIL APPROVED FOR USE 11/2001

REVISED: 9/2005 1/2007 10/2009 10/2014

W101-1

AND ABBREVIATIONS

PLAN SYMBOLS

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e

E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall ftg.

ft3 ft2 flg.

fin.

footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT

Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north

OG

OD

o. to o.

o. c.

original ground outside diameter out to out on center pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W

R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph

V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material P

S e p te m b e r

U

S C m y fi le s p w p r o d u c ti o n d w a e f1 a b .d g n

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DETAIL

U.S. CUSTOMARY DETAIL

STATE PROJECT

NUMBER

SHEET

A.2 FS ERFO 2016(1)-20(2)WA

BH

CP GPS

JH

TP

DI

36 31

6 1

36 31

6 1

SEC.

SEC.

EL. 1234.56

N

E

RIP

G G

W W

DI

T T

NOTE:

NO SCALE

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub θs Ø

∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water

P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain

EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)

Poles (Power, Telephone, Joint Use,

- no symbol -

EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut wall face

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

N

Fiber Roll or Wattle

P re lim in ar y

- N ot fo r C on st ru ct

VICINITY MAPS

S k y k o m is h

N o rt h

R iv e r

Mineral Springs

Garland

B la n c a L a k e

Clacier

Columbia

Lake

Goblin

R

E

R

E

11 12

14 13

S N O Q U A L M I E

N A T I O N A L

F O R E S T

SCALE IN MILES

SCALE IN MILES

65-2.5

65-4.08

S N O Q U A L M I E

N A T I O N A L

F O R E S T

N F -6

NF-66

N F -6

A.3

STATE PROJECT

NUMBER

SHEET

U

S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 a c .d g n

WA FS ERFO 2016(1)-20(2)

S e p te m b e r

S

C h a p m a n

J

B u r k e

C h e c k e d b y

D e s ig n e d b y

63-18.1

63-17.2

63-16.6

63-18.8

63-18.3

6066-5.89

P re lim in ar y

- N ot fo r C on st ru ct

SUMMARY OF WORK

B.1

STATE PROJECT

NUMBER

SHEET

U

S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 b a .d g n

WA FS ERFO 2016(1)-20(2)

S e p te m b e r

K

H a r r is o n

J

B u r k e

C h e c k e d b y

D e s ig n e d b y

wa-ef1612002_aa-US_Sur_ft2D-000
wa-ef1612002_ab-USC-000
wa-ef1612002_ac-US_Sur_ft2D-000
wa-ef1612002ba-US_Sur_ft2D-000

File details come from the government source that posted it. Updated .