671-20-122-VA-SA-Renovate CLC 2nd Floor Halls and Walls-100 CD-Drawings.pdf

PDF 27 MB Posted

Attached to
Z2DA--STX Renovate CLC Halls and Walls 2nd Floor Project Number: 671-20-122
Solicitation number
36C25723B0017
Issued by

About this file

This document outlines a federal contract opportunity for renovations at a Department of Veterans Affairs medical center. The solicitation seeks bids to renovate the halls and walls on the second floor of the Community Living Center at the Veterans Affairs Medical Center located in network 17. Bids are due by February 28, 2022 under solicitation number 36C25723B0017. The selected contractor will be responsible for renovating the specified areas of the existing facility to required standards. The contract award is expected in April 2022 and the project completion date is set for September 2023.

View the file

Other files

File Type Posted
36C25723B0017 0008.docx DOCX document
36C25723B0017 0007.docx DOCX document
671-20-122-Renovate CLC 2nd Floor Halls and Walls-Addendum No1-revised.pdf PDF
36C25723B0017 0006.docx DOCX document
36C25723B0017 0005.docx DOCX document
36C25723B0017 0004.docx DOCX document
Appendix B-CLC Asbestos Report.pdf PDF
SET-Arch As-Builts.pdf PDF
671-20-122-Renovate CLC 2nd Floor Halls and Walls-Addendum No1.pdf PDF
36C25723B0017 0003.docx DOCX document
36C25723B0017 0002.docx DOCX document
36C25723B0017 0001.docx DOCX document
671-20-122-VA-SA-Renovate CLC 2nd Floor Halls and Walls-100 CD-Specificatons.pdf PDF
36C25723B0017_1.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

PQ

COVER SHEET

GI0.1

SAN ANTONIO, TEXAS

AUDIE L. MURPHY MEMORIAL VETERANS HOSPITAL

Department

Veterans Affairs

7400 MERTON MINTER BLVD.

PROJECT: RENOVATE COMMUNITY LIVING CENTER

of

PROJECT NO. : 671-20-122

2ND FLOOR HALLS AND WALLS

100% CONSTRUCTION DEVELOPMENT

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

PQ

GI0.2

DRAWING INDEX

ARCHITECTURAL MECHANICAL

ELECTRICAL

PLUMBING

DRAWING INDEX

ADD ALTERNATES

COORDINATION:

EXISTING CONDITIONS:

SAFETY/SECURITY:

CONSTRUCTION SETS:

CORRESPONDENCE / INSTRUCTIONS:

MISCELLANEOUS:

1. SPECIFICATIONS

2. DRAWINGS

SITE VICINITY MAP

C6

P L A

N

N

O R

T H

T R

U E

N

O R

T H

ABBREVIATIONS

ARCHITECTURAL SYMBOLS LEGEND

CONSTRUCTION SAFETY NOTES

DOCUMENT ORGANIZATION

INFECTION PREVENTION NOTES

GENERAL PROJECT NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

MAIN HOSPITAL

WAREHOUSE

CANTEENPOLYTRAUMA

CLC

HOSPITAL TOWER

V

S

C

H

E

E

L

R

D

W

U

R

Z

B

A

H

A

D

M E

R T

M

I N

T E

R

B

L V

D

M

E

L

R

O

S

L

M

G

R

E

A

D

LOADING

DOCK

MAIN

ENTRY

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

PROJECT AREA

AREA "B"

AREA "A"

AREA "C"

SECOND FLOOR REFERENCE PLAN

F1

VA HOSPITAL CAMPUS PLAN

F5

P L A

N

N

O R

T H

T R

U

E

N

O

R

T

DEMO PHASING PLAN

F1

GENERAL NOTES

PHASING LEGEND

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

EXISTING

ROOF

KEY NOTES

PHASE 5

PHASE 6

PHASE 3

PHASE 2

PHASE 1

PHASE 4

PHASE 6

N.I.C.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531

FEC

N

FEC

FEC

FEC

RECREATION THERAPIST

2B103

ASST.

NURSE

MANAGER

2B104

2B109.1

UNISEX

RESTROOM,

2B110.1

UNISEX

RESTROOM,

2B110

ACTIVITIES ROOM

DINING HALL/

OUTDOOR PATIO

2B111

PSYCHOLOGIST

2B101.2

OFFICE

2B108

HAC

2B107

WORKER

SOCIAL

2B109

BREAK ROOM

LOCKER/

2B105

STOR.

2B102

HAC

2B101.4

STORAGE

2B106

NURSES

(RAC)

DEMOLITION SECOND FLOOR PLAN AT AREA "B"

F1

CLC2S4

STAIR 4

GENERAL DEMOLITION NOTES

2B101

THERAPY WORK ROOM

2C-7A

CORRIDOR

2C-7

CORR.

2A106

ELECTRICAL ROOM

MECHANICAL/

2B100

UNISEX

RESTROOM,

2B101.1

STORAGE

N.I.C.

N.I.C.

N.I.C.

2B101.3

STOR.

DEMOLITION KEY NOTES

DEMOLITION LEGEND

ROOM#

NAME

ROOM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

DN

P

ZONE

VALVE

FEC

MED

SHUTOFF

FEC

FEC

FEC

DEMOLITION SECOND FLOOR PLAN AT AREA "A"

F1

2B101.2

OFFICE

2A104

DIETICIAN

2A105

WORKER

SOCIAL

2A107

DAYROOM

2A109

ROOM

FAMILY

2A110

PATIENT ROOM

2A111

PATIENT ROOM

2A112

PATIENT ROOM

2A113

PATIENT ROOM

2A114

PATIENT ROOM

2A115

PATIENT ROOM

2A116

PATIENT ROOM

2A117

PATIENT ROOM

2A117.1

TOILET

2A116.1

TOILET

2A115.1

TOILET

2A112.1

TOILET

2A110.1

TOILET

2A109.1

TOILET

2A126.1

TOILET

2A124.1

TOILET

2A122.1

TOILET

2A121

STOR.

2A119.1

TOILET

2A118

ELEC.

2A119

PATIENT ROOM

2A120

PATIENT ROOM

2A122

PATIENT ROOM

2A123

PATIENT ROOM

2A124

PATIENT ROOM

2A125

PATIENT ROOM

2A126

PATIENT ROOM

2A127

PATIENT ROOM

2A128

PRACTITIONER

NURSE

2A129

REST.

WOMEN

2A130

ROOM

MEDICATIONS

2A131

SHOWER

PATIENT

2A131.1

TOILET

2A132

REST.

UNISEX

2A133

ELEC.

2A134

IDF

2A108.1

STOR.

2A141

LAUNDRY

2A142

REST.

2A140

PRAC.

NURSE

2A102

REST.

UNISEX

2A139

HAC

2A138

IDF-ECTC

2A137

EOOM

WORK

NURSES

2A136

UTILITY

DIRTY

2A135

SUPPLY

CLEAN

2A100

LOBBY

2A108

NOURISH.

2A143

NURSE STATION

2A143.1

CARE

WOUND

P-1

ELEVATOR

P-2

ELEVATOR

2C-12

CORR.

2A101

RECEPTION

2C-9

CORR.

2C-4

CORRIDOR

2A103

MACHINE ROOM

ELEVATOR

CLC2S2

STAIR 2

CLC2S1

STAIR 1

2A106

ELECTRICAL ROOM

MECHANICAL/

N.I.C.

N.I.C.

N.I.C.

N.I.C.

DEMOLITION LEGEND

ROOM#

NAME

ROOM

GENERAL DEMOLITION NOTESDEMOLITION KEY NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

DEMOLITION SECOND FLOOR PLAN AT AREA "C"

F1

2C116

PATIENT ROOM

2C115

PATIENT ROOM

2C114

PATIENT ROOM

2C113

PATIENT ROOM

2C112

PATIENT ROOM

2C110

PATIENT ROOM

2C100

PATIENT ROOM

2C101

PATIENT ROOM

2C102

PATIENT ROOM

2C103

PATIENT ROOM

2C104

PATIENT ROOM

2C105

PATIENT ROOM

2C106

PATIENT ROOM

2C107

PATIENT ROOM

2C114.1

TOILET

2C112.1

TOILET

2C111

LINEN

CLEAN

2C109.1

TOILET

2C108

ELEC.

2C100.1

TOILET

2C102.1

TOILET

2C104.1

TOILET

2C106.1

TOILET

2C-10

CORRIDOR

DEMOLITION KEY NOTES

2C117

PATIENT ROOM

2C109

PATIENT ROOM

2C116.1

TOILET

CLC2S3

STAIR 3

N.I.C.

GENERAL DEMOLITION NOTES

DEMOLITION LEGEND

ROOM#

NAME

ROOM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

ENLARGED UNISEX RESTROOM 2B100

C3

ENLARGED RESTROOM 2B109.1 & 2B110.1

C1

DEMOLITION KEY NOTES

2B109.1

UNISEX

RESTROOM,

2B110.1

UNISEX

RESTROOM,

2B102

HAC

2B100

UNISEX

RESTROOM,

ENLARGED STORAGE 2B101.4 AND 2B102

C4

2B101.4

STORAGE

DEMO OPENING AT NURSE STATION 2A143

F1

GENERAL NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

DEMOLITION KEY NOTES

AREA 'A'

PATIENT SHOWER 2A131, TOILET 2A131.1

D1

AREA 'A'

UNISEX RESTROOM 2A142

F7

2A142

RESTROOM

2A131.1

TOILET

2A131

PATIENT SHOWER

AREA 'A'

UNISEX RESTROOM 2A102

B3

AREA 'A'

HAC 2A139

F5

AREA 'A'

UNISEX RESTROOM 2A132

F3

AREA 'A'

WOMEN RESTROOM 2A129

F1

AREA 'A'

TOILET 2A109.1

B5

AREA 'A'

TOILET 2A112.1 - TYPICAL

D3

2A102

RESTROOM

2A139

HAC

2A132

TOILET

2A129

RESTROOM

WOMEN

2A109.1

TOILET

2A112.1

TOILET

AREA 'A'

TOILET 2A116.1

D5

2A116.1

TOILET

GENERAL NOTES

ELECTRICAL LEGEND

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

RECREATION THERAPIST

2B103

2B110

ACTIVITIES ROOM

DINING HALL/

OUTDOOR PATIO

2B111

PSYCHOLOGIST

2B108

HAC

2B107

WORKER

SOCIAL

2B109

BREAK ROOM

LOCKER/

2B105

STORAGE

2B101.4

STORAGE

2B101.3

STORAGE

DEMOLITION SECOND FLOOR REFLECTED CEILING PLAN AT AREA "B"

F1

RCP DEMOLITION GENERAL NOTES

2B101

THERAPY WORK ROOM

2C-7A

CORRIDOR

2C-7

CORR.

DEMOLITION KEY NOTES

ASSISTANT NURSE

MANAGER

2B104 2B109.1

UNISEX

RESTROOM,

2B110.1

UNISEX

RESTROOM,

2B100

RESTROOM

UNISEX

2B101.2

OFFICE

2B101.1

STORAGE

2B102

HAC

2B106

(RAC) NURSES

COORDINATORS

RESIDENT ASSESSMENT

CLC2S4

STAIR 4

2A106

ELECTRICAL ROOM

MECHANICAL/

N.I.C.

N.I.C.

N.I.C.

DEMOLITION LEGEND

ROOM#

NAME

ROOM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFIWIFI

DEMOLITION SECOND FLOOR REFLECTED CEILING PLAN AT AREA "A"

F1

2A104

DIETICIAN

2A103

MACHINE ROOM

ELEVATOR

2A107

DAYROOM

2A109.1

TOILET

2A121

STOR.

2A118

ELEC.

2A128

PRACTITIONER

NURSE

2A133

ELEC.

2A134

IDF

2A108.1

STOR.

2A100

LOBBY

2A143

NURSE STATION

2A143.1

CARE

WOUND

P-1

ELEVATOR

P-2

ELEVATOR

2C-12

CORR.

2A101

RECEPTION

2C-9

CORR.

2C-4

CORR.

DEMOLITION KEY NOTES

2A105

WORKER

SOCIAL

2A109

ROOM

FAMILY

2A110

ROOM

PATIENT

2A111

ROOM

PATIENT

2A112

ROOM

PATIENT

2A113

ROOM

PATIENT

2A114

ROOM

PATIENT

2A115

ROOM

PATIENT

2A116

ROOM

PATIENT

2A117

ROOM

PATIENT

2A117.1

TOILET

2A116.1

TOILET

2A115.1

TOILET

2A112.1

TOILET

2A110.1

TOILET

2A126.1

TOILET

2A124.1

TOILET

2A122.1

TOILET

2A119.1

TOILET

2A119

ROOM

PATIENT

2A120

ROOM

PATIENT

2A122

ROOM

PATIENT

2A123

ROOM

PATIENT

2A124

ROOM

PATIENT

2A125

ROOM

PATIENT

2A126

ROOM

PATIENT

2A127

ROOM

PATIENT

2A129

RESTROOM

WOMEN

2A130

ROOM

MEDICATIONS

2A131

SHOWER

PATIENT

2A131.1

TOILET

2A141

LAUNDRY

2A142

STAFF

UNISEX

2A140

PRACTITIONERS

NURSE

2A102

UNISEX

RESTROOM,

2A139

HAC

2A138

IDF-ECTC

2A137

WORK ROOM

NURSES

2A136

UTILITY

DIRTY

2A135

SUPPLY

CLEAN

2A108

NOURISH.

CLC2S2

STAIR 2

CLC2S1

STAIR 1

2A106

ELECTRICAL ROOM

MECHANICAL/

N.I.C.

N.I.C.

N.I.C.

N.I.C.

2A132

REST.

RCP DEMOLITION GENERAL NOTES

DEMOLITION LEGEND

N.I.C.

ROOM#

NAME

ROOM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

DEMOLITION SECOND FLOOR REFLECTED CEILING PLAN AT AREA "C"

F1

2C108

ELEC.

2C-10

CORRIDOR

DEMOLITION KEY NOTES

2C117

PATIENT ROOM

2C116

PATIENT ROOM

2C115

PATIENT ROOM

2C114

PATIENT ROOM

2C113

PATIENT ROOM

2C112

PATIENT ROOM

2C110

PATIENT ROOM

2C109

PATIENT ROOM

2C100

PATIENT ROOM

2C101

PATIENT ROOM

2C102

PATIENT ROOM

2C103

PATIENT ROOM

2C104

PATIENT ROOM

2C105

PATIENT ROOM

2C106

PATIENT ROOM

2C107

PATIENT ROOM

2C116.1

TOILET

2C114.1

TOILET

2C112.1

TOILET

2C111

LINEN

CLEAN

2C109.1

TOILET

2C100.1

TOILET

2C102.1

TOILET

2C104.1

TOILET

2C106.1

TOILET

RCP DEMOLITION NOTESRCP DEMOLITION GENERAL NOTES

DEMOLITION LEGEND

CLC2S3

STAIR 3

N.I.C.

ROOM#

NAME

ROOM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

N

RECREATION THERAPIST

2B103

ASSISTANT

NURSE

MANAGER

2B104

2B109.1

UNISEX

RESTROOM,

2B110.1

UNISEX

RESTROOM,

2B110

ACTIVITIES ROOM

DINING HALL/

2B111

PSYCHOLOGIST

2B101.2

OFFICE

2B108

HAC

2B107

WORKER

SOCIAL

2B109

BREAK ROOM

LOCKER/

2B105

STORAGE

2B102

HAC

2B101.4

STORAGE

2B101.3

STOR.

2B106

(RAC) NURSES

DEMOLITION SECOND FLOOR PLAN

ROOM SIGNAGE AT AREA "B"

F1

2B101

THERAPY WORK ROOM

2C-7A

CORRIDOR

2C-7

CORRIDOR

2B100

RESTROOM

UNISEX

2B101.1

STORAGE

2A106

ELECTRICAL ROOM

MECHANICAL/

N.I.C.

N.I.C.

CLC2S4

STAIR 4

N.I.C.

DEMOLITION KEY NOTE GENERAL DEMOLITION NOTES

DEMOLITION LEGEND

OUTDOOR PATIO

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

P

DEMOLITION SECOND FLOOR PLAN

ROOM SIGNAGE AT AREA "A"

F1

2A104

DIETICIAN

2A105

WORKER

SOCIAL

2A107

DAYROOM

2A109

ROOM

FAMILY

2A110

PATIENT ROOM

2A111

PATIENT ROOM

2A112

PATIENT ROOM

2A113

PATIENT ROOM

2A114

PATIENT ROOM

2A115

PATIENT ROOM

2A116

PATIENT ROOM

2A117

PATIENT ROOM

2A117.1

TOILET

2A116.1

TOILET

2A115.1

TOILET

2A112.1

TOILET

2A110.1

TOILET

2A109.1

TOILET

2A126.1

TOILET

2A124.1

TOILET

2A122.1

TOILET

2A121

STOR.

2A119.1

TOILET

2A118

ELEC.

2A119

PATIENT ROOM

2A120

PATIENT ROOM

2A122

PATIENT ROOM

2A123

PATIENT ROOM

2A124

PATIENT ROOM

2A125

PATIENT ROOM

2A126

PATIENT ROOM

2A127

PATIENT ROOM

2A128

PRACTITIONER

NURSE

2A129

REST.

WOMEN

2A130

ROOM

MEDICATIONS

2A131

SHOWER

PATIENT

2A131.1

TOILET

2A132

REST.

UNISEX

2A133

ELEC.

2A134

IDF

2A108.1

STOR.

2A141

LAUNDRY

2A142

REST.

UNISEX

2A140

PRAC.

NURSE

2A102

REST.

UNISEX

2A139

HAC

2A138

IDF-ECTC

2A137

WORK ROOM

NURSES

2A136

UTILITY

DIRTY

2A135

SUPPLY

CLEAN

2A100

LOBBY

2A108

NOURISH.

2A143

NURSE STATION

2A143.1

CARE

WOUND

P-1

ELEVATOR

P-2

ELEVATOR

2C-12

CORR.

2A101

RECEPTION

2C-9

CORRIDOR

2C-4

CORRIDOR

CLC2S2

STAIR 2

CLC2S1

STAIR 1

2A106

ELECTRICAL ROOM

MECHANICAL/

N.I.C.

N.I.C.

N.I.C.

DEMOLITION KEY NOTE GENERAL DEMOLITION NOTES

DEMOLITION LEGEND

2A103

MACHINE ROOM

ELEVATOR

N.I.C.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

UP

DEMOLITION SECOND FLOOR PLAN

ROOM SIGNAGE AT AREA "C"

F1

2C117

PATIENT ROOM

2C116

PATIENT ROOM

2C115

PATIENT ROOM

2C114

PATIENT ROOM

2C113

PATIENT ROOM

2C112

PATIENT ROOM

2C110

PATIENT ROOM

2C109

PATIENT ROOM

2C100

PATIENT ROOM

2C101

PATIENT ROOM

2C102

PATIENT ROOM

2C103

PATIENT ROOM

2C104

PATIENT ROOM

2C105

PATIENT ROOM

2C106

PATIENT ROOM

2C107

PATIENT ROOM

2C116.1

TOILET

2C114.1

TOILET

2C112.1

TOILET

2C111

LINEN

CLEAN

2C109.1

TOILET

2C108

ELEC.

2C100.1

TOILET

2C102.1

TOILET

2C104.1

TOILET

2C106.1

TOILET

2C-10

CORRIDOR

DEMOLITION KEY NOTE GENERAL DEMOLITION NOTES

DEMOLITION LEGEND

CLC2S3

STAIR 3

N.I.C.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

FEC

D N

RECREATION THERAPIST

2B103

ASST.

NURSE

MANAGER

2B104

2B109.1

UNISEX

RESTROOM,

2B110.1

UNISEX

RESTROOM,

2B110

ACTIVITIES ROOM

DINING HALL/

2B111

PSYCHOLOGIST

2B100

RESTROOM

UNISEX

2B101.2

OFFICE

2B101.1

STORAGE

2B101

THERAPY WORK ROOM

2B108

HAC

2B107

WORKER

SOCIAL

2B109

ROOM

BREAK

LOCKER/

2B105

STORAGE

2B102

HAC

2B101.4

STORAGE

2B101.3

STOR.

2B106

NURSES

RAC

SECOND FLOOR PLAN AT AREA "B"

F1

KEY NOTES GENERAL NOTES

2C-7A

CORRIDOR

2C-7

CORR.

OUTDOOR PATIO

N.I.C.

2A106

ELECTRICAL ROOM

MECHANICAL/

N.I.C.

CLC2S4

STAIR 4

N.I.C.

LEGEND

ROOM#

NAME

ROOM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

ZONE

VALVE

FEC

MED

SHUTOFF

FEC

FEC

FEC

U

P

SECOND FLOOR PLAN AT AREA "A"

F1

2B101.2

OFFICE

2A104

DIETICIAN

2A105

WORKER

SOCIAL

2A103

MACHINE ROOM

ELEVATOR

2A100

LOBBY

2A107

DAYROOM

2A109

ROOM

FAMILY

2A110

PATIENT ROOM

2A111

PATIENT ROOM

2A112

PATIENT ROOM

2A113

PATIENT ROOM

2A114

ROOM

PATIENT

2A115

ROOM

PATIENT

2A117.1

TOILET

2A116.1

TOILET

2A115.1

TOILET

2A112.1

TOILET

2A110.1

TOILET

2A109.1

TOILET

2A126.1

TOILET

2A124.1

TOILET

2A122.1

TOILET

2A121

STOR.

2A119.1

TOILET

2A118

ELEC.

2A119

PATIENT ROOM

2A120

PATIENT ROOM

2A122

PATIENT ROOM

2A123

PATIENT ROOM

2A124

PATIENT ROOM

2A125

PATIENT ROOM

2A126

PATIENT ROOM

2A127

PATIENT ROOM

CLC2S2

STAIR 2

2A128

PRACTITIONER

NURSE

2A129

RESTROOM

WOMEN

2A130

ROOM

MEDICATIONS

2A131

SHOWER

PATIENT

2A131.1

TOILET

2A133

ELEC.

2A134

IDF

CLC2S1

STAIR 1

2A108.1

STOR.

2A108

NOURISH.

2A143

NURSE STATION

2A141

LAUNDRY

2A143.1

CARE

WOUND

2A142

REST.

UNISEX

2A140

PRACTITIONERS

NURSE

2A102

RESTROOM

UNISEX

2A139

HAC

2A138

IDF-ECTC

2A137

WORK ROOM

NURSES

2A136

UTILITY

DIRTY

2A135

SUPPLY

CLEAN

KEY NOTES

P-1

ELEVATOR

P-2

ELEVATOR

2C-12

CORRIDOR

2A101

RECEPTION

2C-4

CORRIDOR

2A106

ELECTRICAL ROOM

MECHANICAL/

2C-9

CORR.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

2A116

ROOM

PATIENT

2A117

ROOM

PATIENT

GENERAL NOTES

LEGEND

ROOM#

NAME

ROOM

2A132

REST.

UNISEX

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

FEC

SECOND FLOOR PLAN AT AREA "C"

F1

2C117

PATIENT ROOM

2C116

PATIENT ROOM

2C115

PATIENT ROOM

2C114

PATIENT ROOM

2C113

PATIENT ROOM

2C112

PATIENT ROOM

2C110

PATIENT ROOM

2C109

PATIENT ROOM

2C100

PATIENT ROOM

2C101

PATIENT ROOM

2C102

PATIENT ROOM

2C103

PATIENT ROOM

2C104

PATIENT ROOM

2C105

PATIENT ROOM

2C106

PATIENT ROOM

2C107

PATIENT ROOM

2C116.1

TOILET

2C114.1

TOILET

2C112.1

TOILET

2C111

LINEN

CLEAN

2C109.1

TOILET

2C108

ELEC.

CLC2S3

STAIR 3

2C100.1

TOILET

2C102.1

TOILET

2C104.1

TOILET

2C106.1

TOILET

2C-10

CORRIDOR

KEY NOTES

N.I.C.

GENERAL NOTES

LEGEND

ROOM#

NAME

ROOM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

DOOR SCHEDULE REMARKS DOOR ABBREVATIONS

DOOR SCHEDULE

FRAME TYPES

F1

DOOR TYPES

F4

DOOR PROTECTION TYPES

F8

DOOR SCHEDULE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

HEAD SECTION DETAIL

B1

JAMB SECTION DETAIL

B3

HEAD SECTION DETAIL

B5

JAMB SECTION DETAIL

B6

HEAD SECTION DETAIL AT LOBBY

F1

JAMB SECTION DETAIL AT LOBBY

F3

FLOORING TRANSITION -

PORCELAIN TO VCT/VLP

D1

FLOORING TRANSITION -

VCT TO VLP TO RT

D3

KEY NOTES

GENERAL NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

KEY NOTES

ENLARGED RESTROOM 2B109.1 & 2B110.1

C1

2B109.1

UNISEX

RESTROOM,

2B110.1

UNISEX

RESTROOM,

2B102

HAC

ENLARGED STORAGE 2B101.4 AND HAC 2B102

C4

2B101.4

STORAGE

ENLARGED UNISEX RESTROOM 2B100

C3

2B100

RESTROOM

UNISEX

GENERAL NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

PATIENT SHOWER 2A131, TOILET 2A131.1

D1

AREA 'A'

HAC 2A139

F6

AREA 'A'

TOILET 2A109.1

B6

AREA 'A'

TOILET 2A112.1

D4

2A139

HAC

2A109.1

TOILET

2A112.1

TOILET

2A131

PATIENT SHOWER

AREA 'A'

TOILET 2A116.1

D6

2A116.1

TOILET

2A131.1

TOILET

AREA 'A'

UNISEX RESTROOM 2A102

B4

AREA 'A'

UNISEX RESTROOM 2A132

F4

AREA 'A'

WOMEN RESTROOM 2A129

F1

2A102

RESTROOM

2A132

TOILET

2A129

RESTROOM

WOMEN

GENERAL NOTES

ELECTRICAL LEGEND

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

MODULAR NURSE STATION GENERAL NOTES

2A142 UNISEX RESTROOM, 2A143 NURSE STATION AREA 'A'

D1

2A101

RECEPTION

2A143

NURSE STATION

2A143.1

WOUND CARE

2A141

LAUNDRY

2A142

RESTROOM

UNISEX

PATIENT ROOMS METAL CABINET - TYPICAL

D6

PATIENT ROOMS METAL CABINET - TYPICAL

B6

KEY NOTES

ALTERNATE #2

PATIENT ROOM METAL CABINET ELEVATION

F1

PATIENT ROOM METAL CABINET ELEVATION

F3

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

GENERAL NOTES

ALTERNATE #1

PATIENT ROOMS MODULAR CASEWORK - TYPICAL

B3

ALTERNATE #1

PATIENT ROOMS MODULAR CASEWORK - TYPICAL

B1

KEY NOTES

M

A

X

ALTERNATE #1

WALL BACKING - HEAVY (51 TO 150 LBS)

B6

ALTERNATE #1

ALTERNATE #1

PATIENT ROOM MODULAR CASWORK ELEVATION

D1

ALTERNATE #1

PATIENT ROOM MODULAR CASWORK ELEVATION

D3

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

GENERAL NOTE

ALTERNATE#2

MODULAR NURSE STATION RENDERING

C1

ALTERNATE#2

MODULAR NURSE STATION RENDERING

C5

ALTERNATE#1

MODULAR PATIENT ROOM RENDERING

F1

ALTERNATE#1

MODULAR PATIENT ROOM RENDERING

F5

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

KEY NOTE

EQUIPMENT GENERAL NOTES

LEGEND

NURSE STATION SCHEDULE

EQUIPMENT PLAN

NURSE STATION 2A143

D1

2A101

RECEPTION

2A143

NURSE STATION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

WALL PARTITION TYPES

F1

PLAN DETAIL

D1

KEY NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

INTERIOR ELEVATIONS

TOILET 2A112.1

E1

INTERIOR ELEVATIONS

TOILET 2A109.1

D1

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A102

B1

INTERIOR ELEVATIONS

TOILET 2A116.1

E1

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A102

B2

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A102

B3

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A102

B4

INTERIOR ELEVATIONS

TOILET 2A109.1

D2

INTERIOR ELEVATIONS

TOILET 2A109.1

D3

INTERIOR ELEVATIONS

TOILET 2A109.1

D4

INTERIOR ELEVATIONS

TOILET 2A112.1

E2

INTERIOR ELEVATIONS

TOILET 2A112.1

E3

INTERIOR ELEVATIONS

TOILET 2A112.1

E4

INTERIOR ELEVATIONS

TOILET 2A116.1

E2

INTERIOR ELEVATIONS

TOILET 2A116.1

E3

INTERIOR ELEVATIONS

TOILET 2A116.1

E4

KEY NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

TOILET 2A131.1

E1

INTERIOR ELEVATIONS

PATIENT SHOWER 2A131

F1

INTERIOR ELEVATIONS

WOMEN RESTROOM 2A129

B1

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A132

C1

INTERIOR ELEVATIONS

WOMEN RESTROOM 2A129

B2

INTERIOR ELEVATIONS

WOMEN RESTROOM 2A129

B3

INTERIOR ELEVATIONS

WOMEN RESTROOM 2A129

B4

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A132

C2

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A132

C3

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A132

C4

INTERIOR ELEVATIONS

TOILET 2A131.1

E2

INTERIOR ELEVATIONS

TOILET 2A131.1

E3

INTERIOR ELEVATIONS

TOILET 2A131.1

E4

INTERIOR ELEVATIONS

PATIENT SHOWER 2A131

F2

INTERIOR ELEVATIONS

PATIENT SHOWER 2A131

F3

INTERIOR ELEVATIONS

PATIENT SHOWER 2A131

F4

KEY NOTES

GENERAL NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

UNISEX RESTROOM 2A142

C1

INTERIOR ELEVATIONS

HAC 2A139

B1

KEY NOTES

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A142

C2

INTERIOR ELEVATIONS

HAC 2A139

B2

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A142

C3

INTERIOR ELEVATIONS

HAC 2A139

B3

INTERIOR ELEVATIONS

UNISEX RESTROOM 2A142

C4

INTERIOR ELEVATIONS

HAC 2A139

B4

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

HAC 2B102

E1

INTERIOR ELEVATIONS

STORAGE 2B101.4

C1

INTERIOR ELEVATIONS

UNISEX RESTROOM 2B100

B1

INTERIOR ELEVATIONS

UNISEX RESTROOM 2B109.1

F1

KEY NOTES

INTERIOR ELEVATIONS

HAC 2B102

E2

INTERIOR ELEVATIONS

STORAGE 2B101.4

C2

INTERIOR ELEVATIONS

UNISEX RESTROOM 2B100

B2

INTERIOR ELEVATIONS

UNISEX RESTROOM 2B109.1

F2

INTERIOR ELEVATIONS

HAC 2B102

E3

INTERIOR ELEVATIONS

STORAGE 2B101.4

C3

INTERIOR ELEVATIONS

UNISEX RESTROOM 2B100

B3

INTERIOR ELEVATIONS

UNISEX RESTROOM 2B109.1

F3

INTERIOR ELEVATIONS

HAC 2B102

E4

INTERIOR ELEVATIONS

STORAGE 2B101.4

C4

INTERIOR ELEVATIONS

UNISEX RESTROOM 2B100

B4

INTERIOR ELEVATIONS

UNISEX RESTROOM 2B109.1

F4

INTERIOR ELEVATIONS

LOCKER/BREAK ROOM 2B109

F8

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

LEGEND

RECREATION THERAPIST

2B103

ASST.

NURSE

MANAGER

2B104

2B109.1

UNISEX

RESTROOM,

2B110.1

UNISEX

RESTROOM,

2B110

ACTIVITIES ROOM

DINING HALL/

OUTDOOR PATIO

2B111

PSYCHOLOGIST

2B100

UNISEX

RESTROOM,

2B101.2

OFFICE

2B101.1

STOR.

2B101

THERAPY WORK ROOM

2B108

HAC

2B107

WORKER

SOCIAL

2B109

BREAK ROOM

LOCKER/

2B105

STORAGE

2B102

HAC

2B101.4

STORAGE

2B101.3

STORAGE

2B106

NURSES

RAC

SECOND FLOOR FINISH PLAN AT AREA "B"

F1

KEY NOTES GENERAL NOTES

2C-7A

CORR.

2C-7

CORR.

N.I.C.

MECHANICAL/

ELECTRICAL

2A106

STAIR

CLC2S4

N.I.C.

N.I.C.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

P

SECOND FLOOR FINISH PLAN AT AREA "A"

F1

2B100

REST.

2B101.1

STOR.

2B101.2

OFFICE

2A104

DIETICIAN

2A105

WORKER

SOCIAL

2A103

MACHINE ROOM

ELEVATOR

2A100

LOBBY

2A107

DAYROOM

2A109.1

TOILET

2A121

STOR.

2A118

ELEC.

2A129

RESTROOM

WOMEN

2A130

ROOM

MEDICATIONS

2A131

SHOWER

PATIENT

2A131.1

TOILET

2A132

REST.

2A133

ELEC.

2A134

IDF

2A108.1

STOR.

2A108

NOURISH.

2A143

STATION

NURSE

2A141

LAUNDRY

2A143.1

CARE

WOUND

2A142

REST.

2A140

PRAC.

NURSE

2A102

UNISEX

RESTROOM,

2A139

HAC

2A138

IDF-ECTC

2A137

WORK ROOM

NURSES

2A136

UTILITY

DIRTY

2A135

SUPPLY

CLEAN

P-1

ELEVATOR

P-2

ELEVATOR

2C-12

CORR.

2A101

RECEPTION

2C-9

CORR.

2C-4

CORR.

LEGEND

GENERAL NOTES

MECHANICAL/

ELECTRICAL

2A106

N.I.C.

STAIR

CLC2S1

N.I.C.

STAIR

CLC2S2

N.I.C.

2A109

ROOM

FAMILY

2A110

ROOM

PATIENT

2A111

ROOM

PATIENT

2A112

ROOM

PATIENT

2A113

ROOM

PATIENT

2A114

ROOM

PATIENT

2A115

ROOM

PATIENT

2A116

ROOM

PATIENT

2A117

ROOM

PATIENT

2A117.1

TOILET

2A116.1

TOILET

2A115.1

TOILET

2A112.1

TOILET

2A110.1

TOILET

2A126.1

TOILET

2A124.1

TOILET

2A122.1

TOILET

2A119.1

TOILET

2A119

ROOM

PATIENT

2A120

ROOM

PATIENT

2A122

ROOM

PATIENT

2A123

ROOM

PATIENT

2A124

ROOM

PATIENT

2A125

ROOM

PATIENT

2A126

ROOM

PATIENT

2A127

ROOM

PATIENT

N.I.C.

KEY NOTES

2A128

PRACTITIONER

NURSE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

SECOND FLOOR FINISH PLAN

AT AREA "C"

F1

2C108

ELEC.

2C-10

CORR.

STAIR

CLC2S3

N.I.C.

2C117

PATIENT ROOM

2C116

PATIENT ROOM

2C115

PATIENT ROOM

2C114

PATIENT ROOM

2C113

PATIENT ROOM

2C112

PATIENT ROOM

2C110

PATIENT ROOM

2C109

PATIENT ROOM

2C100

PATIENT ROOM

2C101

PATIENT ROOM

2C102

PATIENT ROOM

2C103

PATIENT ROOM

2C104

PATIENT ROOM

2C105

PATIENT ROOM

2C106

PATIENT ROOM

2C107

PATIENT ROOM

2C116.1

TOILET

2C114.1

TOILET

2C112.1

TOILET

2C111

LINEN

CLEAN

2C109.1

TOILET

2C100.1

TOILET

2C102.1

TOILET

2C104.1

TOILET

2C106.1

TOILET

LEGEND

GENERAL NOTESKEY NOTE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

MATERIAL LEGEND

ROOM FINISH SCHEDULE

ROOM FINISH SCHEDULE NOTES

MATERIAL LEGEND GENERAL NOTES

WALL, DOOR AND FRAME PROTECTION

MATERIAL LEGEND

WALL, DOOR AND FRAME PROTECTION REMARKS

ROOM FINISH SCHEDULE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

GENERAL NOTE

CHAIR RAIL (WP6)

E5

AREA 'A'

WALL PROTECTION (WP5.1, WP4, WP3)

D1

AREA 'B'

WALL PROTECTION (WP5, WP4, WP3)

D5

AREA 'C'

WALL PROTECTION (WP5.1, WP4)

D7

RIGID VINYL SHEET (WP3)

E7

AREA 'B' AT DINING HALL

WALL PROTECTION (WP5.2, WP4.1)

D3

2A107 DAYROOM

WALL PROTECTION (WP6, WP3)

F3

2A100 LOBBY

WALL PROTECTION (WP6)

F1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

FLUSH MOUNT CORNER GUARD (WP2.1)

F4

SURFACE MOUNT CORNER GUARD (WP1.1)

D4

SURFACE MOUNT CORNER GUARD (WP1)

D1

FLUSH MOUNT CORNER GUARD (WP2)

F1

KEY NOTES

GENERAL NOTE

CEILING EXPANSION JOINT

C6

WALL EXPANSION JOINT

C4

FLOOR EXPANSION JOINT

C1

FLOOR EXPANSION JOINT AT TOILET 2A109.1

D1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

LEGEND

GENERAL NOTES

FINISH PLAN AT 2B110 DINING HALL

D1

FINISH PLAN AT 2A107 DAYROOM

F1

FINISH PLAN AT 2B143 NURSE STATION

D5

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

RECREATION THERAPIST

2B103

ASSISTANT NURSE

MANAGER

2B104 2B109.1

UNISEX

RESTROOM,

2B110.1

UNISEX

RESTROOM,

2B110

ACTIVITIES ROOM

DINING HALL/

2B111

PSYCHOLOGIST

2B100

UNISEX

RESTROOM,

2B101.2

OFFICE

2B101.1

STORAGE

2B108

HAC

2B107

WORKER

SOCIAL

2B109

BREAK ROOM

LOCKER/

2B105

STORAGE

2B102

HAC

2B101.4

STORAGE

2B101.3

STORAGE

2B106

(RAC) NURSES

COORDINATORS

RESIDENT ASSESSMENT

SECOND FLOOR REFLECTED CEILING PLAN AT AREA "B"

F1

CLC2S4

STAIR 4

KEY NOTES

2B101

THERAPY WORK ROOM

2C-7A

CORRIDOR

2C-7

CORRIDOR

2A106

ELECTRICAL ROOM

MECHANICAL/

N.I.C.

N.I.C.

N.I.C.

OUTDOOR PATIO

LEGEND

ROOM#

NAME

ROOM

RCP GENERAL NOTES

SPRINKLER SYSTEM GENERAL NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFIWIFI

SECOND FLOOR REFLECTED CEILING PLAN AT AREA "A"

F1

2A104

DIETICIAN

2A105

WORKER

SOCIAL

2A107

DAYROOM

2A109

ROOM

FAMILY

2A110

ROOM

PATIENT

2A111

ROOM

PATIENT

2A112

ROOM

PATIENT

2A113

ROOM

PATIENT

2A114

ROOM

PATIENT

2A115

ROOM

PATIENT

2A116

ROOM

PATIENT

2A117

ROOM

PATIENT

2A117.1

TOILET

2A116.1

TOILET

2A115.1

TOILET

2A112.1

TOILET

2A110.1

TOILET

2A126.1

TOILET

2A124.1

TOILET

2A122.1

TOILET

2A119.1

TOILET

2A119

ROOM

PATIENT

2A120

ROOM

PATIENT

2A122

ROOM

PATIENT

2A123

ROOM

PATIENT

2A124

ROOM

PATIENT

2A125

ROOM

PATIENT

2A126

ROOM

PATIENT

2A127

ROOM

PATIENT

CLC2S2

STAIR 2

2A132

REST.

CLC2S1

STAIR 1

2A108.1

STOR.

2A141

LAUNDRY

2A142

STAFF

UNISEX

2A140

PRACTITIONERS

NURSE

2A102

UNISEX

RESTROOM,

2A139

HAC

2A138

IDF-ECTC

2A137

WORK ROOM

NURSES

2A136

UTILITY

DIRTY

2A135

SUPPLY

CLEAN

2A100

LOBBY

2A108

NOURISH.

2A143

NURSE STATION

2A143.1

CARE

WOUND

P-1

ELEVATOR

P-2

ELEVATOR

2C-12

CORR.

2A101

RECEPTION

2C-9

CORR.

2C-4

CORRIDOR

2A106

ELECTRICAL ROOM

MECHANICAL/

KEY NOTES

N.I.C.

N.I.C.

N.I.C.

N.I.C.

KEY NOTES

2A121

STOR.

2A118

ELEC.

2A128

PRACTITIONER

NURSE

2A133

ELEC.

2A134

IDF

2A129

RESTROOM

WOMEN

2A130

ROOM

MEDICATIONS

2A131

SHOWER

PATIENT

2A131.1

TOILET

2A109.1

TOILET

LEGEND

ROOM#

NAME

ROOM

RCP NEW GENERAL NOTES

2A103

MACHINE ROOM

ELEVATOR

N.I.C.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

WIFI

SECOND FLOOR REFLECTED CEILING PLAN AT AREA "C"

F1

2C117

PATIENT ROOM

2C116

PATIENT ROOM

2C115

PATIENT ROOM

2C114

PATIENT ROOM

2C113

PATIENT ROOM

2C112

PATIENT ROOM

2C110

PATIENT ROOM

2C109

PATIENT ROOM

2C100

PATIENT ROOM

2C101

PATIENT ROOM

2C102

PATIENT ROOM

2C103

PATIENT ROOM

2C104

PATIENT ROOM

2C105

PATIENT ROOM

2C106

PATIENT ROOM

2C107

PATIENT ROOM

2C116.1

TOILET

2C114.1

TOILET

2C112.1

TOILET

2C111

LINEN

CLEAN

2C109.1

TOILET

2C108

ELEC.

CLC2S3

STAIR 3

2C100.1

TOILET

2C102.1

TOILET

2C104.1

TOILET

2C106.1

TOILET

2C-10

CORRIDOR

KEY NOTESKEY NOTES

LEGEND

ROOM#

NAME

ROOM

RCP NEW GENERAL NOTES

N.I.C.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

FEC

D N

RECREATION THERAPIST

2B103

ASST.

NURSE

MANAGER

2B104

2B109.1

UNISEX

RESTROOM,

2B110.1

UNISEX

RESTROOM,

2B110

ACTIVITIES ROOM

DINING HALL/

OUTDOOR PATIO

2B111

PSYCHOLOGIST

2B100

UNISEX

RESTROOM,

2B101.2

OFFICE

2B101.1

STORAGE

2B101

THERAPY WORK ROOM

2B108

HAC

2B107

WORKER

SOCIAL

2B109

BREAK ROOM

LOCKER/

2B105

STORAGE

2B102

HAC

2B101.4

STORAGE

2B101.3

STORAGE

2B106

NURSES

RAC

SECOND FLOOR PLAN

ROOM SIGNAGE AT AREA "B"

F1

GENERAL NOTES

2C-7A

CORRIDOR

2C-7

CORRIDOR

LEGEND

2A106

ELECTRICAL ROOM

MECHANICAL/

N.I.C.

CLC2S4

STAIR 4

N.I.C.

N.I.C.

OUTDOOR PATIO

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

P

SECOND FLOOR PLAN

ROOM SIGNAGE AT AREA "A"

F1

2B101.2

OFFICE

2A104

DIETICIAN

2A105

WORKER

SOCIAL

2A100

LOBBY

2A107

DAYROOM

2A109

ROOM

FAMILY

2A110

PATIENT ROOM

2A111

PATIENT ROOM

2A112

PATIENT ROOM

2A113

PATIENT ROOM

2A114

PATIENT ROOM

2A115

PATIENT ROOM

2A116

PATIENT ROOM

2A117

PATIENT ROOM

2A117.1

TOILET

2A116.1

TOILET

2A115.1

TOILET

2A112.1

TOILET

2A110.1

TOILET

2A109.1

TOILET

2A126.1

TOILET

2A124.1

TOILET

2A122.1

TOILET

2A121

STOR.

2A119.1

TOILET

2A118

ELEC.

2A119

PATIENT ROOM

2A120

PATIENT ROOM

2A122

PATIENT ROOM

2A123

PATIENT ROOM

2A124

PATIENT ROOM

2A125

PATIENT ROOM

2A126

PATIENT ROOM

2A127

PATIENT ROOM

2A128

PRACTITIONER

NURSE

2A129

REST.

WOMEN

2A130

ROOM

MEDICATIONS

2A131

SHOWER

PATIENT

2A131.1

TOILET

2A132

REST.

2A133

ELEC.

2A134

IDF

2A108.1

STOR.

2A108

NOURISH.

2A143

NURSE STATION

2A141

LAUNDRY

2A143.1

CARE

WOUND

2A142

STAFF

UNISEX

2A140

PRACTITIONERS

NURSE

2A102

UNISEX

RESTROOM,

2A139

HAC

2A138

IDF-ECTC

2A137

WORK ROOM

NURSES

2A136

UTILITY

DIRTY

2A135

SUPPLY

CLEAN

P-1

ELEVATOR

P-2

ELEVATOR

2C-12

CORRIDOR

2A101

RECEPTION

2C-9

CORRIDOR

2C-4

CORRIDOR

2A103

MACHINE ROOM

ELEVATOR

CLC2S2

STAIR 2

CLC2S1

STAIR 1

2A106

ELECTRICAL ROOM

MECHANICAL/

N.I.C.

N.I.C.

N.I.C.

N.I.C.

GENERAL NOTES

LEGEND

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

SECOND FLOOR PLAN

AT AREA "C"

F1

2C117

PATIENT ROOM

2C116

PATIENT ROOM

2C115

PATIENT ROOM

2C114

PATIENT ROOM

2C113

PATIENT ROOM

2C112

PATIENT ROOM

2C110

PATIENT ROOM

2C109

PATIENT ROOM

2C100

PATIENT ROOM

2C101

PATIENT ROOM

2C102

PATIENT ROOM

2C103

PATIENT ROOM

2C104

PATIENT ROOM

2C105

PATIENT ROOM

2C106

PATIENT ROOM

2C107

PATIENT ROOM

2C116.1

TOILET

2C114.1

TOILET

2C112.1

TOILET

2C111

LINEN

CLEAN

2C109.1

TOILET

2C108

ELEC.

2C100.1

TOILET

2C102.1

TOILET

2C104.1

TOILET

2C106.1

TOILET

2C-10

CORRIDOR

CLC2S3

STAIR 3

N.I.C.

GENERAL NOTES

LEGEND

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

SIGNAGE SCHEDULE

SIGN

NO.

SIGN

NAME

COMMENTS

SIGN

TYPE

SECOND FLOOR - AREA A

SIGNAGE SCHEDULE

SIGN

NO.

SIGN

NAME

COMMENTS

SIGN

TYPE

SECOND FLOOR - AREA B

SECOND FLOOR - AREA C

MOUNTING

SURFACE

SIGN

DETAIL

MOUNTING

SURFACE

SIGN

DETAIL

ROOM SIGN LOCATIONS

C8

Q106.5

Waiting Room

ROOM SIGN - TYPE 1

E7

TOILET SIGN - TYPE 2

F7

Q106.5

X115.3

Waiting Room

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

KEY NOTESCEILING-MOUNTED SIGN AT AREA "A" - TYPE 3 (S-3.1)

B1

Elevators Stairs

CEILING-MOUNTED SIGN AREA "A" - TYPE 3 (S-3.2)

B4

Offices Therapy

CEILING-MOUNTED SIGN AT AREA"A" - TYPE 3 (S-3.3)

C1

NH-2A 2C

Dayroom

CEILING-MOUNTED SIGN AT AREA "A" - TYPE 3 (S-3.4)

E1

Support Area Employees Only

CEILING-MOUNTED SIGN AT AREA "B" - TYPE 3 (S-3)

F1

Occupational Therapy Kinesio Therapy Physical Therapy

Nurse Station

CEILING-MOUNTED SIGN DETAIL

E5

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

KEY NOTESCEILING-MOUNTED SIGN AT AREA "A" - TYPE 3 (S-3.1)

B1

Elevators Stairs

CEILING-MOUNTED SIGN AREA "A" - TYPE 3 (S-3.2)

B4

Nursing Units

CEILING-MOUNTED SIGN AT AREA"A" - TYPE 3 (S-3.3)

C1

NH-2A

Dayroom

CEILING-MOUNTED SIGN AT AREA "A" - TYPE 3 (S-3.4)

E1

Nurse Station

NH-2A NH-2C

Nurse Station

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 23, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

JQ

07/23/2021

Renovate Community Living

Center 2nd Floor Halls and Walls

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 22, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

Renovate Community Living

Center 2nd Floor Halls and Walls

OUTDOOR

PATIO

MECHANICAL / ELECTRICAL ROOM

2A106

STORAGE

2B105

HAC

2B102

ASSISTANT NURSE

MANAGER

2B104

STAIR 4

CLC2S4

PSYCHOLOGIST

2B111

THERAPY WORK ROOM

2B101

DINING HALL /

ACTIVITIES ROOM

2B110

RECREATION THERAPIST

2B103

2B108

HAC

LOCKER /

BREAK ROOM

2B109

ELEVATOR

STORAGE

2B101.1

OFFICE

2B101.2

STORAGE

2B101.4

SOCIAL WORKER

2A105

RESTROOM,

UNISEX

2B100

STORAGE

2B101.3

RESTROOM,

UNISEX

2B109.1

RESTROOM,

UNISEX

2B110.1

SOCIAL WORKER

2B107

RESIDENT

ASSESSMENT

COORDINATORS

(RAC) NURSES

2B106

H W

R

HWS HWS

H W

S

HWR HWR

HWS HWS

HWR HWR

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S

H W

R H

W R

H W

R H

W R

H W

R H

W R

H W

R

HWS

HWR

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 22, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

P L A

N

N

O R

T H

MD102

SECOND FLOOR DEMOLITION MECHANICAL PLAN - AREA 'B'

H W

R

HWS HWS

H W

S

HWR

HWS HWS

HWR

H W

S H

W S

H W

S H

W S

H W

S H

W S

H W

S

H W

R H

W R

H W

R H

W R

H W

R

HWS

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 22, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

P L A

N

N

O R

T H

M-102

SECOND FLOOR MECHANICAL PLAN - AREA 'B'

M-102

DUCT DETAILS

M-102

DUCT DETAILS

M-102

TYPICAL DIFFUSER CONNECTION DETAIL

M-102

DUCT TAP DETAILS

SS

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 22, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

Renovate Community Living

Center 2nd Floor Halls and Walls

IDF

2A134

MECHANICAL / ELECTRICAL ROOM

2A106

ELECTRICAL

2A133

PATIENT ROOM

2C117

LAUNDRY

2A141

CLEAN

SUPPLY

2A135

MEDICATIONS ROOM

2A130

DIRTY

UTILITY

2A136

WAITING

2A100

STAIR 1

CLC2S1

STAIR 2

CLC2S2

DIETICIAN

2A104

ELEVATOR

MACHINE ROOM

2A103

PATIENT ROOM

2C100

NURSES

WORK ROOM

2A137

IDF-ECTC

2A138

ELECTRICAL

CLOSET

TOILET

2A118

2A131.1

1,157.48 SF

DAYROOM

2A107

TOILET

2A122.1

PATIENT ROOM

2A125

TOILET

2A124.1

STORAGE

2A121

TOILET

2A119.1

STORAGE

2B101.1

OFFICE

2B101.2

PATIENT ROOM

2A127

TOILET

2A126.1

NURSE

PRACTITIONER

2A128

PATIENT ROOM

PATIENT ROOM

2A126

2A113

2A114

PATIENT ROOM

PATIENT ROOM

TOILET

2A115

2A114.1

TOILET

2A112.1

2A117.1

TOILET

TOILET

2A116.1

PATIENT ROOM

2A110

PATIENT ROOM

2A111

PATIENT ROOM

2A117

PATIENT ROOM

2A112

PATIENT ROOM

2A116

TOILET

2A110.1

BREAK ROOM

2A109

TOILET

2A109.1

CORRIDOR

HAC

46.26 SF

2A139

NURSE STATION

2A143

RESTROOM,

UNISEX

2A132

194.96 SF

PATIENT

SHOWER

2A131

WOMEN

RESTROOM

2A129

STORAGE

2A108.1

KITCHEN

2A108

PATIENT ROOM

2A120

PATIENT ROOM

2A119

PATIENT ROOM

2A122

PATIENT ROOM

2A123

PATIENT ROOM

2A124

WOUND CARE

2A143.1

UNISEX

STAFF

2A142

NURSE

PRACTITIONERS

2A140

RESTROOM,

UNISEX

2A102

SOCIAL WORKER

2A105

RESTROOM,

UNISEX

2B100

(ROOF

BELOW)

DN

ELEVATOR

P14

ELEVATOR

P15

U

P

ZONE

VALVE

FEC

MED

SHUTOFF

FEC

FEC

FEC

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 22, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

P L A

N

N

O R

T H

PD101

SECOND FLOOR DEMOLITION PLUMBING PLAN - AREA 'A'

OUTDOOR

PATIO

MECHANICAL / ELECTRICAL ROOM

2A106

STORAGE

2B105

HAC

2B102

ASSISTANT NURSE

MANAGER

2B104

STAIR 4

CLC2S4

PSYCHOLOGIST

2B111

THERAPY WORK ROOM

2B101

DINING HALL /

ACTIVITIES ROOM

2B110

RECREATION THERAPIST

2B103

2B108

HAC

LOCKER /

BREAK ROOM

2B109

ELEVATOR

STORAGE

2B101.1

OFFICE

2B101.2

STORAGE

2B101.4

SOCIAL WORKER

2A105

RESTROOM,

UNISEX

2B100

STORAGE

2B101.3

RESTROOM,

UNISEX

2B109.1

RESTROOM,

UNISEX

2B110.1

SOCIAL WORKER

2B107

RESIDENT

ASSESSMENT

COORDINATORS

(RAC) NURSES

2B106

FEC

D N

S S

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 22, 2021

100% CD SET

CONSULTANTS:

Office of

Facilities

Renovate Community Living

Center 2nd Floor Halls and Walls

KEY PLAN

B

A

C

P L A

N

N

O R

T H

PD102

SECOND FLOOR DEMOLITION PLUMBING PLAN - AREA 'B'

ELECTRICAL

2C108

2C102

STORAGE

PATIENT

2C101

PATIENT

2C116

PATIENT ROOM

2C117

PATIENT ROOM

2C103

PATIENT ROOM

2C107

CORRIDOR

PATIENT

ROOM

2C106

PATIENT ROOM

2C115

SHARED

2C109.1

PATIENT ROOM

2C114

Corridor

PATIENT ROOM

2C100

PATIENT

ROOM

CLEAN

LINEN

2C110

2C111

PATIENT

ROOM

2C104

PATIENT

ROOM

2C112

PATIENT ROOM

2C109

PATIENT

ROOM

2C105

SHARED

2C106.1

SHARED

2C114.1

SHARED

2C102.1

SHARED

2C112.1

SHARED

2C104.1

PATIENT

ROOM

2C113

SHARED

2C116.1

SHARED

2C100.1

2A132

STAIR 3

CLC2S3

UP

FEC

FEC

GLOVES

PPE

I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Engineering Firm F-19531 www.westeastdesign.com

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -20-122

Management

JULY 22, 2021

100% CD SET

CONSULTANT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .