671-20-122-VA-SA-Renovate CLC 2nd Floor Halls and Walls-100 CD-Drawings.pdf
PDF 27 MB Posted
- Solicitation number
- 36C25723B0017
About this file
This document outlines a federal contract opportunity for renovations at a Department of Veterans Affairs medical center. The solicitation seeks bids to renovate the halls and walls on the second floor of the Community Living Center at the Veterans Affairs Medical Center located in network 17. Bids are due by February 28, 2022 under solicitation number 36C25723B0017. The selected contractor will be responsible for renovating the specified areas of the existing facility to required standards. The contract award is expected in April 2022 and the project completion date is set for September 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25723B0017 0008.docx | DOCX document | |
| 36C25723B0017 0007.docx | DOCX document | |
| 671-20-122-Renovate CLC 2nd Floor Halls and Walls-Addendum No1-revised.pdf | ||
| 36C25723B0017 0006.docx | DOCX document | |
| 36C25723B0017 0005.docx | DOCX document | |
| 36C25723B0017 0004.docx | DOCX document | |
| Appendix B-CLC Asbestos Report.pdf | ||
| SET-Arch As-Builts.pdf | ||
| 671-20-122-Renovate CLC 2nd Floor Halls and Walls-Addendum No1.pdf | ||
| 36C25723B0017 0003.docx | DOCX document | |
| 36C25723B0017 0002.docx | DOCX document | |
| 36C25723B0017 0001.docx | DOCX document | |
| 671-20-122-VA-SA-Renovate CLC 2nd Floor Halls and Walls-100 CD-Specificatons.pdf | ||
| 36C25723B0017_1.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
PQ
COVER SHEET
GI0.1
SAN ANTONIO, TEXAS
AUDIE L. MURPHY MEMORIAL VETERANS HOSPITAL
Department
Veterans Affairs
7400 MERTON MINTER BLVD.
PROJECT: RENOVATE COMMUNITY LIVING CENTER
of
PROJECT NO. : 671-20-122
2ND FLOOR HALLS AND WALLS
100% CONSTRUCTION DEVELOPMENT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
PQ
GI0.2
DRAWING INDEX
ARCHITECTURAL MECHANICAL
ELECTRICAL
PLUMBING
DRAWING INDEX
ADD ALTERNATES
COORDINATION:
EXISTING CONDITIONS:
SAFETY/SECURITY:
CONSTRUCTION SETS:
CORRESPONDENCE / INSTRUCTIONS:
MISCELLANEOUS:
1. SPECIFICATIONS
2. DRAWINGS
SITE VICINITY MAP
C6
P L A
N
N
O R
T H
T R
U E
N
O R
T H
ABBREVIATIONS
ARCHITECTURAL SYMBOLS LEGEND
CONSTRUCTION SAFETY NOTES
DOCUMENT ORGANIZATION
INFECTION PREVENTION NOTES
GENERAL PROJECT NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
MAIN HOSPITAL
WAREHOUSE
CANTEENPOLYTRAUMA
CLC
HOSPITAL TOWER
V
S
C
H
E
E
L
R
D
W
U
R
Z
B
A
H
A
D
M E
R T
M
I N
T E
R
B
L V
D
M
E
L
R
O
S
L
M
G
R
E
A
D
LOADING
DOCK
MAIN
ENTRY
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
PROJECT AREA
AREA "B"
AREA "A"
AREA "C"
SECOND FLOOR REFERENCE PLAN
F1
VA HOSPITAL CAMPUS PLAN
F5
P L A
N
N
O R
T H
T R
U
E
N
O
R
T
DEMO PHASING PLAN
F1
GENERAL NOTES
PHASING LEGEND
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
EXISTING
ROOF
KEY NOTES
PHASE 5
PHASE 6
PHASE 3
PHASE 2
PHASE 1
PHASE 4
PHASE 6
N.I.C.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531
FEC
N
FEC
FEC
FEC
RECREATION THERAPIST
2B103
ASST.
NURSE
MANAGER
2B104
2B109.1
UNISEX
RESTROOM,
2B110.1
UNISEX
RESTROOM,
2B110
ACTIVITIES ROOM
DINING HALL/
OUTDOOR PATIO
2B111
PSYCHOLOGIST
2B101.2
OFFICE
2B108
HAC
2B107
WORKER
SOCIAL
2B109
BREAK ROOM
LOCKER/
2B105
STOR.
2B102
HAC
2B101.4
STORAGE
2B106
NURSES
(RAC)
DEMOLITION SECOND FLOOR PLAN AT AREA "B"
F1
CLC2S4
STAIR 4
GENERAL DEMOLITION NOTES
2B101
THERAPY WORK ROOM
2C-7A
CORRIDOR
2C-7
CORR.
2A106
ELECTRICAL ROOM
MECHANICAL/
2B100
UNISEX
RESTROOM,
2B101.1
STORAGE
N.I.C.
N.I.C.
N.I.C.
2B101.3
STOR.
DEMOLITION KEY NOTES
DEMOLITION LEGEND
ROOM#
NAME
ROOM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
DN
P
ZONE
VALVE
FEC
MED
SHUTOFF
FEC
FEC
FEC
DEMOLITION SECOND FLOOR PLAN AT AREA "A"
F1
2B101.2
OFFICE
2A104
DIETICIAN
2A105
WORKER
SOCIAL
2A107
DAYROOM
2A109
ROOM
FAMILY
2A110
PATIENT ROOM
2A111
PATIENT ROOM
2A112
PATIENT ROOM
2A113
PATIENT ROOM
2A114
PATIENT ROOM
2A115
PATIENT ROOM
2A116
PATIENT ROOM
2A117
PATIENT ROOM
2A117.1
TOILET
2A116.1
TOILET
2A115.1
TOILET
2A112.1
TOILET
2A110.1
TOILET
2A109.1
TOILET
2A126.1
TOILET
2A124.1
TOILET
2A122.1
TOILET
2A121
STOR.
2A119.1
TOILET
2A118
ELEC.
2A119
PATIENT ROOM
2A120
PATIENT ROOM
2A122
PATIENT ROOM
2A123
PATIENT ROOM
2A124
PATIENT ROOM
2A125
PATIENT ROOM
2A126
PATIENT ROOM
2A127
PATIENT ROOM
2A128
PRACTITIONER
NURSE
2A129
REST.
WOMEN
2A130
ROOM
MEDICATIONS
2A131
SHOWER
PATIENT
2A131.1
TOILET
2A132
REST.
UNISEX
2A133
ELEC.
2A134
IDF
2A108.1
STOR.
2A141
LAUNDRY
2A142
REST.
2A140
PRAC.
NURSE
2A102
REST.
UNISEX
2A139
HAC
2A138
IDF-ECTC
2A137
EOOM
WORK
NURSES
2A136
UTILITY
DIRTY
2A135
SUPPLY
CLEAN
2A100
LOBBY
2A108
NOURISH.
2A143
NURSE STATION
2A143.1
CARE
WOUND
P-1
ELEVATOR
P-2
ELEVATOR
2C-12
CORR.
2A101
RECEPTION
2C-9
CORR.
2C-4
CORRIDOR
2A103
MACHINE ROOM
ELEVATOR
CLC2S2
STAIR 2
CLC2S1
STAIR 1
2A106
ELECTRICAL ROOM
MECHANICAL/
N.I.C.
N.I.C.
N.I.C.
N.I.C.
DEMOLITION LEGEND
ROOM#
NAME
ROOM
GENERAL DEMOLITION NOTESDEMOLITION KEY NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
DEMOLITION SECOND FLOOR PLAN AT AREA "C"
F1
2C116
PATIENT ROOM
2C115
PATIENT ROOM
2C114
PATIENT ROOM
2C113
PATIENT ROOM
2C112
PATIENT ROOM
2C110
PATIENT ROOM
2C100
PATIENT ROOM
2C101
PATIENT ROOM
2C102
PATIENT ROOM
2C103
PATIENT ROOM
2C104
PATIENT ROOM
2C105
PATIENT ROOM
2C106
PATIENT ROOM
2C107
PATIENT ROOM
2C114.1
TOILET
2C112.1
TOILET
2C111
LINEN
CLEAN
2C109.1
TOILET
2C108
ELEC.
2C100.1
TOILET
2C102.1
TOILET
2C104.1
TOILET
2C106.1
TOILET
2C-10
CORRIDOR
DEMOLITION KEY NOTES
2C117
PATIENT ROOM
2C109
PATIENT ROOM
2C116.1
TOILET
CLC2S3
STAIR 3
N.I.C.
GENERAL DEMOLITION NOTES
DEMOLITION LEGEND
ROOM#
NAME
ROOM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
ENLARGED UNISEX RESTROOM 2B100
C3
ENLARGED RESTROOM 2B109.1 & 2B110.1
C1
DEMOLITION KEY NOTES
2B109.1
UNISEX
RESTROOM,
2B110.1
UNISEX
RESTROOM,
2B102
HAC
2B100
UNISEX
RESTROOM,
ENLARGED STORAGE 2B101.4 AND 2B102
C4
2B101.4
STORAGE
DEMO OPENING AT NURSE STATION 2A143
F1
GENERAL NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
DEMOLITION KEY NOTES
AREA 'A'
PATIENT SHOWER 2A131, TOILET 2A131.1
D1
AREA 'A'
UNISEX RESTROOM 2A142
F7
2A142
RESTROOM
2A131.1
TOILET
2A131
PATIENT SHOWER
AREA 'A'
UNISEX RESTROOM 2A102
B3
AREA 'A'
HAC 2A139
F5
AREA 'A'
UNISEX RESTROOM 2A132
F3
AREA 'A'
WOMEN RESTROOM 2A129
F1
AREA 'A'
TOILET 2A109.1
B5
AREA 'A'
TOILET 2A112.1 - TYPICAL
D3
2A102
RESTROOM
2A139
HAC
2A132
TOILET
2A129
RESTROOM
WOMEN
2A109.1
TOILET
2A112.1
TOILET
AREA 'A'
TOILET 2A116.1
D5
2A116.1
TOILET
GENERAL NOTES
ELECTRICAL LEGEND
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
RECREATION THERAPIST
2B103
2B110
ACTIVITIES ROOM
DINING HALL/
OUTDOOR PATIO
2B111
PSYCHOLOGIST
2B108
HAC
2B107
WORKER
SOCIAL
2B109
BREAK ROOM
LOCKER/
2B105
STORAGE
2B101.4
STORAGE
2B101.3
STORAGE
DEMOLITION SECOND FLOOR REFLECTED CEILING PLAN AT AREA "B"
F1
RCP DEMOLITION GENERAL NOTES
2B101
THERAPY WORK ROOM
2C-7A
CORRIDOR
2C-7
CORR.
DEMOLITION KEY NOTES
ASSISTANT NURSE
MANAGER
2B104 2B109.1
UNISEX
RESTROOM,
2B110.1
UNISEX
RESTROOM,
2B100
RESTROOM
UNISEX
2B101.2
OFFICE
2B101.1
STORAGE
2B102
HAC
2B106
(RAC) NURSES
COORDINATORS
RESIDENT ASSESSMENT
CLC2S4
STAIR 4
2A106
ELECTRICAL ROOM
MECHANICAL/
N.I.C.
N.I.C.
N.I.C.
DEMOLITION LEGEND
ROOM#
NAME
ROOM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFIWIFI
DEMOLITION SECOND FLOOR REFLECTED CEILING PLAN AT AREA "A"
F1
2A104
DIETICIAN
2A103
MACHINE ROOM
ELEVATOR
2A107
DAYROOM
2A109.1
TOILET
2A121
STOR.
2A118
ELEC.
2A128
PRACTITIONER
NURSE
2A133
ELEC.
2A134
IDF
2A108.1
STOR.
2A100
LOBBY
2A143
NURSE STATION
2A143.1
CARE
WOUND
P-1
ELEVATOR
P-2
ELEVATOR
2C-12
CORR.
2A101
RECEPTION
2C-9
CORR.
2C-4
CORR.
DEMOLITION KEY NOTES
2A105
WORKER
SOCIAL
2A109
ROOM
FAMILY
2A110
ROOM
PATIENT
2A111
ROOM
PATIENT
2A112
ROOM
PATIENT
2A113
ROOM
PATIENT
2A114
ROOM
PATIENT
2A115
ROOM
PATIENT
2A116
ROOM
PATIENT
2A117
ROOM
PATIENT
2A117.1
TOILET
2A116.1
TOILET
2A115.1
TOILET
2A112.1
TOILET
2A110.1
TOILET
2A126.1
TOILET
2A124.1
TOILET
2A122.1
TOILET
2A119.1
TOILET
2A119
ROOM
PATIENT
2A120
ROOM
PATIENT
2A122
ROOM
PATIENT
2A123
ROOM
PATIENT
2A124
ROOM
PATIENT
2A125
ROOM
PATIENT
2A126
ROOM
PATIENT
2A127
ROOM
PATIENT
2A129
RESTROOM
WOMEN
2A130
ROOM
MEDICATIONS
2A131
SHOWER
PATIENT
2A131.1
TOILET
2A141
LAUNDRY
2A142
STAFF
UNISEX
2A140
PRACTITIONERS
NURSE
2A102
UNISEX
RESTROOM,
2A139
HAC
2A138
IDF-ECTC
2A137
WORK ROOM
NURSES
2A136
UTILITY
DIRTY
2A135
SUPPLY
CLEAN
2A108
NOURISH.
CLC2S2
STAIR 2
CLC2S1
STAIR 1
2A106
ELECTRICAL ROOM
MECHANICAL/
N.I.C.
N.I.C.
N.I.C.
N.I.C.
2A132
REST.
RCP DEMOLITION GENERAL NOTES
DEMOLITION LEGEND
N.I.C.
ROOM#
NAME
ROOM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
DEMOLITION SECOND FLOOR REFLECTED CEILING PLAN AT AREA "C"
F1
2C108
ELEC.
2C-10
CORRIDOR
DEMOLITION KEY NOTES
2C117
PATIENT ROOM
2C116
PATIENT ROOM
2C115
PATIENT ROOM
2C114
PATIENT ROOM
2C113
PATIENT ROOM
2C112
PATIENT ROOM
2C110
PATIENT ROOM
2C109
PATIENT ROOM
2C100
PATIENT ROOM
2C101
PATIENT ROOM
2C102
PATIENT ROOM
2C103
PATIENT ROOM
2C104
PATIENT ROOM
2C105
PATIENT ROOM
2C106
PATIENT ROOM
2C107
PATIENT ROOM
2C116.1
TOILET
2C114.1
TOILET
2C112.1
TOILET
2C111
LINEN
CLEAN
2C109.1
TOILET
2C100.1
TOILET
2C102.1
TOILET
2C104.1
TOILET
2C106.1
TOILET
RCP DEMOLITION NOTESRCP DEMOLITION GENERAL NOTES
DEMOLITION LEGEND
CLC2S3
STAIR 3
N.I.C.
ROOM#
NAME
ROOM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
N
RECREATION THERAPIST
2B103
ASSISTANT
NURSE
MANAGER
2B104
2B109.1
UNISEX
RESTROOM,
2B110.1
UNISEX
RESTROOM,
2B110
ACTIVITIES ROOM
DINING HALL/
2B111
PSYCHOLOGIST
2B101.2
OFFICE
2B108
HAC
2B107
WORKER
SOCIAL
2B109
BREAK ROOM
LOCKER/
2B105
STORAGE
2B102
HAC
2B101.4
STORAGE
2B101.3
STOR.
2B106
(RAC) NURSES
DEMOLITION SECOND FLOOR PLAN
ROOM SIGNAGE AT AREA "B"
F1
2B101
THERAPY WORK ROOM
2C-7A
CORRIDOR
2C-7
CORRIDOR
2B100
RESTROOM
UNISEX
2B101.1
STORAGE
2A106
ELECTRICAL ROOM
MECHANICAL/
N.I.C.
N.I.C.
CLC2S4
STAIR 4
N.I.C.
DEMOLITION KEY NOTE GENERAL DEMOLITION NOTES
DEMOLITION LEGEND
OUTDOOR PATIO
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
P
DEMOLITION SECOND FLOOR PLAN
ROOM SIGNAGE AT AREA "A"
F1
2A104
DIETICIAN
2A105
WORKER
SOCIAL
2A107
DAYROOM
2A109
ROOM
FAMILY
2A110
PATIENT ROOM
2A111
PATIENT ROOM
2A112
PATIENT ROOM
2A113
PATIENT ROOM
2A114
PATIENT ROOM
2A115
PATIENT ROOM
2A116
PATIENT ROOM
2A117
PATIENT ROOM
2A117.1
TOILET
2A116.1
TOILET
2A115.1
TOILET
2A112.1
TOILET
2A110.1
TOILET
2A109.1
TOILET
2A126.1
TOILET
2A124.1
TOILET
2A122.1
TOILET
2A121
STOR.
2A119.1
TOILET
2A118
ELEC.
2A119
PATIENT ROOM
2A120
PATIENT ROOM
2A122
PATIENT ROOM
2A123
PATIENT ROOM
2A124
PATIENT ROOM
2A125
PATIENT ROOM
2A126
PATIENT ROOM
2A127
PATIENT ROOM
2A128
PRACTITIONER
NURSE
2A129
REST.
WOMEN
2A130
ROOM
MEDICATIONS
2A131
SHOWER
PATIENT
2A131.1
TOILET
2A132
REST.
UNISEX
2A133
ELEC.
2A134
IDF
2A108.1
STOR.
2A141
LAUNDRY
2A142
REST.
UNISEX
2A140
PRAC.
NURSE
2A102
REST.
UNISEX
2A139
HAC
2A138
IDF-ECTC
2A137
WORK ROOM
NURSES
2A136
UTILITY
DIRTY
2A135
SUPPLY
CLEAN
2A100
LOBBY
2A108
NOURISH.
2A143
NURSE STATION
2A143.1
CARE
WOUND
P-1
ELEVATOR
P-2
ELEVATOR
2C-12
CORR.
2A101
RECEPTION
2C-9
CORRIDOR
2C-4
CORRIDOR
CLC2S2
STAIR 2
CLC2S1
STAIR 1
2A106
ELECTRICAL ROOM
MECHANICAL/
N.I.C.
N.I.C.
N.I.C.
DEMOLITION KEY NOTE GENERAL DEMOLITION NOTES
DEMOLITION LEGEND
2A103
MACHINE ROOM
ELEVATOR
N.I.C.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
UP
DEMOLITION SECOND FLOOR PLAN
ROOM SIGNAGE AT AREA "C"
F1
2C117
PATIENT ROOM
2C116
PATIENT ROOM
2C115
PATIENT ROOM
2C114
PATIENT ROOM
2C113
PATIENT ROOM
2C112
PATIENT ROOM
2C110
PATIENT ROOM
2C109
PATIENT ROOM
2C100
PATIENT ROOM
2C101
PATIENT ROOM
2C102
PATIENT ROOM
2C103
PATIENT ROOM
2C104
PATIENT ROOM
2C105
PATIENT ROOM
2C106
PATIENT ROOM
2C107
PATIENT ROOM
2C116.1
TOILET
2C114.1
TOILET
2C112.1
TOILET
2C111
LINEN
CLEAN
2C109.1
TOILET
2C108
ELEC.
2C100.1
TOILET
2C102.1
TOILET
2C104.1
TOILET
2C106.1
TOILET
2C-10
CORRIDOR
DEMOLITION KEY NOTE GENERAL DEMOLITION NOTES
DEMOLITION LEGEND
CLC2S3
STAIR 3
N.I.C.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
FEC
D N
RECREATION THERAPIST
2B103
ASST.
NURSE
MANAGER
2B104
2B109.1
UNISEX
RESTROOM,
2B110.1
UNISEX
RESTROOM,
2B110
ACTIVITIES ROOM
DINING HALL/
2B111
PSYCHOLOGIST
2B100
RESTROOM
UNISEX
2B101.2
OFFICE
2B101.1
STORAGE
2B101
THERAPY WORK ROOM
2B108
HAC
2B107
WORKER
SOCIAL
2B109
ROOM
BREAK
LOCKER/
2B105
STORAGE
2B102
HAC
2B101.4
STORAGE
2B101.3
STOR.
2B106
NURSES
RAC
SECOND FLOOR PLAN AT AREA "B"
F1
KEY NOTES GENERAL NOTES
2C-7A
CORRIDOR
2C-7
CORR.
OUTDOOR PATIO
N.I.C.
2A106
ELECTRICAL ROOM
MECHANICAL/
N.I.C.
CLC2S4
STAIR 4
N.I.C.
LEGEND
ROOM#
NAME
ROOM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
ZONE
VALVE
FEC
MED
SHUTOFF
FEC
FEC
FEC
U
P
SECOND FLOOR PLAN AT AREA "A"
F1
2B101.2
OFFICE
2A104
DIETICIAN
2A105
WORKER
SOCIAL
2A103
MACHINE ROOM
ELEVATOR
2A100
LOBBY
2A107
DAYROOM
2A109
ROOM
FAMILY
2A110
PATIENT ROOM
2A111
PATIENT ROOM
2A112
PATIENT ROOM
2A113
PATIENT ROOM
2A114
ROOM
PATIENT
2A115
ROOM
PATIENT
2A117.1
TOILET
2A116.1
TOILET
2A115.1
TOILET
2A112.1
TOILET
2A110.1
TOILET
2A109.1
TOILET
2A126.1
TOILET
2A124.1
TOILET
2A122.1
TOILET
2A121
STOR.
2A119.1
TOILET
2A118
ELEC.
2A119
PATIENT ROOM
2A120
PATIENT ROOM
2A122
PATIENT ROOM
2A123
PATIENT ROOM
2A124
PATIENT ROOM
2A125
PATIENT ROOM
2A126
PATIENT ROOM
2A127
PATIENT ROOM
CLC2S2
STAIR 2
2A128
PRACTITIONER
NURSE
2A129
RESTROOM
WOMEN
2A130
ROOM
MEDICATIONS
2A131
SHOWER
PATIENT
2A131.1
TOILET
2A133
ELEC.
2A134
IDF
CLC2S1
STAIR 1
2A108.1
STOR.
2A108
NOURISH.
2A143
NURSE STATION
2A141
LAUNDRY
2A143.1
CARE
WOUND
2A142
REST.
UNISEX
2A140
PRACTITIONERS
NURSE
2A102
RESTROOM
UNISEX
2A139
HAC
2A138
IDF-ECTC
2A137
WORK ROOM
NURSES
2A136
UTILITY
DIRTY
2A135
SUPPLY
CLEAN
KEY NOTES
P-1
ELEVATOR
P-2
ELEVATOR
2C-12
CORRIDOR
2A101
RECEPTION
2C-4
CORRIDOR
2A106
ELECTRICAL ROOM
MECHANICAL/
2C-9
CORR.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
2A116
ROOM
PATIENT
2A117
ROOM
PATIENT
GENERAL NOTES
LEGEND
ROOM#
NAME
ROOM
2A132
REST.
UNISEX
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
FEC
SECOND FLOOR PLAN AT AREA "C"
F1
2C117
PATIENT ROOM
2C116
PATIENT ROOM
2C115
PATIENT ROOM
2C114
PATIENT ROOM
2C113
PATIENT ROOM
2C112
PATIENT ROOM
2C110
PATIENT ROOM
2C109
PATIENT ROOM
2C100
PATIENT ROOM
2C101
PATIENT ROOM
2C102
PATIENT ROOM
2C103
PATIENT ROOM
2C104
PATIENT ROOM
2C105
PATIENT ROOM
2C106
PATIENT ROOM
2C107
PATIENT ROOM
2C116.1
TOILET
2C114.1
TOILET
2C112.1
TOILET
2C111
LINEN
CLEAN
2C109.1
TOILET
2C108
ELEC.
CLC2S3
STAIR 3
2C100.1
TOILET
2C102.1
TOILET
2C104.1
TOILET
2C106.1
TOILET
2C-10
CORRIDOR
KEY NOTES
N.I.C.
GENERAL NOTES
LEGEND
ROOM#
NAME
ROOM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
DOOR SCHEDULE REMARKS DOOR ABBREVATIONS
DOOR SCHEDULE
FRAME TYPES
F1
DOOR TYPES
F4
DOOR PROTECTION TYPES
F8
DOOR SCHEDULE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
HEAD SECTION DETAIL
B1
JAMB SECTION DETAIL
B3
HEAD SECTION DETAIL
B5
JAMB SECTION DETAIL
B6
HEAD SECTION DETAIL AT LOBBY
F1
JAMB SECTION DETAIL AT LOBBY
F3
FLOORING TRANSITION -
PORCELAIN TO VCT/VLP
D1
FLOORING TRANSITION -
VCT TO VLP TO RT
D3
KEY NOTES
GENERAL NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
KEY NOTES
ENLARGED RESTROOM 2B109.1 & 2B110.1
C1
2B109.1
UNISEX
RESTROOM,
2B110.1
UNISEX
RESTROOM,
2B102
HAC
ENLARGED STORAGE 2B101.4 AND HAC 2B102
C4
2B101.4
STORAGE
ENLARGED UNISEX RESTROOM 2B100
C3
2B100
RESTROOM
UNISEX
GENERAL NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
PATIENT SHOWER 2A131, TOILET 2A131.1
D1
AREA 'A'
HAC 2A139
F6
AREA 'A'
TOILET 2A109.1
B6
AREA 'A'
TOILET 2A112.1
D4
2A139
HAC
2A109.1
TOILET
2A112.1
TOILET
2A131
PATIENT SHOWER
AREA 'A'
TOILET 2A116.1
D6
2A116.1
TOILET
2A131.1
TOILET
AREA 'A'
UNISEX RESTROOM 2A102
B4
AREA 'A'
UNISEX RESTROOM 2A132
F4
AREA 'A'
WOMEN RESTROOM 2A129
F1
2A102
RESTROOM
2A132
TOILET
2A129
RESTROOM
WOMEN
GENERAL NOTES
ELECTRICAL LEGEND
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
MODULAR NURSE STATION GENERAL NOTES
2A142 UNISEX RESTROOM, 2A143 NURSE STATION AREA 'A'
D1
2A101
RECEPTION
2A143
NURSE STATION
2A143.1
WOUND CARE
2A141
LAUNDRY
2A142
RESTROOM
UNISEX
PATIENT ROOMS METAL CABINET - TYPICAL
D6
PATIENT ROOMS METAL CABINET - TYPICAL
B6
KEY NOTES
ALTERNATE #2
PATIENT ROOM METAL CABINET ELEVATION
F1
PATIENT ROOM METAL CABINET ELEVATION
F3
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
GENERAL NOTES
ALTERNATE #1
PATIENT ROOMS MODULAR CASEWORK - TYPICAL
B3
ALTERNATE #1
PATIENT ROOMS MODULAR CASEWORK - TYPICAL
B1
KEY NOTES
M
A
X
ALTERNATE #1
WALL BACKING - HEAVY (51 TO 150 LBS)
B6
ALTERNATE #1
ALTERNATE #1
PATIENT ROOM MODULAR CASWORK ELEVATION
D1
ALTERNATE #1
PATIENT ROOM MODULAR CASWORK ELEVATION
D3
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
GENERAL NOTE
ALTERNATE#2
MODULAR NURSE STATION RENDERING
C1
ALTERNATE#2
MODULAR NURSE STATION RENDERING
C5
ALTERNATE#1
MODULAR PATIENT ROOM RENDERING
F1
ALTERNATE#1
MODULAR PATIENT ROOM RENDERING
F5
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
KEY NOTE
EQUIPMENT GENERAL NOTES
LEGEND
NURSE STATION SCHEDULE
EQUIPMENT PLAN
NURSE STATION 2A143
D1
2A101
RECEPTION
2A143
NURSE STATION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
WALL PARTITION TYPES
F1
PLAN DETAIL
D1
KEY NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
INTERIOR ELEVATIONS
TOILET 2A112.1
E1
INTERIOR ELEVATIONS
TOILET 2A109.1
D1
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A102
B1
INTERIOR ELEVATIONS
TOILET 2A116.1
E1
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A102
B2
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A102
B3
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A102
B4
INTERIOR ELEVATIONS
TOILET 2A109.1
D2
INTERIOR ELEVATIONS
TOILET 2A109.1
D3
INTERIOR ELEVATIONS
TOILET 2A109.1
D4
INTERIOR ELEVATIONS
TOILET 2A112.1
E2
INTERIOR ELEVATIONS
TOILET 2A112.1
E3
INTERIOR ELEVATIONS
TOILET 2A112.1
E4
INTERIOR ELEVATIONS
TOILET 2A116.1
E2
INTERIOR ELEVATIONS
TOILET 2A116.1
E3
INTERIOR ELEVATIONS
TOILET 2A116.1
E4
KEY NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
TOILET 2A131.1
E1
INTERIOR ELEVATIONS
PATIENT SHOWER 2A131
F1
INTERIOR ELEVATIONS
WOMEN RESTROOM 2A129
B1
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A132
C1
INTERIOR ELEVATIONS
WOMEN RESTROOM 2A129
B2
INTERIOR ELEVATIONS
WOMEN RESTROOM 2A129
B3
INTERIOR ELEVATIONS
WOMEN RESTROOM 2A129
B4
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A132
C2
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A132
C3
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A132
C4
INTERIOR ELEVATIONS
TOILET 2A131.1
E2
INTERIOR ELEVATIONS
TOILET 2A131.1
E3
INTERIOR ELEVATIONS
TOILET 2A131.1
E4
INTERIOR ELEVATIONS
PATIENT SHOWER 2A131
F2
INTERIOR ELEVATIONS
PATIENT SHOWER 2A131
F3
INTERIOR ELEVATIONS
PATIENT SHOWER 2A131
F4
KEY NOTES
GENERAL NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
UNISEX RESTROOM 2A142
C1
INTERIOR ELEVATIONS
HAC 2A139
B1
KEY NOTES
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A142
C2
INTERIOR ELEVATIONS
HAC 2A139
B2
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A142
C3
INTERIOR ELEVATIONS
HAC 2A139
B3
INTERIOR ELEVATIONS
UNISEX RESTROOM 2A142
C4
INTERIOR ELEVATIONS
HAC 2A139
B4
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
HAC 2B102
E1
INTERIOR ELEVATIONS
STORAGE 2B101.4
C1
INTERIOR ELEVATIONS
UNISEX RESTROOM 2B100
B1
INTERIOR ELEVATIONS
UNISEX RESTROOM 2B109.1
F1
KEY NOTES
INTERIOR ELEVATIONS
HAC 2B102
E2
INTERIOR ELEVATIONS
STORAGE 2B101.4
C2
INTERIOR ELEVATIONS
UNISEX RESTROOM 2B100
B2
INTERIOR ELEVATIONS
UNISEX RESTROOM 2B109.1
F2
INTERIOR ELEVATIONS
HAC 2B102
E3
INTERIOR ELEVATIONS
STORAGE 2B101.4
C3
INTERIOR ELEVATIONS
UNISEX RESTROOM 2B100
B3
INTERIOR ELEVATIONS
UNISEX RESTROOM 2B109.1
F3
INTERIOR ELEVATIONS
HAC 2B102
E4
INTERIOR ELEVATIONS
STORAGE 2B101.4
C4
INTERIOR ELEVATIONS
UNISEX RESTROOM 2B100
B4
INTERIOR ELEVATIONS
UNISEX RESTROOM 2B109.1
F4
INTERIOR ELEVATIONS
LOCKER/BREAK ROOM 2B109
F8
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
LEGEND
RECREATION THERAPIST
2B103
ASST.
NURSE
MANAGER
2B104
2B109.1
UNISEX
RESTROOM,
2B110.1
UNISEX
RESTROOM,
2B110
ACTIVITIES ROOM
DINING HALL/
OUTDOOR PATIO
2B111
PSYCHOLOGIST
2B100
UNISEX
RESTROOM,
2B101.2
OFFICE
2B101.1
STOR.
2B101
THERAPY WORK ROOM
2B108
HAC
2B107
WORKER
SOCIAL
2B109
BREAK ROOM
LOCKER/
2B105
STORAGE
2B102
HAC
2B101.4
STORAGE
2B101.3
STORAGE
2B106
NURSES
RAC
SECOND FLOOR FINISH PLAN AT AREA "B"
F1
KEY NOTES GENERAL NOTES
2C-7A
CORR.
2C-7
CORR.
N.I.C.
MECHANICAL/
ELECTRICAL
2A106
STAIR
CLC2S4
N.I.C.
N.I.C.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
P
SECOND FLOOR FINISH PLAN AT AREA "A"
F1
2B100
REST.
2B101.1
STOR.
2B101.2
OFFICE
2A104
DIETICIAN
2A105
WORKER
SOCIAL
2A103
MACHINE ROOM
ELEVATOR
2A100
LOBBY
2A107
DAYROOM
2A109.1
TOILET
2A121
STOR.
2A118
ELEC.
2A129
RESTROOM
WOMEN
2A130
ROOM
MEDICATIONS
2A131
SHOWER
PATIENT
2A131.1
TOILET
2A132
REST.
2A133
ELEC.
2A134
IDF
2A108.1
STOR.
2A108
NOURISH.
2A143
STATION
NURSE
2A141
LAUNDRY
2A143.1
CARE
WOUND
2A142
REST.
2A140
PRAC.
NURSE
2A102
UNISEX
RESTROOM,
2A139
HAC
2A138
IDF-ECTC
2A137
WORK ROOM
NURSES
2A136
UTILITY
DIRTY
2A135
SUPPLY
CLEAN
P-1
ELEVATOR
P-2
ELEVATOR
2C-12
CORR.
2A101
RECEPTION
2C-9
CORR.
2C-4
CORR.
LEGEND
GENERAL NOTES
MECHANICAL/
ELECTRICAL
2A106
N.I.C.
STAIR
CLC2S1
N.I.C.
STAIR
CLC2S2
N.I.C.
2A109
ROOM
FAMILY
2A110
ROOM
PATIENT
2A111
ROOM
PATIENT
2A112
ROOM
PATIENT
2A113
ROOM
PATIENT
2A114
ROOM
PATIENT
2A115
ROOM
PATIENT
2A116
ROOM
PATIENT
2A117
ROOM
PATIENT
2A117.1
TOILET
2A116.1
TOILET
2A115.1
TOILET
2A112.1
TOILET
2A110.1
TOILET
2A126.1
TOILET
2A124.1
TOILET
2A122.1
TOILET
2A119.1
TOILET
2A119
ROOM
PATIENT
2A120
ROOM
PATIENT
2A122
ROOM
PATIENT
2A123
ROOM
PATIENT
2A124
ROOM
PATIENT
2A125
ROOM
PATIENT
2A126
ROOM
PATIENT
2A127
ROOM
PATIENT
N.I.C.
KEY NOTES
2A128
PRACTITIONER
NURSE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
SECOND FLOOR FINISH PLAN
AT AREA "C"
F1
2C108
ELEC.
2C-10
CORR.
STAIR
CLC2S3
N.I.C.
2C117
PATIENT ROOM
2C116
PATIENT ROOM
2C115
PATIENT ROOM
2C114
PATIENT ROOM
2C113
PATIENT ROOM
2C112
PATIENT ROOM
2C110
PATIENT ROOM
2C109
PATIENT ROOM
2C100
PATIENT ROOM
2C101
PATIENT ROOM
2C102
PATIENT ROOM
2C103
PATIENT ROOM
2C104
PATIENT ROOM
2C105
PATIENT ROOM
2C106
PATIENT ROOM
2C107
PATIENT ROOM
2C116.1
TOILET
2C114.1
TOILET
2C112.1
TOILET
2C111
LINEN
CLEAN
2C109.1
TOILET
2C100.1
TOILET
2C102.1
TOILET
2C104.1
TOILET
2C106.1
TOILET
LEGEND
GENERAL NOTESKEY NOTE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
MATERIAL LEGEND
ROOM FINISH SCHEDULE
ROOM FINISH SCHEDULE NOTES
MATERIAL LEGEND GENERAL NOTES
WALL, DOOR AND FRAME PROTECTION
MATERIAL LEGEND
WALL, DOOR AND FRAME PROTECTION REMARKS
ROOM FINISH SCHEDULE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
GENERAL NOTE
CHAIR RAIL (WP6)
E5
AREA 'A'
WALL PROTECTION (WP5.1, WP4, WP3)
D1
AREA 'B'
WALL PROTECTION (WP5, WP4, WP3)
D5
AREA 'C'
WALL PROTECTION (WP5.1, WP4)
D7
RIGID VINYL SHEET (WP3)
E7
AREA 'B' AT DINING HALL
WALL PROTECTION (WP5.2, WP4.1)
D3
2A107 DAYROOM
WALL PROTECTION (WP6, WP3)
F3
2A100 LOBBY
WALL PROTECTION (WP6)
F1
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
FLUSH MOUNT CORNER GUARD (WP2.1)
F4
SURFACE MOUNT CORNER GUARD (WP1.1)
D4
SURFACE MOUNT CORNER GUARD (WP1)
D1
FLUSH MOUNT CORNER GUARD (WP2)
F1
KEY NOTES
GENERAL NOTE
CEILING EXPANSION JOINT
C6
WALL EXPANSION JOINT
C4
FLOOR EXPANSION JOINT
C1
FLOOR EXPANSION JOINT AT TOILET 2A109.1
D1
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
LEGEND
GENERAL NOTES
FINISH PLAN AT 2B110 DINING HALL
D1
FINISH PLAN AT 2A107 DAYROOM
F1
FINISH PLAN AT 2B143 NURSE STATION
D5
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
RECREATION THERAPIST
2B103
ASSISTANT NURSE
MANAGER
2B104 2B109.1
UNISEX
RESTROOM,
2B110.1
UNISEX
RESTROOM,
2B110
ACTIVITIES ROOM
DINING HALL/
2B111
PSYCHOLOGIST
2B100
UNISEX
RESTROOM,
2B101.2
OFFICE
2B101.1
STORAGE
2B108
HAC
2B107
WORKER
SOCIAL
2B109
BREAK ROOM
LOCKER/
2B105
STORAGE
2B102
HAC
2B101.4
STORAGE
2B101.3
STORAGE
2B106
(RAC) NURSES
COORDINATORS
RESIDENT ASSESSMENT
SECOND FLOOR REFLECTED CEILING PLAN AT AREA "B"
F1
CLC2S4
STAIR 4
KEY NOTES
2B101
THERAPY WORK ROOM
2C-7A
CORRIDOR
2C-7
CORRIDOR
2A106
ELECTRICAL ROOM
MECHANICAL/
N.I.C.
N.I.C.
N.I.C.
OUTDOOR PATIO
LEGEND
ROOM#
NAME
ROOM
RCP GENERAL NOTES
SPRINKLER SYSTEM GENERAL NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFIWIFI
SECOND FLOOR REFLECTED CEILING PLAN AT AREA "A"
F1
2A104
DIETICIAN
2A105
WORKER
SOCIAL
2A107
DAYROOM
2A109
ROOM
FAMILY
2A110
ROOM
PATIENT
2A111
ROOM
PATIENT
2A112
ROOM
PATIENT
2A113
ROOM
PATIENT
2A114
ROOM
PATIENT
2A115
ROOM
PATIENT
2A116
ROOM
PATIENT
2A117
ROOM
PATIENT
2A117.1
TOILET
2A116.1
TOILET
2A115.1
TOILET
2A112.1
TOILET
2A110.1
TOILET
2A126.1
TOILET
2A124.1
TOILET
2A122.1
TOILET
2A119.1
TOILET
2A119
ROOM
PATIENT
2A120
ROOM
PATIENT
2A122
ROOM
PATIENT
2A123
ROOM
PATIENT
2A124
ROOM
PATIENT
2A125
ROOM
PATIENT
2A126
ROOM
PATIENT
2A127
ROOM
PATIENT
CLC2S2
STAIR 2
2A132
REST.
CLC2S1
STAIR 1
2A108.1
STOR.
2A141
LAUNDRY
2A142
STAFF
UNISEX
2A140
PRACTITIONERS
NURSE
2A102
UNISEX
RESTROOM,
2A139
HAC
2A138
IDF-ECTC
2A137
WORK ROOM
NURSES
2A136
UTILITY
DIRTY
2A135
SUPPLY
CLEAN
2A100
LOBBY
2A108
NOURISH.
2A143
NURSE STATION
2A143.1
CARE
WOUND
P-1
ELEVATOR
P-2
ELEVATOR
2C-12
CORR.
2A101
RECEPTION
2C-9
CORR.
2C-4
CORRIDOR
2A106
ELECTRICAL ROOM
MECHANICAL/
KEY NOTES
N.I.C.
N.I.C.
N.I.C.
N.I.C.
KEY NOTES
2A121
STOR.
2A118
ELEC.
2A128
PRACTITIONER
NURSE
2A133
ELEC.
2A134
IDF
2A129
RESTROOM
WOMEN
2A130
ROOM
MEDICATIONS
2A131
SHOWER
PATIENT
2A131.1
TOILET
2A109.1
TOILET
LEGEND
ROOM#
NAME
ROOM
RCP NEW GENERAL NOTES
2A103
MACHINE ROOM
ELEVATOR
N.I.C.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
WIFI
SECOND FLOOR REFLECTED CEILING PLAN AT AREA "C"
F1
2C117
PATIENT ROOM
2C116
PATIENT ROOM
2C115
PATIENT ROOM
2C114
PATIENT ROOM
2C113
PATIENT ROOM
2C112
PATIENT ROOM
2C110
PATIENT ROOM
2C109
PATIENT ROOM
2C100
PATIENT ROOM
2C101
PATIENT ROOM
2C102
PATIENT ROOM
2C103
PATIENT ROOM
2C104
PATIENT ROOM
2C105
PATIENT ROOM
2C106
PATIENT ROOM
2C107
PATIENT ROOM
2C116.1
TOILET
2C114.1
TOILET
2C112.1
TOILET
2C111
LINEN
CLEAN
2C109.1
TOILET
2C108
ELEC.
CLC2S3
STAIR 3
2C100.1
TOILET
2C102.1
TOILET
2C104.1
TOILET
2C106.1
TOILET
2C-10
CORRIDOR
KEY NOTESKEY NOTES
LEGEND
ROOM#
NAME
ROOM
RCP NEW GENERAL NOTES
N.I.C.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
FEC
D N
RECREATION THERAPIST
2B103
ASST.
NURSE
MANAGER
2B104
2B109.1
UNISEX
RESTROOM,
2B110.1
UNISEX
RESTROOM,
2B110
ACTIVITIES ROOM
DINING HALL/
OUTDOOR PATIO
2B111
PSYCHOLOGIST
2B100
UNISEX
RESTROOM,
2B101.2
OFFICE
2B101.1
STORAGE
2B101
THERAPY WORK ROOM
2B108
HAC
2B107
WORKER
SOCIAL
2B109
BREAK ROOM
LOCKER/
2B105
STORAGE
2B102
HAC
2B101.4
STORAGE
2B101.3
STORAGE
2B106
NURSES
RAC
SECOND FLOOR PLAN
ROOM SIGNAGE AT AREA "B"
F1
GENERAL NOTES
2C-7A
CORRIDOR
2C-7
CORRIDOR
LEGEND
2A106
ELECTRICAL ROOM
MECHANICAL/
N.I.C.
CLC2S4
STAIR 4
N.I.C.
N.I.C.
OUTDOOR PATIO
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
P
SECOND FLOOR PLAN
ROOM SIGNAGE AT AREA "A"
F1
2B101.2
OFFICE
2A104
DIETICIAN
2A105
WORKER
SOCIAL
2A100
LOBBY
2A107
DAYROOM
2A109
ROOM
FAMILY
2A110
PATIENT ROOM
2A111
PATIENT ROOM
2A112
PATIENT ROOM
2A113
PATIENT ROOM
2A114
PATIENT ROOM
2A115
PATIENT ROOM
2A116
PATIENT ROOM
2A117
PATIENT ROOM
2A117.1
TOILET
2A116.1
TOILET
2A115.1
TOILET
2A112.1
TOILET
2A110.1
TOILET
2A109.1
TOILET
2A126.1
TOILET
2A124.1
TOILET
2A122.1
TOILET
2A121
STOR.
2A119.1
TOILET
2A118
ELEC.
2A119
PATIENT ROOM
2A120
PATIENT ROOM
2A122
PATIENT ROOM
2A123
PATIENT ROOM
2A124
PATIENT ROOM
2A125
PATIENT ROOM
2A126
PATIENT ROOM
2A127
PATIENT ROOM
2A128
PRACTITIONER
NURSE
2A129
REST.
WOMEN
2A130
ROOM
MEDICATIONS
2A131
SHOWER
PATIENT
2A131.1
TOILET
2A132
REST.
2A133
ELEC.
2A134
IDF
2A108.1
STOR.
2A108
NOURISH.
2A143
NURSE STATION
2A141
LAUNDRY
2A143.1
CARE
WOUND
2A142
STAFF
UNISEX
2A140
PRACTITIONERS
NURSE
2A102
UNISEX
RESTROOM,
2A139
HAC
2A138
IDF-ECTC
2A137
WORK ROOM
NURSES
2A136
UTILITY
DIRTY
2A135
SUPPLY
CLEAN
P-1
ELEVATOR
P-2
ELEVATOR
2C-12
CORRIDOR
2A101
RECEPTION
2C-9
CORRIDOR
2C-4
CORRIDOR
2A103
MACHINE ROOM
ELEVATOR
CLC2S2
STAIR 2
CLC2S1
STAIR 1
2A106
ELECTRICAL ROOM
MECHANICAL/
N.I.C.
N.I.C.
N.I.C.
N.I.C.
GENERAL NOTES
LEGEND
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
SECOND FLOOR PLAN
AT AREA "C"
F1
2C117
PATIENT ROOM
2C116
PATIENT ROOM
2C115
PATIENT ROOM
2C114
PATIENT ROOM
2C113
PATIENT ROOM
2C112
PATIENT ROOM
2C110
PATIENT ROOM
2C109
PATIENT ROOM
2C100
PATIENT ROOM
2C101
PATIENT ROOM
2C102
PATIENT ROOM
2C103
PATIENT ROOM
2C104
PATIENT ROOM
2C105
PATIENT ROOM
2C106
PATIENT ROOM
2C107
PATIENT ROOM
2C116.1
TOILET
2C114.1
TOILET
2C112.1
TOILET
2C111
LINEN
CLEAN
2C109.1
TOILET
2C108
ELEC.
2C100.1
TOILET
2C102.1
TOILET
2C104.1
TOILET
2C106.1
TOILET
2C-10
CORRIDOR
CLC2S3
STAIR 3
N.I.C.
GENERAL NOTES
LEGEND
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
SIGNAGE SCHEDULE
SIGN
NO.
SIGN
NAME
COMMENTS
SIGN
TYPE
SECOND FLOOR - AREA A
SIGNAGE SCHEDULE
SIGN
NO.
SIGN
NAME
COMMENTS
SIGN
TYPE
SECOND FLOOR - AREA B
SECOND FLOOR - AREA C
MOUNTING
SURFACE
SIGN
DETAIL
MOUNTING
SURFACE
SIGN
DETAIL
ROOM SIGN LOCATIONS
C8
Q106.5
Waiting Room
ROOM SIGN - TYPE 1
E7
TOILET SIGN - TYPE 2
F7
Q106.5
X115.3
Waiting Room
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
KEY NOTESCEILING-MOUNTED SIGN AT AREA "A" - TYPE 3 (S-3.1)
B1
Elevators Stairs
CEILING-MOUNTED SIGN AREA "A" - TYPE 3 (S-3.2)
B4
Offices Therapy
CEILING-MOUNTED SIGN AT AREA"A" - TYPE 3 (S-3.3)
C1
NH-2A 2C
Dayroom
CEILING-MOUNTED SIGN AT AREA "A" - TYPE 3 (S-3.4)
E1
Support Area Employees Only
CEILING-MOUNTED SIGN AT AREA "B" - TYPE 3 (S-3)
F1
Occupational Therapy Kinesio Therapy Physical Therapy
Nurse Station
CEILING-MOUNTED SIGN DETAIL
E5
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
KEY NOTESCEILING-MOUNTED SIGN AT AREA "A" - TYPE 3 (S-3.1)
B1
Elevators Stairs
CEILING-MOUNTED SIGN AREA "A" - TYPE 3 (S-3.2)
B4
Nursing Units
CEILING-MOUNTED SIGN AT AREA"A" - TYPE 3 (S-3.3)
C1
NH-2A
Dayroom
CEILING-MOUNTED SIGN AT AREA "A" - TYPE 3 (S-3.4)
E1
Nurse Station
NH-2A NH-2C
Nurse Station
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 23, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
JQ
07/23/2021
Renovate Community Living
Center 2nd Floor Halls and Walls
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 22, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
Renovate Community Living
Center 2nd Floor Halls and Walls
OUTDOOR
PATIO
MECHANICAL / ELECTRICAL ROOM
2A106
STORAGE
2B105
HAC
2B102
ASSISTANT NURSE
MANAGER
2B104
STAIR 4
CLC2S4
PSYCHOLOGIST
2B111
THERAPY WORK ROOM
2B101
DINING HALL /
ACTIVITIES ROOM
2B110
RECREATION THERAPIST
2B103
2B108
HAC
LOCKER /
BREAK ROOM
2B109
ELEVATOR
STORAGE
2B101.1
OFFICE
2B101.2
STORAGE
2B101.4
SOCIAL WORKER
2A105
RESTROOM,
UNISEX
2B100
STORAGE
2B101.3
RESTROOM,
UNISEX
2B109.1
RESTROOM,
UNISEX
2B110.1
SOCIAL WORKER
2B107
RESIDENT
ASSESSMENT
COORDINATORS
(RAC) NURSES
2B106
H W
R
HWS HWS
H W
S
HWR HWR
HWS HWS
HWR HWR
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S
H W
R H
W R
H W
R H
W R
H W
R H
W R
H W
R
HWS
HWR
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 22, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
P L A
N
N
O R
T H
MD102
SECOND FLOOR DEMOLITION MECHANICAL PLAN - AREA 'B'
H W
R
HWS HWS
H W
S
HWR
HWS HWS
HWR
H W
S H
W S
H W
S H
W S
H W
S H
W S
H W
S
H W
R H
W R
H W
R H
W R
H W
R
HWS
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 22, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
P L A
N
N
O R
T H
M-102
SECOND FLOOR MECHANICAL PLAN - AREA 'B'
M-102
DUCT DETAILS
M-102
DUCT DETAILS
M-102
TYPICAL DIFFUSER CONNECTION DETAIL
M-102
DUCT TAP DETAILS
SS
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 22, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
Renovate Community Living
Center 2nd Floor Halls and Walls
IDF
2A134
MECHANICAL / ELECTRICAL ROOM
2A106
ELECTRICAL
2A133
PATIENT ROOM
2C117
LAUNDRY
2A141
CLEAN
SUPPLY
2A135
MEDICATIONS ROOM
2A130
DIRTY
UTILITY
2A136
WAITING
2A100
STAIR 1
CLC2S1
STAIR 2
CLC2S2
DIETICIAN
2A104
ELEVATOR
MACHINE ROOM
2A103
PATIENT ROOM
2C100
NURSES
WORK ROOM
2A137
IDF-ECTC
2A138
ELECTRICAL
CLOSET
TOILET
2A118
2A131.1
1,157.48 SF
DAYROOM
2A107
TOILET
2A122.1
PATIENT ROOM
2A125
TOILET
2A124.1
STORAGE
2A121
TOILET
2A119.1
STORAGE
2B101.1
OFFICE
2B101.2
PATIENT ROOM
2A127
TOILET
2A126.1
NURSE
PRACTITIONER
2A128
PATIENT ROOM
PATIENT ROOM
2A126
2A113
2A114
PATIENT ROOM
PATIENT ROOM
TOILET
2A115
2A114.1
TOILET
2A112.1
2A117.1
TOILET
TOILET
2A116.1
PATIENT ROOM
2A110
PATIENT ROOM
2A111
PATIENT ROOM
2A117
PATIENT ROOM
2A112
PATIENT ROOM
2A116
TOILET
2A110.1
BREAK ROOM
2A109
TOILET
2A109.1
CORRIDOR
HAC
46.26 SF
2A139
NURSE STATION
2A143
RESTROOM,
UNISEX
2A132
194.96 SF
PATIENT
SHOWER
2A131
WOMEN
RESTROOM
2A129
STORAGE
2A108.1
KITCHEN
2A108
PATIENT ROOM
2A120
PATIENT ROOM
2A119
PATIENT ROOM
2A122
PATIENT ROOM
2A123
PATIENT ROOM
2A124
WOUND CARE
2A143.1
UNISEX
STAFF
2A142
NURSE
PRACTITIONERS
2A140
RESTROOM,
UNISEX
2A102
SOCIAL WORKER
2A105
RESTROOM,
UNISEX
2B100
(ROOF
BELOW)
DN
ELEVATOR
P14
ELEVATOR
P15
U
P
ZONE
VALVE
FEC
MED
SHUTOFF
FEC
FEC
FEC
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 22, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
P L A
N
N
O R
T H
PD101
SECOND FLOOR DEMOLITION PLUMBING PLAN - AREA 'A'
OUTDOOR
PATIO
MECHANICAL / ELECTRICAL ROOM
2A106
STORAGE
2B105
HAC
2B102
ASSISTANT NURSE
MANAGER
2B104
STAIR 4
CLC2S4
PSYCHOLOGIST
2B111
THERAPY WORK ROOM
2B101
DINING HALL /
ACTIVITIES ROOM
2B110
RECREATION THERAPIST
2B103
2B108
HAC
LOCKER /
BREAK ROOM
2B109
ELEVATOR
STORAGE
2B101.1
OFFICE
2B101.2
STORAGE
2B101.4
SOCIAL WORKER
2A105
RESTROOM,
UNISEX
2B100
STORAGE
2B101.3
RESTROOM,
UNISEX
2B109.1
RESTROOM,
UNISEX
2B110.1
SOCIAL WORKER
2B107
RESIDENT
ASSESSMENT
COORDINATORS
(RAC) NURSES
2B106
FEC
D N
S S
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 22, 2021
100% CD SET
CONSULTANTS:
Office of
Facilities
Renovate Community Living
Center 2nd Floor Halls and Walls
KEY PLAN
B
A
C
P L A
N
N
O R
T H
PD102
SECOND FLOOR DEMOLITION PLUMBING PLAN - AREA 'B'
ELECTRICAL
2C108
2C102
STORAGE
PATIENT
2C101
PATIENT
2C116
PATIENT ROOM
2C117
PATIENT ROOM
2C103
PATIENT ROOM
2C107
CORRIDOR
PATIENT
ROOM
2C106
PATIENT ROOM
2C115
SHARED
2C109.1
PATIENT ROOM
2C114
Corridor
PATIENT ROOM
2C100
PATIENT
ROOM
CLEAN
LINEN
2C110
2C111
PATIENT
ROOM
2C104
PATIENT
ROOM
2C112
PATIENT ROOM
2C109
PATIENT
ROOM
2C105
SHARED
2C106.1
SHARED
2C114.1
SHARED
2C102.1
SHARED
2C112.1
SHARED
2C104.1
PATIENT
ROOM
2C113
SHARED
2C116.1
SHARED
2C100.1
2A132
STAIR 3
CLC2S3
UP
FEC
FEC
GLOVES
PPE
I
210 . 530 . 0755
E S T E DA S T SE
210 . 293. 1018FAX:
NG G UOR P
AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA
W
Texas Registered Engineering Firm F-19531 www.westeastdesign.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
ARCHITECT:
671 -20-122
Management
JULY 22, 2021
100% CD SET
CONSULTANT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .