This asbestos survey report details sampling conducted at a community living center. Samples of various floor tiles, ceiling tiles, mastic, float mud, wallboard, and duct insulation were taken from rooms and corridors throughout the building and submitted for laboratory analysis. No asbestos was detected in any of the materials tested.
The related federal contract opportunity is a solicitation from the Department of Veterans Affairs to renovate halls and walls on the second floor of the community living center. The solicitation number, project number, and opportunity type are provided, along with the contracting agency and network. Renovation work will include the materials surveyed in the asbestos report.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25723B0017 0008.docx | DOCX document | |
| 36C25723B0017 0007.docx | DOCX document | |
| 671-20-122-Renovate CLC 2nd Floor Halls and Walls-Addendum No1-revised.pdf | ||
| 36C25723B0017 0006.docx | DOCX document | |
| 36C25723B0017 0005.docx | DOCX document | |
| 36C25723B0017 0004.docx | DOCX document | |
| SET-Arch As-Builts.pdf | ||
| 671-20-122-Renovate CLC 2nd Floor Halls and Walls-Addendum No1.pdf | ||
| 36C25723B0017 0003.docx | DOCX document | |
| 36C25723B0017 0002.docx | DOCX document | |
| 36C25723B0017 0001.docx | DOCX document | |
| 671-20-122-VA-SA-Renovate CLC 2nd Floor Halls and Walls-100 CD-Specificatons.pdf | ||
| 36C25723B0017_1.docx | DOCX document | |
| 671-20-122-VA-SA-Renovate CLC 2nd Floor Halls and Walls-100 CD-Drawings.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sam ple
Loc ati on
(R oo m #)
Surv ey
Date s
Pro jec t #
Susp ect
ACM
Test ed
# o f
Sam ples
Lab R esu lts
Appro xim at e Q uan tit ies of
ACM
1C112 8/21/13 - 8/22/13 13-075 12" Beige Multi Speck Floor Tile 1 NAD 1C117 8/21/13 - 8/22/13 13-075 12" Beige Multi Speck Floor Tile 2 NAD 1C100 8/21/13 - 8/22/13 13-075 12" Black Dot Floor Tile 1 NAD 1C102 8/21/13 - 8/22/13 13-075 12" Black Dot Floor Tile 1 NAD 1C110 8/21/13 - 8/22/13 13-075 12" Black Dot Floor Tile 1 NAD 1C110 8/21/13 - 8/22/13 13-075 12" Gray Floor Tile 1 NAD
Corridor in Front of 1C100 8/21/13 - 8/22/13 13-075 12" Gray Floor Tile 1 NAD Corridor in Front of Stair 3 8/21/13 - 8/22/13 13-075 12" Gray Floor Tile 1 NAD Corridor in Front of 1C100 8/21/13 - 8/22/13 13-075 12" Gray Marble Floor Tile 1 NAD Corridor in Front of Stair 3 8/21/13 - 8/22/13 13-075 12" Gray Marble Floor Tile 1 NAD
Stair 4 8/21/13 - 8/22/13 13-075 12" Gray Marble Floor Tile 1 NAD Corridor in Front of 2A106 8/21/13 - 8/22/13 13-075 12" Lt. Brown Speck Floor Tile 1 NAD Corridor in Front of Stair 4 8/21/13 - 8/22/13 13-075 12" Lt. Brown Speck Floor Tile 1 NAD
Corridor to CLC 8/21/13 - 8/22/13 13-075 12" Lt. Brown Speck Floor Tile 1 NAD 2B101 8/21/13 - 8/22/13 13-075 12" Tan Multi Dot Floor Tile 1 NAD
2B101.1 8/21/13 - 8/22/13 13-075 12" Tan Multi Dot Floor Tile 1 NAD 2B109 8/21/13 - 8/22/13 13-075 12" Tan Multi Dot Floor Tile 1 NAD
Corridor in Front of 2A106 8/21/13 - 8/22/13 13-075 12" Tan Speck Floor Tile 1 NAD Corridor in Front of Stair 4 8/21/13 - 8/22/13 13-075 12" Tan Speck Floor Tile 1 NAD
Corridor to CLC 8/21/13 - 8/22/13 13-075 12" Tan Speck Floor Tile 1 NAD Corridor in Front of 1A132 8/21/13 - 8/22/13 13-075 Ceiling Tile (Crater) 1 NAD Corridor in Front of 1B103 8/21/13 - 8/22/13 13-075 Ceiling Tile (Crater) 1 NAD Corridor in Front of 1B105 8/21/13 - 8/22/13 13-075 Ceiling Tile (Crater) 1 NAD
1A144.1 8/21/13 - 8/22/13 13-075 Ceiling Tile (Worm) 1 NAD Corridor in Front of 2A106 8/21/13 - 8/22/13 13-075 Ceiling Tile (Worm) 1 NAD
Corridor to CLC 8/21/13 - 8/22/13 13-075 Ceiling Tile (Worm) 1 NAD 1A107 8/21/13 - 8/22/13 13-075 Duct Mastic 3 NAD 1C117 8/21/13 - 8/22/13 13-075 Float Mud 1 NAD
2B101.1 8/21/13 - 8/22/13 13-075 Float Mud 1 NAD Corridor to CLC 8/21/13 - 8/22/13 13-075 Float Mud 1 NAD
1A107 8/21/13 - 8/22/13 13-075 Pipe Mastic 2 NAD Stair 4 8/21/13 - 8/22/13 13-075 Pipe Mastic 1 NAD 1C117 8/21/13 - 8/22/13 13-075 Wallboard 1 NAD
2B101.1 8/21/13 - 8/22/13 13-075 Wallboard 1 NAD Corridor to CLC 8/21/13 - 8/22/13 13-075 Wallboard 1 NAD