Appendix B-CLC Asbestos Report.pdf

PDF 45 KB Posted

Attached to
Z2DA--STX Renovate CLC Halls and Walls 2nd Floor Project Number: 671-20-122
Solicitation number
36C25723B0017
Issued by

About this file

This asbestos survey report details sampling conducted at a community living center. Samples of various floor tiles, ceiling tiles, mastic, float mud, wallboard, and duct insulation were taken from rooms and corridors throughout the building and submitted for laboratory analysis. No asbestos was detected in any of the materials tested.

The related federal contract opportunity is a solicitation from the Department of Veterans Affairs to renovate halls and walls on the second floor of the community living center. The solicitation number, project number, and opportunity type are provided, along with the contracting agency and network. Renovation work will include the materials surveyed in the asbestos report.

View the file

Other files

File Type Posted
36C25723B0017 0008.docx DOCX document
36C25723B0017 0007.docx DOCX document
671-20-122-Renovate CLC 2nd Floor Halls and Walls-Addendum No1-revised.pdf PDF
36C25723B0017 0006.docx DOCX document
36C25723B0017 0005.docx DOCX document
36C25723B0017 0004.docx DOCX document
SET-Arch As-Builts.pdf PDF
671-20-122-Renovate CLC 2nd Floor Halls and Walls-Addendum No1.pdf PDF
36C25723B0017 0003.docx DOCX document
36C25723B0017 0002.docx DOCX document
36C25723B0017 0001.docx DOCX document
671-20-122-VA-SA-Renovate CLC 2nd Floor Halls and Walls-100 CD-Specificatons.pdf PDF
36C25723B0017_1.docx DOCX document
671-20-122-VA-SA-Renovate CLC 2nd Floor Halls and Walls-100 CD-Drawings.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sam ple

Loc ati on

(R oo m #)

Surv ey

Date s

Pro jec t #

Susp ect

ACM

Test ed

# o f

Sam ples

Lab R esu lts

Appro xim at e Q uan tit ies of

ACM

1C112 8/21/13 - 8/22/13 13-075 12" Beige Multi Speck Floor Tile 1 NAD 1C117 8/21/13 - 8/22/13 13-075 12" Beige Multi Speck Floor Tile 2 NAD 1C100 8/21/13 - 8/22/13 13-075 12" Black Dot Floor Tile 1 NAD 1C102 8/21/13 - 8/22/13 13-075 12" Black Dot Floor Tile 1 NAD 1C110 8/21/13 - 8/22/13 13-075 12" Black Dot Floor Tile 1 NAD 1C110 8/21/13 - 8/22/13 13-075 12" Gray Floor Tile 1 NAD

Corridor in Front of 1C100 8/21/13 - 8/22/13 13-075 12" Gray Floor Tile 1 NAD Corridor in Front of Stair 3 8/21/13 - 8/22/13 13-075 12" Gray Floor Tile 1 NAD Corridor in Front of 1C100 8/21/13 - 8/22/13 13-075 12" Gray Marble Floor Tile 1 NAD Corridor in Front of Stair 3 8/21/13 - 8/22/13 13-075 12" Gray Marble Floor Tile 1 NAD

Stair 4 8/21/13 - 8/22/13 13-075 12" Gray Marble Floor Tile 1 NAD Corridor in Front of 2A106 8/21/13 - 8/22/13 13-075 12" Lt. Brown Speck Floor Tile 1 NAD Corridor in Front of Stair 4 8/21/13 - 8/22/13 13-075 12" Lt. Brown Speck Floor Tile 1 NAD

Corridor to CLC 8/21/13 - 8/22/13 13-075 12" Lt. Brown Speck Floor Tile 1 NAD 2B101 8/21/13 - 8/22/13 13-075 12" Tan Multi Dot Floor Tile 1 NAD

2B101.1 8/21/13 - 8/22/13 13-075 12" Tan Multi Dot Floor Tile 1 NAD 2B109 8/21/13 - 8/22/13 13-075 12" Tan Multi Dot Floor Tile 1 NAD

Corridor in Front of 2A106 8/21/13 - 8/22/13 13-075 12" Tan Speck Floor Tile 1 NAD Corridor in Front of Stair 4 8/21/13 - 8/22/13 13-075 12" Tan Speck Floor Tile 1 NAD

Corridor to CLC 8/21/13 - 8/22/13 13-075 12" Tan Speck Floor Tile 1 NAD Corridor in Front of 1A132 8/21/13 - 8/22/13 13-075 Ceiling Tile (Crater) 1 NAD Corridor in Front of 1B103 8/21/13 - 8/22/13 13-075 Ceiling Tile (Crater) 1 NAD Corridor in Front of 1B105 8/21/13 - 8/22/13 13-075 Ceiling Tile (Crater) 1 NAD

1A144.1 8/21/13 - 8/22/13 13-075 Ceiling Tile (Worm) 1 NAD Corridor in Front of 2A106 8/21/13 - 8/22/13 13-075 Ceiling Tile (Worm) 1 NAD

Corridor to CLC 8/21/13 - 8/22/13 13-075 Ceiling Tile (Worm) 1 NAD 1A107 8/21/13 - 8/22/13 13-075 Duct Mastic 3 NAD 1C117 8/21/13 - 8/22/13 13-075 Float Mud 1 NAD

2B101.1 8/21/13 - 8/22/13 13-075 Float Mud 1 NAD Corridor to CLC 8/21/13 - 8/22/13 13-075 Float Mud 1 NAD

1A107 8/21/13 - 8/22/13 13-075 Pipe Mastic 2 NAD Stair 4 8/21/13 - 8/22/13 13-075 Pipe Mastic 1 NAD 1C117 8/21/13 - 8/22/13 13-075 Wallboard 1 NAD

2B101.1 8/21/13 - 8/22/13 13-075 Wallboard 1 NAD Corridor to CLC 8/21/13 - 8/22/13 13-075 Wallboard 1 NAD

CLC