623-CSI-103_100 Combined Drawings.pdf
PDF 19 MB Posted
- Solicitation number
- 36C25921R0060
About this file
This document provides details for a federal contract solicitation for site preparation work at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is soliciting proposals for renovations associated with Site Prep for MRI #2 at the Muskogee VAMC located in Muskogee, Oklahoma. The work includes all labor, materials, equipment, tools, and supervision to perform renovations and is estimated to cost between $500,000 and $1,000,000. The NAICS code for this procurement is 236220 for commercial and institutional building construction. The solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses and proposals are due by August 30, 2021. The point of contact listed for any questions is Christina Beeler-Blackburn.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25921R0060 0006.docx | DOCX document | |
| MRI Field Strength RFI.docx | DOCX document | |
| MRI-M145015-PRE-00-A.pdf | ||
| 36C25921R0060 0005.docx | DOCX document | |
| 2nd Questions Response 04262021.docx | DOCX document | |
| 36C25921R0060 0004.docx | DOCX document | |
| 623-C00108 Site Preparation for MRI2 Addendum.zip | ZIP file | |
| 36C25921R0060 0003.docx | DOCX document | |
| 25_FP101 FIRE PROTECTION.pdf | ||
| Request for Information and Answers.docx | DOCX document | |
| S04- Site Visit Attendance_36C25921R0060.pdf | ||
| 36C25921R0060 0002.docx | DOCX document | |
| S04- Site Visit Meeting Doc.docx | DOCX document | |
| 36C25921R0060 0001.docx | DOCX document | |
| MRI form.pdf | ||
| 36C25921R0060_1.docx | DOCX document | |
| 623-CSI-103_Specifications Bound.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAMPUS AERIAL
AREA OF WORK
AREA MAP
US 64
BOARDER AVE
RAIL LINE
AIRPORT
US 62
JCMVAMC
N
0T H
ST
PROJECT LOCATION
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH NO. CA. 2295, EXP. 06/30/2022
OK ENGR NO. CA. 7127, EXP. 06/30/2022
STRUCTURAL / CIVIL
ENGINEER
KFC ENGINEERING
525 CENTRAL PARK DR, SUITE 202
OKLAHOMA CITY, OK 73120
(405) 528-4596
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION
ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:1 :0
A
M
60-G-000
COVER SHEET
ECO
1 52
BKM
ORIGINAL CONTRACT DRAWINGS
SITE PREPARATION FOR MRI #2
VA PROJECT NUMBER: 623-CSI-103
SITE PREPARATION FOR MRI #2
12/22/2021
623-CSI-103
1101 HONOR HEIGHTS DRIVE
MUSKOGEE, OK 74401-1302
JACK C. MONTGOMERY VA MEDICAL CENTER
1101 HONOR HEIGHTS DRIVE
MUSKOGEE, OK 74401-1302
ORIGINAL CONTRACT DRAWINGS
SHEET INDEX
NUMBER SEQUENCE NAME
[01] GENERAL
60-G-000 1 COVER SHEET
60-G-001 2 GENERAL INFORMATION
60-G-010 3 PARTITION TYPES
60-G-011 4 LIFE SAFETY PLANS
[02] STRUCTURAL
60-S-100 5 GENERAL NOTES
60-S-101 6 GENERAL NOTES
60-S-102 7 STATEMENT OF SPECIAL INSPECTIONS
60-S-103 8 TYPICAL DETAILS
60-S-200 9 FOUNDATION PLAN
60-S-300 10 FRAMING PLAN
60-S-500 11 FOUNDATION SECTIONS & DETAILS
60-S-600 12 FRAMING SECTIONS & DETAILS
[03] ARCHITECTURAL
60-AD-101 13 ARCHITECTURAL DEMOLITION FLOOR PLAN
60-AE-201 14 ARCHITECTURAL FLOOR PLAN
60-AE-202 15 ARCHITECTURAL EQUIPMENT PLAN
60-AE-301 16 ARCHITECTURAL REFLECTED CEILING PLAN
60-AE-401 17 ARCHITECTURAL ROOF PLAN
60-AE-701 18 ARCHITECTURAL BUILDING SECTIONS
60-AE-801 19 ARCHITECTURAL FINISH FLOOR PLAN & FINISH SHCEDULES
60-AE-901 20 DOOR & WINDOW SCHEDULE
[04] FIRE PROTECTION
60-FA001 21 FIRE ALARM GENERAL NOTES, RISER, AND MATRIX
60-FA101 22 FIRE ALARM FLOOR PLAN
60-FX101 23 FIRE SUPPRESSION FLOOR PLAN
[05] PLUMBING
60-P-000 24 PLUMBING SYMBOLS & ABBREVIATIONS
60-PLD-101 25 PLUMBING WASTE DEMOLITION FLOOR PLAN
60-PPD-101 26 PLUMBING SUPPLY DEMOLITION FLOOR PLAN
60-PL-101 27 PLUMBING WASTE FLOOR PLAN
60-PP-101 28 PLUMBING SUPPLY FLOOR PLAN
60-PJ-101 29 PLUMBING MEDICAL GAS FLOOR PLAN
60-P-501 30 PLUMBING DETAILS
60-P-601 31 PLUMBING SCHEDULES
[06] MECHANICAL
60-M-000 32 MECHANICAL SYMBOLS & ABBREVIATIONS
60-MHD-101 33 MECHANICAL HVAC DEMOLITION FLOOR PLAN
60-MPD-101 34 MECHANICAL PIPING DEMOLITION FLOOR PLAN
60-MH-101 35 MECHANICAL HVAC FLOOR PLAN
60-MP-101 36 MECHANICAL PIPING FLOOR PLAN
60-M-102 37 MECHANICAL ROOF PLAN
60-M-501 38 MECHANICAL DETAILS
60-M-502 39 MECHANICAL DETAILS
60-M-601 40 MECHANICAL SCHEDULES
60-M-701 41 MECHANICAL CONTROLS
60-M-702 42 MECHANICAL CONTROLS
[07] ELECTRICAL
60-E-000 43 ELECTRICAL SYMBOLS & ABBREVIATIONS
60-EPD-101 44 ELECTRICAL DEMOLITION POWER PLAN
60-EPD-102 45 ELECTRICAL DEMOLITION LIGHTING PLAN
60-EP-101 46 ELECTRICAL POWER FLOOR PLAN
60-EP-102 47 ELECTRICAL LIGHTING PLAN
60-EP-103 48 ELECTRICAL DATA FLOOR PLAN
60-EP-104 49 ELECTRICAL POWER PLANS
60-EPD-601 50 EXISTING PARITIAL ONE-LINE DIAGRAM
60-EP-601 51 NEW PARITIAL ONE-LINE DIAGRAM
60-EP-602 52 ELECTRICAL SCHEDULES AND DETAILS
TOTAL SHEETS: 52
N
ABBREVIATIONS CODES STANDARDS & EXECUTIVE ORDERS
4' -0
M
A X
3' -4
M
A X
1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT BLOCKING FOR ALL WALL
MOUNTED ACCESSORIES, FIXTURES, & EQUIPMENT. SUPPORT BRACKETS TO BE PLACED
AT ALL OPEN COUNTERTOPS - 18"-24" ON CENTER.
2. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER FINISHED FLOOR TO THE OPERABLE
PART OF THE FIXTURE.
3. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL FIXTURES MAY BE USED.
REFER TO SPECIFICATIONS FOR FIXTURE TYPES USED IN THIS PROJECT.
4. GRAB BARS ARE REQUIRED IN ALL VA TOILET STALLS.
TOILET ROOM TURNING RADIUS
DRINKING
FOUNTAINPAPER TOWEL
DISPENSER
SANITARY NAPKIN
DISPENSER
4' -0
M
A X
WASTE
RECEPTACLE
4' -0
M
A X
SOAP DISPENSER
3' -0
M
A X
1'-6" MIN
WALL
4' -0
M
A X
WALL HOOK
7' -6
CLOCK
FFE
3' -6
M
A X
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
5' -0
M
A X
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4' -0
M
A X
4' -0
M
A X
TOILET SEAT
COVER
DISPENSER
BABY CHANGING
STATION
CLEAR FLOOR SPACE @
WATER CLOSET
5'-6"
6' -0
2'-6"
4' -0
2'-6"
4' -0
HANDRAILS &
BUMPERGUARDS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH, PULL
SIDE
HINGE APPROACH, PULL
SIDE
*12" MIN
M
IN
FRONT APPROACH, PUSH
SIDE
M
IN
HINGE APPROACH, PUSH
SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH, PULL
SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH, PUSH
SIDE
*IF BOTH CLOSER &
LATCH ARE PROVIDED
*54" MIN IF CLOSER IS
PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH, PUSH
SIDE
M
IN
42" MIN
M
IN
DOOR & FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT & USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT & BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY ST&ARDS, BOTH DOMESTIC & INTERNATIONAL, WHENEVER FEASIBLE, & TO PARTICIPATE IN VOLUNTARY
ST&ARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES & STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY & THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS & MASTER SPECIFICATIONS SPECIFY
OTHER CODES & ST&ARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD ST&ARD APPLICATION GUIDE, & OTHER GUIDANCE ON THE TECHNICAL INFORMATION
LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 & NFPA 900
• OCCUPATIONAL, SAFETY & HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC)
• SAFETY CODE FOR ELEVATORS & ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER & PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN STANDARD (PG-18-13)
• ANSI ICC A117.1
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE & COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD & RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION ST&ARDS FOR NEW FEDERAL, COMMERCIAL & MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS & NEW LOW-RISE
RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 & 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE & SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, & TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION & SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) & THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH & SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS & GIVEN OPPORTUNITY
TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY & FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT & VENTILATION, & ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 & DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION.
THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 & DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS
ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES & ST&ARDS & VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS & VA ADOPTED NATIONALLY RECOGNIZED CODES & STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY
THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2016 EDITION
BUILDING LOCATION: MUSKOGEE, OK
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING & COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM & MINIMUM VALUES FOR THE ASSOCIATED
TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
OPAQUE THERMAL ENVELOPE REQUIREMENTS (TABLE 5.5-4):
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls N/A
ATTIC & OTHER: R-49 N/A
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. N/A METAL BUILDING: R-0 + R-15.8 c.i. N/A STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED & OTHER: R-13 + R-3.8 c.i. or R-20 N/A
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. N/A
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED & OTHER R-30 N/A
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 FOR 24 in. R-15 FOR 24 in.
HEATED SLABS: R-20 for 24 in. N/A
OPAQUE DOORS
SWINGING: U-0.370 U-0.370
NONSWINGING: U-0.310 N/A
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
NON-METAL FRAMING (ALL): 0.31 N/A
METAL FRAMING, FIXED: 0.38 0.38
METAL FRAMING, OPERABLE: 0.46 N/A
METAL FRAMING ENTRANCE DOOR: 0.68 N/A
DEFINITIONS:
c.i. = CONTINUOUS INSULATION
NR = NO (INSULATION) REQUIREMENT
N/A = NOT APPLICABLE
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM ALL ITEMS REQUIRED
BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY WORK TO CONFIRM THE ACCURACY OF THE DRAWINGS, & REPORT ANY DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE
DRAWINGS. FIELD VERIFY ALL DIMENSIONS & EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN & FREE OF
OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES & WARNING SIGNS TO DIVERT & WARN PASSERS-BY OF THE CONSTRUCTION WORK.
PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH & DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES & CONDITIONS TO REMAIN IN PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH & REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH
EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR REPLACED BACK TO
ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT PARTICULATE MATERIAL
FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE ADEQUATE LIGHTING
LEVELS FOR CONSTRUCTION.
10. CONTRACTOR & SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER DISCIPLINES TO INSTALL COMPLETE & OPERATIONAL SYSTEMS. DRAWINGS, AS A WHOLE, REPRESENT A COMPLETE SET & DEPICT REQUIREMENTS FOR COMPLETE & OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE & ACCURATE INFORMATION TO COORDINATE COMPLETE & OPERATIONAL SYSTEMS, BUT DO SO AS
AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS. CONTRACTOR &
SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS & SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE & OPERATIONAL GOAL. LACK OF COORDINATION & REVIEW OF DRAWINGS & SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE & OPERATIONAL SYSTEMS, BEING OBVIOUS & TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS & SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, & APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE DESIRED TIME & SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS & MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING & APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE &/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS & MAY NOT BE AN ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING THE
CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
1023A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00"
4B
3A
ROOM NAME
000A
150 SF
/1 A101
X0000
6"
3' -0
M
A X
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
AMT AMOUNT
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR COLOR
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CSWK CASEWORK
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EQ EQUAL
EXP EXPOSED
EXT EXTERIOR
F
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FT FEET
FTG FOOTING
G
GR FL GROUND FLOOR
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HORIZ HORIZONTAL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING
CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LOC LOCATION
LT LIGHT
LVR LOUVER
M
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORIG ORIGINAL
P
PA PUBLIC ADDRESS
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PL PROPERTY LINE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PWR POWER
Q
QTY QUANTITY
R
RCP REFLECTED CEILING PLAN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RFG ROOFING
RM ROOM
RO ROUGH OPENING
S
SCHED SCHEDULE
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
STD STANDARD
STOR STORAGE
T
TEL TELEPHONE
TEMP TEMPORARY
TFF TOP OF FINISH FLOOR
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR INSTALLED
VV VA PROVIDED / VA INSTALLED
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
X
X BRACE CROSS BRACE
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD & LINE
LEVEL INDICATOR
MATCH LINE & VIEW
REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER &
LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'- 0"
5'- 6"
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE @
ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
FIBERGLASS BATT INSULATION
MINERAL WOOL INSULATION
EXPANDED POLYSTYRENE
INSULATION
EXTRUDED POLYSTYRENE
INSULATION
POLYISOCYANURATE INSULATION
SPRAY-APPLIED CLOSED CELL
INSULATION
CONCRETE / PRECAST CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR PLASTER
FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY UNIT
STONE / CAST STONE
GYPSUM BOARD
EXTERIOR SHEATHING BOARD
PLYWOOD
2' -1
0" M
A X
2' -3
M
IN
1'-6" MIN
6" MAX
9" M
IN
SHOWER LAVATORY WITH
MIRROR ON
CENTER
WALL
2' -1
0" O
F R
E F
L E C
T
IV
E S
U R
F A
C E
3' -4
M
A X
. T O
B O
T T
O M
17 MIN
2' -3
M
IN
2' -9
M
A X
4' -0
M
IN
2'-0" MIN
8" MIN
WALL
LAVATORY WITH
APRON
1' -5
M
A X
1'-6" MIN
URINAL
WALL
1'-5"- 1'-7" (AMBULATORY)
1'-4"- 1'-6" (WHEELCHAIR)
CLEAR FLOOR
5'-6"
CLEAR FLOOR
6'-0"
3'-0" MIN
2' -9
3' -0
MIN
1'-0"
3'-6" MIN MAX
1'-0"
4'-6" MIN
1' -5
1' -7
1' -6
M
IN
A N
S I I
C C
A
7.
1)
1' -3
M
IN
A D
A /A
B A
2' -9
3' -0
WALL
WALL
WALL
4"
6"
MIN
2'-0"
6" MAX
7" - 9"
3"
1' -6
11" MIN
17" - 25"
39"- 41"
1"
M
IN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH NO. CA. 2295, EXP. 06/30/2022
OK ENGR NO. CA. 7127, EXP. 06/30/2022
STRUCTURAL / CIVIL
ENGINEER
KFC ENGINEERING
525 CENTRAL PARK DR, SUITE 202
OKLAHOMA CITY, OK 73120
(405) 528-4596
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION
ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:1 :0
A
M
60-G-001
GENERAL INFORMATION
BHR
2 52
JDP
ORIGINAL CONTRACT DRAWINGS
SITE PREPARATION FOR MRI #2
12/22/2021
623-CSI-103
1101 HONOR HEIGHTS DRIVE
MUSKOGEE, OK 74401-1302
1. NOT ALL PARTITION TYPES SHOWN HERE MAY BE USED. REFER TO PLANS FOR LOCATION AND
TYPES OF EACH PARTITION.
2. PAINT CONTINUOUS 4" TALL, STENCILED LETTERS, ABOVE CEILING, ON BOTH SIDES OF ALL FIRE AND SMOKE WALLS DESIGNATING THE PARTITION RATING INDICATED ON THE LIFE SAFETY PLAN.
3. ALL SUSPENDED WALLS AND PARTITIONS SHALL HAVE GYP. BD. WHICH EXTENDS A MINIMUM OF 6" ABOVE THE SUSPENDED CEILING UNLESS SHOWN AND/OR NOTED OTHERWISE BY THE ARCHITECT.
4. REFER TO STRUCTURAL DRAWINGS FOR ALL LOAD BEARING WALL CONDITIONS IN REGARDS TO
STRUCTURAL REQUIREMENTS.
5. "ALIGN" MEANS SIMILAR COMPONENTS OF CONSTRUCTION, E.G. WALLS, JAMBS, ETC. SHALL ALIGN
ACROSS VOIDS AND JOINTS.
6. PARTITIONS SHALL BE CONTINUOUS OVER DOORS SAME ADJACENT WALLS (UNLESS NOTED
OTHERWISE) WHERE DRYWALL CONTINUES ABOVE CEILING AND ABOVE THE CEILING LEVEL UP TO
THE STRUCTURE ABOVE. ALL GYPSUM BOARD RETURNS SHALL HAVE CORNER BEADS MINIMUM
FLOOR TO CEILING. ALL PENETRATIONS IN DRYWALL CONSTRUCTION ABOVE FINISHED CEILING SHALL BE EFFECTIVELY SEALED TO PREVENT SOUND LEAKAGE AND FIRE STOPPING TAPE/CAULK AT
ALL RATED PARTITIONS.
7. ALL MECHANICAL CHASES AND OTHER NOTED CHASES ARE TO EXTEND UP TO THE UNDERSIDE OF THE DECK STRUCTURE ABOVE. ALL PLUMBING CHASES UNLESS OTHERWISE NOTED, SHALL EXTEND
ABOVE THE HIGHEST ADJOINING CEILING AND BE BRACED TO STRUCTURE.
8. ALL CONSTRUCTION DESIGNATED TO BE SUPPORTED BY ROOF STRUCTURE SHALL BE SUPPORTED
BY TOP CHORD OF STRUCTURAL JOISTS AND NOT FROM THE METAL DECK.
9. COORDINATE WITH MILLWORK DRAWINGS FOR PLACEMENT OF BLOCKING IN WALLS/PARTITIONS.
ALL WOOD BLOCKING IS TO BE FIRE RETARDANT TREATED.
10. IMPACT RESISTANT GYP. BD., WHERE NOTED, IS OPTIONAL ABOVE 8' AFF AND BEHIND LOCKERS.
11. SEAL THE TOP AND BOTTOM OF WALL AS WELL AS ALL PENETRATIONS WHERE SMOKE
PARTITIONS ARE DESIGNATED ON THE LIFE SAFETY PLAN TO ELIMINATE THE PASSAGE OF SMOKE.
GENERAL PARTITION NOTES
LINE OF STRUCTURAL DECK
TAPE AND BED GYP BD
ONLY ABOVE CEILING
EACH SIDE
CEILING MATERIAL AS
SCHEDULED
WALL FINISH AS
SCHEDULED
SOUND ATTENUATION
BATTS AS REQ'D
2 LAYERS OF 5/8" TYPE 'X' GYP BD
EACH SIDE OF METAL STUDS AT 16" O.C.
BASE AND FLOORING
AS SCHEDULED
C E
IL
IN
G H
E
IG
H T
R E
R
C P
F L
O O
R T
O U
N D
E R
S
ID
E O
F S
T R
U C
T U
R E
A B
O V
E
2 LAYERS OF 5/8" TYPE 'X' GYP BD ON EACH SIDE OF 6" METAL STUDS AT 16" O.C.
EXTEND & SEAL FROM FIN FLR TO UNDERSIDE OF DECK ABOVE. (UL# U404)
TYPE 1
SUFFIX
A
DETAILS
SEAL TO FLOOR ASSEMBLY
PER UL# U404 INSTRUCTION
SEAL TO UNDERSIDE OF ASSEMBLY,
PER UL# U404 INSTRUCTION
LINE OF STRUCTURAL DECK
TAPE AND BED GYP BD
ONLY ABOVE CEILING
EACH SIDE
COPPER SHIELDED CEILING
SYSTEM AS SCHEDULED
WALL FINISH AS
SCHEDULED
SOUND ATTENUATION
BATTS AS REQ'D
BASE AND FLOORING
AS SCHEDULED
C E
IL
IN
G H
E
IG
H T
R E
R
C P
1 LAYER OF 5/8" TYPE 'X' GYP BD ON COPPER-LINER ON 3-5/8" METAL FRAMING
TO EXTEND FROM FIN FLR TO UNDERSIDE OF CEILING ABOVE
TYPE 4
SUFFIX
A
DETAILS
5/8" GYP BD ON COPPER-LINED
3-5/8" METAL STUD FRAMING
MRI SIDE
2-HOUR RATED (SMOKE BARRIER) NON RATED (RF LINER)
5/8" GYP BD
1 LAYER 5/8" GYP BD ON ONE SIDE AND 1 LAYER OF 5/8" TYPE 'X' GYP BD ON COPPER-
LINER ON OTHER SIDE ON 3-5/8" METAL FRAMING FRAMING TO EXTEND FROM FIN FLR
TO UNDERSIDE OF CEILING ABOVE
B
SCHEDULED CEILING
2" th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH NO. CA. 2295, EXP. 06/30/2022
OK ENGR NO. CA. 7127, EXP. 06/30/2022
STRUCTURAL / CIVIL
ENGINEER
KFC ENGINEERING
525 CENTRAL PARK DR, SUITE 202
OKLAHOMA CITY, OK 73120
(405) 528-4596
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION
ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:1 :0
A
M
60-G-010
PARTITION TYPES
BHR
3 52
JDP
ORIGINAL CONTRACT DRAWINGS
SITE PREPARATION FOR MRI #2
12/22/2021
623-CSI-103
1101 HONOR HEIGHTS DRIVE
FD
CRU 1 CRU 2
LIFE SAFETY LEGEND
1 OCCUPANT LOAD
BUILDING EXIT
FIRE RATED WALL SYMBOLS:
EGRESS PATH
1 HOUR FIRE
2 HOUR FIRE
3 HOUR FIRE
4 HOUR FIRE
1 HOUR FIRE / SMOKE
2 HOUR FIRE / SMOKE
3 HOUR FIRE / SMOKE
4 HOUR FIRE / SMOKE
FACP
FEC
FIRE ALARM CONTROL PANEL
FIRE EXTINGUISHER CABINET
NFPA 101-2015 EDITION
ALL EXIT DOORS PROVIDED ARE 36" LEAF MINIMUM YIELDING 34" CLEAR EXIT WIDTH .
- 15"/PERSON (IBC 1005.3.2, EXCEPTION 1) ALLOWS 226 OCCUPANT LOAD PER DOOR MAX.
STAIR WIDTH PROVIDED IS 44 1/4" AT STAIR 1 (SOUTH) AND 42 1/2" AT STAIR 2 (WEST)
- .3"/PERSON (IBC 1005.3.1) ALLOWS 146 OCCUPANT LOAD AT STAIR 1 MAX.
- .3"/PERSON (IBC 1005.3.1) ALLOWS 141 OCCUPANT LOAD AT STAIR 2 MAX.
BUILDING HEIGHT: 1 STORY, 18'-0" HEIGHT
BUILDING AREA: 3,916 GROSS S.F. 2013 BUILDING ADDITION
AREA LIMITATION: 37,500 S.F. PER FLOOR (2015 IBC TABLE 503)
BUILDING IS EQUIPPED WITH A FULLY AUTOMATIC FIRE SPRINKLER SYSTEM THROUGHOUT
CONSTRUCTION TYPE: (TABLE A.8.2.1.2): TYPE II (000)
FIRE RESISTANCE RATINGS (TABLE A.8.2.1.2):
• COLUMNS: 0 HR
• BEAM, GIRDERS, TRUSSES: 0 HR
• FLOOR/CEILING ASSEMBLIES: 0 HR
• ROOF/CEILING ASSEMBLIES: 0 HR
• EXTERIOR NON-BEARING WALLS: 0 HR
• INTERIOR NON-BEARING WALLS: 0 HR
FIRE-RESISTIVE REQUIREMENTS:
• NON COMBUSTIBLE MATERIALS FOR STRUCTURAL FRAME, FLOORS, ROOF DECK, EXTERIOR NON-
BEARING WALLS, INTERIOR NON-BEARING WALLS (U.N.O. AT EXTERIOR)
CHAPTER 38: NEW BUSINESS OCCUPANCY
OCCUPANT LOADS (TABLE 7.3.1.2):
• FIRST FLOOR BUSINESS USE = 100 SF/PERSON
• SECOND FLOOR BUSINESS USE = 100 SF/PERSON
• FIRST FLOOR WAITING AREAS WITHOUT FIXED SEATING = 15 SF/PERSON
• SECOND FLOOR WAITING AREAS WITHOUT FIXED SEATING = 15 SF/PERSON
SHAFTS MINIMUM 1-HOUR RATING (8.6.5)
DEAD END CORRIDOR MAXIMUM DISTANCE: 50' (38.2.5.2.1)
MAXIMUM COMMON PATH OF TRAVEL: 100' (38.2.5.3.1)
MAXIMUM TRAVEL DISTANCE: 300' (38.2.6.3)
CORRIDOR MINIMUM FIRE RATING: 0 HR (38.3.6.1 EXCEPTION 3)
SMOKE COMPARTMENTALIZATION:
- NOT REQUIRED FOR BUSINESS OCCUPANCIES, NOT PROVIDED.
PROTECTED AREAS:
- STORAGE ROOMS/CLEAN/SOILED - REQUIRED VA FIRE PROTECTION DESIGN MANUAL 3.1.A AND PER
NFPA 101: 38.3.2.1 AND 8.7 SMOKE PARTITIONS WITH SPRINKLER PROTECTION, PROVIDED.
MEDICAL RECORDS STORAGE - 1 HR PER VA FIRE PROTECTION DESIGN MANUAL SECTION 3.1.B.
FIRE ALARM SYSTEM:
- REQUIRED / PROVIDED MANUAL SYSTEM.
STANDPIPES:
- NOT REQUIRED / NOT PROVIDED.
MRI #1
EQUIPMENT
ROOM
213 SF
EQUIPMENT
ROOM
MRI #1
445 SF
MRI #2
CONTROL
ROOM
STAFF ROOM
HAC
PATIENT
TOILET
LOBBY /
WAITING
QUARANTINE
STORAGE
READ ROOM
DRESSING
ROOM 3
DRESSING
ROOM 2
DRESSING
ROOM
PATIENT
TOILET
PATIENT
SCREENING
PATIENT
TRANSFER
ENTRY
VESITBULE
CORRIDOR
RECEPTION
PATIENT
HOLDING
PENETRATIONS
CABINET
122B
47'-4"
'-6
'-3
102'-1"
2'
-8
TOTAL TRAVEL DISTANCE: 135'-9"
3'-9"
'-1
26'-7"
34'-1"
135'-9"
SCOPE BOUNDARY
FEC
NEW GAUSS BARRIER /
GUARDRAIL
EXISTING
RETAINING WALL
EXISTING
LADDER
5 GAUSS LINE
KEY PLAN
N th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
OK ARCH NO. CA. 2295, EXP. 06/30/2022
OK ENGR NO. CA. 7127, EXP. 06/30/2022
STRUCTURAL / CIVIL
ENGINEER
KFC ENGINEERING
525 CENTRAL PARK DR, SUITE 202
OKLAHOMA CITY, OK 73120
(405) 528-4596
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
FIRE PROTECTION
ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:1 :0
A
M
60-G-011
LIFE SAFETY PLANS
BHR
4 52
JDP
ORIGINAL CONTRACT DRAWINGS
SITE PREPARATION FOR MRI #2
12/22/2021
623-CSI-103
1101 HONOR HEIGHTS DRIVE
MUSKOGEE, OK 74401-1302
N
1/4" = 1'-0"
LEVEL 1 - LIFE SAFETY PLAN
1) POST-INSTALLED EXPANSION AND UNDERCUT ANCHORS SHALL MEET THE ASSESSMENT
CRITERIA OF ACI 355.2 "QUALIFICATION OF POST-INSTALLED MECHANICAL ANCHORS
IN CONCRETE."
B. QUALIFICATION REQUIREMENTS FOR PRODUCTS
2) PER ACI 318-14 SECTION 17.8.2.2, INSTALLATION OF ADHESIVE ANCHORS
HORIZONTALLY OR UPWARDLY INCLINED SHALL BE PERFORMED BY PERSONNEL CERTIFIED
BY AN APPLICABLE CERTIFICATION PROGRAM. CERTIFICATION SHALL INCLUDE WRITTEN
AND PERFORMANCE TESTS IN ACCORDANCE WITH THE ACI/CRSI ADHESIVE ANCHOR
INSTALLER (AAI) CERTIFICATION PROGRAM, OR EQUIVALENT.
1) CONTRACTOR SHALL REQUEST, SCHEDULE AND FACILITATE THE ANCHOR AND/OR
ADHESIVE MANUFACTURER'S REPRESENTATIVE TO PROVIDE ONSITE INSTALLATION
TRAINING FOR ALL THE MANUFACTURER'S SPECIFIED ANCHORING PRODUCTS. THE
ENGINEER MUST RECEIVE DOCUMENTED CONFIRMATION THAT ALL OF THE CONTRACTOR'S
ANCHOR INSTALLATION PERSONNEL ARE TRAINED PRIOR TO COMMENCEMENT OF ANCHOR
INSTALLATION OPERATIONS.
A. QUALIFICATION REQUIREMENTS FOR INSTALLERS
9. POST-INSTALLED ANCHORS AND DOWELS
5) MOIST CURING OF SLABS: SLABS-ON-GRADE AND SLABS-ON-DECK SHALL BE WATER
CURED FOR A MINIMUM OF 7 DAYS BY PONDING, SPRAYING, SPRINKLING OR BY USE OF
SATURATED COVERINGS. CURING COMPOUNDS ARE EXPRESSLY PROHIBITED.
4) SURFACE FINISH: ALL HORIZONTAL CONCRETE SURFACES SHALL HAVE A TROWELED
FINISH UNLESS NOTED OTHERWISE IN ARCHITECTURAL DRAWINGS OR FLOORING
SPECIFICATIONS. AT STAIR TREAD PLACEMENTS PROVIDE A FINE BROOM FINISH
TRANSVERSE TO THE RISERS.
3) CHAMFERED EDGES: UNLESS NOTED OTHERWISE ON ARCHITECTURAL DRAWINGS, PROVIDE
3/4" CHAMFER ON ALL EXPOSED CONCRETE EDGES.
2) EQUIPMENT PADS: PROVIDE CONCRETE EQUIPMENT PADS OF SIZE REQUIRED FOR
EQUIPMENT FURNISHED. SEE MECHANICAL, PLUMBING, FIRE PROTECTION AND
ELECTRICAL DRAWINGS FOR NUMBER, SIZE, AND LOCATION OF SUCH PADS. UNLESS
OTHERWISE SHOWN, MINIMUM PAD THICKNESS SHALL BE 4" AND SHALL EXTEND A
MINIMUM OF 6" BEYOND THE FACE OF THE EQUIPMENT. MINIMUM REINFORCING SHALL
BE #4 BARS AT 12" O.C. EACH WAY. TOOLED OR CHAMFERED EDGES SHALL BE
PROVIDED AT ALL EQUIPMENT PADS. ANCHORAGE TO SUPPORTING SLAB SHALL BE
MADE. REFER TO TYPICAL DETAILS.
1) WATERSTOPS AND WATERPROOFING: ALL CONSTRUCTION JOINTS (VERTICAL AND
HORIZONTAL) IN BELOW-GRADE CONCRETE WALLS, TRENCHES AND PITS SHALL BE KEYED
AND HAVE BENTONITE WATERSTOPS INSTALLED UNLESS NOTED OTHERWISE. ALL
BELOW-GRADE CONCRETE WALLS, PITS AND TRENCHES SHALL BE WATERPROOFED AS
SHOWN IN ARCHITECTURAL DRAWINGS, UNLESS NOTED OTHERWISE.
H. CONCRETE MISCELLANEOUS:
1) CONCRETE SLABS-ON-GRADE: REFER TO SLAB-ON-GRADE CONSTRUCTION NOTES ABOVE
FOR INFORMATION REGARDING JOINTS.
G. JOINTS IN CONCRETE CONSTRUCTION:
1) THE SIZE AND LOCATION OF ALL FLOOR PITS, TRENCH DRAINS, AND OPENINGS FOR
ALL DUCTS AND PIPES THROUGH WALLS, FLOORS, AND FOUNDATION WORK SHALL BE
VERIFIED WITH THE MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL
CONTRACTOR'S REQUIREMENTS PRIOR TO THE START OF ANY CONCRETE WORK.
F. OPENINGS IN CONCRETE STRUCTURES:
6) CONCRETE COVER OVER STEEL REINFORCING FOR NON-PRESTRESSED CAST-IN-PLACE
CONSTRUCTION SHALL CONFORM TO THE TABLE PROVIDED BELOW.
5) AT INTERSECTING FOUNDATIONS, EXTEND ALL HORIZONTAL REINFORCING OF THE
INTERSECTING MEMBERS BEYOND THE POINT OF INTERSECTION TO THE OPPOSITE FACE.
BEND TO A STANDARD 90 DEGREE HOOK OR PROVIDE BENT DOWELS OF EQUAL SIZE AND
SPACING AND LAP AS REQUIRED FOR A CLASS B TENSION SPLICE (BUT NOT LESS THAN
12") IN EACH DIRECTION. REFER TO TYPICAL DETAILS FOR ADDITIONAL
INFORMATION.
4) PROVIDE CORNER BARS IN BOTH FACES OF ALL CONTINUOUS GRADE BEAMS, FOOTINGS
AND WALLS. NUMBER, SIZE, AND SPACING OF CORNER BARS SHALL BE EQUAL TO
NUMBER, SIZE AND SPACING OF HORIZONTAL REINFORCING WITH WHICH THEY LAP AND
SHALL HAVE CLASS B TENSION LAP SPLICES IN EACH DIRECTION. REFER TO TYPICAL
DETAILS FOR ADDITIONAL INFORMATION.
3) PLACEMENT OF WELDED WIRE REINFORCEMENT SHALL BE CONTINUOUS, SHALL NOT BE
INTERRUPTED BY BEAMS AND GIRDERS, AND SHALL BE LAPPED A MINIMUM OF 8-INCHES
UNLESS SHOWN OTHERWISE IN DETAILS.
2) UNLESS OTHERWISE NOTED, LAP SPLICES OF DEFORMED REINFORCING BARS SHALL
CONFORM TO ACI REQUIREMENTS FOR CLASS B TENSION SPLICES. REFER TO LAP
LENGTH SCHEDULES FOR TYPICAL LAP REQUIREMENTS.
1) ALL DETAILING, FABRICATION, AND PLACING OF REINFORCING STEEL, UNLESS
OTHERWISE NOTED, SHALL FOLLOW ALL SECTIONS OF THE ACI "DETAILING
MANUAL-2004" (SP-66 04), THE ACI "BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE" (ACI 318-14), AND ALL SECTIONS OF THE CONCRETE REINFORCING STEEL
INSTITUTE (CRSI) "MANUAL OF STANDARD PRACTICE."
E. CONCRETE REINFORCING:
7) DOCUMENTATION OF CONCRETE MIXTURE CHARACTERISTICS SHALL BE SUBMITTED FOR
REVIEW BEFORE THE MIXTURE IS USED. EVIDENCE OF THE ABILITY OF THE PROPOSED
MIXTURE TO COMPLY WITH THE CONCRETE MIXTURE REQUIREMENTS IN THE
CONSTRUCTION DOCUMENTS SHALL BE INCLUDED IN THE SUBMITTAL. THE EVIDENCE
SHALL BE BASED ON FIELD TEST RECORDS OR LABORATORY TRIAL BATCHES.
C) THE CONCRETE SHALL CONFORM TO STRENGTH TEST REQUIREMENTS FOR
STANDARD-CURED SPECIMENS.
B) THE CONCRETE SHALL MEET REQUIREMENTS FOR THE ASSIGNED EXPOSURE CLASSES
OUTLINED HEREIN.
A) THE CONCRETE CAN BE PLACED READILY WITHOUT SEGREGATION INTO FORMS AND
AROUND REINFORCEMENT UNDER ANTICIPATED PLACEMENT CONDITIONS. THE
CONCRETE PRODUCER SHALL DETERMINE WHETHER ADMIXTURES ARE NECESSARY FOR
WATER REDUCTION, SET TIME, OR SLUMP REQUIREMENTS.
6) CONCRETE MIX PROPORTIONS SHALL BE ESTABLISHED IN ACCORDANCE WITH ARTICLE
4.2.3 OF "SPECIFICATIONS FOR STRUCTURAL CONCRETE (ACI 301)." SO THAT THE
CONCRETE SATISFIES THE FOLLOWING THREE REQUIREMENTS:
9) MAXIMUM WATER-SOLUBLE CHLORIDE ION CONTENT IN CONCRETE, PERCENT BY
WEIGHT OF CEMENT: 1.00
8) TARGET AIR CONTENT: DO NOT ALLOW AIR CONTENT OF TROWEL-FINISHED
FLOORS TO EXCEED 3 PERCENT
7) MAXIMUM AGGREGATE SIZE: 1 1/2-INCHES
6) MAXIMUM WATER/CEMENT RATIO: 0.45
5) 28-DAY COMPRESSIVE STRENGTH: 4,000 PSI
4) CORROSION PROTECTION CATEGORY (C): CLASS C0
3) WATER EXPOSURE CATEGORY (W): CLASS W0
2) SULFATE EXPOSURE CATEGORY (S): CLASS S0
1) FREEZING AND THAWING EXPOSURE CATEGORY (F): CLASS F0
B) INTERIOR SLABS-ON-GRADE
9) MAXIMUM WATER-SOLUBLE CHLORIDE ION CONTENT IN CONCRETE, PERCENT BY
WEIGHT OF CEMENT: 0.30
8) TARGET AIR CONTENT: 4.5 PERCENT PLUS OR MINUS 1.5 PERCENT
7) MAXIMUM AGGREGATE SIZE: 1 1/2 INCHES
6) MAXIMUM WATER/CEMENT RATIO: 0.55
5) 28-DAY COMPRESSIVE STRENGTH: 3,500 PSI
4) CORROSION PROTECTION CATEGORY (C): CLASS C1
3) WATER EXPOSURE CATEGORY (W): CLASS W0
2) SULFATE EXPOSURE CATEGORY (S): CLASS S0
1) FREEZING AND THAWING EXPOSURE CATEGORY (F): CLASS F0
A) BELOW GRADE FOUNDATIONS AND WALLS
5) MIX DESIGNS SHALL BE PROPORTIONED BASED ON THE FOLLOWING MIX
CHARACTERISTICS;
E) MOISTURE VAPOR REDUCTION: ASTM C494.
D) INHIBITING CHLORIDE INDUCED CORROSION: ASTM C1582.
C) AIR ENTRAINMENT: ASTM C260.
B) PRODUCING FLOWING CONCRETE: ASTM C1017.
A) WATER REDUCTION AND SETTING TIME MODIFICATION: ASTM C494.
4) ADMIXTURES, IF USED, SHALL CONFORM TO THE FOLLOWING:
3) MIXING WATER SHALL CONFORM TO ASTM C1062. MIXING WATER, INCLUDING THAT
PORTION OF MIXING WATER CONTRIBUTED IN THE FORM OF FREE MOISTURE ON
AGGREGATES, SHALL NOT CONTAIN DELETERIOUS AMOUNTS OF CHLORIDE IONS.
2) ALL CONCRETE MIXES SHALL BE COMPRISED OF NORMAL WEIGHT AGGREGATES
CONFORMING TO ASTM C33, EXCEPT WHERE SPECIFICALLY INDICATED AS LIGHTWEIGHT,
IN WHICH CASE AGGREGATES SHALL CONFORM TO ASTM C330.
B) FLY ASH: ASTM C618 CLASS F OR C. THE MAXIMUM PERCENTAGE OF FLY ASH SHALL
NOT EXCEED 25 PERCENT OF THE TOTAL CEMENTITIOUS MATERIAL.
A) PORTLAND CEMENT: ASTM C150 TYPE I OR II UNLESS SPECIFICALLY NOTED
OTHERWISE.
1) CEMENTITIOUS MATERIALS
D. CONCRETE MIXTURES:
C. TOLERANCES: TOLERANCES FOR CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE WITH
"SPECIFICATION FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS (ACI
117-10) AND COMMENTARY (ACI 117R-10)."
B. CONCRETE CONSTRUCTION CRITERIA: ALL CONCRETE CONSTRUCTION SHALL COMPLY WITH
THE PROVISIONS OF "SPECIFICATIONS FOR STRUCTURAL CONCRETE (ACI 301-16)."
A. DESIGN CRITERIA: THE DESIGN OF CONCRETE IS GOVERNED BY "BUILDING CODE
REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318-14) AND COMMENTARY (ACI
318R-14)."
8. CONCRETE CONSTRUCTION NOTES
4) CONSTRUCTION MONITORING: A GEOTECHNICAL ENGINEER SHALL BE RETAINED TO
PROVIDE OBSERVATIONS AND TESTING OF SOILS EXPOSED DURING PROJECT
CONSTRUCTION IN ORDER TO VERIFY THAT SOIL CONDITIONS ARE AS ANTICIPATED.
CONSTRUCTION ACTIVITIES PERTAINING TO EARTHWORK AND OTHER RELATED
ACTIVITIES SHALL ALSO BE OBSERVED BY THE GEOTECHNICAL ENGINEER AS OUTLINED
ABOVE.
3) TRENCH BACKFILL: ALL REQUIRED TRENCH BACKFILL SHALL BE ACCEPTABLE FILL
MATERIAL AS DEFINED ABOVE AND SHALL BE MECHANICALLY COMPACTED IN LAYERS TO
AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY AS DETERMINED BY
ASTM D 698. SOME SETTLEMENT OF THE BACKFILL MAY BE EXPECTED AND ANY
UTILITIES WITHIN THE TRENCHES SHALL BE CONSTRUCTED TO ALLOW THESE
DIFFERENTIAL MOVEMENTS. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
2) EXCAVATION AND TEMPORARY SLOPES: THE CONTRACTOR, DESIGNATED AS
"RESPONSIBLE PERSON" IN OSHA CONSTRUCTION STANDARDS FOR EXCAVATIONS, 29 CFR
PART 1926, IS SOLELY RESPONSIBLE FOR PLANNING AND IMPLEMENTING ALL SAFETY
PROCEDURES DURING CONSTRUCTION. ALL EXCAVATION HEIGHT, SLOPE, AND DEPTH
MUST ADHERE TO ALL SPECIFICATIONS OUTLINED IN LOCAL, STATE, AND FEDERAL
SAFETY REGULATIONS. THE STRUCTURAL ENGINEER DOES NOT ASSUME ANY
RESPONSIBILITY FOR CONSTRUCTION SITE SAFETY OR ANY PARTY'S, INCLUDING THE
CONTRACTOR'S, COMPLIANCE WITH THE APPLICABLE LOCAL, STATE, AND FEDERAL
SAFETY REGULATIONS OR ANY OTHER APPLICABLE REGULATIONS.
1) DRAINAGE CONSIDERATIONS DURING CONSTRUCTION: DUE TO ADVERSE EFFECT ON
STRUCTURES, WATER SHALL NOT BE ALLOWED TO COLLECT IN THE FOUNDATION
EXCAVATION OR ON PREPARED SUBGRADE OF THE CONSTRUCTION AREA EITHER DURING
OR AFTER CONSTRUCTION. UNDERCUT OR EXCAVATED AREAS SHALL BE SLOPED TOWARD
ONE CORNER TO FACILITATE REMOVAL OF ANY COLLECTED RAINWATER, OR POSITIVE
RUNOFF SHALL BE PROVIDED. THE CONTRACTOR SHALL EXERCISE CARE IN CREATING
DRAINAGE PATHS FOR WATER DURING THE CONSTRUCTION PHASE OF THE PROJECT. TO
REDUCE INFILTRATION OF SURFACE WATER AROUND THE PERIMETER OF THE BUILDING
AND BENEATH THE FLOOR SLABS, POSITIVE DRAINAGE SHALL BE PROVIDED DURING ALL
PHASES OF CONSTRUCTION.
D. FOUNDATION MISCELLANEOUS
C) EJ = EXPANSION JOINT
B) SJ = SAWED CONTRACTION JOINT
A) CJ = CONSTRUCTION JOINT
8) SLAB JOINTS: SLAB JOINTS SHALL BE PROVIDED AS SHOWN ON THE PLANS AND
TYPICAL DETAILS AND AS DESCRIBED FURTHER IN THE SLAB-ON-GRADE SCHEDULE. THE
FOLLOWING JOINT TYPES ARE SHOWN ON THE DRAWINGS:
7) ISOLATION JOINTS: PROVIDE SLAB ISOLATION AROUND COLUMNS PENETRATING THE
SLAB-ON-GRADE. PROVIDE 1/2 INCH PREMOLDED EXPANSION JOINT MATERIAL AROUND
PERIMETER OF ISOLATION JOINTS. REFER TO TYPICAL DETAILS AND ADDITIONAL
INFORMATION.
6) MOIST CURING OF SLAB: SLABS-ON-GRADE SHALL BE WATER CURED FOR A MINIMUM OF
7 DAYS BY PONDING, SPRAYING, SPRINKLING OR BY USE OF SATURATED COVERINGS.
CURING COMPOUNDS ARE EXPRESSLY PROHIBITED.
5) EVAPORATION RETARDER: APPLY EVAPORATION RETARDER TO UNFORMED CONCRETE
SURFACES IF HOT, DRY, OR WINDY CONDITIONS CAUSE MOISTURE LOSS APPROACHING
0.2 LB/SQ. FT./H BEFORE AND DURING FINISHING OPERATIONS. APPLY ACCORDING TO
MANUFACTURER'S WRITTEN INSTRUCTIONS AFTER PLACING, SCREEDING, AND BULL
FLOATING OR DARBYING CONCRETE, BUT BEFORE FLOAT FINISHING. A METHODOLOGY
FOR CALCULATING THE MOISTURE LOSS DUE TO EVAPORATION IS PROVIDED IN ACI
305.1-14 "SPECIFICATION FOR HOT WEATHER CONCRETING."
4) VAPOR RETARDER: A 15 MIL VAPOR RETARDER SHALL BE PLACED IMMEDIATELY BELOW
THE CONCRETE SLAB. VAPOR RETARDER SHALL BE SEALED AT ALL LAPS AND SEALED
TO PREVIOUSLY PLACED CONCRETE AS RECOMMENDED BY VAPOR RETARDER
MANUFACTURER. BEFORE PLACING CONCRETE, PATCH AND SEAL ANY RIPS, TEARS OR
HOLES IN VAPOR RETARDER INCURRED DURING CONSTRUCTION.
D) COMPACTED TO 98% STANDARD PROCTOR MAXIMUM DRY DENSITY.
C)PLASTICITY INDEX, PI, SHALL BE LESS THAN OR EQUAL TO 6
B) LESS THAN 5 PERCENT SHALL PASS THE #8 SIEVE
A)100 PERCENT SHALL PASS THE 1½" SIEVE
3) AGGREGATE BASE COURSE: A 4-INCH THICK, FREE-DRAINING AGGREGATE BASE COURSE
SHALL BE PLACED BENEATH THE FLOOR SLAB TO ENHANCE DRAINAGE AND PROVIDE
INCREASED SUBGRADE STRENGTH. AT THE TIME OF THE SLAB PLACEMENT, THE
GRANULAR BASE SHALL BE MOIST, BUT FREE OF ANY STANDING OR SELF-DRAINING
WATER. THE AGGREGATE BASE COURSE MATERIAL SHALL MEET THE FOLLOWING
CRITERIA:
2) CONSTRUCTION MONITORING: CONSTRUCTION ACTIVITY MAY CAUSE DAMAGE AND
DETERIORATION TO THE PREPARED SUBGRADE. A FIELD REPRESENTATIVE OF THE
GEOTECHNICAL ENGINEER SHALL OBSERVE THE FINAL SUBGRADE PRIOR TO PLACEMENT
OF THE SLAB ON GRADE, PERFORM FURTHER TESTING AS NECESSARY, AND DETERMINE
IF ANY REMEDIAL MEASURES ARE NECESSARY PRIOR TO SLAB PLACEMENT.
1) SLAB THICKNESS AND REINFORCING: SLABS-ON-GRADE SHALL BE 6" THICK CONCRETE
REINFORCED WITH #4 BARS AT 18" ON CENTER EACH WAY. REINFORCING BARS SHALL
BE PLACED 1¾" CLEAR FROM TOP OF SLAB USING CHAIRS OR SLAB BOLSTERS
COMPLYING WITH CRSI'S "MANUAL OF STANDARD PRACTICE".
C. SLAB-ON-GRADE CONSTRUCTION
C) ALLOWABLE SKIN FRICTION (NET UPLIFT OR SOIL HEAVE): 2500 PSF
B) ALLOWABLE SKIN FRICTION (DOWNWARD LOADS): 2500 PSF
A) ALLOWABLE END BEARING PRESSURE: 6000 PSF
1) PIER DESIGN PARAMETERS: THE EXISTING BUILDING DRILLED PIER FOUNDATIONS
CAPACITIES ARE BASED ON THE FOLLOWING DESIGN PARAMETERS:
B. DRILLED PIER FOUNDATIONS:
A. A GEOTECHNICAL ENGINEERING REPORT FOR THE ORIGINAL BUILDING CONSTRUCTION WAS
COMPLETED BY AIMRIGHT TESTING & ENGINEERING, DATED NOVEMBER 21, 2011 (PROJECT
NO. 131011).
7. FOUNDATION NOTES
E. ADDITIONAL ITEMS IMPACTING STRUCTURAL DESIGN, INCLUDING BUT NOT LIMITED TO,
ELEVATORS AND MECHANICAL EQUIPMENT WEIGHTS, SHALL BE SUBMITTED TO OWNER'S
REPRESENTATIVE FOR EVALUATION
D. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY BOTH THE OWNER'S REPRESENTATIVE AND
THE BUILDING OFFICIAL.
C. DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE OWNER'S
REPRESENTATIVE WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL
WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN
REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING.
3) ANALYSIS OF CONCRETE SLABS FOR SUPPORT OF PROPOSED LIFT EQUIPMENT
2) ROOF MOUNTED EQUIPMENT AND ASSOCIATED ANCHORAGES (FOR KFC FILE ONLY, WILL
NOT BE REVIEWED AND RETURNED)
1) SHORING
B. DEFERRED DESIGN SUBMITTALS ARE TO BE SUBMITTED TO THE OWNER'S REPRESENTATIVE
AND SHALL INCLUDE BOTH SHOP DRAWINGS AND SIGNED AND SEALED CALCULATIONS
PERFORMED BY AN ENGINEER LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED
AND EXPERIENCED IN THE DESIGN OF THE SPECIFIC BUILDING ELEMENT BEING SUBMITTED.
THE FOLLOWING ITEMS ARE CONSIDERED DEFERRED SUBMITTALS:
A. SOME STRUCTURAL AND/OR OTHER BUILDING ELEMENTS ARE DESIGNATED AS
VENDOR-DESIGNED IN THE CONSTRUCTION DOCUMENTS. THESE ELEMENTS HAVE NOT BEEN
INCLUDED IN THE BUILDING PERMIT ISSUED BY THE BUILDING OFFICIAL AND REQUIRE
THEIR DESIGN BE SUBSTANTIATED BY DEFERRED SUBMITTALS.
6. DEFERRED SUBMITTALS
H. THE PROJECT AREA SHALL BE MAINTAINED AS CLEAN AS POSSIBLE WITH DUST BEING
LIMITED AS MUCH AS PRACTICAL.
G. DAMAGE TO PORTIONS OF THE EXISTING STRUCTURE OR OTHER EXISTING BUILDING
COMPONENTS CAUSED BY DEMOLITION OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR
AT THE CONTRACTOR'S EXPENSE AND TO A LEVEL ACCEPTABLE TO THE OWNER'S
REPRESENTATIVE.
F. CORING FOR PIPING OR CONDUIT THROUGH EXISTING STRUCTURAL MEMBERS IS NOT
ALLOWED UNLESS SPECIFICALLY SHOWN IN THE CONTRACT DOCUMENTS OR SPECIFICALLY
ALLOWED BY THE STRUCTURAL ENGINEER IN WRITING.
E. ALL DRILLING, CUTTING, DEMOLITION OR OTHER MODIFICATIONS TO EXISTING
CONSTRUCTION SHALL BE PERFORMED IN A MANNER THAT WILL NOT REDUCE THE STABILITY
OR STRUCTURAL INTEGRITY OF THE EXISTING CONSTRUCTION. WHEN SAW CUTTING,
SPECIAL CARE SHALL BE TAKEN TO NOT OVER CUT INTO AN EXISTING AREA OF STRUCTURE
THAT WILL REMAIN.
D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING EXISTING UTILITIES, BOTH
CHARTED AND UNCHARTED BEFORE COMMENCING WITH ANY EXCAVATION OR DEMOLITION
WORK. DEPTH OF CONCRETE SAW SHALL BE SET SO AS NOT TO CUT ANY LOCAL EMBEDDED
OR UNDER-FLOOR PIPING OR WIRING WHICH IS TO REMAIN.
C. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL SHORING, PROPS, AND GUYS REQUIRED
FOR THE TEMPORARY SUPPORT OF THE EXISTING STRUCTURE, UTILITIES, ETC. AS MAY BE
NECESSARY TO SAFELY COMPLETE DEMOLITION OR NEW WORK.
B. PRIOR TO DEMOLITION OR INSTALLATION OF NEW WORK, THE CONTRACTOR SHALL MAKE
WRITTEN DOCUMENTATION IF UNFORESEEN CONDITIONS OCCUR IN THE EXISTING
CONSTRUCTION. THESE UNFORESEEN CONDITIONS SHALL BE SUBMITTED TO THE OWNER'S
REPRESENTATIVE FOR REVIEW AND A WRITTEN RESPONSE BEFORE PROCEEDING WITH THE
WORK.
A. ALL VERTICAL AND HORIZONTAL DIMENSIONS, FINISHED FLOOR AND ROOF ELEVATIONS,
PLUMBNESS, AND DETAILS FOR THE EXISTING STRUCTURE SHALL BE VERIFIED IN THE
FIELD PRIOR TO PROCEEDING WITH ANY DEMOLITION OR INSTALLATION OF NEW WORK.
5. EXISTING CONSTRUCTION
2) STRUCTURAL STEEL FRAMING WITH COMPLETED STEEL CONNECTIONS, INCLUDING
PERMANENT VERTICAL AND/OR HORIZONTAL BRACING
1) FOUNDATIONS
E. THE CONTRACTOR SHALL NOT REMOVE TEMPORARY SUPPORTS UNTIL THE INSTALLATION OF
ALL STRUCTURAL ELEMENTS IS COMPLETE AND HAS BEEN ACCEPTED AS COMPLETE BY THE
OWNER'S REPRESENTATIVE. FOR THE PURPOSES OF THIS PARAGRAPH, "ALL STRUCTURAL
ELEMENTS" INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING
STRUCTURAL ELEMENTS:
D. THE CONTRACTOR SHALL PROVIDE TEMPORARY SHORES, GUYS, BRACES, AND OTHER
SUPPORTS DURING CONSTRUCTION TO KEEP STRUCTURAL FRAMING COMPONENTS SECURE,
PLUMB, AND IN ALIGNMENT AGAINST TEMPORARY CONSTRUCTION LOADS AND LOADS EQUAL
IN INTENSITY TO DESIGN LOADS. THE TEMPORARY SUPPORTS SHALL BE SUFFICIENT TO
SECURE THE PARTIALLY ERECTED STRUCTURE OR ANY PORTION THEREOF AGAINST LOADS
THAT ARE LIKELY TO BE ENCOUNTERED DURING CONSTRUCTION, INCLUDING THOSE DUE TO
WIND AND THOSE THAT RESULT FROM CONSTRUCTION OPERATIONS.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING THE ABILITY OF THE
PARTIALLY COMPLETED OR FULLY COMPLETED STRUCTURE TO RESIST ALL CONSTRUCTION
LOADS INCLUDING BUT ARE NOT NECESSARILY LIMITED TO MATERIAL STAGING, PERSONNEL,
AND EQUIPMENT.
B. THE STRUCTURAL FRAMING SYSTEM AND FOUNDATIONS HAVE BEEN DESIGNED AS A COMPLETE
STRUCTURAL SYSTEM FOR SUPPORT OF THE LOADS INDICATED IN THE CONSTRUCTION
DOCUMENTS. THE STRUCTURE HAS NOT BEEN DESIGNED OR CHECKED FOR TEMPORARY
CONSTRUCTION LOADS NOR HAS IT BEEN DESIGNED OR CHECKED FOR ADEQUACY OR
STABILITY AS A PARTIALLY ERECTED STRUCTURE.
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL TEMPORARY CONSTRUCTION
LOADS CAN BE SAFELY SUPPORTED BY THE STRUCTURE DURING CONSTRUCTION.
4. CONSTRUCTION LOADS AND STABILITY
4) ALL OTHER SHAPES AND PLATES UNLESS NOTED (ASTM A36)....FY = 36 KSI
3) ANCHOR RODS (ASTM F1554, GRADE 36).....................FY = 36 KSI
2) SQUARE AND RECTANGULAR HSS (ASTM A500, GRADE C)........FY = 50 KSI
1) ALL WIDE FLANGE SHAPES (ASTM A992)....................FY = 50 KSI
C. STRUCTURAL STEEL (MINIMUM YIELD STRENGTH)
4) WELDABLE REINFORCING BARS (ASTM A706) .................FY = 60 KSI
3) WELDED DEFORMED WIRE REINFORCEMENT (ASTM A1064)........FY = 70 KSI
2) WELDED PLAIN WIRE REINFORCEMENT (ASTM A1064)...........FY = 65 KSI
1) ALL PLAIN AND DEFORMED BARS (ASTM A615, GRADE 60)......FY = 60 KSI
B. CONCRETE REINFORCEMENT (MINIMUM YIELD STRENGTH)
3) ALL OTHER STRUCTURAL CONCRETE, U.N.O:....................4,000 PSI
2) SLAB-ON-GRADE:...........................................4,000 PSI
1) FOUNDATIONS:.............................................4,000 PSI
A. CONCRETE (MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS, NORMAL WEIGHT
U.N.O.)
3. MATERIAL DESIGN VALUES
11)SEISMIC DESIGN CATEGORY:.........................................B
10)1.0 SEC. DESIGN SPECTRAL ACCELERATION, Sd1:..................0.076
9) 0.2 SEC. DESIGN SPECTRAL ACCELERATION, Sds:..................0.123
8) SITE COEFFICIENT, 1.0 SEC. PERIOD, Fv:........................1.50
7) SITE COEFFICIENT, 0.2 SEC. PERIOD, Fa:........................1.30
6) 1.0 SEC. MAPPED SPECTRAL ACCELERATION, S1:...................0.076
5) 0.2 SEC. MAPPED SPECTRAL ACCELERATION, Ss:...................0.142
4) SOIL SITE CLASSIFICATION:........................................C
3) SEISMIC IMPORTANCE FACTOR, Ie:................................1.25
2) RISK CATEGORY: ................................................III
1) GOVERNING CODE:..........................................ASCE 7-16
F. SEISMIC DESIGN CRITERIA:
10)RAIN ON SNOW SURCHARGE LOAD:................................5 PSF
9) MINIMUM FLAT ROOF SNOW LOAD, I*Pg:.........................11 PSF
8) CALCULATED FLAT ROOF SNOW LOAD, Pf:.......................7.7 PSF
7) ROOF SLOPE FACTOR, Cs:........................................1.0
6) THERMAL FACTOR, Ct:...........................................1.0
5) EXPOSURE FACTOR, Ce:..........................................1.0
4) EXPOSURE OF ROOF: ..............................PARTIALLY EXPOSED
3) GROUND SNOW LOAD, Pg:......................................10 PSF
2) SNOW IMPORTANCE FACTOR, Is:...................................1.1
1) GOVERNING CODE:.........................................ASCE 7-16
E. SNOW LOADS:
8) NOMINAL DESIGN WIND SPEED, Vasd:............................89 MPH
7) ULTIMATE DESIGN WIND SPEED, Vult:..........................115 MPH
6) DIRECTIONALITY FACTOR, KD:....................................0.85
5) TOPOGRAPHIC FACTOR, KZT:.......................................1.0
4) INTERNAL PRESSURE COEFFICIENT, GCPI:.......
This is the start of the file's text. The full file is on GovTribe.