This document is an amendment to a solicitation for the M2M & M12N Feeder Repair Project at the Naval Submarine Base New London. The key details are:
The proposal due date has been extended to Tuesday, July 2, 2024 at noon ET. The RFI responses have been posted to SAM.gov. The work includes replacing the entirety of the M2M and M12N 13.8KV feeders from switches to the Main Substation. Only contractors under the specified MACC contracts are allowed to bid on this project. The contracting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 2 Responses.pdf | ||
| RFI Responses.pdf | ||
| Site Visit Log.pdf | ||
| (A) RFP Information Rev1.pdf | ||
| (O) 2016-R-0149.pdf | ||
| (L) Base Map.pdf | ||
| (J) ECMS.pdf | ||
| (G) Price Proposal Form.pdf | ||
| (C) Drawings.pdf | ||
| (P) CERT-141.pdf | ||
| (M) Map to B135.pdf | ||
| (K) RFI Form.pdf | ||
| (H) FAR 52.204-24.pdf | ||
| (F) CT20240024 03 MAY 2024.pdf | ||
| (N) Building Contractors Guide to Taxes.pdf | ||
| (B) Specifications.pdf | ||
| (A) RFP Information.pdf | ||
| (I) General Requirements.pdf | ||
| (E) LESSA.pdf | ||
| (D) NEPA.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Solicitation ACQR 6012068 M2M & M12N Feeder Repair Project, Naval Submarine Base New London
1. The proposal due date is Tuesday, 02 July, 2024 at noon ET.
2. The RFI responses are posted to SAM.gov. (see attachment RFI Responses)
NAVFAC SYSCOM MID-ATLANTIC PWD NEW LONDON
BOX 400 B135
NALVAL SUBMARINE BASE NEW LONDON
GROTON, CT 06349-5026
SEE ITEM #6
ACQR 6012068
1 1
06/17/2024
05/17/2024
File details come from the government source that posted it. Updated .