60-79500-25-00264_3. 60-79500-25-00264 Appendix D.2_Housing Cost Estimate and Pricing Support Cost Form.xlsx.XLSX
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 60-79500-25-00264
- Issued by
- New Mexico
About this file
This file is a Housing Cost Estimate and Pricing Support Cost Form (Appendix D.2) for the New Mexico Home Recovery Program's Residential Construction Services contract. The form provides standardized templates for three housing types—Mobile Home Units (MHU), Modular, and Reconstruction—with configurations spanning 2, 3, and 4-bedroom units. Each housing type includes square footage ranges aligned with HRP standards, with Single Wide and Double Wide options for MHU configurations and corresponding bedroom/bathroom combinations for Reconstruction units.
The pricing structure is organized into three mandatory cost categories: Core Costs (base unit price, delivery/transportation, and setup/foundation/anchoring); Connections & Add-Ons (utility connections, elevation allowances per foot above Base Flood Elevation, and accessibility features); and Other Costs (hazard-specific mitigation for wildfire, permits, fees, and notes). Offerors must itemize all costs in accordance with these standardized categories to align with HRP Scope of Work requirements. An Unknown Cost column and Notes section function as a catch-all for any items not fitting the standard categories, requiring supporting documentation. All pricing fields are currently populated with $0.00, indicating this is a blank template awaiting offeror completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions |
| Each housing-type sheet (Reconstruction, Modular, and MHU) has been standardized to include three categories of costs: |
| 1. Core Costs – base unit price, delivery/transportation, setup/foundation/anchoring, and total core cost. |
| 2. Connections & Add-Ons – utility connections, elevation (if applicable), and accessibility features. |
| 3. Other Costs – hazard-specific mitigation (wildfire, asbestos, lead, mold), permits/fees, and notes. |
| NOTE: Offerors must itemize costs in accordance with these categories to ensure alignment with HRP Scope of Work requirements. |
| NOTE: The Unknown Cost column and Notes section serve as a catch-all for any items not included in the cost form. All such costs must be listed in the Unknown Cost column with supporting detail provided in the Notes section. |
MHU
| Configuration | Core Costs | Connections & Add-Ons | Other Costs | Totals | |||||||||||
| Unit Type | Bedroom Count | Square Footage Range (HRP Standard) | Base Unit Price | Delivery/Transportation | Setup (site prep, foundation/anchoring) | Total Core Cost | Utility Connections Allowance | Elevation Allowance (per ft above BFE) | Accessibility Features Allowance | Wildfire Mitigation | Permits/Fees Allowance | Notes | Total Connections & Add-Ons | Total Other Costs | Grand Total |
| Single Wide | 2 BR / 2 BA | 1,000-1,330 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| Single Wide | 3 BR / 2 BA | 1,331-1,425 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| Single Wide | 4 BR / 2 BA | 1,426–1,500 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| Double Wide | 2 BR / 2 BA | 1,000-1,330 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| Double Wide | 3 BR / 2 BA | 1,331-1,425 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| Double Wide | 4 BR / 2 BA | 1,426–1,500 | $0.00 | $0.00 | $0.00 | $0.00 |
Reconstruction
| Configuration | Core Costs | Connections & Add-Ons | Other Costs | Totals | ||||||||||
| Bedroom Count | Square Footage Range (HRP Standard) | Base Unit Price | Delivery/Transportation | Setup (site prep, foundation/anchoring) | Total Core Cost | Utility Connections Allowance | Elevation Allowance (per ft above BFE) | Accessibility Features Allowance | Wildfire Mitigation | Permits/Fees Allowance | Notes | Total Connections & Add-Ons | Total Other Costs | Grand Total |
| 2 BR / 2 BA | 1,000-1,330 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 3 BR / 2 BA | 1,331-1,425 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 4 BR / 2 BA | 1,426–1,500 | $0.00 | $0.00 | $0.00 | $0.00 |
File details come from the government source that posted it. Updated .