60-79500-25-00264_3. 60-79500-25-00264 Appendix D.2_Housing Cost Estimate and Pricing Support Cost Form.xlsx.XLSX

XLSX spreadsheet 23 KB Posted

Attached to
RESIDENTIAL CONSTRUCTION SERVICES/NEW MEXICO HOME RECOVERY PROGRAM
Solicitation number
60-79500-25-00264
Issued by
New Mexico

About this file

This file is a Housing Cost Estimate and Pricing Support Cost Form (Appendix D.2) for the New Mexico Home Recovery Program's Residential Construction Services contract. The form provides standardized templates for three housing types—Mobile Home Units (MHU), Modular, and Reconstruction—with configurations spanning 2, 3, and 4-bedroom units. Each housing type includes square footage ranges aligned with HRP standards, with Single Wide and Double Wide options for MHU configurations and corresponding bedroom/bathroom combinations for Reconstruction units.

The pricing structure is organized into three mandatory cost categories: Core Costs (base unit price, delivery/transportation, and setup/foundation/anchoring); Connections & Add-Ons (utility connections, elevation allowances per foot above Base Flood Elevation, and accessibility features); and Other Costs (hazard-specific mitigation for wildfire, permits, fees, and notes). Offerors must itemize all costs in accordance with these standardized categories to align with HRP Scope of Work requirements. An Unknown Cost column and Notes section function as a catch-all for any items not fitting the standard categories, requiring supporting documentation. All pricing fields are currently populated with $0.00, indicating this is a blank template awaiting offeror completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
Each housing-type sheet (Reconstruction, Modular, and MHU) has been standardized to include three categories of costs:
1. Core Costs – base unit price, delivery/transportation, setup/foundation/anchoring, and total core cost.
2. Connections & Add-Ons – utility connections, elevation (if applicable), and accessibility features.
3. Other Costs – hazard-specific mitigation (wildfire, asbestos, lead, mold), permits/fees, and notes.
NOTE: Offerors must itemize costs in accordance with these categories to ensure alignment with HRP Scope of Work requirements.
NOTE: The Unknown Cost column and Notes section serve as a catch-all for any items not included in the cost form. All such costs must be listed in the Unknown Cost column with supporting detail provided in the Notes section.

MHU

ConfigurationCore CostsConnections & Add-OnsOther CostsTotals
Unit TypeBedroom CountSquare Footage Range (HRP Standard)Base Unit PriceDelivery/TransportationSetup (site prep, foundation/anchoring)Total Core CostUtility Connections AllowanceElevation Allowance (per ft above BFE)Accessibility Features AllowanceWildfire MitigationPermits/Fees AllowanceNotesTotal Connections & Add-OnsTotal Other CostsGrand Total
Single Wide2 BR / 2 BA1,000-1,330$0.00$0.00$0.00$0.00
Single Wide3 BR / 2 BA1,331-1,425$0.00$0.00$0.00$0.00
Single Wide4 BR / 2 BA1,426–1,500$0.00$0.00$0.00$0.00
Double Wide2 BR / 2 BA1,000-1,330$0.00$0.00$0.00$0.00
Double Wide3 BR / 2 BA1,331-1,425$0.00$0.00$0.00$0.00
Double Wide4 BR / 2 BA1,426–1,500$0.00$0.00$0.00$0.00

Reconstruction

ConfigurationCore CostsConnections & Add-OnsOther CostsTotals
Bedroom CountSquare Footage Range (HRP Standard)Base Unit PriceDelivery/TransportationSetup (site prep, foundation/anchoring)Total Core CostUtility Connections AllowanceElevation Allowance (per ft above BFE)Accessibility Features AllowanceWildfire MitigationPermits/Fees AllowanceNotesTotal Connections & Add-OnsTotal Other CostsGrand Total
2 BR / 2 BA1,000-1,330$0.00$0.00$0.00$0.00
3 BR / 2 BA1,331-1,425$0.00$0.00$0.00$0.00
4 BR / 2 BA1,426–1,500$0.00$0.00$0.00$0.00

File details come from the government source that posted it. Updated .