6-Schedules-A B (RFP LMSD Operational BLDG) (1).pdf
PDF 142 KB Posted
- Attached to
- Lake Mountain School District Design-Build Services Centralized District Operations & Institutional Facility
- Solicitation number
- LMSD06292026
- Issued by
- Utah County, Utah
About this file
This document contains Schedules A and B from a Request for Proposal (RFP) issued by Lake Mountain School District in Utah for Design-Build Services to construct a new approximately 25,000 square foot pre-engineered steel institutional facility. The RFP seeks turnkey civil engineering, architectural design, structural engineering, utility extension, permitting, procurement, and complete construction services for a facility to serve as a centralized district operations and institutional center. The project site comprises approximately seven acres located within Utah County Parcel No. 66:290:0008, currently owned by the District and undeveloped. The RFP closing date is Monday, June 29, 2026 at 4:00 PM Mountain Time. Construction is anticipated to commence on October 15, 2026 and achieve substantial completion by June 2027. The selected Design-Build team will provide single-point responsibility for all aspects of design and construction, including utility extensions, site development, building construction, and commissioning under a single contract.
Schedule B outlines specific evaluation criteria for responsive proposals, requiring submission of a bid bond equal to 5% of the total bid amount as mandated by Utah Procurement Code 63G-6a-1102 (applicable to bids exceeding $50,000), with a performance bond of 100% of the contract price required from the successful vendor per 63G-6a-1103. Proposals must demonstrate expertise in high-efficiency utilities and institutional facilities through resumes of the Lead Architect, Principal MEP Engineer, and Construction Site Superintendent, along with a summary of strategies to maximize facility life-cycle efficiency and manage specialized loads such as print shop exhaust/drainage and data center cooling. Proposals must also evidence proven Design-Build experience delivering projects on time and within budget, feasibility of the proposed schedule, and references from at least three commercial office or public institution facilities of 20,000+ square feet completed within the past ten years demonstrating unified design-build delivery.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE ‘A’ - CERTIFICATION OF PROPOSAL FORM
I have read the Lake Mountain School District Request for Proposal, RFP, and fully understand the intent. I certify that I have adequate personnel and resources to fulfill the RFP requirements. I further understand that my ability to meet the criteria and provide the required services shall be judged solely by The District.
I further certify that, since the receipt of this RFP, no contact, discussion, or negotiations have been made nor will be made regarding this proposal with any District contact. I understand that any such contact could disqualify this
RFP.
I further certify that I am properly licensed to conduct business within the scope of this RFP, in the State of Utah.
I certify that all Schedules contained herein shall be considered part of the entire RFP response and that the complete RFP document submitted shall be considered a legally binding document.
Company Name
Authorized Signature
Printed Name and Title
Phone
Date
SCHEDULE ‘B’
• Demonstrated Expertise in High-Efficiency Utilities & Institutional Facilities: Joint venture details or contractor/architect partnership profiles. Include resumes for the Lead Architect, Principal MEP Engineer, and Construction Site Superintendent. A brief summary explaining how your team intends to maximize facility life-cycle efficiency through high-performance building systems, energy-efficient lighting, advanced controls, durable building assemblies, and long-term operational sustainability and manage specialized loads (Print Shop exhaust/drainage, Data Center cooling) while optimizing initial structural framing costs.
• Integrated Team Dynamics & DB Experience: History of the contractor and design sub-consultants successfully executing single-point responsibility design-build projects on time and within budget. Proven track record of designing and constructing high-ROI institutional/commercial facility envelopes, clear-span steel layouts, and integrated security/utility loops.
• Efficiency of Proposed Schedule: Feasibility, path logic, and speed of the timeline leading from contract award through concurrent grading and steel procurement to the final June 2027 completion target.
• References & Past Performance: Feedback from previous clients regarding the team's punch-list management, minimizing change orders, and keeping overall project drag low.
Highlight at least three (3) commercial office or public institution facilities of 20,000+ sq.
ft. completed within the past ten (10) years demonstrating unified design-build delivery, civil infrastructure integration, or heavy utility expansion.
• Provide bid bond with proposal. As per Utah Procurement Code 63G-6a-1102, if bid exceeds $50,000 it is required to submit a bid bond of 5% of the total bid (must be included on cost sheet Schedule C). A performance bond will be required from the successful vendor in the amount of 100% of the contract price. (63G-6a-1103).