This is a Schedule C Cost Proposal Form for the Lake Mountain School District's Design-Build Services contract for a Centralized District Operations & Institutional Facility located in Utah County. The Lake Mountain School District is seeking competitive proposals from qualified Design-Build teams consisting of general contracting firms partnered with licensed architectural and engineering sub-consultants to provide turnkey services for a new approximately 25,000 square foot pre-engineered steel institutional facility on a seven-acre undeveloped site. The project scope includes civil engineering, architectural design, structural engineering, utility extensions, permitting, procurement, and complete construction services. The RFP closing date is Monday, June 29, 2026, at 4:00 PM Mountain Time, with construction anticipated to commence on October 15, 2026, and substantial completion targeted for June 2027. The selected Design-Build team will provide single-point responsibility for all aspects of design and construction, including site development, building construction, and commissioning under a single contract.
The cost proposal form requires bidders to submit fixed design and construction costs organized by project phase, including Pre-Construction (schematic design, geotechnical, structural, MEP engineering, permits and stamped plans), Phase I through Phase VI covering civil site work, site logistics and security, centralized MEP utility integration, structural steel frame and foundations, exterior enclosure and code compliance, and interior specialized build-out consisting of board room and executive suite, print shop public counter, fingerprinting terminals, and preschool clinic. The form explicitly states that failure to enter a price on any line item will result in zero points for cost. The turnkey cost and value pricing must include construction overhead, general conditions, performance and payment bonds, and contingency, with all costs to be provided as a single line item total for evaluation by the Purchasing Department.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE “C” COST PROPOSAL FORM
*Failure to enter price on any line item will result in 0 points for cost.
Turnkey Cost & Value Pricing
Construction Overhead, General Conditions, Performance/Payment Bonds, and Contingency
Authorized Signature: _______________________________________Date_________
Project Component / Phase Fixed Design & Construction Cost
Pre-Construction (Schematic Design, Geotechnical, Structural, MEP Engineering, Permits & Stamped Plans)
Phase I: Civil Site Work (Mass Grading, Excavation, Sub-Grade Prep, Stormwater Basins)
Phase II: Site Logistics & Security (300-Stall Parking Lot, S/W/N Fence Extensions, Turnkey PoE Surveillance Network)
Phase III: Centralized MEP Utility Integration (Trenching, Main Extensions, Rocky Mountain Power Grid Upgrades)
Phase IV: Structural Steel Frame & Foundations (Pre-Engineered Columns, Foundations & Reinforced Concrete 6" Slab)
Phase V: Exterior Enclosure & Code Compliance (R-30 TPO Membrane Roof, Chapter 19.16 Masonry Wainscot, IMP Cladding, Screening)
Phase VI: Interior Specialized Build-Out (Board Room/Executive Suite, Print Shop Public Counter, Fingerprinting Terminals, Preschool Clinic)