6-PRK21071 Addendum No. 1.pdf
PDF 2 MB Posted
- Attached to
- RAC Playground with Shade Sails
- Solicitation number
- PRK21071
- Issued by
- Utah
About this file
Summary
This is an Addendum No. 1 document issued by the Salt Lake City Department of Public Services, Architecture and Construction Management Division, dated September 28, 2026, for the RAC Playground with Shade Sails project (Job No. PRK21071) located at 2280 N Rose Park Lane, Salt Lake City, Utah. The addendum modifies the initial bidding documents and includes revisions to drawings (sheets LS002, LE101, C001, and LS503), responses to bidder questions regarding shade structure heights and bench specifications, and minutes from the pre-bid conference held September 22, 2026. The addendum clarifies that two of three shade structures are 12 feet in height while the third is 14 feet high, and confirms that the City prefers backed benches rather than backless benches. The project scope includes furnishing and installing playground equipment with shade sails, play safety surfacing, concrete walkways, ramps, flatwork, plantings, and modifications to existing irrigation and storm drainage systems. Bids were due September 30, 2026, at 2:00 p.m., with public opening to occur virtually via Microsoft Teams shortly thereafter. The anticipated contract time is 90 calendar days after Notice to Proceed, with winter shutdown days excluded, and an anticipated Notice to Proceed in October 2026 with substantial completion anticipated in May 2027.
The project engineer's estimate exceeds $250,000 but remains below $2,000,000, and the work does not require permits for activities in the public way. Bidders must acknowledge receipt of the addendum on the bid form (Document 00 41 00) or risk disqualification. Performance and payment bonds equal to 5 percent of the total bid are required, and contractors must maintain insurance policies rated A- or better by A.M. Best Company or listed in the United States Treasury Department's Approved Sureties. Liquidated damages are assessed at $350.00 per day for failure to meet deadlines. The contractor is responsible for all quality control and assurance field inspections, including asphalt, concrete, and soil density testing with 24-hour notice required for scheduling. Key project constraints include water and power unavailability at the site (requiring contractor-supplied generator and portable facilities), staging limitations in the southern parking lot, coordination with Regional Athletic Complex staff regarding off-season scheduling (October 26 through April 19), and contractor responsibility for utility coordination with applicable agencies. The Value-Based Procurement Program submission is voluntary but may place non-participating bidders at a competitive disadvantage.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT of PUBLIC SERVICES
ERIN MENDENHALL SEAN A. FYFE, AIA
MAYOR CITY ARCHITECT
ARCHITECTURE AND CONSTRUCTION MANAGEMENT DIVISION
P.O. BOX 145506
349 S 200 EAST, STE 100 WWW.SLCGOV.COM
SALT LAKE CITY, UT 84114-5506 TEL 801-535-7116 FAX 801-535-6093
September 28, 2026
ADDENDUM NO. 1 (DOCUMENT 00 91 14)
Job Name: RAC Playground with Shade Sails
Job No.: PRK21071
Attached are copies of Addendum No. 1.
Addendum No. 1 makes changes, corrections, deletions and additions to the initial Bidding Documents. In case of any conflict between the drawings, specifications and the attached Addendum, the Addendum shall govern.
The Addendum forms a part of the Contract Documents and modifies the original Bidding documents.
Acknowledge receipt of the Addendum in the space provided on page 1 of the Bid Form (Document 00 41 00).
Failure to do so may disqualify Bidder’s bid.
The addendum consists of twelve (12) pages of written addendum and plan sheets.
Sincerely, Sean A Fyfe, AIA
City Architect
SF:mm
Attachments cc: Nathan Johnsen
Jon Ruedas, ASLA, SITES, AP
Makaylah Maponga Megan Jones Shiotani
Vault
Addendum No. 1
00 91 14 - 1
DOCUMENT 00 91 14
ADDENDUM No. 1
PART 1 GENERAL
1.1 DOCUMENT INCLUDES
A. Changes to the Bid Drawings.
B. Responses to Questions from Bidders.
C. Minutes to Pre-Bid Conference with Attendee Log.
1.2 CONSTRUCTION CONTRACT
A. Job Name: RAC Playground with Shade Sails
Job No.: PRK21070
PART 2 CHANGES
2.1
2.2
2.3
2.4
2.5
2.6
CHANGES TO PRIOR ADDENDA
A. N/A.
CHANGES TO PROCUREMENT AND CONTRACTING REQUIREMENTS
A. None.
CHANGES TO GENERAL REQUIREMENTS
A. None.
CHANGES TO SPECIFICATIONS
A. None.
CHANGES TO DRAWINGS
A. See attached drawing revisions to LS002, LE101, C001, and LS503.
QUESTIONS FROM BIDDERS
A. Question from Bonfire: Do you have the height for the (3) three 16'X16' shade structures?
Answer: Two shade structures are 12’ height. The third is 14’ height. Refer to sheet LM101.
B. Question from Bonfire: On the references notes legend, the benches are listed as having backs. On the detail page they show as backless. Which one would you prefer?
Answer: The City would like to use a backed bench. See revision to detail attached.
2.7 MINUTES-NOTES FROM PRE-BID CONFERENCE WITH ATTENDEE LOG(S)
A. See attached Meeting Minutes from Pre-Bid Conference held September 22, 2026.
END OF ADDENDUM
SALT LAKE CITY
CORPORATION
ENGINEERING DIVISION
SALT LAKE CITY
CORPORATION
DEPARTMENT OF COMMUNITY
AND NEIGHBORHOODS
CALL BLUESTAKES
@ 811 AT LEAST 48 HOURS
PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION.Know what's below.
before you dig.Call
R
RAC
PLAYGROUND
WITH SHADE
SAILS
2280 N
ROSE PARK LN
DS
GW, MJ
PRK21071
100% DESIGN
DATE:
08/21/2025
NOTES
LS002
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH PLANS APPROVED BY SALT LAKE CITY.
2. REFER TO EXISTING CONDITIONS SURVEY AND OTHER AVAILABLE DOCUMENTS FOR PROPERTY LIMITS, EXISTING
CONDITIONS, AND HORIZONTAL AND VERTICAL CONTROL.
3. THE LIMITS OF WORK OCCUR AS SHOWN ON PLANS.
4. VERIFY EXISTING SITE CONDITIONS INCLUDING, WALLS, VEGETATION FENCES, UTILITIES, PROPERTY LINES, LIMITS OF
ROADWAYS, CURBS AND GUTTERS, AND OTHER OBSTRUCTIONS THAT MAY AFFECT THE PROGRESS OF WORK.
5. OWNER TO RELOCATE EXISTING IRRIGATION. COORDINATE WITH OWNER'S REPRESENTATIVE PRIOR TO
CONSTRUCTION AND AFTER COMPLETION TO COORDINATE IRRIGATION SYSTEM UPDATES AND IRRIGATION
SCHEDULE FOR PLANT ESTABLISHMENT.
6. LOCATE UTILITIES AND MAINTAIN THEIR LOCATION DURING ALL PHASES OF WORK. DO NOT DAMAGE UTILITY LINES/STRUCTURES. NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES BEFORE STARTING ANY WORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION OF UNDERGROUND UTILITIES OR STRUCTURES, WHETHER OR NOT SHOWN OR DETAILED AND INSTALLED BY ANY OTHER CONTRACT. RESTORATION OF UTILITIES DAMAGED BY
THE CONTRACTOR SHALL BE AT THE CONTRACTOR'S EXPENSE.
7. THOROUGHLY REVIEW THE SITE CONDITIONS, DRAWINGS, AND TECHNICAL SPECIFICATIONS PRIOR TO CONSTRUCTION. COMPLETE THE WORK OF THIS PROJECT IN ACCORDANCE WITH APPROVED DRAWINGS.
8. INFORMATION PROVIDED WITHIN THE TECHNICAL SPECIFICATIONS SHALL TAKE PRECEDENT IN ANY INSTANCE WHERE THE INFORMATION PROVIDED IN THE DRAWINGS CONFLICTS WITH THAT PROVIDED IN THE TECHNICAL SPECIFICATIONS. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE LANDSCAPE ARCHITECT AND SALT LAKE CITY OWNERS REPRESENTATIVE UPON THE DISCOVERY OF ANY PERCEIVED DISCREPANCIES BETWEEN INFORMATION
PROVIDED IN THE DRAWINGS AND TECHNICAL SPECIFICATIONS.
9. CONSTRUCTION INSTALLATION, MATERIALS, TESTING AND INSPECTION SHALL COMPLY WITH APPLICABLE CODES
AND ORDINANCES.
10. TAKE NECESSARY STEPS TO PROTECT AND MAINTAIN ALL FINISHED WORK FOR THE DURATION OF THE CONTRACT
UNTIL FINAL ACCEPTANCE.
11. THESE DRAWINGS DO NOT SPECIFY SAFETY MATERIALS, EQUIPMENT, METHODS OR SEQUENCING TO PROTECT PERSONS AND PROPERTY. DIRECT AND IMPLEMENT SAFETY OPERATIONS AND PROCEDURES TO PROTECT THE OWNER, OTHER CONTRACTORS, THE PUBLIC, AND OTHER FOR THE DURATION OF THE CONTRACT.
12. NOTES AND DETAILS ON SPECIFIC DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.
13. OBTAIN NECESSARY PERMITS FROM ALL JURISDICTIONS AS REQUIRED TO CONSTRUCT THE WORK OF THIS PROJECT.
14. THE WORK OF THIS CONTRACT WILL NOT BE CONSIDERED COMPLETE UNTIL ALL AREAS HAVE BEEN CLEANED OF
ALL DIRT AND DEBRIS AND ALL DAMAGED ITEMS ARE REPAIRED.
15. CONTRACTOR SHALL PRODUCE A CONSTRUCTION ACCESS STAGING PLAN AND SUBMIT TO DEPARTMENT OF PUBLIC
LANDS PROJECT MANAGER FOR REVIEW AND APPROVAL PRIOR TO MOBILIZATION.
16. REFER TO GEOTECHNICAL REPORT FOR ALL COMPACTION RECOMMENDATIONS. GEOTECHNICAL REPORT WAS
PROVIDED BY SALT LAKE CITY TO DIG STUDIO. NO SOIL TESTING WAS COMPLETED BY DIG STUDIO.
GENERAL NOTES
1. VERIFY EXISTING SITE INFORMATION INCLUDING, BUT NOT LIMITED TO STREET GRADES, UTILITIES, DRAINS, PROPERTY
LINES, LIMITS OF ROADWAYS, CURBS AND GUTTERS TAKEN FROM THE SURVEYOR'S DRAWINGS.
2. ALL WORK SHALL COMPLY WITH APPLICABLE CODES AND ORDINANCES.
3. TAKE ALL DIMENSIONS FROM BACK OF CURB, FACE OF WALL, AND CENTERLINE OF TREES UNLESS OTHERWISE
NOTED.
4. ALL DIMENSIONS CALLED OUT AS 'EQUAL' ARE EQUIDISTANT MEASUREMENTS.
5. WRITTEN DIMENSIONS SUPERCEDE SCALED DIMENSIONS. DO NOT SCALE DRAWINGS, IF THERE IS A QUESTION
REGARDING DIMENSIONS, CONTACT DIG STUDIO FOR VERIFICATION.
6. ALL ANGLES TO MATCH THOSE NOTED ON DRAWING AND ALL LINES OF PAVING TO BE PARALLEL UNLESS OTHERWISE
NOTED. MAINTAIN HORIZONTAL ALIGNMENT OF ADJACENT ELEMENTS AS NOTED ON DRAWINGS.
7. REFERENCE TO NORTH REFERS TO TRUE NORTH. REFERENCE TO SCALE IS FOR FULL SIZED DRAWINGS ONLY. DO
NOT SCALE FROM DRAWINGS.
8. SLEEVES AND CONDUITS SHALL BE INSTALLED A MINIMUM OF 18 INCHES BELOW FINISHED GRADE AND SHALL
EXTEND 12 INCHES BEYOND BACK OF CURBS, WALLS, AND PAVING.
9. COORDINATE AND FIELD VERIFY WITH LANDSCAPE ARCHITECT ALL SLEEVING LOCATIONS FOR ALL UTILITY, ELECTRICAL, AND IRRIGATION WITH PRIOR TO CONSTRUCTION. INFORM LANDSCAPE ARCHITECT OF ANY
DISCREPANCY IMMEDIATELY.
10. CONTRACTOR SHALL STAKE OUT ALL PLAYGROUND EQUIPMENT FALL ZONES PER DRAWINGS PRIOR TO INSTALLING
ANY AND ALL SURROUNDING SITE CONSTRUCTION.
LAYOUT NOTES
1. EMPLOY A LICENSED SURVEYOR TO ESTABLISH ALL GRADES AND LAYOUT LINES. HAVE OWNERS REPRESENTATIVE
REVIEW GRADE STAKES PRIOR TO FINAL GRADING.
2. ALL PROPOSED GRADES SHALL MEET AND BLEND WITH EXISTING GRADES AT PROJECT LIMITS AND AT CURBS, SIDEWALKS AND ROADWAYS. EXISTING ELEVATIONS INDICATED ON PLANS SHALL BE VERIFIED IN FIELD TO AS-BUILT
CONDITIONS.
3. EROSION CONTROL- CONTRACTOR TO PROVIDE PLAN TO THE CLIENT AND LANDSCAPE ARCHITECT PRIOR TO
CONSTRUCTION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR 'ROUNDING OFF' ALL SHARP RIDGES EXISTING ON SITE WHETHER OR NOT SUCH CONDITIONS ARE INDICATED ON PLANS. ROUND TOPS AND TOES OF SLOPE TO PROVIDE SMOOTH TRANSITION TO EXISTING GRADE. BERMS AND LANDFORMS WILL BE SMOOTH AND ROUNDED VERTICAL CURVES
WITH NO SHARP TRANSITION IN GRADE.
5. CONTRACTOR SHALL NOT PROCEED WITH CONSTRUCTION WHEN IT BECOMES EVIDENT THAT UNFORSEEN OBSTRUCTIONS, AREA DISCREPANCIES AND/OR GRADE DIFFERENCES EXIST. SUCH CONDITIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF SLC PROJECT MANAGER AND THE LANDSCAPE ARCHITECT FOR DECISION. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL NECESSARY REVISIONS DUE TO
FAILURE TO GIVE SUCH NOTIFICATION.
6. ALL LANDSCAPE GRADES ARE BASED UPON ELEVATIONS SHOWN ON THE SURVEY PROVIDED BY SALT LAKE CITY CORPORATION ENGINEERING DIVISION AND SHOULD BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COORDINATION WITH SUBCONTRACTORS AS REQUIRED TO
ACCOMPLISH ALL GRADING OPERATIONS.
8. MAINTAIN POSITIVE DRAINAGE, UNLESS SPECIFICALLY DESIGNED FOR PONDING, AT ALL TIMES. REFER TO CIVIL
ENGINEER'S DRAWINGS FOR DRAINAGE STRUCTURE LOCATIONS AND DETAILS.
9. ALL WALKS SHALL HAVE A MAXIMUM 1.8% CROSS SLOPE TO MEET ADA STANDARDS. ALL PAVING SHALL HAVE A MINIMUM 1.0% SLOPE FOR DRAINAGE IF NOT OTHERWISE INDICATED ON PLANS.MAXIMUM SLOPES ON WALKS SHALL
NOT EXCEED 4.8% IN THE DIRECTION OF TRAVEL, WITHOUT A HANDRAIL.
10. ELIMINATE ANGLED TRANSITION AT CHANGE OF GRADE ALONG PATHS BY ROUNDING TRANSITION AT GRADE BREAK.
11. NO CHANGE IN CONTRACT PRICE WILL BE ALLOWED FOR ACTUAL OR CLAIMED DISCREPANCY BETWEEN EXISTING
GRADE AND THOSE SHOWN ON PLANS AFTER CONTRACTOR HAS ACCEPTED EXISTING GRADES AND MOVED ONTO
SITE.
GRADING NOTES
1. ALL MATERIAL, EQUIPMENT, INSTALLATION AND CONSTRUCTION SHALL BE IN
ACCORDANCE WITH THE LATEST EDITION OF THE FOLLOWING STANDARD REFERENCES
AS APPLICABLE:
a. SALT LAKE CITY, STANDARDS AND DETAILS FOR ENGINEERING DIVISION
b. STORM DRAINAGE AND SANITARY SEWER CONSTRUCTION DETAIL AND TECHNICAL
SPECIFICATIONS
c. DEPARTMENT OF ENGINEERING STANDARD SPECIFICATIONS FOR CONSTRUCTION
GENERAL CONTRACT CONDITIONS
d. WASTEWATER MANAGEMENT DIVISION STANDARD DETAILS
e. TRAFFIC STANDARD DRAWINGS AND TRAFFIC ENGINEERING SERVICES PROJECT
SPECIALS
f. UTAH DEPARTMENT OF TRANSPORTATION (UDOT) STANDARD SPECIFICATIONS FOR
ROAD AND BRIDGE CONSTRUCTION AND STANDARD PLANS, (M&S STANDARDS)
g. FEDERAL HIGHWAY ADMINISTRATION (FHWA), MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) FOR STREETS AND HIGHWAYS AND THE UTAH
SUPPLEMENT THERETO
h. AMERICAN ASSOCIATION OF STATE AND HIGHWAY TRANSPORTATION OFFICIALS
(AASHTO) ROADSIDE DESIGN GUIDE
2. THE CONTRACTOR SHALL HAVE ONSITE AT ALL TIMES, ONE COPY OF THE APPROVED
PLANS, ONE COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND
COPIES OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB. THE
CONTRACTOR SHOULD UPLOAD A COPY OF ALL PERMITS TAKEN OUT INTO PROCORE.
3. IF DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH
COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED ON THE PLANS OR
SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE PROJECT MANAGER
IMMEDIATELY.
PROJECT PLANS, SPECIFICATIONS & PERMIT NOTES
1. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND
UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS, UNLESS
OTHERWISE NOTED. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG
THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION.
RESPONSIBILITIES FOR THE RELOCATION OF UTILITY LINES ARE AS NOTED IN THE
PROJECT SPECIAL PROVISIONS. THE CONTRACTOR SHALL COOPERATE WITH
COMPANIES TRYING TO COORDINATE THE RELOCATION EFFORT. LINES NOT
RELOCATED SHALL BE PROTECTED BY THE CONTRACTOR IN PLACE. THE
CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY NOTIFICATION CENTER
OF UTAH, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR
GRADING. CONTRACTOR SHALL SCHEDULE BLUE STAKES MARKING TO CONFIRM
ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO START OF CONSTRUCTION.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING UTILITIES DURING
CONSTRUCTION AND SHALL HOLD THE CITY AND ITS ENGINEERS HARMLESS FOR
DAMAGES ARISING FROM THE CONTRACTOR'S FAILURE TO ADEQUATELY
PROTECT EXISTING UTILITIES. DAMAGED UTILITIES SHALL BE REPAIRED BY AND
AT THE EXPENSE OF THE CONTRACTOR.
3. THE CONTRACTOR IS REQUIRED TO RESET, ADJUST OR REPLACE ANY UTILITIES
THAT ARE IMPACTED BY CONSTRUCTION AND ARE DESIGNED TO REMAIN WITHIN
THE PROJECT LIMITS.
UTILITY NOTES
1. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN
THE LIMITS OF DISTURBANCE AND TOES OF SLOPE AS SHOWN ON THE PLANS AND
CROSS SECTION. ANY DISTURBANCE BEYOND THESE LIMITS SHALL BE RESTORED
TO ORIGINAL CONDITIONS AT THE EXPENSE OF THE CONTRACTOR.
2. WATER SHALL BE USED AS A DUST PALLIATIVE WHERE REQUIRED. COST FOR DUST
PALLIATIVE SHALL NOT BE MEASURED AND PAID FOR SEPARATELY, BUT SHALL BE
CONSIDERED INCIDENTAL TO THE WORK.
3. THE DEPTH OF RECONDITIONING AND FOR THE BASES OF CUTS AND FILLS SHALL BE
6 INCHES. THE PROJECT SPECIFIED MOISTURE DENSITY CONTROL SHALL BE
APPLIED FOR THE SPECIFIED DEPTH. THE EXCAVATION REQUIRED FOR COMPACTION
OF BASES OF CUTS AND FILLS WILL BE CONSIDERED SUBSIDIARY TO THAT
OPERATION AND WILL NOT BE PAID FOR SEPARATELY.
4. MOISTURE DENSITY CONTROL SHALL BE APPLIED FULL DEPTH FOR ALL
EMBANKMENTS.
5. DURING EACH PHASE OF CONSTRUCTION, THE CONTRACTOR SHALL SHAPE TO
DRAIN AND COMPACT THE WORK AREA TO A UNIFORM CROSS-SECTION. ELIMINATE
ALL RUTS AND LOW SPOTS THAT COULD HOLD WATER. AREAS AND FACILITIES
SUBJECTED TO FLOODING, REGARDLESS OF THE SOURCE OF WATER, SHALL BE
PROMPTLY DEWATERED AND RESTORED AT NO ADDITIONAL COST TO THE CITY.
6. ALL WORK SHALL BE PROPERLY BACKFILLED PRIOR TO THE END OF THE WORKDAY.
NO OPEN HOLES ARE ALLOWED OVERNIGHT. IF OPEN OVERNIGHT EXCAVATIONS ARE
UNAVOIDABLE, CONTRACTOR SHALL COVER AND TAPE OFF ALL OPEN HOLES PRIOR
TO LEAVING THE CONSTRUCTION SITE OR ENSURE ALL OPEN HOLES ARE WITHIN A
FENCED, LOCKED, AND SECURED CONSTRUCTION SITE.
7. WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS, EXCAVATED
MATERIAL IS TO BE PLACED ON THE UPHILL SIDE OF TRENCHES.
EARTHWORK & EXCAVATION NOTES
AutoCAD SHX Text
BINDING ORDER
AutoCAD SHX Text
PROJECT OWNER:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
DRAWING FILE:
AutoCAD SHX Text
FILE #:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
MARK
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PROJECT IDENTIFICATION:
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
COPYRIGHT:
AutoCAD SHX Text
PREPARER CONSULTANTS:
AutoCAD SHX Text
SHEET IDENTIFIER:
AutoCAD SHX Text
PROFESSIONAL SEAL:
AutoCAD SHX Text
PROJECT #:
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
PREPARER #:
AutoCAD SHX Text
451 SOUTH STATE STREET SALT LAKE CITY, UTAH 84111-2836 WWW.SLCGOV.COM
AutoCAD SHX Text 349 SOUTH 200 EAST, SUITE 100 SALT LAKE CITY, UTAH 84114-5506 TELEPHONE: 801-535-7961 FAX: 801-535-6093 WWW.SLCGOV.COM
Megan_J Cloud
Megan_J Polygon
Megan_J Text Box
Megan_J Cloud
Megan_J Polygon
Megan_J Text Box
Megan_J Polygon
Megan_J Text Box
Megan_J Cloud
Megan_J Polygon
Megan_J Text Box
Megan_J Text Box 09/28/26
Megan_J Text Box
ADDENDUM 1
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w
S
S sd sd sd sd sd sd ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w W V
E e e e e e e e e w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w ss ss ss ss ss ss ss ss ss ss ss
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
TOC
15.27
TOC
14.85
TOC
14.85
TOC
15.27
TOC
14.85
TOC
14.85
TOC
15.36TOC
15.36TOC
15.20
TOC
15.26
TOC
15.36
EXIST
TOC
14.69
EXIST
TOC
14.95
EXIST
TOC
14.85
TOC
14.94
TOC
14.85
TOC
15.36
EXIST
TOC
14.78
EXIST
TOC
14.68
RIDGE
0.9% 0.0%
2.0%
2.0%
2.0% 1.9% 0.0% 0.8%
1.0% 1.3%
2.3%
1.0%
1.0%
2.5%
2.9%
2.0% 0.0%
0.3%
1.8%
1.5%
TOC
15.03
1.3%
0.0% 0.0%
1.9% 0.0%
1.1%
1.3% 1.3%
0.0%
TOC
15.26
FF=4215.50
1.3%
TOC
15.03
TOC
15.05
1.2% LO
W
LO
W
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LO
W
LO
W
LO
W
LO
W
LO
W
LO
W
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LO
W
LO
W
LO
W
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LO
W
LO
W
LO
W
LO
W
LO
W
CATCH BASIN
CATCH BASIN
CATCH BASIN
SPRINKLER, TYP.
EXISTING DRAIN
MANHOLE
CONCRETE PAD
PARKING LOT
EXISTING TREE, TYP.
EXISTING
CONDITIONS
SALT LAKE CITY
CORPORATION
ENGINEERING DIVISION
SALT LAKE CITY
CORPORATION
DEPARTMENT OF COMMUNITY
AND NEIGHBORHOODS
CALL BLUESTAKES
@ 811 AT LEAST 48 HOURS
PRIOR TO THE
COMMENCEMENT OF ANY
CONSTRUCTION.Know what's below.
before you dig.Call
R
PARKING
FIELD
FIELD
FIELD
FIELD
FIELD
FIELD
FIELD
FIELD
MAINT.
BLDG.
POND
SOUTH
GATE
KEYMAP - NTS
I-215
2100N
N 1990 W
R O
S E
P A
R K
LN
R
O S
E P
A R
K
LN
RESTROOM/
PAVILION
NORTH
0 20' 40'10'
SCALE: 1" = 20'-0"
RAC
PLAYGROUND
WITH SHADE
SAILS
2280 N
ROSE PARK LN
DS
GW, MJ
PRK21071
100% DESIGN
DATE:
08/21/2025
LOCAL BENCHMARK: EXISTING STORM
DRAIN CATCH BASIN IN MAINTENANCE
YARD SOUTH OF PROPOSED BUILDING
ELEVATION = 4213.84
BENCHMARK
LIMIT OF WORK (L.O.W.) = 0.50ALOW
EXISTING TREE TO REMAIN
EXISTING BURIED WATER LINE
EXISTING BURIED STORM LINE
LE101
NOTES�
1. SURVEY PROVIDED BY SALT LAKE CITY. CONTRACTOR
SHALL CONFIRM ALL EXISTING SITE CONDITIONS
BEFORE STARTING ANY WORK ON SITE. ANY AND ALL
DISCREPANCIES MUST BE IMMEDIATELY BROUGHT TO
THE ATTENTION OF THE CITY PROJECT MANAGER.
2. SALT LAKE CITY PARKS DEPARTMENT WILL MODIFY
IRRIGATION SYSTEM LAYOUT PRIOR TO
CONSTRUCTION START. CONTRACTOR SHALL
PROTECT ALL IRRIGATION DURING CONSTRUCTION
AND REPAIR AND REPLACE ANY DAMAGED OR
BROKEN SEGMENTS, PARTS, OR PIECES.
CONTRACTOR SHALL ENSURE ALL LANDSCAPING
AFFECTED BY CONSTRUCTION REMAINS WATERED IF
IRRIGATION SYSTEM IS SHUT OFF DURING
CONSTRUCTION PERIOD. CONTRACTOR IS
RESPONSIBLE FOR COORDINATING WITH SALT LAKE
CITY PARKS DEPARTMENT AT THE END OF
CONSTRUCTION TO ENSURE ALL IRRIGATION SYSTEMS
ARE FUNCTIONING PROPERLY AND WERE NOT
AFFECTED BY CONSTRUCTION.
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text
CB
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
CB
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
CB
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
CB
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
CB
AutoCAD SHX Text W
AutoCAD SHX Text
CB
AutoCAD SHX Text
SOCCER FIELD
AutoCAD SHX Text
ASPHALT PATH
AutoCAD SHX Text
RESTROOMS
AutoCAD SHX Text
SPRINK
AutoCAD SHX Text
BINDING ORDER
AutoCAD SHX Text
PROJECT OWNER:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
DRAWING FILE:
AutoCAD SHX Text
FILE #:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
MARK
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PROJECT IDENTIFICATION:
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
COPYRIGHT:
AutoCAD SHX Text
PREPARER CONSULTANTS:
AutoCAD SHX Text
SHEET IDENTIFIER:
AutoCAD SHX Text
PROFESSIONAL SEAL:
AutoCAD SHX Text
PROJECT #:
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
PREPARER #:
AutoCAD SHX Text
451 SOUTH STATE STREET SALT LAKE CITY, UTAH 84111-2836 WWW.SLCGOV.COM
AutoCAD SHX Text 349 SOUTH 200 EAST, SUITE 100 SALT LAKE CITY, UTAH 84114-5506 TELEPHONE: 801-535-7961 FAX: 801-535-6093 WWW.SLCGOV.COM
AutoCAD SHX Text
LAYOUT LEGEND
Megan_J Polygon
Megan_J Text Box
Megan_J Text Box 09/28/26
Megan_J Text Box
ADDENDUM 1
Megan_J Cloud
Megan_J Polygon
Megan_J
MONUMENT LINE
CENTER LINE
SUBJECT PROPERTY LINE
ADJACENT PROPERTY LINE
EASEMENT LINE
DITCH FLOWLINE
FENCE LINE
ATMS CABLE
CABLE TV LINE
COMMUNICATIONS LINE
FIBER-OPTIC CABLE
FIRE LINE
IRRIGATION LINE
NATURAL GAS LINE
OVERHEAD COMMUNICATIONS
OVERHEAD POWER LINE
OVERHEAD TELEPHONE LINE
OVERHEAD TELEVISION LINE
POWER LINE
POWER/COMMUNICATIONS LINE
POWER/TELEPHONE LINE
POWER/TELE/COMM LINE
ROOF DRAIN LINE
SECONDARY WATER LINE
SANITARY SEWER LINE
STEAM LINE
STORM DRAIN LINE
TELEPHONE LINE
TELEPHONE/COMM LINE
UNDERDRAIN
UNDERGROUND COMMUNICATIONS
UNDERGROUND POWER LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND TELEVISION
WATER LINE
CONTOUR LINE
CURB & GUTTER (STD)
CURB & GUTTER (OUTFALL)
SECTION CORNER (FOUND)
SECTION CORNER (NOT FOUND)
STREET MONUMENT
BRASS CAP MONUMENT
POWER POLE
UTILITY POLE
GUY ANCHOR
POWER TRANSFORMER
TRAFFIC SIGNAL CABINET
LIGHT POLE
TELEPHONE RISER
TELEPHONE MANHOLE
TRAFFIC SIGNAL BOX
WATER MANHOLE
WATER VALVE
WATER METER
FIRE HYDRANT
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUT
STORM DRAIN MANHOLE
STORM DRAIN CURB INLET
STORM DRAIN CATCH BASIN
STORM DRAIN CLEANOUT
STORM DRAIN COMBO BOX
MAILBOX
SIGN
FLOW DIRECTION
SPOT ELEVATION
CONIFEROUS TREE
DECIDUOUS TREE
EXISTINGNEW EXISTINGNEW
ATMS
X X atms
ABBREVIATIONS
LEGEND
TV tv
C c
FO fo
F f
G g
IRR irr
OHP ohp
P p
P/C p/c
P/T p/t
P/T/C p/t/c
RD rd
SW sw
S s
ST st
SD sd
T t
T/C t/c
UGP ugp
W w
AC ACRE
ADA AMERICANS WITH DISABILITIES ACT
ATMS ADVANCED TRAFFIC MGMT. SYSTEM
B&C BAR & CAP
BC BUILDING CORNER
BFG BOTTOM FINISH GRADE
BLUE BLUE STAKED ELECTRIC
BLUFO BLUE STAKED FIBER OPTIC
BLUG BLUE STAKED NATURAL GAS
BLUIRR BLUE STAKED IRRIGATION
BLUSD BLUE STAKED STORM DRAIN
BLUSS BLUE STAKED SANITARY SEWER
BLUT BLUE STAKED TELEPHONE
BLUW BLUE STAKED WATER
BM BENCHMARK
BOF BOTTOM OF FOOTING
BOB BOTTOM OF BOX
BOL BOLLARD
BOT BOTTOM
BOV BLOW-OFF VALVE
BOW BACK OF WALK
BW FINISH GRADE AT BOTTOM OF WALL
℄ CENTERLINE
CATV CABLE TELEVISION
CBR CONCRETE BARRIER
CC CURB CUT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
CONST CONSTRUCTION
CMP CORRUGATED METAL PIPE
CP CONTROL POINT
CTREE CONIFEROUS TREE
CUFT CUBIC FOOT
CUYD CUBIC YARD
DEL DELINEATOR
DIA or Ø DIAMETER
DIP DUCTILE IRON PIPE
DTREE DECIDUOUS TREE
DYL DOUBLE YELLOW LINE
E EAST
EB ELECTRIC BOX
EGL ENERGY GRADE LINE
ELEV ELEVATION
EM ELECTRIC METER
EMH ELECTRIC MANHOLE
EOA EDGE OF ASPHALT
EOC EDGE OF CONCRETE
EOG EDGE OF GRAVEL
EOL EDGE OF LAWN
EX or EXIST EXISTING
F FIRE
FC FOUNDATION CORNER
FD FOUND or FOUNDATION DRAIN
FDC FIRE DEPT. CONNECTION
FDMN FOUND MONUMENT
FDSC FOUND SECTION CORNER
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOW LINE
FNC FENCE
FNCCL CHAIN LINK FENCE
FNCIRN IRON FENCE
FNCVYL VINYL FENCE
FNCWD WOOD FENCE
FNCWR WIRE FENCE
FO FIBER OPTIC
FOW FRONT OF WALK
FT FEET
G NATURAL GAS
GAR GARAGE
GB GRADE BREAK
GL GROUND LIGHT
GM GAS METER
GMH GAS MANHOLE
GUY GUY WIRE
GV GAS VALVE
HDPE HIGH DENSITY POLYETHYLENE
HG HEADGATE
HGL HYDRAULIC GRADE LINE
HP HIGH POINT
HW HEADWALL or HIGH WATER
HWY HIGHWAY
ICO IRRIGATION CLEANOUT
ICV IRRIGATION CONTROL VALVE
IE INVERT ELEVATION
IRR IRRIGATION
LF LINEAR FEET
LIP LIP OF GUTTER
LP LOW POINT or LIGHT POLE
MAX MAXIMUM
MIN MINIMUM
MON MONUMENT
MP METAL PIPE
MW MONITORING WELL
N NORTH
NG NATURAL GROUND
NGRET NG AT RETAINING WALL
NR NAIL & RIBBON
NW NAIL & WASHER
NTS NOT TO SCALE
OG ORIGINAL GROUND
OH OVERHANG
OHC OVERHEAD COMMUNICATIONS
OHP OVERHEAD POWER
OHT OVERHEAD TELEPHONE
OHTV OVERHEAD TELEVISION
⅊ PROPERTY LINE
PB POWER BOX
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVE
PI POINT OF INTERSECTION
PM PARKING METER
PP POWER POLE
PRC POINT OF REVERSE CURVE
PRK PARKING STRIPE
POC POINT OF CONNECTION
PT POINT OF TANGENCY
PWR POWER
PVC POLYVINYL CHLORIDE PIPE
R RANGE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
REV REVISION
ROW RIGHT-OF-WAY
RR RAILROAD
S SOUTH
SAD SEE ARCHITECTURAL DRAWINGS
SD STORM DRAIN
SDCB STORM DRAIN CATCH BASIN
SDCO STORM DRAIN CLEOUNOUT BOX
SDMH STORM DRAIN MANHOLE
SEC SECTION
SPECS SPECIFICATIONS
SLB&M SALT LAKE BASE & MERIDIAN
SQ SQUARE
SQFT SQUARE FEET
SQYD SQUARE YARD
SS SANITARY SEWER
SSCO SANITARY SEWER CLEANOUT
SSMH SANITARY SEWER MANHOLE
ST STEAM
STA STATION
STD STANDARD
STM STORM
SYL SOLID YELLOW LINE
SWL SOLID WHITE LINE
T TOWNSHIP
TBC TOP BACK OF CURB
TELE TELEPHONE
TFC TOP FACE OF CURB
TFG TOP FINISH GRADE
TL TREE LINE
TMH TELEPHONE MANHOLE
TOA TOP OF ASPHALT
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOG TOP OF GRATE
TOE TOE OF SLOPE
TOP TOP OF SLOPE or TOP OF PIPE
TOW TOP OF WALL
TR TELEPHONE RISER
TV TELEVISION
TW FINISH GRADE AT TOP OF WALL
TRANS TRANSFORMER
TSP TRAFFIC SIGNAL POLE
TSB TRAFFIC SIGNAL BOX
UD UNDERDRAIN
UGC UNDERGROUND COMMUNICATIONS
UGP UNDERGROUND POWER
UGT UNDERGROUND TELEPHONE
UGTV UNDERGROUND TELEVISION
U.N.O. UNLESS NOTED OTHERWISE
UP UTILITY POLE
VCP VITRIFIED CLAY PIPE
VP VERTICAL PIPE
W WEST or WATER
WM WATER METER
WMH WATER MANHOLE
WS WATER SURFACE
WTR WATER
WV WATER VALVE
WW WATERWAY
1.1 COMPLIANCE
1. ALL WORK TO CONFORM TO GOVERNING MUNICIPALITY'S STANDARDS, SPECIFICATIONS AND
REQUIREMENTS.
2. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE CONTRACT
DOCUMENTS AND THE MOST RECENT, ADOPTED EDITIONS OF THE FOLLOWING: INTERNATIONAL
BUILDING CODE (IBC), THE INTERNATIONAL PLUMBING CODE, STATE DRINKING WATER
REGULATIONS, APWA MANUAL OF STANDARD PLANS AND SPECIFICATIONS, ADA ACCESSIBILITY
GUIDELINES.
3. ALL CONSTRUCTION SHALL BE AS SHOWN ON THESE PLANS. ANY REVISIONS MUST HAVE PRIOR
WRITTEN APPROVAL.
1.2 PERMITTING AND INSPECTIONS
1. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING
SURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION
OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED THOROUGHLY REVIEWED
PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF THE PERMITTING AUTHORITIES.
2. CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AND NOTIFYING ARCHITECT/ENGINEER OR
INSPECTING AUTHORITY 48 HOURS IN ADVANCE OF COVERING UP ANY PHASE OF CONSTRUCTION
REQUIRING OBSERVATION.
3. ANY WORK IN THE PUBLIC RIGHT-OF-WAY WILL REQUIRE PERMITS FROM THE APPROPRIATE, CITY, COUNTY OR STATE AGENCY CONTROLLING THE ROAD AND WITH APPROPRIATE INSPECTIONS.
1.3 COORDINATION & VERIFICATION
1. ALL DIMENSIONS, GRADES & UTILITY DESIGNS SHOWN ON THE PLANS SHALL BE VERIFIED BY THE
CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY ARCHITECT/ENGINEER OF
ANY DISCREPANCIES PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR
GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR WORK
HAVING TO BE REDONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS, IF NOT VERIFIED AND NOTIFICATION OF CONFLICTS HAVE NOT BEEN BROUGHT TO THE ATTENTION
OF THE ARCHITECT/ENGINEER.
2. CONTRACTOR MUST VERIFY ALL EXISTING CONDITIONS BEFORE BIDDING AND BRING UP ANY
QUESTIONS BEFOREHAND. NO ALLOWANCE WILL BE MADE FOR DISCREPANCIES OR OMISSIONS
THAT CAN BE EASILY OBSERVED.
3. CONTRACTOR TO COORDINATE WITH ALL OTHER DISCIPLINES, INCLUDING BUT NOT LIMITED TO:
LANDSCAPE PLANS, SITE ELECTRICAL SITE LIGHTING PLANS AND ELECTRICAL SERVICE TO THE BUILDING(S), MECHANICAL PLANS FOR LOCATION OF SERVICES TO THE BUILDING(S), INCLUDING FIRE PROTECTION, ARCHITECTURAL SITE PLAN FOR DIMENSIONS, ACCESSIBLE ROUTES, ETC., NOT
SHOWN ON CIVIL PLANS.
4. CONTRACTOR IS TO COORDINATE LOCATION OF NEW TELEPHONE SERVICE, GAS SERVICE, CABLE, ETC. TO BUILDING WITH THE APPROPRIATE UTILITY COMPANY. FOR TELEPHONE, CONTRACTOR TO
FURNISH CONDUIT, PLYWOOD BACKBOARD, AND GROUND WIRE, AS REQUIRED.
1.4 SAFETY AND PROTECTION
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION,
2. CONTRACTOR IS RESPONSIBLE FOR THE SAFETY OF THE PROJECT AND SHALL MEET ALL OSHA
REQUIREMENTS.
3. CONTRACTOR IS RESPONSIBLE FOR CONFORMING TO LOCAL AND FEDERAL CODES GOVERNING
SHORING AND BRACING OF EXCAVATIONS AND TRENCHES, AND FOR THE PROTECTION OR
WORKERS AND PUBLIC.
4. CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO PROTECT ALL EXISTING PUBLIC AND
PRIVATE PROPERTY, ROADWAYS, AND UTILITY IMPROVEMENTS. DAMAGE TO EXISTING
IMPROVEMENTS CAUSED BY THE CONTRACTOR MUST BE REPAIRED BY THE CONTRACTOR AT
HIS/HER EXPENSE TO THE SATISFACTION OF THE OWNER OF SAID IMPROVEMENTS.
5. CONTRACTOR IS REQUIRED TO KEEP ALL CONSTRUCTION ACTIVITIES WITHIN THE APPROVED PROJECT LIMITS. THIS INCLUDES, BUT IS NOT LIMITED TO, VEHICLE AND EQUIPMENT STAGING, MATERIAL STORAGE AND LIMITS OF TRENCH EXCAVATION.
6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN PERMISSION AND/OR EASEMENTS FROM THE
APPROPRIATE GOVERNMENT AGENCY AND/OR INDIVIDUAL PROPERTY OWNER(S) FOR WORK OR
STAGING OUTSIDE OF THE PROJECT LIMITS.
7. CONTRACTOR SHALL PROVIDE BARRICADES, SIGNS, FLASHERS, OTHER EQUIPMENT AND FLAG
PERSONS NECESSARY TO INSURE THE SAFETY OF WORKERS AND VISITORS. ALL CONSTRUCTION
SIGNING, BARRICADING, AND TRAFFIC DELINEATION SHALL CONFORM TO THE "MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES", LATEST EDITION.
8. CONTRACTOR SHALL COMPLY WITH LOCAL NOISE ORDINANCE STANDARDS.
9. CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL ACCORDING TO GOVERNING AGENCY
STANDARDS.
10. CONTRACTOR SHALL TAKE ALL NECESSARY AND PROPER PRECAUTIONS TO PROTECT ADJACENT
PROPERTIES FROM ANY AND ALL DAMAGE THAT MAY OCCUR FROM STORM WATER RUNOFF AND/OR
DEPOSITION OF DEBRIS RESULTING FROM ANY AND ALL WORK IN CONNECTION WITH
CONSTRUCTION. SUBMIT A STORM WATER POLLUTION PREVENTION PLAN, IF REQUIRED.
11. WORK IN PUBLIC STREETS, ONCE BEGUN, SHALL BE PROSECUTED TO COMPLETION WITHOUT
DELAY AS TO PROVIDE MINIMUM INCONVENIENCE TO ADJACENT PROPERTY OWNERS AND TO THE
TRAVELING PUBLIC.
12. CONTRACTOR SHALL PROVIDE ALL NECESSARY HORIZONTAL AND VERTICAL TRANSITIONS
BETWEEN NEW CONSTRUCTION AND EXISTING SURFACES TO PROVIDE FOR PROPER DRAINAGE
AND FOR INGRESS AND EGRESS TO NEW CONSTRUCTION.
13. NATURAL VEGETATION AND SOIL COVER SHALL NOT BE DISTURBED PRIOR TO ACTUAL
CONSTRUCTION OF A REQUIRED FACILITY OR IMPROVEMENT. MASS CLEARING OF THE SITE IN
ANTICIPATION OF CONSTRUCTION SHALL BE AVOIDED. CONSTRUCTION TRAFFIC SHALL BE LIMITED
TO ONE APPROACH TO THE SITE. THE APPROACH SHALL BE DESIGNATED BY THE OWNER OR
GOVERNING AGENCY.
14. THE CONTRACTOR SHALL TAKE REASONABLE MEASURE TO PROTECT EXISTING IMPROVEMENTS
FROM DAMAGE AND ALL SUCH IMPROVEMENTS DAMAGED BY THE CONTRACTOR'S OPERATION
SHALL BE REPAIRED OR RECONSTRUCTED TO THE ENGINEER/OWNER'S SATISFACTION AT THE
EXPENSE OF THE CONTRACTOR.
1.5 MATERIALS
1. SITE CONCRETE SHALL BE A MINIMUM 6.5 BAG MIX, 4000 P.S.I. @ 28 DAYS, 4" MAXIMUM SLUMP WITH
5 + OR - 1% AIR ENTRAINMENT, UNLESS SPECIFIED OTHERWISE. -SEE SPECIFICATION
A. SLABS-ON-GRADE WILL BE TYPICALLY SCORED (1/4 THE DEPTH) AT INTERVALS NOT TO EXCEED
THEIR WIDTH OR 12 TIMES THEIR DEPTH, WHICHEVER IS LESS. SCORING WILL BE PLACED TO
PREVENT RANDOM CRACKING. FULL DEPTH EXPANSION JOINTS WILL BE PLACED AGAINST ANY
OBJECT DEEMED TO BE FIXED, CHANGES IN DIRECTION AND AT EQUAL INTERVALS NOT TO
EXCEED 50 FEET.
B. CONCRETE WATERWAYS, CURBWALLS, MOWSTRIPS, CURB AND GUTTER, ETC. WILL TYPICALLY
BE SCORED (1/4 THE DEPTH AT INTERVALS NOT TO EXCEED 10 FEET AND HAVE FULL DEPTH
EXPANSION JOINTS AT EQUAL SPACING NOT TO EXCEED 50 FEET.
C. UNLESS OTHERWISE NOTED, ALL SLABS-ON-GRADE WILL HAVE A MINIMUM 8" TURNED-DOWN
EDGE TO HELP CONTROL FROST HEAVE.
D. UNLESS OTHERWISE NOTED, ALL ON-GRADE CONCRETE WILL BE PLACED ON A MINIMUM 4"
GRAVEL BASE OVER A WELL COMPACTED (90%) SUBGRADE.
E. ALL EXPOSED SURFACES WILL HAVE A TEXTURED FINISH, RUBBED OR BROOMED. ANY
"PLASTERING" OF NEW CONCRETE WILL BE DONE WHILE IT IS STILL "GREEN".
F. ALL JOINTS (CONTROL, CONSTRUCTION OR EXPANSION JOINTS, ETC.) WILL BE SEALED WITH A
ONE PART POLYURETHANE SEALANT (SEE SPECIFICATION).
2. ASPHALTIC CONCRETE PAVEMENT SHALL BE A MINIMUM 3" OVER 8" OF COMPACTED (95%) ROAD
BASE OVER PROPERLY PREPARED AND COMPACTED (90%) SUBGRADE, UNLESS NOTED
OTHERWISE. -SEE SPECIFICATIONS, AND DETAIL 'D1' SHEET C5.01
A. ASPHALT COMPACTION SHALL BE A MINIMUM 96% (MARSHALL DESIGN).
B. SURFACE COARSE SHALL BE ½ " MINUS. MIX DESIGN TO BE SUBMITTED FOR APPROVAL AT
LEAST TWO WEEKS PRIOR TO ANTICIPATED PAVING SCHEDULE.
C. AC PAVEMENT TO BE A ¼" ABOVE LIP OF ALL GUTTER AFTER COMPACTION.
D. THICKNESSES OVER 3" WILL BE LAID IN TWO LIFTS WITH THE FIRST LIFT BEING AN APPROVED
3/4" MINUS DESIGN.
1.6 GRADING / SOILS
1. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS
AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT, WHICH BY REFERENCE ARE A
PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND IN CASE OF CONFLICT SHALL TAKE
PRECEDENCE, UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS, OR IN THE
SPECIFICATIONS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY BETWEEN
THE SOILS REPORT AND THESE PLANS AND SPECIFICATIONS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ALL SOFT, YIELDING OR UNSUITABLE MATERIALS AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE
SOILS REPORT.
3. ALL EXCAVATED OR FILLED AREAS SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR MAXIMUM DENSITY PER ASTM TEST D-1557, EXCEPT UNDER BUILDING FOUNDATIONS WHERE IT SHALL BE 98% MIN. OF MAXIMUM DENSITY. MOISTURE CONTENT AT TIME OF PLACEMENT SHALL NOT EXCEED 2%
ABOVE NOR 3% BELOW OPTIMUM.
4. CONTRACTOR SHALL SUBMIT A COMPACTION REPORT PREPARED BY A QUALIFIED REGISTERED SOILS ENGINEER, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITH THE BUILDING PAD AREA AND AREAS TO BE PAVED, HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS
AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT.
5. SITE CLEARING SHALL INCLUDE THE LOCATING AND REMOVAL OF ALL UNDERGROUND TANKS, PIPES, VALVES, ETC.
6. ALL EXISTING VALVES, MANHOLES, ETC. SHALL BE RAISED OR LOWERED TO GRADE AS REQUIRED.
1.7 UTILITIES
1. THE LOCATIONS OF UNDERGROUND FACILITIES SHOWN ON THESE PLANS ARE BASED ON FIELD
SURVEYS AND LOCAL UTILITY COMPANY RECORDS. IT SHALL BE THE CONTRACTOR'S FULL
RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES EITHER DIRECT OR THROUGH
BLUE STAKE TO LOCATE THEIR FACILITIES PRIOR TO STARTING CONSTRUCTION.
2. CONTRACTOR TO VERIFY BY POTHOLING BOTH THE VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UTILITIES PRIOR TO INSTALLING ANY NEW LINES. NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR DAMAGE AND REPAIR TO THESE FACILITIES CAUSED BY HIS
WORK FORCE.
3. CONTRACTOR MUST START AT LOW END OF ALL NEW GRAVITY UTILITY LINES. MECHANICAL
SUB-CONTRACTOR MUST BE PROVIDED CIVIL SITE DRAWINGS FOR COORDINATION AND TO CHECK THE FLOW FROM THE LOWEST POINT IN BUILDING TO THE FIELD VERIFIED CONNECTION AT THE EXISTING MAIN. NO EXTRA COMPENSATION IS TO BE PAID TO THE CONTRACTOR FOR WORK HAVING
TO BE REDONE DUE TO FAILURE TO COMPLY WITH THESE REQUIREMENTS.
4. CONTRACTOR IS TO VERIFY LOCATION, DEPTH, SIZE, TYPE, AND OUTSIDE DIAMETERS OF UTILITIES IN THE FIELD BY POTHOLING A MINIMUM OF 300 FEET AHEAD, PIPELINE CONSTRUCTION TO AVOID CONFLICTS WITH DESIGNED PIPELINE GRADE AND ALIGNMENT. EXISTING UTILITY INFORMATION
SHOWN ON PLANS OR OBTAINED FROM UTILITY COMPANIES OR BLUE STAKED MUST BE ASSUMED
AS APPROXIMATE, REQUIRING FIELD VERIFICATION.
5. CULINARY WATER AND FIRE SERVICE LINES TO BE CONSTRUCTED IN ACCORDANCE WITH LOCAL
GOVERNING MUNICIPALITY STANDARDS AND SPECIFICATIONS.
6. SANITARY SEWER MAINS AND LATERALS TO BE CONSTRUCTED IN ACCORDANCE WITH LOCAL
GOVERNING MUNICIPALITY SEWER DISTRICT STANDARDS AND SPECIFICATIONS.
7. STORM SEWER TO BE CONSTRUCTED IN ACCORDANCE WITH THE GOVERNING MUNICIPALITY
STANDARDS AND SPECIFICATIONS.
8. ALL STORM DRAIN AND IRRIGATION CONDUITS SHALL BE INSTALLED WITH WATER TIGHT JOINTS
AND CONNECTIONS.
9. ALL STORM DRAIN PIPE PENETRATIONS INTO BOXES SHALL BE CONSTRUCTED WITH WATER TIGHT
SEALS ON THE OUTSIDE AND GROUTED SMOOTH WITH A NON-SHRINK GROUT ON THE INSIDE.
CONDUITS SHALL BE CUT OFF FLUSH WITH THE INSIDE OF THE BOX.
10. NO CHANGE IN THE DESIGN OF UTILITIES AS SHOWN WILL BE MADE BY THE CONTRACTOR WITHOUT
THE WRITTEN APPROVAL OF THE GOVERNING MUNICIPALITY, OR OTHER AUTHORITY HAVING
JURISDICTION OVER THAT UTILITY.
11. ALL STORM DRAIN CONDUITS AND BOXES SHALL BE CLEAN AND FREE OF ROCKS, DIRT, AND
CONSTRUCTION DEBRIS PRIOR TO FINAL INSPECTION.
1.8 SURVEY CONTROL
1. CONTRACTOR MUST PROVIDE A REGISTERED LAND SURVEYOR OR PERSONS UNDER THE
SUPERVISION OF A REGISTERED LAND SURVEYOR TO SET STAKES FOR THE ALIGNMENT AND
GRADE OF EACH MAIN AND/OR FACILITY AS SHOWN ON THE PLANS. THE STAKES SHALL BE MARKED WITH THE HORIZONTAL LOCATION (STATION) AND VERTICAL LOCATION (GRADE) WITH CUTS AND/OR
FILLS TO THE APPROVED GRADE OF THE MAIN AND OR FACILITY AS SHOWN ON THE PLANS.
2. THE CONTRACTOR SHALL PROTECT ALL STAKES AND MARKERS FOR VERIFICATION PURPOSES.
3. CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING, MAINTAINING, OR RESTORING ALL
MONUMENTS AND REFERENCE MARKS WITHIN THE PROJECT SITE.
1.9 AMERICAN DISABILITIES ACT
1. PEDESTRIAN / ADA ROUTES SHALL MEET THE FOLLOWING SPECIFICATIONS:
*ROUTES SHALL HAVE A 2.08% (1:48) MAXIMUM CROSS SLOPE.
*ROUTES SHALL HAVE A 5.00% (1:20) MAXIMUM RUNNING SLOPE.
*RAMPS SHALL HAVE A 8.33% (1:12) MAXIMUM RUNNING SLOPE.
2. ADA PARKING STALLS AND ADJACENT ROUTES SHALL HAVE A 2.08% (1:48) MAXIMUM SURFACE
SLOPE IN ANY DIRECTION.
3. THE CONTRACTOR SHALL ADHERE TO THE ABOVE SPECIFICATIONS. IN THE EVENT OF A
DISCREPANCY IN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE
ARCHITECT/ENGINEER PRIOR TO ANY CONSTRUCTION.
GUY GUY
TRANS TRANS
TR TR
T T
W W
WM WM
S S
SSCO SSCO
SD SD
SD SD
MB MB
44.00
EX TOC
44.00
TOC
OHC ohc
OHT oht
OHTV ohtv
UGC ugc
UGTV ugtv
UGT ugt
[ 72 ]
UD ud
1. COMPLIANCE
ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE CONTRACT
DOCUMENTS AND THE MOST RECENT EDITIONS OF THE FOLLOWING: THE INTERNATIONAL PLUMBING
CODE, UTAH DRINKING WATER REGULATIONS, APWA MANUAL OF STANDARD PLANS AND
SPECIFICATIONS, AND SLC PUBLIC UTILITIES MODIFICATIONS TO APWA STANDARD PLANS AND APPROVED MATERIALS AND SLC PUBLIC UTILITIES APWA SPECIFICATIONS MODIFICATIONS. THE
CONTRACTOR IS REQUIRED TO ADHERE TO ALL OF THE ABOVE-MENTIONED DOCUMENTS UNLESS
OTHERWISE NOTED AND APPROVED IN WRITING BY THE SALT LAKE CITY DIRECTOR OF PUBLIC
UTILITIES.
2. COORDINATION
THE CONTRACTOR IS RESPONSIBLE TO NOTIFY ALL APPROPRIATE GOVERNMENT AND PRIVATE
ENTITIES ASSOCIATED WITH THE PROJECT. THE FOLLOWING MUST BE CONTACTED 48-HOURS PRIOR
TO CONSTRUCTION AS APPLICABLE TO THE PROJECT:
PUBLIC UTILITIES
- BACKFLOW PREVENTION - 483-6795
DEVELOPMENT REVIEW ENGINEERING - 483-6781
- INSPECTIONS, PERMITS, CONTRACTS & AGREEMENTS - 483-6727
- PRETREATMENT - 799-4002
- STORM WATER - 483-6751
SLC DEPARTMENTS
- ENGINEERING - PUBLIC WAY PERMITS AND ISSUES - 535-6248
- ENGINEERING - SUBDIVISIONS - 535-6159
- FIRE DEPARTMENT - 535-6636
PERMITS AND LICENSING (BLDG SERVICES) - 535-7752
- PLANNING AND ZONING - 535-7700
- TRANSPORTATION - 535-6630
- ALL OTHER POTENTIALLY IMPACTED GOVERNING AGENCIES OR ENTITIES
- ALL WATER USERS INVOLVED IN WATER MAIN SHUTDOWNS
- APPLICABLE SEWER, WATER AND DRAINAGE DISTRICTS
- BLUESTAKES LOCATING SERVICES - 532-5000
- COUNTY FIRE DEPARTMENT - 743-7231
- COUNTY FLOOD CONTROL - 468-2779
- COUNTY HEALTH DEPARTMENT - 385-468-3913
- COUNTY PUBLIC WAY PERMITS - 468-2241
- HOLLADAY CITY - 272-9450
- SALT LAKE COUNTY HIGHWAY DEPARTMENT - 468-3705 OR 468-2156
- THE UTAH TRANSIT AUTHORITY FOR RE-ROUTING SERVICE - 262-5626
- UNION PACIFIC RAILROAD CO., SUPERINTENDENTS OFFICE - 595-3405
- UTAH DEPARTMENT OF TRANSPORTATION, REGION #2 - 975-4800
- UTAH STATE ENGINEER - 538-7240
3. SCHEDULE
PRIOR TO CONSTRUCTION THE CONTRACTOR WILL PROVIDE, AND WILL UPDATE AS CHANGES OCCUR, A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE SPECIFICATIONS AND SALT LAKE CITY
ENGINEERING OR SALT LAKE COUNTY REGULATIONS AS APPLICABLE FOR WORKING WITHIN THE
PUBLIC WAY.
4. PERMITS, FEES AND AGREEMENTS
CONTRACTOR MUST OBTAIN ALL THE NECESSARY PERMITS AND AGREEMENTS AND PAY ALL
APPLICABLE FEES PRIOR TO ANY CONSTRUCTION ACTIVITIES. CONTACT SALT LAKE CITY
ENGINEERING (535-6248) FOR PERMITS AND INSPECTIONS REQUIRED FOR ANY WORK CONDUCTED WITHIN SALT LAKE CITY'S PUBLIC RIGHT-OF-WAY. APPLICABLE UTILITY PERMITS MAY INCLUDE MAINLINE EXTENSION AGREEMENTS AND SERVICE CONNECTION PERMITS. ALL UTILITY WORK MUST
BE BONDED. ALL CONTRACTORS MUST BE LICENSED TO WORK ON CITY UTILITY MAINS.
CONSTRUCTION SITES MUST BE IN COMPLIANCE WITH THE UTAH POLLUTION DISCHARGE
ELIMINATION SYSTEM (UPDES) STORM WATER PERMIT FOR CONSTRUCTION ACTIVITIES (538-6923). A
COPY OF THE PERMIT'S STORM WATER POLLUTION PREVENTION PLAN MUST BE SUBMITTED TO
PUBLIC UTILITIES FOR REVIEW AND APPROVAL. ADDITIONAL WATER QUALITY AND EROSION CONTROL
MEASURES MAY BE REQUIRED. THE CONTRACTOR MUST ALSO COMPLY WITH SALT LAKE CITY'S
CLEAN WHEEL ORDINANCE.
5. ASPHALT AND SOIL TESTING
THE CONTRACTOR IS TO PROVIDE MARSHALL AND PROCTOR TEST DATA 24-HOURS PRIOR TO USE.
CONTRACTOR IS TO PROVIDE COMPACTION AND DENSITY TESTING AS REQUIRED BY SALT LAKE CITY
ENGINEERING, UDOT, SALT LAKE COUNTY OR OTHER GOVERNING ENTITY. TRENCH BACKFILL
MATERIAL AND COMPACTION TESTS ARE TO BE TAKEN PER APWA STANDARD SPECIFICATIONS,
SECTION 330520 - BACKFILLING TRENCHES, OR AS REQUIRED BY THE SLC PROJECT ENGINEER IF NATIVE MATERIALS ARE USED. NO NATIVE MATERIALS ARE ALLOWED WITHIN THE PIPE ZONE. THE MAXIMUM LIFTS FOR BACKFILLING EXCAVATIONS IS 8-INCHES. ALL MATERIALS AND COMPACTION TESTING IS TO BE PERFORMED BY A LAB RECOGNIZED AND ACCEPTED BY SALT LAKE COUNTY PUBLIC
WORKS AND/OR SALT LAKE CITY ENGINEERING.
6. TRAFFIC CONTROL AND HAUL ROUTES
TRAFFIC CONTROL MUST CONFORM TO THE MOST CURRENT EDITION OF SALT LAKE CITY TRAFFIC CONTROL MANUAL - PART 6 OF “MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES” FOR SALT LAKE
COUNTY AND STATE ROADS. SLC TRANSPORTATION MUST APPROVE ALL PROJECT HAUL ROUTES
(535-7129). THE CONTRACTOR MUST ALSO CONFORM TO UDOT, SALT LAKE COUNTY OR OTHER
APPLICABLE GOVERNING ENTITIES REQUIREMENTS FOR TRAFFIC CONTROL.
7. SURVEY CONTROL
CONTRACTOR MUST PROVDE A REGISTERED LAND SURVEYOR OR PERSONS UNDER SUPERVISION OF A REGISTERED LAND SURVEYOR TO SET STAKES FOR ALIGNMENT AND GRADE OF EACH MAIN AND/OR FACILITY AS APPROVED. THE STAKES SHALL BE MARKED WITH THE HORIZONTAL LOCATION (STATION) AND VERTICAL LOCATION (GRADE) WITH CUTS AND/OR FILLS TO THE GRADE OF THE MAIN AND/OR FACILITY AS APPROVED. IN ADDITION, THE CONTRACTOR AND/OR SURVEYOR SHALL PROVIDE TO SALT LAKE CITY PUBLIC UTILITIES CUT SHEETS FILLED OUT COMPLETELY AND CLEARLY SHOWING THE PERTINENT GRADES, ELEVATIONS AND CUT/FILLS ASSOCIATED WITH THE FIELD STAKING OF THE MAIN AND/OR FACILITY. THE CUT SHEET FORM IS AVAILABLE AT THE CONTRACTS AND AGREEMENTS
OFFICE AT PUBLIC UTILITIES. ALL MAINS AND LATERALS NOT MEETING MINIMUM GRADE
REQUIREMENTS AS SPECIFIED BY ORDINANCE OR AS REQUIRED TO MEET THE MINIMUM REQUIRED
FLOWS OR AS APPROVED MUST BE REMOVED AND RECONSTRUCTED TO MEET DESIGN GRADE. THE
CONTRACTOR SHALL PROTECT ALL STAKES AND MARKERS UNTIL PUBLIC UTILITY SURVEYORS
COMPLETE FINAL MEASUREMENTS. THE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING,
MAINTAINING, OR RESTORING ALL MONUMENTS AND REFERENCE MARKS WITHIN THE PROJECT SITE.
CONTACT THE COUNTY SURVEYOR (468-2028) FOR MONUMENT LOCATIONS AND CONSTRUCTION
REQUIREMENTS. ALL ELEVATIONS SHALL BE REFERENCED TO SALT LAKE CITY DATUM UNLESS NOTED
OTHERWISE ON THE PLANS.
8. ASPHALT GUARANTEE
THE CONTRACTOR SHALL REMOVE, DISPOSE OF, FURNISH AND PLACE PERMANENT ASPHALT PER
SALT LAKE CITY ENGINEERING, UDOT, COUNTY, OR OTHER GOVERNMENT STANDARDS AS
APPLICABLE TO THE PROJECT. THE CONTRACTOR SHALL GUARANTEE THE ASPHALT RESTORATION
FOR A PERIOD AS REQUIRED BY THE GOVERNING ENTITY.
9. TEMPORARY ASPHALT
IF THE CONTRACTOR CHOOSES TO WORK WITHIN THE PUBLIC WAY WHEN HOT MIX ASPHALT IS NOT
AVAILABLE, THE CONTRACTOR MUST OBTAIN APPROVAL FROM THE APPROPRIATE GOVERNING
ENTITY PRIOR TO INSTALLING TEMPORARY ASPHALT SURFACING MATERIAL. WITHIN SALT LAKE CITY, WHEN PERMANENT ASPHALT BECOMES AVAILABLE, THE CONTRACTOR SHALL REMOVE THE
TEMPORARY ASPHALT, FURNISH AND INSTALL THE PERMANENT ASPHALT. THE CONTRACTOR SHALL GUARANTEE THE ASPHALT RESTORATION FOR A PERIOD AS REQUIRED BY THE GOVERNING ENTITY
FROM THE DATE OF COMPLETION.
10. SAFETY
THE CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF SAFETY OF THE PROJECT AND SHALL MEET ALL OSHA, STATE, COUNTY AND OTHER GOVERNING ENTITY REQUIREMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFORMING TO LOCAL AND FEDERAL CODES GOVERNING SHORING AND
BRACING OF EXCAVATIONS AND TRENCHES, AND FOR THE PROTECTION OF WORKERS.
11. DUST CONTROL
THE CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL ACCORDING TO THE GOVERNING ENTITY
STANDARDS. USE OF HYDRANT WATER OR PUMPING FROM CITY-OWNED CANALS OR STORM
DRAINAGE FACILITIES IS NOT ALLOWED FOR DUST CONTROL ACTIVITIES WITHOUT WRITTEN
APPROVAL OF THE PUBLIC UTILITIES DIRECTOR.
12. DEWATERING
ALL ON-SITE DEWATERING ACTIVITIES MUST BE APPROVED IN WRITING BY PUBLIC UTILITIES.
PROPOSED OUTFALL LOCATIONS AND ESTIMATED FLOW VOLUME CALCULATIONS MUST BE
SUBMITTED TO PUBLIC UTILITIES FOR REVIEW AND APPROVAL. ADEQUATE MEASURES MUST BE
TAKEN TO REMOVE ALL SEDIMENT PRIOR TO DISCHARGE. PUBLIC UTILITIES MAY REQUIRE
ADDITIONAL MEASURES FOR SEDIMENT CONTROL AND REMOVAL.
13. PROJECT LIMITS
THE CONTRACTOR IS REQUIRED TO KEEP ALL CONSTRUCTION ACTIVITIES WITHIN THE APPROVED PROJECT LIMITS. THIS INCLUDES, BUT IS NOT LIMITED TO, VEHICLE AND EQUIPMENT STAGING, MATERIAL STORAGE AND LIMITS OF TRENCH EXCAVATION. IT IS THE CONTRACTORS RESPONSIBILITY TO OBTAIN PERMISSION AND/OR EASEMENTS FROM THE APPROPRIATE GOVERNING ENTITY AND/OR
INDIVIDUAL PROPERTY OWNER(S) FOR WORK OR STAGING OUTSIDE OF THE PROJECT LIMITS.
14. WATER, FIRE, SANITARY SEWER AND STORM DRAINAGE UTILITIES
A. INSPECTIONS -
IT IS THE CONTRACTOR'S RESPONSIBILITY TO SCHEDULE ANY WATER, SEWER, BACKFLOW
AND DRAINAGE INSPECTION 48-HOURS IN ADVANCE TO WHEN NEEDED. CONTACT 483-6727 TO
SCHEDULE INSPECTIONS.
B. DAMAGE TO EXISTING UTILITIES -
THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE, CAUSED BY ANY
CONDITION INCLUDING SETTLEMENT, TO EXISTING UTILITIES FROM WORK PERFORMED AT OR
NEAR EXISTING UTILITIES. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO
PROTECT ALL EXISTING PUBLIC AND PRIVATE ROADWAY AND UTILITY FACILITIES. DAMAGE TO
EXISTING FACILITIES CAUSED BY THE CONTRACTOR, MUST BE REPAIRED BY THE
CONTRACTOR AT HIS/HER EXPENSE, TO THE SATISFACTION OF THE OWNER OF SAID
FACILITIES.
C. UTILITY LOCATIONS -
CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING AND AVOIDING ALL UTILITIES AND
SERVICE LATERALS, AND FOR REPAIRING ALL DAMAGE THAT OCCURS TO THE UTILTIES DUE
TO THE CONTRACTOR'S ACTIVITIES. CONTRACTOR IS TO VERIFY LOCATION, DEPTH, SIZE,
MATERIAL AND OUTSIDE DIAMETERS OF UTILITIES IN THE FIELD BY POTHOLING A MINIMUM OF
300-FEET AHEAD OF SCHEDULED CONSTRUCTION IN ORDER TO IDENTIFY POTENTIAL
CONFLICTS AND PROBLEMS WITH FUTURE CONSTRUCTION ACTIVITIES. EXISTING UTILITY
INFORMATION OBTAINED FROM SLC PUBLIC UTILITIES' MAPS MUST BE ASSUMED AS
APPROXIMATE AND REQUIRING FIELD VERIFICATION. CONTACT BLUE STAKES OR
APPROPRIATE OWNER FOR COMMUNICATION LINE LOCATIONS.
D. UTILITY RELOCATIONS -
FOR UTILITY CONFLICTS REQUIRING MAINLINE RELOCATIONS, THE CONTRACTOR MUST NOTIFY
THE APPLICABLE UTILITY COMPANY OR USER A MINIMUM OF 2-WEEKS IN ADVANCE. A
ONE-WEEK MINIMUM NOTIFICATION IS REQUIRED FOR CONFLICTS REQUIRING THE
RELOCATION OF SERVICE LATERALS. ALL RELOCATIONS ARE SUBJECT TO APPROVAL FROM
THE APPLICABLE UTILITY COMPANY AND/OR USER.
E. FIELD CHANGES -
NO ROADWAY, UTILITY ALIGNMENT OR GRADE CHANGES ARE ALLOWED FROM THE APPROVED
CONSTRUCTION PLANS/DOCUMENTS WITHOUT WRITTEN APPROVAL FROM THE SLC PUBLIC
UTILITIES DIRECTOR. CHANGES TO HYDRANT LOCATIONS AND/OR FIRE LINES MUST BE
REVIEWED AND APPROVED BY THE SALT LAKE CITY OR SALT LAKE COUNTY FIRE DEPARTMENT
(AS APPLICABLE TO THE PROJECT) AND PUBLIC UTILITIES.
F. PUBLIC NOTICE TO PROJECTS IN THE PUBLIC WAY-
FOR APPROVED PROJECTS THE CONTRACTOR IS RESPONSIBLE TO PROVIDE AND DISTRIBUTE
WRITTEN NOTICE TO ALL RESIDENTS LOCATED WITHIN THE PROJECT AREA AT LEAST
72-HOURS PRIOR TO CONSTRUCTION. WORK TO BE CONDUCTED WITHIN COMMERCIAL OR
INDUSTRIAL AREAS MAY REQUIRE A LONGER NOTIFICATION PERIOD AND ADDITIONAL
CONTRACTOR COORDINATION WITH PROPERTY OWNERS. THE WRITTEN NOTICE IS TO BE
APPROVED BY THE SLC PUBLIC UTILITIES PROJECT ENGINEER.
G. PUBLIC NOTICE FOR WATER MAIN SHUT DOWNS -
THROUGH THE SLC PUBLIC UTILITIES INSPECTOR AND WITH THE PUBLIC UTILITIES PROJECT
ENGINEER APPROVAL, SLC PUBLIC UTILITIES MUST BE CONTACTED AND APPROVE ALL WATER
MAIN SHUTDOWNS. ONCE APPROVED THE CONTRACTOR MUST NOTIFY ALL EFFECTED USERS
BY WRITTEN NOTICE A MINIMUM OF 48-HOURS (RESIDENTIAL) AND 72-HOURS
(COMMERCIAL/INDUSTRIAL) PRIOR TO THE WATER MAIN SHUT DOWN. PUBLIC UTILITIES MAY
REQUIRE LONGER NOTICE PERIODS.
H. WATER AND SEWER SEPARATION -
IN ACCORDANCE WITH UTAH'S DEPARTMENT OF HEALTH REGULATIONS, A MINIMUM TEN-FOOT
HORIZONTAL AND 1.5-FOOT VERTICAL (WITH WATER ON TOP) SEPARATION IS REQUIRED. IF
THESE CONDITIONS CANNOT BE MET, STATE AND SLC PUBLIC UTILITIES APPROVAL IS
REQUIRED. ADDITIONAL CONSTRUCTION MEASURES WILL BE REQUIRED FOR THESE
CONDITIONS.
I. SALVAGE -
ALL METERS MUST BE RETURNED TO PUBLIC UTILITIES, AND AT PUBLIC UTILITIES REQUEST
ALL SALVAGED PIPE AND/OR FITTINGS MUST BE RETURNED TO SLC PUBLIC UTILTIES (483-6727)
LOCATED AT 1530 SOUTH WEST TEMPLE.
J. SEWER MAIN AND LATERAL CONSTRUCTION REQUIREMENTS -
SLC PUBLIC UTILITIES MUST APPROVE ALL SEWER CONNECTIONS. ALL SEWER LATERALS
6-INCHES AND SMALLER MUST WYE INTO THE MAINS PER SLC PUBLIC UTILITIES
REQUIREMENTS. ALL 8-INCH AND LARGER SEWER CONNECTIONS MUST BE PETITIONED FOR AT
PUBLIC UTILTIES (483-6762) AND CONNECTED AT A MANHOLE. INSIDE DROPS IN MANHOLES
ARE NOT ALLOWED. A MINIMUM 4-FOOT BURY DEPTH IS REQUIRED ON ALL SEWER MAINS AND
LATERALS. CONTRACTOR SHALL INSTALL INVERT COVERS IN ALL SEWER MANHOLES WITHIN
THE PROJECT AREA.
CONTRACTOR TO PROVIDE AIR PRESSURE TESTING OF SEWER MAINS IN ACCORDANCE WITH
PIPE MANUFACTURERS RECOMMENDATIONS AND SALT LAKE CITY PUBLIC UTILITIES
REQUIREMENTS. ALL PVC SEWER MAIN AND LATERAL TESTING SHALL BE IN ACCORDANCE
WITH UNI-BELL UN-B-6-98 RECOMMENDED PRACTICE FOR LOW PRESSURE AIR TESTING OF
INSTALLED SEWER PIPE. CONTRACTOR SHALL PROVIDE SEWER LATERAL WATER TESTING AS
REQUIRED BY THE SALT LAKE CITY PUBLIC UTILITIES PROJECT ENGINEER OR INSPECTOR. A
MINIMUM OF 9-FEET OF HEAD PRESSURE IS REQUIRED AS MEASURED VERTICALLY FROM THE
HIGH POINT OF THE PIPELINE AND AT OTHER LOCATIONS ALONG THE PIPELINE AS
DETERMINED BY THE SLC PUBLIC UTILITIES PROJECT ENGINEER OR INSPECTOR. TESTING
TIME WILL BE NO LESS THAN AS SPECIFIED FOR THE AIR TEST DURATION IN TABLE I ON PAGE 12 OF UNI-B-6-98. ALL PIPES SUBJECT TO WATER TESTING SHALL BE FULLY VISIBLE TO THE
INSPECTOR DURING TESTING. TESTING MUST BE PERFORMED IN THE PRESENCE OF A SLC
PUBLIC UTILITIES REPRESENTATIVE. ALL VISIBLE LEAKAGE MUST BE REPAIRED TO THE
SATISFACTION OF THE SLC PUBLIC UTILITIES ENGINEER OR INSPECTOR.
K. WATER AND FIRE MAIN AND SERVICE CONSTRUCTION REQUIREMENTS -
SLC PUBLIC UTILITIES MUST APPROVE ALL FIRE AND WATER SERVICE CONNECTIONS. A
MINIMUM 3-FOOT SEPARATION IS REQUIRED BETWEEN ALL WATER AND FIRE SERVICE TAPS
INTO THE MAIN. ALL CONNECTIONS MUST BE MADE MEETING SLC PUBLIC UTILITIES
REQUIREMENTS. A 5-FOOT MINIMUM BURY DEPTH (FINAL GRADE TO TOP OF PIPE) IS REQUIRED ON ALL WATER/FIRE LINES UNLESS OTHERWISE APPROVED BY PUBLIC UTILITIES. WATER LINE
THRUST BLOCK AND RESTRAINTS ARE AS PER SLC APPROVED DETAIL DRAWINGS AND
SPECIFICATIONS. ALL EXPOSED NUTS AND BOLTS WILL BE COATED WITH CHEVRON FM1
GREASE PLUS MINIMUM 8 MIL THICKNESS PLASTIC. PROVIDE STAINLESS STEEL NUTS, BOLTS
AND WASHERS FOR HIGH GROUNDWATER/ SATURATED CONDITIONS AT FLANGE FITTINGS,
ETC.
ALL WATERLINES INSTALLATIONS AND TESTING TO BE IN ACCORDANCE WITH AWWA SECTIONS
C600, C601, C651, C206, C200, C900, C303 AWWA MANUAL M11 AND ALL OTHER…
This is the start of the file's text. The full file is on GovTribe.