6-JF26-029-IFB Technical Specifications 1.pdf
PDF 1 MB Posted
- Solicitation number
- JF26-029-IFB
- Issued by
- Salt Lake County, Utah
About this file
Technical Specifications for West Valley Elementary School Asphalt Rehabilitation
This is a Technical Specifications document issued by the Granite School District (GSD) for the asphalt rehabilitation project at West Valley Elementary School located at 6049 Brud Drive, West Valley City, Utah. The project involves milling and replacement of existing asphalt in drive, parking, pick-up, and playground areas at the facility. The work includes site construction, milling, pavements, and pavement painting/striping to be executed under a single prime contract. The specifications require that contractors hold a valid General Building Contractor (B100), General Engineering Contractor (E100), or Asphalt Contractor (S260) license. A pre-bid meeting is mandatory for all interested bidders, with details provided in the project manual. The GSD Board is scheduled to review the award recommendation on June 2, 2026, with final award issuance to follow board approval. The project will proceed as a single award to the lowest cost responsive and responsible bidder. The owner will occupy the site during the entire construction period, requiring contractors to coordinate all work to minimize disruption to normal school operations.
The specifications establish comprehensive requirements for project execution, including unit pricing methodology, alternate bid options, submittal procedures, quality assurance standards, and testing and inspection services to be conducted by an independent laboratory paid by the owner. Contractors must submit all required submittals electronically in Adobe PDF format within specified timeframes, with a 14-day review period allowed for architect approval. The project manual details strict protocols for site access, parking, storage areas, hazardous materials handling, temporary facilities, and environmental controls. All cleaning materials must comply with Green Seal environmental standards, and smoking is prohibited within school interiors and restricted to public sidewalks off school property. Project completion and closeout requirements include final cleaning, operation and maintenance documentation, warranties, spare parts delivery, and demonstration of equipment to owner personnel. The contract includes specific provisions for alternates, particularly Alternate No. 1 addressing the Bus Loop Mill and Pave work, with pricing adjustments made through change orders based on actual quantities and measurements supplied during construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2500 South State Street Salt Lake City, Utah 84115
May 11, 2026
Technical Specifications for West Valley Elementary School
Asphalt Rehabilitation
West Valley Elementary School 6049 Brud Drive (3100 South) West Valley City, Utah 84128
TABLE OF CONTENTS
SECTION SECTION
NUMBER TITLE
TABLE OF CONTENTS TOC-1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
NOT USED
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 22 00 Unit Prices 01 23 00 Alternates 01 25 00 Substitution Procedures 01 31 00 Project Management and Coordination 01 33 00 Submittal Procedures 01 35 16 Alteration Project Procedures 01 40 00 Quality Requirements 01 45 23 Testing and Inspection Services 01 50 00 Temporary Facilities and Controls 01 60 00 Product Requirements 01 73 29 Cutting and Patching 01 77 00 Closeout Procedures
DIVISION 02 – 33
NOT USED
END OF TABLE OF CONTENTS
Granite School District WEST VALLEY ELEMENTARY SCHOOL Rev. November 1, 2022
ASPHALT REHABILITATION
SUMMARY OF WORK 01 11 00-1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 – GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project description.
2. Work by Others.
3. Work sequence.
4. Owner occupancy.
5. Contractor’s use of site and premises.
1.2 PROJECT DESCRIPTION
A. Work of this Project is described as rehabilitation, through milling and replacement, of existing asphalt drive, parking, pick-up, and playground areas to an existing facility entitled West Valley Elementary School, located at 6049 Brud Drive (3100 South), West Valley City, Utah.
B. Work includes site construction, milling, pavements, and pavement painting/striping.
C. The Project will be constructed under a single prime contract.
1.3 WORK BY OTHERS
A. Separate Contracts:
1. The Owner may execute a contract for additional work at the site, that is excluded from the work of this Contract, and that includes:
a. Perimeter and playground site fencing.
2. Work under separate contract may be executed concurrent with Work of this Contract.
3. Cooperate with the Owner and separate contractors to accommodate this requirement.
B. Work by Owner: The Owner will remove and retain possession of the following items prior to start of work under this Contract:
1. Not applicable.
C. Owner’s Products: The Contractor shall remove and the Owner will take possession of the following items upon the start of work under this Contract:
1. Not applicable.
1.4 WORK SEQUENCE
A. Construct Work to accommodate Owner's use of premises during construction period.
SUMMARY OF WORK 01 11 00-2
B. Coordinate construction schedule and operations with the Owner and Architect.
C. Schedule the Work to accommodate this requirement.
1.5 OWNER OCCUPANCY
A. The Owner will occupy the site and premises during the entire period of construction for conduct of normal operations.
B. Cooperate with the Owner to minimize conflict, and to facilitate Owner’s operations.
C. Schedule the Work to accommodate this requirement.
1.6 CONTRACTOR’S USE OF SITE AND PREMISES
A. Limit use of site and premises to allow for:
1. Owner occupancy.
2. Use of site and adjacent premises by the public.
B. Move any stored products under Contractor’s control that interfere with the operations of the Owner.
C. Assume full responsibility for protection and safekeeping of products under this Contract stored on site.
D. Obtain and pay for use of any additional storage or work areas needed for operations.
E. Coordinate use of site and premises with the Owner:
1. Employee parking: In designated areas.
2. Access to site and premises: In designated areas.
3. Storage and staging areas: In designated areas.
F. Conform to Building Rules and Regulations.
G. Confine operations to construction area unless otherwise approved by Owner.
H. If access to adjacent common or occupied spaces is required:
1. Schedule operations with Owner in advance.
2. Perform work after normal business hours or on weekends when directed by
Owner.
I. Do not interrupt building fire or life safety systems.
J. Do not close or obstruct exits.
K. Do not use or store hazardous or flammable materials on premises without Owner’s approval; follow requirements of governing authorities having jurisdiction over the work.
SUMMARY OF WORK 01 11 00-3
L. Prohibit smoking within interior spaces or anywhere on School property. Smoking is only permitted at public ways, such as sidewalks, off of School property. Keep areas where smoking occurs clean and free from trash or “butts”.
PART 2 – PRODUCTS
Not Used
PART 3 – EXECUTION
END OF SECTION 01 11 00
Granite School District WEST VALLEY ELEMENTARY SCHOOL Rev. May 31, 2023
UNIT PRICES 01 22 00-1
SECTION 01 22 00
UNIT PRICES
1. Measurement.
2. Payment.
B. Related Sections:
1. Individual specification sections.
1.2 UNIT PRICES
A. Provide unit prices for items listed, for inclusion in Contract, guaranteed to apply for duration of Project as basis for additions to or deductions from Contract Sum.
B. Take measurements and compute quantities.
C. Quantities and measurements indicated are for Contract purposes only. Actual quantities and measurements supplied or placed in the Work will determine payment.
D. Payment includes full compensation for all required labor, Products, tools, equipment, plant, transportation, services, and incidentals, and for erection, application, or installation of an item of the Work.
E. Adjustments to Contract Sum will be made by Change Order based on net cumulative change for each item of the Work.
3.1 UNIT PRICE SCHEDULE
A. See Project Bid Form for Unit Price Matrix.
END OF SECTION 01 22 00
ALTERNATES 01 23 00-1
SECTION 01 23 00
ALTERNATES
A. Section Includes
1. Documentation of changes to Contract Sum and Contract Time.
B. Contract Documents contain pertinent requirements for materials and methods to accomplish work described herein.
C. Provide alternate costs for inclusion in Contract Sum if accepted by Owner.
1.2 RELATED REQUIREMENTS
A. Owner/Contractor Agreement: Alternates accepted by Owner for incorporation into the Work.
B. Individual specification sections identified.
1.3 PROCEDURES
A. Alternates will be exercised at the option of Owner.
B. Coordinate related work and modify surrounding work as required to complete the work, including changes under each Alternate, when acceptance is designated in Owner/Contractor Agreement.
1.4 DESCRIPTION OF ALTERNATES
A. Alternate No. 1 – Bus Loop Mill and Pave:
1. Base Bid: Remove and Replace approximately 2,200 SF asphalt and repair soft spots.
2. Alternate Bid: Mill and Remove approximately 17,700 SF 2” Asphalt. Furnish and Install 17,700 SF 2” Class 2 Asphalt, 15% max RAP.
ALTERNATES 01 23 00-2
END OF SECTION 01 23 00
SUBSTITUTION PROCEDURES 01 25 00-1
SECTION 01 25 00
SUBSTITUTION PROCEDURES
1. Product Substitution Procedures.
1.2 GENERAL
A. Definition: Proposal by Contractor to use manufacturer, product, material, or system different from one required in Contract Documents.
B. Do not substitute Products unless a substitution request has been approved by
Architect.
C. Substitutions during Bidding: Submit substitution requests not later than 5 days prior to Bid Due Date.
1. Substitution requests will not be considered after award of Contract except due to non-availability of a specified Product after award, through no fault of the Contractor.
D. In case of non-availability of a specified Product notify Architect in writing as soon as non-availability becomes apparent.
1.3 SUBSTITUTION REQUESTS
A. Submit substitution requests on Contractor’s standard form.
B. Document specified product and proposed substitution with complete data, including:
1. Product identification, including name and address of manufacturer.
2. Product description, performance and test data, and reference standards.
3. Sample, if requested.
4. Description of any anticipated effect that acceptance of proposed substitution will have on Progress Schedule, construction methods, or other items of Work.
5. Description of any differences between specified product and proposed substitution.
6. Difference in cost between specified product and proposed substitution.
C. Burden of proof for substantiating compliance of proposed substitution with Contract
Document requirements remains with Contractor.
D. A request constitutes a representation that the Contractor:
1. Has investigated the proposed Product and determined that it meets or exceeds the quality level of the specified Product.
2. Will provide the same warranty for the substitution as for the specified Product.
SUBSTITUTION PROCEDURES 01 25 00-2
3. Will coordinate installation and make changes to other Work that may be required for the Work to be complete with no additional cost to Owner.
4. Waives claims for additional costs or time extension that may subsequently become apparent.
5. Will reimburse Owner for design services associated with re-approval by authorities or revisions to Contract Documents to accommodate the substitution.
E. Substitutions will not be considered if:
1. They are indicated or implied on Shop Drawings or other submittals without submittal of a substitution request.
2. Approval will require substantial revision of Contract Documents without additional compensation to Architect.
F. Submit electronically in Adobe PDF format.
G. Architect will notify Contractor of approval or rejection of each Substitution Request.
END OF SECTION 01 25 00
Granite School District WEST VALLEY ELEMENTARY Rev. May 31, 2023
PROJECT MANAGEMENT AND COORDINATION 01 31 00-1
SECTION 01 31 00
PROJECT MANAGEMENT AND COORDINATION
1. Project coordination.
2. Project meetings.
1. Section 01 77 00 - Contract Closeout.
1.2 PROJECT COORDINATION
A. Submit required project submittals electronically in Abode PDF format.
B. Coordinate scheduling, submittals, and work of various Sections of specifications to assure efficient and orderly sequence of installation of interdependent construction elements.
C. Verify that utility requirement characteristics of operating equipment are compatible with building utilities. Coordinate work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service such equipment.
D. Coordinate space requirements and installation of mechanical and electrical items that are indicated diagrammatically on Drawings.
1. Follow routing shown as closely as practical; place runs parallel with building lines.
2. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
E. In finished areas, conceal pipes, ducts, and wiring within construction. Coordinate locations of fixtures and outlets with finish elements.
F. Coordinate completion and clean-up of work of separate Sections in preparation for
Substantial Completion.
G. After Owner occupancy, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents to minimize disruption of Owner's activities.
1.3 PROJECT MEETINGS
A. Schedule and administer preconstruction meeting, progress (OAC) meetings, and pre-installation conferences.
B. Make physical arrangements for meetings; notify involved parties at least four (4)
PROJECT MANAGEMENT AND COORDINATION 01 31 00-2
days in advance.
C. Record significant proceedings and decisions at each meeting; reproduce and distribute copies to parties in attendance and others affected by proceedings and decisions made.
1.4 PRECONSTRUCTION MEETING
A. Preconstruction meeting will be scheduled by the Owner after date of Notice to Proceed at location determined by the Owner.
B. Attendance:
1. Contractor.
2. Owner.
3. Architect and principal consultants.
4. Major subcontractors and suppliers as Contractor deems appropriate.
C. Review and Discuss:
1. Relation and coordination of various parties, and responsible personnel for each party.
2. Use of premises, including office and storage areas, temporary controls, and security procedures.
3. Construction schedule and critical work sequencing.
4. Frequency of Owner/Architect/Contractor (O.A.C.) meetings.
a. Day of Week
b. Time
c. Frequency (weekly, every other week, etc.)
5. Processing of:
a. Contract modifications.
b. Shop Drawings, Product Data, and Samples.
c. Applications for Payment.
d. Substitutions.
e. Requests for Information.
f. Other required submittals.
6. Adequacy of distribution of Contract Documents.
7. Procedures for maintaining contract closeout submittals.
8. Installation and removal of temporary facilities.
9. Notification procedures and extent of testing and inspection services.
1.5 PROGRESS MEETINGS (OWNER/ARCHITECT/CONTACTOR (O.A.C.) MEETING)
A. Location: Contractor’s Project field office, or as determined during preconstruction meeting.
B. Attendance:
1. Contractor.
2. Owner.
3. Architect and consultants as appropriate to agenda.
4. Subcontractors and suppliers as appropriate to agenda.
5. Others as appropriate to agenda.
PROJECT MANAGEMENT AND COORDINATION 01 31 00-3
C. Review and Discuss:
1. Work progress since previous meeting, including:
a. Field observations, deficiencies, conflicts, and problems.
b. Progress and completion date.
c. Corrective measures needed to maintain quality standards, progress, and completion date.
2. Status of:
a. Requests for information.
b. Submittals.
c. Contract modifications.
3. Coordination between various elements of Work.
4. Maintenance of Project Record Documents.
1.6 PRE-INSTALLATION CONFERENCES
A. Where required in individual specification Section, convene a pre-installation conference at project site or other designated location.
B. Require attendance of parties directly affecting or affected by work of the specific
Section.
C. Review conditions of installation, preparation and installation procedures, and coordination with related work.
END OF SECTION 01 31 00
SUBMITTAL PROCEDURES 01 33 00-1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1. Submittal procedures.
2. Submittal schedule.
3. Shop Drawings.
4. Product Data.
5. Quality control submittals.
1. Section 01 40 00 - Quality Requirements.
1.2 SUBMITTAL PROCEDURES
A. Number each submittal with Project Manual section number and a sequential number within each section. Number resubmittals with original number and an alphabetic suffix.
B. Identify Project, Contractor, Subcontractor or supplier, pertinent Drawing sheet and detail numbers, and specification Section number, as appropriate.
C. Submit all submittals listed under “Submittals for Review” simultaneously for each Product or Specification Section.
D. Where multiple Products function as an assembly, group submittals for all related
Products into single submittal.
E. Architect will not review incomplete submittals.
F. Apply Contractor’s stamp, signed or initialed certifying that:
1. Submittal was reviewed.
2. Products, field dimensions, and adjacent construction have been verified.
3. Information has been coordinated with requirements of Work and Contract
Documents.
G. Schedule submittals to expedite the Project, and deliver to Architect. Coordinate submittal of related items.
H. For each submittal, allow 14 days for Architect’s review, excluding delivery time to and from Contractor.
I. Identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of completed Work.
SUBMITTAL PROCEDURES 01 33 00-2
J. Revise and resubmit submittals when required; identify all changes made since previous submittal.
K. Distribute copies of reviewed submittals to concerned parties and to Project Record
Documents file. Instruct parties to promptly report any inability to comply with provisions.
1.3 SUBMITTAL SCHEDULE
A. Within 15 days after date of Notice to Proceed, submit a submittal schedule showing all submittals proposed for project, including submittals listed as:
1. Submittals for Review.
2. Quality Control Submittals.
3. Closeout Submittals.
B. Include for each submittal:
1. Specification section number.
2. Description of submittal.
3. Type of submittal.
4. Anticipated submittal date.
5. For submittals requiring Architect’s review, date reviewed submittal will be required from Architect.
C. Submit electronically in Adobe PDF format.
1.4 SHOP DRAWINGS
A. Present information in clear and thorough manner.
B. Identify details by reference to sheet and detail numbers or room number shown on Drawings.
C. Reproductions of details contained in Contract Documents are not acceptable.
D. Submit electronically in Adobe PDF format. Architect will return one copy to
Contractor for printing and distribution.
1.5 PRODUCT DATA
A. Mark each copy to identify applicable products, models, options, and other data.
B. Supplement manufacturers' standard data to provide information unique to this Project.
C. Submit electronically in Adobe PDF format. Architect will return one copy to
Contractor for printing and distribution.
SUBMITTAL PROCEDURES 01 33 00-3
1.6 QUALITY CONTROL SUBMITTALS
A. Quality control submittals specified in Section 01 40 00 are for information and do not require Architect’s responsive action except to require resubmission of incomplete or incorrect information.
END OF SECTION 01 33 00
Granite School District WEST VALLEY ELEMENTARY SCHOOL Rev. June 1, 2023
ALTERATION PROJECT PROCEDURES 01 35 16-1
SECTION 01 35 16
ALTERATION PROJECT PROCEDURES
1. Patching and extending existing work.
2. Transitions and adjustments.
3. Repair of damaged surfaces.
1. Section 07 84 00 - Firestopping.
1.2 PROJECT CONDITIONS
A. Hazardous Materials:
1. A survey of hazardous materials was performed by the Owner; a copy of the report is available for review at the office of the Owner and will be provided to the Contractor. Review report prior to commencement of work under this Contract. Contractor must keep a copy of the hazardous materials report on site at all times during the construction of the project.
2. Owner will remove or encapsulate existing asbestos and other hazardous materials prior to commencement of work under this Contract.
B. Unknown Hazardous Materials: If asbestos, lead-bearing paint, or other suspected hazardous materials are encountered during work of this Contract:
1. Cease work in affected area immediately.
2. Notify Architect and await instructions.
3. Close off affected areas.
2.1 MATERIALS
A. New Materials:
1. Provide new materials to match existing adjacent materials for closing of openings, repairs, and reconstructions where suitable salvaged materials do not exist, are insufficient in quantity, or where reuse is not permitted.
2. Match existing materials in material, type, size, quality, color, finish, and other attributes.
B. Reused Materials:
1. Clean and prepare salvaged materials for reuse.
2. Do not use materials with objectionable chips, cracks, splits, dents, scratches, or other defects.
3. Repair operable items to function properly.
ALTERATION PROJECT PROCEDURES 01 35 16-2
3.1 PREPARATION
A. Test materials to be used in repairs for compatibility with existing materials; do not use incompatible materials.
B. Cut, move, or remove items as necessary for access to alterations and renovation work. Replace and restore upon completion.
C. Remove, cut, and patch work in manner to minimize damage and to provide means for restoring products and finishes to their original or specified new condition.
D. Remove unsuitable materials not marked for salvage.
E. Remove debris and abandoned items from areas of work and from concealed spaces.
3.2 ALTERATIONS
A. Coordinate alterations and renovations to expedite completion.
B. Install products and finish surfaces as specified in individual sections, or where no specification section exists to match existing.
C. Refinish visible surfaces to specified condition, with neat transition to adjacent surfaces.
D. Finish patches to provide uniform color and texture over entire surface, with repairs not discernible from normal viewing distance. If finish cannot be matched, refinish entire surface to nearest intersections.
E. Where removal of partitions or walls results in adjacent spaces becoming one, rework finished surfaces to smooth plane, without breaks, steps, or bulkheads.
F. Where new work abuts or aligns with existing, provide smooth and even transition.
Where a change in plane of 1/4-inch or more occurs, submit recommendation to Architect for transition.
G. Where alterations expose mechanical and electrical components that were previously concealed, renovate to be concealed in completed work.
H. In addition to specified replacement of equipment and fixtures, restore mechanical and electrical systems to full operational condition.
I. Patch holes in exposed surfaces left by removal of mechanical and electrical components.
J. Existing Fire-Rated Assemblies:
ALTERATION PROJECT PROCEDURES 01 35 16-3
1. Patch or replace fire protection materials to maintain integrity of fire ratings.
2. Seal penetrations through and perimeter of fire-rated assemblies under provisions of Section 07 84 00.
END OF SECTION 01 35 16
QUALITY REQUIREMENTS 01 40 00-1
SECTION 01 40 00
QUALITY REQUIREMENTS
1. References.
2. Quality assurance and control of installation.
3. Test reports and certifications.
4. Manufacturer's installation instructions.
1.2 REFERENCES
A. For products or workmanship specified by reference to association, trade, or industry standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Should specified reference standards conflict with Contract Documents, request clarification from Architect before proceeding.
C. Conform to edition of reference standard in effect as of date of Project Manual.
D. The contractual relationship of the parties to the Contract shall not be altered from the Contract Documents by mention or inference otherwise in any reference document.
1.3 QUALITY ASSURANCE AND CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply fully with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect before proceeding.
D. Comply with specified standards as a minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Perform work by persons qualified to produce workmanship of specified quality.
F. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion or disfigurement.
QUALITY REQUIREMENTS 01 40 00-2
1.4 TEST REPORTS AND CERTIFICATIONS
A. When specified in individual specification Sections, require material or Product suppliers or manufacturers to provide test reports and manufacturers’ certifications.
B. Indicate that material or Product conforms to or exceeds specified requirements.
Submit supporting reference data, affidavits, and certifications as appropriate.
C. Submittals may be recent or previous test results on material or Product, but must be acceptable to Architect.
D. Submit electronically in Adobe PDF format.
1.5 MANUFACTURER'S INSTALLATION INSTRUCTIONS
A. When Contract Documents require that Products be installed in accordance with manufacturer's instructions:
1. Submit manufacturer's most recent printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, as applicable.
a. Submit in quantities specified for Product Data.
b. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
c. Identify conflicts between manufacturers' instructions and requirements of Contract Documents.
2. Perform installation of Products to comply with requirements of manufacturer's instructions.
3. If installation cannot be performed in accordance with manufacturer's instructions, notify Architect and await instructions.
4. Submit electronically in Adobe PDF format.
END OF SECTION 01 40 00
TESTING AND INSPECTION SERVICES 01 45 23-1
SECTION 01 45 23
TESTING AND INSPECTION SERVICES
1. Laboratory selection and payment.
2. Laboratory duties.
3. Contractor’s responsibilities.
A. ASTM International (ASTM):
1. C1077 - Standard Practice for Laboratories Testing Concrete and Concrete
Aggregates for Use in Construction and Criteria for Laboratory Evaluation.
2. D3666 - Standard Specification for Minimum Requirements for Agencies
Testing and Inspecting Road and Paving Materials.
3. D3740 - Standard Practice for Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction.
4. E329 - Standard Specification for Agencies Engaged in Construction Inspection and/or Testing.
5. E543 - Standard Specification for Agencies Performing Nondestructive Testing.
1.3 QUALITY ASSURANCE
A. Owner will employ and pay for services of an independent testing laboratory to perform specified testing and inspection.
B. Contractor shall cooperate with the Testing Laboratory to facilitate performance of its work.
C. Refer to the Conditions of the Contract for provisions related to special inspections and testing.
D. Qualifications of Laboratory:
1. Meet requirements of ASTM C1077, D3666, D3740, E329, and E543.
2. Authorized to operate in State in which project is located.
1.4 LABORATORY DUTIES
A. Cooperate with Architect and Contractor; provide qualified personnel after due notice.
B. Perform specified inspections, sampling, and testing of materials and methods of construction:
1. Comply with specified standards.
TESTING AND INSPECTION SERVICES 01 45 23-2
2. Ascertain compliance or noncompliance of materials with requirements of Contract Documents.
C. Promptly notify Architect and Contractor of observed irregularities or deficiencies of
Work or products.
D. Promptly submit written report of each test and inspection; submit one (1) copy electronically in Adobe PDF format to Architect, Owner, and Contractor.
E. Each report to include:
1. Date issued.
2. Project title and number.
3. Testing Laboratory name, address, and telephone number.
4. Name of Inspector and signature of individual in charge.
5. Date and time of sampling or inspection.
6. Record of temperature and weather conditions.
7. Date of test.
8. Identification of product and specification section.
9. Location of sample or test in project.
10. Type of inspection or test.
11. Results of tests and compliance or noncompliance with Contract Documents.
12. Interpretation of test results when requested by Architect or Contractor.
F. Perform additional tests when required by Architect or Owner.
G. Laboratory is not authorized to:
1. Release, revoke, alter, or enlarge on requirements of Contract Documents.
2. Approve or accept any portion of work.
3. Perform any duties of Contractor.
1.5 CONTRACTOR’S RESPONSIBILITIES
A. Cooperate with Laboratory personnel, provide access to Work, and to manufacturer's
B. When materials require testing prior to being incorporated into Work, secure and deliver to Laboratory adequate quantities of representative samples of materials proposed to be used.
C. Furnish copies of product test reports as required.
D. Furnish incidental labor and facilities:
1. To provide access to work to be tested.
2. To obtain and handle samples at site or at source of product to be tested.
3. To facilitate inspections and tests.
4. For safe storage and curing of test samples.
E. Notify Laboratory sufficiently in advance of operations to allow for Laboratory assignment of personnel and scheduling of tests.
F. When tests or inspections cannot be performed after such notice, reimburse Owner
TESTING AND INSPECTION SERVICES 01 45 23-3
for Laboratory personnel and travel expenses incurred due to Contractor’s negligence.
G. Make arrangements with Laboratory and pay for additional samples and tests required for Contractor’s convenience.
END OF SECTION 01 45 23
TEMPORARY FACILITIES AND CONTROLS 01 50 00-1
SECTION 01 50 00
TEMPORARY FACILITIES AND CONTROLS
1. Temporary utilities.
2. Field offices and sheds.
3. Temporary controls.
4. Protection of installed Work.
5. Security.
6. Progress cleaning.
7. Water, erosion, sediment, dust, and mold and mildew control.
8. Access roads and parking areas.
9. Removal.
A. Green Seal, Inc. (GS) 37 - Environmental Standard for Industrial and Institutional Cleaners.
2.1 MATERIALS
A. Cleaning Materials: Use only materials that:
1. Comply with GS 37.
2. Are not potentially hazardous to health or property.
3. Do not contain hazardous ingredients.
4. Are non-carcinogenic.
5. Are non or mildly irritating to skin, eyes, and mucous membranes.
6. Have an LD50 rating above 5 grams per kilogram.
7. Are non-reactive.
8. Contain minimum fragrance and dye.
9. Do not require respiratory protection.
3.1 TEMPORARY ELECTRICITY
A. Provide temporary electrical service of capacity and characteristics required for construction.
B. Connect to existing electrical system for electricity required during construction.
1. Cost of electricity used will be paid for by Owner. Exercise measures to conserve
TEMPORARY FACILITIES AND CONTROLS 01 50 00-2
electricity.
2. Regulate system to prevent interference with Owner's normal usage.
3. Maintain continuous power operation of Owner's facilities during changeover of electrical services.
4. Notify Owner when unusually heavy loads will be connected, including welding and other equipment with special power requirements.
5. Provide and pay for required service of capacity or characteristics other than that currently available.
C. Provide power outlets for construction operations, with branch wiring and distribution boxes located as required. Provide flexible power cords as required.
D. Maintain distribution system and provide routine repairs.
3.2 TEMPORARY LIGHTING
A. Provide temporary lighting for construction and security purposes.
B. Provide branch wiring from power source to distribution boxes with lighting conductors, pigtails, and lamps as required.
C. Maintain lamps and provide routine repairs.
D. Provide portable lights when required to provide minimum lighting levels necessary for specific work.
3.3 TEMPORARY HEAT
A. Provide temporary heating devices required to maintain specified ambient temperatures for construction.
B. Utilize existing facilities for heat required during construction.
1. Extend and supplement with temporary heat devices required to maintain specified ambient temperatures for construction.
2. Costs of fuel used from existing facilities will be paid for by Owner. Exercise measures to conserve fuel.
C. Maintain minimum ambient temperature of [fifty (50°)] degrees F in areas where construction is in progress, unless otherwise indicated in individual specification sections.
3.4 TEMPORARY VENTILATION
A. Ventilate enclosed areas to facilitate curing of materials, disperse humidity, and prevent accumulations of dust, fumes, vapors, or gases.
B. Provide temporary fan units as required to maintain clean air for construction.
C. Utilize existing ventilation equipment. Extend and supplement with temporary fan units as required to maintain clean air for construction.
TEMPORARY FACILITIES AND CONTROLS 01 50 00-3
3.5 TEMPORARY TELEPHONE, FACSIMILE, AND COMPUTER SERVICES
A. Contractor shall be accessible during normal business hours via mobile telephone with voice mail or an answering service.
B. Provide computer in Contractor’s field office with printer, Internet access, scanner, and email service.
3.6 TEMPORARY WATER
A. Provide temporary water required for construction.
B. Connect to existing water source for water required for construction.
1. Regulate system to prevent interference with Owner's usage.
2. Costs of water used will be paid for by Owner. Exercise measures to conserve water.
C. Extend branch piping and provide temporary hoses so that water is available at locations needed for work.
D. Protect from freezing.
E. Maintain distribution system and provide routine repairs.
3.7 TEMPORARY SANITARY FACILITIES
A. Provide chemical toilets for use during construction.
B. Maintain facilities in clean and sanitary condition.
3.8 FIELD OFFICES AND SHEDS
A. Provide temporary field offices and storage sheds required for construction.
B. Areas on site designated by Owner may be used for field office and storage of materials subject to damage by weather. Store large materials and those not subject to damage by weather outside building.
C. Do not unreasonably encumber site or premises with excess materials or equipment.
D. Temporary Structures:
1. Portable or mobile buildings, structurally sound, weathertight, with floors raised above ground.
2. Thermal transmission resistance: Compatible with occupancy and storage requirements.
3. Provide connections for utility services when required.
4. Provide steps and landings at entrances.
E. Field Office:
1. Size required for Contractor’s use and to provide space for project meetings.
2. Adequate electrical power, lighting, heating, and cooling to maintain human
TEMPORARY FACILITIES AND CONTROLS 01 50 00-4
comfort.
3. Provide facilities for storage of Project Record Documents.
4. Provide thermometer mounted at convenient outside location, not in direct sunlight.
3.9 BARRIERS
A. Provide barriers to prevent unauthorized entry to construction areas, to allow Owner’s use of site and premises, and to protect existing facilities and adjacent properties from construction operations.
B. Provide barricades required by governing authorities for public rights-of-way and for public access to existing facilities.
C. Fencing:
1. Provide temporary fencing for construction operations.
2. Construction: Contractor’s option.
3. Height: six (6) feet.
4. Locate to protect construction operations, materials, and equipment.
5. Provide vehicular and pedestrian gates.
D. Tree and Plant Protection:
1. Protect existing trees and plants at site that are designated to remain.
2. Remove roots and branches that interfere with construction.
3. Provide temporary barriers to height of six (6) feet around individual or groups of trees and plants.
4. Do not permit vehicular traffic, parking, storage of materials, dumping of harmful chemicals or liquids, or standing or continuously running water within root zones.
5. Supervise earthwork operations to prevent damage to root zones.
6. Replace trees and plants that are damaged or destroyed due to construction
3.10 PROTECTION OF INSTALLED WORK
A. Protect installed work from construction operations; provide special protection when required in individual specification sections.
B. Prohibit traffic from landscaped areas.
3.11 SECURITY
A. Provide a project security program, to:
1. Protect the Work, stored products, and construction equipment from theft and vandalism.
2. Prevent entry by unauthorized persons.
3. Protect Owner's operations from theft, vandalism, and damage.
3.12 PROGRESS CLEANING
A. Maintain areas free from waste materials, debris, and rubbish. Maintain site in clean and orderly condition.
TEMPORARY FACILITIES AND CONTROLS 01 50 00-5
B. Provide containers for collection of waste materials, debris, and rubbish; remove and dispose of off-site as required by construction activities. Do not use Owner’s waste containers for construction waste.
C. Periodically clean interior areas to provide suitable conditions for finish work.
3.13 TEMPORARY CONTROLS
A. Water Control:
1. Grade site to drain. Prevent puddling water.
2. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.
3. Provide water barriers to protect site from soil erosion.
B. Erosion and Sediment Control:
1. Plan and execute methods to control surface drainage from cuts, fills, borrow areas, and waste disposal areas. Prevent erosion and sedimentation.
2. Minimize amount of bare soil exposed at any one time.
3. Provide temporary measures such as silt fences, dikes, berms, settlement basins, and drainage systems to prevent water flow and sedimentation.
4. Periodically inspect earthwork to detect erosion and sedimentation; promptly employ corrective measures.
C. Dust Control:
1. Provide dust control materials and methods to minimize dust from construction
2. Prevent dust from dispersing into atmosphere.
3.14 ACCESS ROADS AND PARKING AREAS
A. Existing roads designated by Owner may be used for construction purposes.
B. Provide for access by emergency vehicles.
C. Keep fire hydrants and water control valves free from obstruction and accessible for use.
D. Provide parking facilities for construction personnel. When parking needs exceed on site capacity, provide additional off-site facilities.
E. Maintain existing construction, and restore to original or specified condition at completion of Work.
3.15 REMOVAL
A. Remove temporary utilities, equipment, facilities, and services when construction needs can be met by use of permanent construction or upon completion of Project.
B. Remove foundations and underground installations; grade site as indicated.
TEMPORARY FACILITIES AND CONTROLS 01 50 00-6
C. Clean and repair damage caused by installation or use of temporary work.
D. Restore existing and permanent facilities used during construction to original or to specified condition.
END OF SECTION 01 50 00
PRODUCT REQUIREMENTS 01 60 00-1
SECTION 01 60 00
PRODUCT REQUIREMENTS
1. Products.
2. Transportation and handling.
3. Storage and protection.
4. Reuse of existing materials.
5. Product options.
1. Section 01 25 00 - Substitution Procedures.
1.2 PRODUCTS
A. Provide interchangeable components by the same manufacturer for identical items.
B. Do not use products containing asbestos or other known hazardous materials.
C. Do not reuse materials and equipment removed from existing construction in completed Work, except as specifically permitted by the Contract Documents.
1.3 TRANSPORTATION AND HANDLING
A. Coordinate delivery of Products to prevent conflict with Work and adverse conditions at site.
B. Transport and handle Products in accordance with manufacturer's instructions.
C. Promptly inspect shipments to ensure that Products comply with requirements of
Contract Documents, are undamaged, and quantities are correct.
D. Provide equipment and personnel to handle products by methods to prevent damage.
1.4 STORAGE AND PROTECTION
A. Store and protect Products in accordance with manufacturer's instructions with manufacturer's seals and labels intact and legible.
B. Store Products on site unless prior written approval to store off site has been obtained from Owner.
C. Store Products subject to damage by elements in weathertight enclosures. Maintain temperature and humidity within ranges required by manufacturer's instructions.
PRODUCT REQUIREMENTS 01 60 00-2
D. Exterior Storage:
1. Store fabricated Products above ground; prevent soiling and staining.
2. Cover products subject to deterioration with impervious sheet coverings;
provide ventilation to prevent condensation.
3. Store loose granular materials in well drained area on solid surfaces; prevent mixing with foreign matter.
E. Arrange storage areas to permit access for inspection. Periodically inspect stored products to verify that products are undamaged and in acceptable condition.
1.5 REUSE OF EXISTING MATERIALS
A. Reuse existing materials only where specifically permitted by the Contract Documents.
B. Carefully remove, handle, protect, and store Products.
C. Clean and refinish Products to original or specified condition.
D. Restore operable components to working condition.
E. Arrange and pay for transportation, storage, and handling of Products requiring off site storage, restoration, or renovation.
1.6 PRODUCT OPTIONS
A. Products specified by reference standard only:
1. Select any Product meeting the specified standard.
2. Submit Product Data to substantiate compliance of proposed Product with specified requirements.
B. Products specified by naming two or more acceptable Products: Select any named Product.
C. Products specified by stating that the Contract Documents are based on a Product by a single manufacturer followed by the statement "Equivalent products by the following manufacturers are acceptable":
1. Select the specified Product or a Product by a named manufacturer having equivalent or superior characteristics to the specified Product and meeting the requirements of the Contract Documents.
2. If the specified Product is not selected, submit Product Data to substantiate compliance of proposed Product with specified requirements.
3. The specified Product establishes the required standard of quality.
D. Products specified by naming one or more Products followed by "or approved substitute" or similar statement:
1. Submit a substitution request under provisions of Section 01 25 00 for Products not listed.
2. The specified Product establishes the required standard of quality.
PRODUCT REQUIREMENTS 01 60 00-3
E. Products specified by naming one or more Products or manufacturers followed by the statement "Substitutions: Under provisions of Division 01":
1. Submit a substitution request under provisions of Section 01 25 00 for Products not listed.
2. The specified Product establishes the required standard of quality.
F. Products specified by naming one Product followed by the statement "Substitutions:
Not permitted": Substitutions will not be allowed.
G. Products specified by required performance or attributes, without naming a manufacturer or Product:
1. Select any Product meeting specified requirements.
2. Submit Product Data to substantiate compliance of proposed Product with specified requirements.
END OF SECTION 01 60 00
CUTTING AND PATCHING 01 73 29-1
SECTION 01 73 29
CUTTING AND PATCHING
1. Requirements and limitations for cutting and patching of work.
B. Related sections:
1. Section 01 25 00 - Substitution Procedures.
1.2 SUBMITTALS
A. Submit written request in advance of executing cutting or alteration that affects:
1. Work of Owner or separate contractor.
2. Structural integrity of project.
3. Integrity or effectiveness of weather exposed or moisture resistant elements or systems.
4. Efficiency, operational life, maintenance, or safety of operational elements.
5. Visual qualities of sight exposed elements.
B. Include in Request:
1. Identification of project.
2. Description of work affected.
3. Necessity for cutting or patching.
4. Effect of cutting or patching on work of Owner or separate contractor, or on structural, weatherproof, or visual integrity of project.
5. Description of proposed work:
a. Scope of cutting and patching.
b. Subcontractor and trades to execute work.
c. Products proposed to be used.
d. Extent of refinishing.
6. Alternate to cutting and patching.
7. Cost proposal, if applicable.
8. Written permission of any separate contractor whose work will be affected.
C. If conditions of work or schedule necessitate a change of material from that originally installed, submit substitution request in accordance with Section 01 25 00.
CUTTING AND PATCHING 01 73 29-2
3.1 PREPARATION
A. Examine existing conditions of work, including elements subject to movement or damage during cutting and patching.
B. After uncovering work, examine conditions affecting installation of new products or performance of work.
C. Provide protection for other portions of project.
D. Provide protection from elements.
3.2 CUTTING AND PATCHING
A. Execute cutting to include excavating, fitting, and patching of Work required to:
1. Make several parts fit properly.
2. Uncover work to provide for installation of ill-timed work.
3. Remove and replace defective work.
4. Remove and replace work not conforming to requirements of Contract
Documents.
5. Provide routine penetrations of nonstructural surfaces for installation of piping and electrical conduit.
B. Execute fitting and adjustment of products to provide finished installation to comply with specified tolerances, and finishes.
C. Execute cutting and demolition by methods that will prevent damage to other work, and will provide proper surfaces to receive installation of repairs and new work.
D. Execute excavating and backfilling by methods that will prevent damage to other Work, and will prevent settlement.
E. Employ original installer or fabricator to perform cutting and patching for:
1. Weather exposed or moisture resistant elements.
2. Sight exposed finished surfaces.
F. Restore work that has been cut or removed; install new products to provide completed Work in accordance with requirements of Contract Documents.
G. Refinish entire surfaces as necessary to provide an even finish:
1. Continuous surfaces: To nearest intersections.
2. Assembly: Refinish entirely.
END OF SECTION 01 73 29
CLOSEOUT PROCEDURES 01 77 00-1
SECTION 01 77 00
CLOSEOUT PROCEDURES
1. Closeout procedures.
2. Final cleaning.
3. Adjusting.
4. Project record documents.
5. Operation and maintenance data.
6. Warranties.
7. Spare parts and maintenance materials.
8. Starting of systems.
9. Demonstration and instructions.
1.2 CLOSEOUT PROCEDURES
A. Final Inspection:
1. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with the Contract Documents and ready for Architect's inspection.
2. If Architect performs reinspection due to failure of Work to comply with claims of status of completion made by Contractor, Owner will compensate Architect for such additional services and will deduct the amount of such compensation from final payment to Contractor.
B. Submit final Application for Payment showing original Contract Sum, adjustments, previous payments, retainage withheld from previous payments, and sum remaining due.
C. Closeout Submittals:
1. Project Record Documents.
2. Operation and Maintenance Data.
3. Warranties.
4. Keys and keying schedule.
5. Spare parts and maintenance materials.
6. Evidence of payment of Subcontractors and suppliers.
7. Final lien waiver.
8. Certificate of insurance for products and completed operations.
D. Owner will occupy all of the building as specified in Section 01 11 00.
1.3 FINAL CLEANING
A. Execute final cleaning prior to final inspection.
CLOSEOUT PROCEDURES 01 77 00-2
B. Clean surfaces exposed to view:
1. Clean glass.
2. Remove temporary labels, stains and foreign substances.
3. Polish transparent and glossy surfaces.
4. Vacuum carpeted surfaces; damp mop hard surface flooring.
C. Clean equipment and fixtures to a sanitary condition.
D. Clean or replace filters of operating equipment.
E. Clean debris from roofs and drainage systems.
F. Clean site; sweep paved areas, rake clean landscaped surfaces.
G. Remove waste and surplus materials, rubbish, and construction facilities from the site.
1.4 ADJUSTING
A. Adjust operating Products and equipment to ensure smooth and unhindered operation.
1.5 PROJECT RECORD DOCUMENTS
A. Maintain following record documents on site; record actual revisions to the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other Modifications to the Contract.
5. Reviewed Shop Drawings, Product Data, and Samples.
6. Material Safety Data Sheets.
B. Store Record Documents separate from documents used for construction.
C. Record information concurrent with construction progress.
D. Make entries neatly and accurately.
E. Label each set or volume with title "PROJECT RECORD DOCUMENTS", project title, and description of contents.
1. Organize contents according to Project Manual table of contents.
2. Provide table of contents for each volume.
F. Drawings: Mark each item to record actual construction including:
1. Measured depths of foundations in relation to finish floor datum.
2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.
3. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.
4. Field changes of dimension and detail.
5. Details not on original Drawings.
CLOSEOUT PROCEDURES 01 77 00-3
G. Specifications: Mark each Product section description of actual Products installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and Modifications.
H. Shop Drawings: Mark each item to record actual construction including:
1. Field changes of dimension and detail.
2. Details not on original Shop Drawings.
I. Submit electronically in Adobe PDF format.
1.6 OPERATION AND MAINTENANCE DATA
A. Identify as "OPERATION AND MAINTENANCE INSTRUCTIONS" and title of project.
B. Contents:
1. Directory: List names, addresses, and telephone numbers of Architect, Contractor, Subcontractors, and major equipment suppliers.
2. Operation and maintenance instructions: Arranged by system and subdivided by specification section. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Identify the following:
a. Significant design criteria.
b. List of equipment.
c. Parts list for each component.
d. Operating instructions.
e. Maintenance instructions for equipment and systems.
f. Maintenance instructions for special finishes, including recommended cleaning methods and materials and special precautions identifying detrimental agents.
3. Project documents and certificates including:
a. Shop drawings and product data.
b. HVAC balance reports.
c. Certificates.
d. Copies of warranties and bonds.
C. Submittal:
1. Submit electronically in Adobe PDF format at least 15 days prior to final inspection.
2. Architect will notify Contractor of any required revisions after final inspection.
3. Revise content of documents as required prior to final submittal.
4. Submit three copies of revised documents in three-ring binders, each binder to be indexed by volume and include Table of Contents. In addition to hardcopy, submit revised documents electronically in Adobe PDF format. Revised documents shall be submitted within 10 days after final inspection.
1.7 WARRANTIES
A. Execute and assemble documents from Subcontractors, suppliers, and manufacturers.
CLOSEOUT PROCEDURES 01 77 00-4
B. Include Table of Contents.
C. Submit three copies in three-ring binders. In addition to hardcopy, submit electronically in Adobe PDF format. Warranties to be submitted along with final Application for Payment.
D. For items of Work delayed beyond date of Substantial Completion, provide updated submittal within 10 days after acceptance, listing date of acceptance as start of warranty period.
1.8 SPARE PARTS AND MAINTENANCE MATERIALS
A. Provide products, spare parts, maintenance and extra materials (“attic stock”) in quantities specified in…