6. Roads List.pdf

PDF 176 KB Posted

Attached to
127EAW22R0004 - Caldor Fire BAER Road Maintenance, Phase 1
Solicitation number
127EAW22R0004
Issued by

About this file

This document contains a roads list and details for a federal contract opportunity for Caldor Fire BAER Road Maintenance Phase 1 work. The roads list includes 17 roads in El Dorado National Forest totaling 65.3 miles, along with surface type, number of lanes and length for each. The related federal contract opportunity is solicitation number 127EAW22R0004 issued by the USDA Forest Service for maintenance of the listed roads between $250,000 to $500,000, with a total small business set aside. Requests for information are due by December 13, 2021 and a pre-proposal site visit will be held.

View the file

Other files

File Type Posted
RFI Official Responses - 2.pdf PDF
RFI Official Responses - 1.pdf PDF
Amendment - A00001.pdf PDF
RFI Official Responses - 3.pdf PDF
127EAW22R0004 - Caldor Fire BAER Road Maintenance - Phase 1.pdf PDF
4. Maps.pdf PDF
1. Statement of Work.pdf PDF
5. Plans.pdf PDF
3. FP14 FSSS - Caldor Fire Phase I Road Stormproofing.pdf PDF
8. RFI Form.docx DOCX document
2. Fire Plan.pdf PDF
7. Davis-Bacon Act WD # CA20210007.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID NAME SURFACE TYPE LANES LENGTH

09N73 GRIZZLY CALDOR AC - ASPHALT 1 - SINGLE LANE 6.0

10N83 NORTH SOUTH AC - ASPHALT 2 - DOUBLE LANE 14.2

11N26 WRIGHTS LAKE AC - ASPHALT 2 - DOUBLE LANE 2.7

11N09 ASPEN CREEK AC - ASPHALT 2 - DOUBLE LANE 2.2

10N43 LIGHT CANYON BST - BITUMINOUS SURFACE TREATMENT 1 - SINGLE LANE 1.6

09N22 BUCKSKIN JOE BST - BITUMINOUS SURFACE TREATMENT 1 - SINGLE LANE 2.2

10N83 NORTH SOUTH BST - BITUMINOUS SURFACE TREATMENT 2 - DOUBLE LANE 2.5

09N46 BEAR MEADOW LOOP BST - BITUMINOUS SURFACE TREATMENT 1 - SINGLE LANE 6.4

11N40 SILVER FORK BST - BITUMINOUS SURFACE TREATMENT 2 - DOUBLE LANE 2.5

10N55 BONETTI BST - BITUMINOUS SURFACE TREATMENT 1 - SINGLE LANE 8.6

09N17 CAT CREEK BST - BITUMINOUS SURFACE TREATMENT 2 - DOUBLE LANE 1.8

09N30 CAPPS RESERVOIR CSOIL - COMPACTED SOIL 1 - SINGLE LANE 9.0

10N58 FIDDLERS SPUR NAT - NATIVE MATERIAL 1 - SINGLE LANE 5.6

Total 65.3

Caldor Fire BAER Road Maintenance Phase 1 Road List

Caldor_Fire_Phase_1_Roads_List_211003

File details come from the government source that posted it. Updated .