This document provides details for a federal contract opportunity to perform road maintenance work following the Caldor Fire. The solicitation number is 127EAW22R0004 for the Caldor Fire BAER Road Maintenance, Phase 1 project on the El Dorado National Forest. The work is estimated to cost between $250,000 and $500,000 and has been set aside for total small business participation. All requests for information must be submitted by December 13, 2021 to the contracting officer. An organized pre-proposal site visit will also be held. The agency is the Department of Agriculture Forest Service.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
#0
#0 #0
#0 #0
")$1
$1 $1
$1
$1
$1
$1 $1
#0 #0
#0
#0#0#0
#0
%2
%2
%2
%2 %2
%2
%2
%2
%2
%2
%2
%2
%2
%2
%2
%2
%2
%2
%2
%2
Various forest and district offices of the Pacific Southwest Region±
Legend #* Armor Crossing, Riprap Class III
#0 Install Critical Dip
#0 Increase Catch Basin, 5' x 5' x 1'
#0 Increase Catch Basin, 10' x 10' x 2'
$1 Install 24" CMP Riser
$1 Install 30" CMP Riser
$1 Install 36" CMP Riser
") Install 18" CMP End Section
") Install 24" CMP End Section
") Install 30" CMP End Section
") Install 36" CMP End Section
"/ Install 36" CMP End Section & Critical Dip
"/ Install 48" CMP End Section
"/ Replace 42" CMP End Section
%2 BAER Sign - 36 in x 48 in
%2 BAER Sign - 42 in x 60 in
!. Water Source
Road Reconditioning, Gravel/Native Surface
Road Reconditioning, Asphalt/Chip Seal±6,900 0 6,9003,450 Meters