RFI Official Responses - 2.pdf

PDF 199 KB Posted

Attached to
127EAW22R0004 - Caldor Fire BAER Road Maintenance, Phase 1
Solicitation number
127EAW22R0004
Issued by

About this file

This document contains responses to requests for information (RFIs) regarding solicitation 127EAW22R0004 for Caldor Fire BAER Road Maintenance, Phase 1. The contract will be for 90 days with a value between $250,000 and $500,000. It is a total small business set aside being carried out by the US Forest Service. The RFI responses provide details on material testing not being required, procedures for closing roads during construction, specifications for catch basin sizes for different culvert diameters, and a sample BAER sign. No other products or services are specified in the RFI responses.

View the file

Other files

File Type Posted
RFI Official Responses - 1.pdf PDF
Amendment - A00001.pdf PDF
RFI Official Responses - 3.pdf PDF
127EAW22R0004 - Caldor Fire BAER Road Maintenance - Phase 1.pdf PDF
4. Maps.pdf PDF
6. Roads List.pdf PDF
1. Statement of Work.pdf PDF
5. Plans.pdf PDF
3. FP14 FSSS - Caldor Fire Phase I Road Stormproofing.pdf PDF
8. RFI Form.docx DOCX document
2. Fire Plan.pdf PDF
7. Davis-Bacon Act WD # CA20210007.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES

127EAW22R0004 - Caldor Fire BAER Road Maintenance, Phase 1

RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov

Telephone requests for information will not be accepted or returned.

RFI #1 - Is the contract 60 or 90 days ?

USFS Response – This will be a 90 day contract

RFI #2 – Is material testing required?

USFS Response – Material testing is not required.

RFI #3 – According to the road closure plan, any road may be closed with detouring?

USFS Response – Although the roads in this scope of work are within a closure area, there is administrative traffic as Caldor recovery work occurs. Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.

RFI #4 – Please provide a BAER sign mockup. What do the signs say?

USFS Response – Please see below:

FOR OFFICIAL USE ONLY

RFI #5 – Please provide specification information on the work item “ Increase Catch basin.”

USFS Response – For culverts that are 30 inch in diameter or below, provide a 5 ft wide by 5 ft in length by 1 ft wide catch basin. For culverts that are 36 inch in diameter or above, provide a 10 foot wide by 10 foot in length by 2 foot wide catch basin.