6.Image 2 - Progression of Soil Pile.pdf

PDF 169 KB Posted

Attached to
Removal and Disposal of PFAS/PFOA Compromised Soil
Solicitation number
W50S9F25Q0004
Issued by

About this file

This document contains a series of Google Earth satellite images tracking construction and excavation projects at a site from November 2020 to November 2023. The images document three specific project excavations: F-35 Simulator (July 2021 to August 2021), 3-Bay Hangar (March 2023 to April 2023), and Alert Shelter (September 2021 to April 2022).

The progression of satellite images shows the gradual development of the site, with visible changes in terrain, excavation areas, and construction progress over the three-year period. Each timestamped image reveals different stages of ground preparation, earthwork, and potential building foundations, suggesting ongoing military or aerospace-related infrastructure development. The most recent image from November 2023 to the present shows the most significant excavation and ground modification, with a large, distinct work area clearly visible.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nov. 2020 Jul. 2022Sep 2021

Nov. 2023 to presentJul. 2023Project Excavations:

F-35 Simulator: 7/21 – 8/21

3-Bay Hangar: 3/23 – 4/23

Alert Shelter: 9/21 – 4/22

Photos from Google Earth

Slide Number 1

File details come from the government source that posted it. Updated .