6-Attachment D Technical Criteria.docx
DOCX document 2 MB Posted
- Attached to
- NC26-56 Golf Carts for State Parks
- Solicitation number
- NC26-56
- Issued by
- Utah
About this file
This is an evaluation criteria document for a Request for Proposal (RFP) issued by the State of Utah Division of Purchasing, Division of State Parks, for the procurement of golf carts designed for rough terrain courses. The RFP, identified as NC26-56, will result in a single contract award to the responsive and responsible vendor with the highest technical score. The contract term is five years, with vendors required to guarantee pricing for the initial 12 months. The document outlines a two-stage evaluation process, with Stage 1 focusing on technical proposal evaluation using specific criteria to assess vendor qualifications and product suitability.
The technical evaluation employs a 1,000-point scoring system with four primary evaluation criteria: Compliance with Minimum Specifications and Technical Requirements (250 points), which assesses whether carts meet seating, steering, suspension, brakes, load capacity, noise levels, motor/fuel systems, canopy, bag holders, terrain capability, and durability specifications; Product Lifecycle and Operational Value (250 points), evaluating estimated useful life, durability, long-term performance, and energy efficiency; Warranty, Maintenance, and Service Support (200 points), assessing warranty coverage, maintenance program availability, repair turnaround time, and vendor responsiveness; and Delivery, Lead Time, and Order Fulfillment (150 points), examining the vendor's ability to meet small, mid-sized (10-19 carts), and bulk order timelines. Additionally, Vendor Experience and Qualifications (150 points) evaluate relevant industry experience and organizational capacity. Proposals must achieve a minimum technical score threshold of 600 points (60 percent) to advance in the evaluation process. All mandatory minimum requirements must be met for a proposal to be considered responsive, with failure to meet any requirement potentially resulting in disqualification. Future price increases beyond the initial 12-month guarantee period must be submitted with market research and require agency approval, with each approved increase guaranteed for one year.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Claim of Business Confidentiality Updated.pdf.pdf | ||
| 7-Score-Sheet-NC26-56 For Informational Purposes Only.xls | XLS spreadsheet | |
| 2-Vendor Prerequisites - RFP Agency.pdf | ||
| 4-Attachment C - Cost Proposal Form.xlsx | XLSX spreadsheet | |
| 5-Attachment B Scope of Work.docx | DOCX document | |
| 3-Att.-A-Agency-Terms-and-Conditions-GS (5).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Golf Carts for State Parks
NC26-56
ATTACHMENT D: EVALUATION CRITERIA AND PROCESS
UTAH DIVISION OF STATE PARKS GOLF CART PROCUREMENT
All Scope of Services Requirements must be met for a proposal to be considered responsive. Failure to meet any of these requirements at any point in the evaluation process may result in disqualification pursuant to Utah Code Annotated § 63G-6a-704.
Stage 1: Technical Proposal Evaluation Only proposals that meet all mandatory minimum requirements advance to the technical evaluation. Please respond in your solicitation how your product and service meets or exceeds each of the items below.
Instructions for Offerors
· Provide a point-by-point response for each evaluation criterion. Responses of “not applicable” will receive zero points.
· Include supporting documentation, references, and examples to demonstrate capability.
· Scoring will be based on quality, completeness, responsiveness, and alignment with the RFP requirements.
Points are assigned to each criterion as follows:
| Evaluation Criteria |
| Max Points |
| Description |
| Compliance with Minimum Specifications & Technical Requirements |
| 250 |
| Evaluate whether carts meet/exceed all technical specifications: seating, steering, suspension, brakes, load capacity, noise levels, motor/fuel systems, canopy, bag holders, terrain capability, and overall durability. |
Product Lifecycle and Operational Value
Warranty, Maintenance, and Service Support
Evaluate estimated useful life, durability, long-term performance, energy efficiency, and overall operational impact.
Evaluate warranty length and coverage (parts & labor), availability of maintenance programs, repair turnaround time, and vendor support responsiveness.
| Delivery, Lead Time, and Order Fulfillment |
| 150 |
| Evaluate ability to meet small, mid-sized (10–19 carts), and bulk order timelines, reliability of order fulfillment, and past performance. |
| Vendor Experience and Qualifications |
| 150 |
| Evaluate relevant experience supplying golf carts or similar equipment, references from comparable clients, and organizational capacity to support high-use operations. |
Total Technical Points Possible: 1000
Technical Score Threshold: 600 points (60%) – proposals below this threshold will not advance.
File details come from the government source that posted it. Updated .