6-3-MP27006-26032100 Bid Schedule.pdf

PDF 229 KB Posted

Attached to
DFCM Construction - VBS Construction Stage I - UDC - USCF Water Pump Station Modification & Fire Storage Tank- Project #26032100
Solicitation number
MP27006-Stage 1
Issued by
Utah

About this file

Summary

This is a Bid Schedule document for construction services related to the Utah Division of Facilities Construction and Management (DFCM) project to construct a dedicated fire water storage tank and valve building at the University of Utah School of Computing and Fine Arts (USCF) campus. The project aims to separate the culinary water and fire water systems on the USCF campus. The bid schedule itemizes 24 distinct line items encompassing site preparation, utility work, tank construction, building construction, and commissioning activities. Key construction components include a 0.5 million gallon reinforced concrete water storage tank, a valve control building, various HDPE piping systems ranging from 12 inches to 18 inches in diameter, site grading of 1,030 cubic yards, three precast storm drain junction boxes, 170 linear feet of 18-inch HDPE storm drain pipe, and associated electrical and SCADA integration work. All items are presented as lump sum payments except for site grading (measured per cubic yard), clearing and grubbing (per acre), precast junction boxes (per each), and storm drain pipe (per linear foot).

The construction cost estimate for the project is $2,500,000.00. The bid schedule provides detailed measurement and payment specifications for each line item, with work encompassing mobilization and demobilization, surveying and staking, traffic control and site security, temporary erosion control, ground improvement per geotechnical requirements, demolition and removal of existing utilities and structures, tank mixer installation, tank cleaning and commissioning, hydrostatic and water quality testing, site electrical work, and SCADA system integration. No set-asides, incumbent contractor information, specific response dates, or renewal options are identified in this document.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

USCF 0.5MG FIRE TANK

Item No. Description Quantity Units Unit Price Total Price

1.01 Mobilization & Demobilization 1 LS $ $

1.02 Construction Surveying & Staking 1 LS $ $

1.03 Traffic Control, Access Control, & Site Security 1 LS $ $

1.04 Temporary Erosion Control 1 LS $ $

1.05 Clearing & Grubbing 1 AC $ $

1.06 Ground Improvement (Per Geotechnical Report & Specification) 1 LS $ $

1.07 Demolition & Removal of Existing Utilities, Structures 1 LS $ $

1.08 12" DR11 HDPE Pipe (Tank Inlet) 1 LS $ $

1.09 12" DR21 HDPE Pipe (Tank Drain) 1 LS $ $

1.10 16" DR11 HDPE Pipe (Tank Outlet) 1 LS $ $

1.11 18" DR21 HDPE Pipe (Tank Overflow) 1 LS $ $

1.12 Site Grading (Fill Import & Compaction) 1,030 CY $ $

1.13 0.5 MG Reinforced Concrete Water Storage Tank 1 LS $ $

1.14 Valve Control Building 1 LS $ $

1.15 Site Concrete (Pads, Walkways, Entrance Slabs) 1 LS $ $

1.16 4.5' x 4.5' x 6.5' Tank Drain Valve Box 1 LS $ $

1.17 3' x 3' Precast Storm Drain Junction Box 3 EA $ $

1.18 3’×5’ Precast Drain Junction Box 1 EA $ $

1.19 18" HDPE N12 Dual Wall Storm Drain Pipe 170 LF $ $

1.20 Tank Mixer 1 LS $ $

1.21 Tank Cleaning, Disinfection, and Commissioning 1 LS $ $

1.22 Hydrostatic and Water Quality Testing 1 LS $ $

1.23 Site Electrical Work 1 LS $ $

1.24 SCADA Integration 1 LS $ $

TOTAL $

MEASUREMENT AND PAYMENT

Bid Items - GENERAL ITEMS

1.01 Mobilization & Demobilization

Measurement: Lump Sum Payment: Full compensation to cover Contractor's cost for general and miscellaneous responsibilities and operations not normally attributed to any other single bid item. This shall include, but is not limited to, mobilizing equipment and personnel to the project site; establishing temporary facilities; furnishing temporary utilities; providing construction water as required; providing on-site sanitary facilities and potable water facilities; arranging for and erecting Contractor's work and storage areas; Contractor and Subcontractor insurance and bonds; obtaining required permits, licenses, and fees unless specifically paid under another item; developing and maintaining the construction schedule; contract closeout; site cleanup; demobilization; and other incidental work required to complete the Contract.

1.02 Construction Surveying & Staking

Measurement: Lump Sum Payment: Full compensation for all labor, equipment, materials, layout, calculations, staking, survey control, construction staking, record measurements, and coordination required for construction surveying and staking. This item includes replacement or re-establishment of disturbed stakes, protection of survey control points, field verification of existing conditions, and survey support required for installation of the tank, valve building, piping, storm drain, site grading, site concrete, and related appurtenances unless specifically paid under another item.

1.03 Traffic Control, Access Control, & Site Security

Measurement: Lump Sum Payment: Full compensation for all labor, equipment, materials, signs, barricades, temporary fencing, gates, access controls, flagging, temporary access measures, maintenance of access, site security, notifications, coordination, and related incidentals required to maintain safe access, control traffic, and secure the site during construction. This item includes installing, maintaining, relocating, and removing temporary traffic control and site security measures for the duration of the Work.

1.04 Temporary Erosion Control

Measurement: Lump Sum Payment: Full compensation for furnishing, installing, maintaining, relocating, repairing, and removing temporary erosion and sediment control best management practices required for the Work. This item includes, but is not limited to, inlet protection, sediment barriers, stabilized construction entrances, construction exits, tracking control, dust control, temporary drainage controls, inspection support, maintenance after storm events, cleanup of sediment, and final removal of temporary controls. If a SWPPP, NOI, NOT, or other storm water permit documentation is required by the Contract Documents or jurisdictional authority, related preparation, implementation, and closeout shall be included in this item unless specifically paid under another item.

1.05 Clearing & Grubbing

Measurement: Per Acre Payment: Full compensation for clearing, grubbing, stripping, removing, hauling, and disposing of vegetation, brush, roots, debris, unsuitable surface materials, and other obstructions within the limits of disturbance. Measurement will be based on the acreage of clearing and grubbing completed within the limits shown on the Plans or authorized by the Engineer. Payment includes protection of existing improvements to remain, temporary stockpiling, off-site disposal, and incidental work required to prepare the site for earthwork and construction.

1.06 Ground Improvement (Per Geotechnical Report & Specification) Measurement: Lump Sum Payment: Full compensation for all labor, equipment, materials, professional design services, and incidentals required to design, furnish, install, test, monitor, document, and complete the ground improvement system shown on the Plans and specified in the Contract Documents. This item includes, but is not limited to, mobilization and demobilization of specialty equipment; preparation of design calculations, working drawings, work plans, and other required submittals; layout and installation of ground improvement elements or zones; pre-drilling and excavation required for installation; handling, temporary stockpiling, hauling, and disposal of spoils and water generated by the Work; construction, maintenance, repair, and removal or incorporation of required working platforms and load transfer platforms; protection and monitoring of adjacent structures and utilities; quality control; verification and load testing; daily installation reports; testing reports;

certifications; as-built surveys and drawings; and correction or replacement of nonconforming ground improvement.

Payment includes furnishing the type, number, diameter, spacing, and length of ground improvement elements necessary to satisfy the performance requirements of the Contract Documents. Excavation of obstructions, replacement of resulting voids with compacted structural fill, and repair of working surfaces disturbed by the ground improvement operation are included in this item and will not be paid for separately. Independent quality assurance testing furnished directly by the Owner is excluded.

1.07 Demolition & Removal of Existing Utilities, Structures

Measurement: Lump Sum Payment: Full compensation for locating, protecting, removing, abandoning, salvaging where required, hauling, and disposing of existing utilities, structures, foundations, piping, appurtenances, and other improvements identified for removal or required to complete the Work. The phasing of said demolition should be approved by the owner/operators to keep systems functional and maintain minimal downtime. This item includes sawcutting, excavation, removal, backfill, compaction, temporary support, utility coordination, disposal fees, and incidental restoration not paid under another item.

1.08 12" DR11 HDPE Pipe (Tank Inlet) Measurement: Lump Sum Payment: Full compensation for furnishing, installing, testing, disinfecting as applicable, and placing into service the 12-inch DR11 HDPE tank inlet and drain piping shown on the Plans. This item includes pipe, fittings, fused joints, flange adapters, backup rings, bolt packs, gaskets, wall penetrations, couplings, transitions, restrained flexible connections, pipe supports, thrust restraint, corrosion protection, trench excavation, bedding, pipe zone material, backfill, compaction, testing, flushing, connection to the tank and valve building piping, and all appurtenant work unless specifically paid under another bid item.

1.09 12" DR21 HDPE Pipe (Tank Drain) Measurement: Lump Sum Payment: Full compensation for furnishing, installing, testing, disinfecting as applicable, and placing into service the 12-inch DR21 HDPE tank inlet and drain piping shown on the Plans. This item includes pipe, fittings, fused joints, flange adapters, backup rings, bolt packs, gaskets, wall penetrations, couplings, transitions, restrained flexible connections, pipe supports, thrust restraint, corrosion protection, trench excavation, bedding, pipe zone material, backfill, compaction, testing, flushing, connection to the tank and valve building piping, and all appurtenant work unless specifically paid under another bid item.

1.10 16" DR11 HDPE Pipe (Tank Outlet) Measurement: Lump Sum Payment: Full compensation for furnishing, installing, testing, disinfecting as applicable, and placing into service the 16-inch DR11 HDPE tank outlet piping shown on the Plans. This item includes pipe, fittings, fused joints, flange adapters, backup rings, bolt packs, gaskets, wall penetrations, couplings, transitions, restrained connections, pipe supports, thrust restraint, corrosion protection, trench excavation, bedding, pipe zone material, backfill, compaction, testing, flushing, connection to the tank and valve building piping, and all appurtenant work unless specifically paid under another bid item.

1.11 18" DR21 HDPE Pipe (Tank Overflow) Measurement: Lump Sum Payment: Full compensation for furnishing, installing, testing, and placing into service the 18-inch DR21 HDPE tank overflow piping shown on the Plans. This item includes pipe, fittings, fused joints, flange adapters, backup rings, bolt packs, gaskets, wall penetrations, couplings, transitions, outfall or discharge connections, pipe supports, corrosion protection, trench excavation, bedding, pipe zone material, backfill, compaction, testing, and all appurtenant work unless specifically paid under another bid item.

1.12 Site Grading (Fill Import & Compaction)

Measurement: Per Cubic Yard Payment: Full compensation for furnishing, importing, placing, grading, moisture conditioning, and compacting approved fill material required to achieve proposed site grades. Measurement will be based on compacted cubic yards of imported fill placed within the limits shown on the Plans or authorized by the Engineer. Payment includes loading, hauling, source coordination, material testing support, lift placement, compaction, shaping, proof rolling, reworking unsuitable areas directly related to imported fill placement, and incidental work required to complete the final subgrade. Excavation, pipe trench backfill, tank structural backfill, and other earthwork paid under separate bid items will not be measured under this item.

1.13 0.5 MG Reinforced Concrete Water Storage Tank Measurement: Lump Sum Payment: Full compensation for all labor, equipment, materials, and incidentals required to construct the 0.5 million gallon reinforced concrete water storage tank complete in place. This item includes, but is not limited to, excavation and subgrade preparation specifically required for the tank, foundation preparation, drain gravel, separation fabric, foundation drains, reinforcing steel, cast-in-place concrete, formwork, waterstops, joints, grout, tank roof, columns, hatches, vents, access components, ladders, safety appurtenances, coatings or sealants specified for the tank, wall sleeves, embedded items, piping penetrations and appurtenances associated with the tank, leak repair related to tank construction, and all appurtenant items required for a complete tank unless specifically paid under another bid item.

1.14 Valve Control Building

Measurement: Lump Sum Payment: Full compensation for all labor, materials, equipment, and incidentals required to furnish and construct the complete valve control building as shown on the Plans and specified in the Contract Documents. This item includes, but is not limited to, foundations; reinforced concrete; masonry; structural framing; roofing; architectural finishes; doors, frames, hardware, and louvers; insulation; sealants; building ventilation; heating equipment; HVAC components and accessories;

floor drains; pipe penetrations; embedded items; supports; anchors; miscellaneous metals; painting; testing; startup; and all appurtenant work necessary to provide a complete and functional valve control building.

This item also includes coordination with mechanical, electrical, and process piping work. Electrical work specifically identified for payment under the Site Electrical bid item will not be measured or paid for under this item.

1.15 Site Concrete (Pads, Walkways, Entrance Slabs)

Measurement: Lump Sum Payment: Full compensation for furnishing and installing site concrete improvements including pads, walkways, entrance slabs, equipment pads, miscellaneous concrete flatwork, and related appurtenances shown on the Plans. This item includes subgrade preparation, forms, reinforcement, dowels, joints, joint sealant, finishing, curing, thickened edges where shown, concrete testing support, backfill against concrete edges, and incidental restoration required for complete concrete improvements.

1.16 4.5' x 4.5' x 6.5' Tank Drain Valve Box Measurement: Lump Sum Payment: Full compensation for furnishing and installing the tank drain valve box complete in place. This item includes excavation, bedding, precast or cast-in-place structure, base, risers, lid, frame and cover, grout, pipe penetrations, waterstops or boots, valves and appurtenances indicated for the valve box unless paid elsewhere, coatings, drainage, backfill, compaction, testing, adjustment to grade, and all incidental work required for a complete installation.

1.17 3' x 3' Precast Storm Drain Junction Box Measurement: Per Each Payment: Full compensation for each 3-foot by 3-foot precast storm drain junction box furnished and installed complete in place. Measurement will be based on the number of junction boxes installed and accepted. Payment includes excavation, bedding, precast box sections, risers, lids, frames and covers or grates, pipe penetrations, boots or grout, channeling, sealing, backfill, compaction, adjustment to grade, testing as required, and incidental work required for complete storm drain structures.

1.18 3' x 5' Precast Drain Junction Box Measurement: Per Each Payment: Full compensation for each 3-foot by 5-foot precast drain junction box furnished and installed complete in place. Measurement will be based on the number of junction boxes installed and accepted. Payment includes excavation, bedding, precast box sections, risers, lids, frames and covers or grates, pipe penetrations, boots or grout, channeling, sealing, backfill, compaction, adjustment to grade, testing as required, and incidental work required for complete storm drain structures.

1.19 18" HDPE N12 Dual Wall Storm Drain Pipe Measurement: Per Linear Foot Payment: Full compensation for furnishing and installing 18-inch HDPE N12 dual wall storm drain pipe complete in place.

Measurement will be based on linear feet of pipe installed along the pipe centerline between structure connection points or end points shown on the Plans. Payment includes pipe, fittings, couplings, gaskets, adapters, end treatments, trench excavation, bedding, pipe zone material, backfill, compaction, dewatering incidental to pipe installation, testing if required, connections to structures, and all appurtenant work required for a complete storm drain pipe installation.

1.20 Tank Mixer

Measurement: Lump Sum Payment: Full compensation for furnishing, installing, testing, and placing into service the tank mixer system complete in place. This item includes mixer equipment, mounting hardware, brackets, supports, penetrations, cables, conduits integral to the mixer installation, controls furnished with the mixer, coordination with electrical and SCADA work, startup, manufacturer services where required, testing, and all appurtenant items required for a complete and functional mixer installation.

1.21 Tank Cleaning, Disinfection, and Commissioning

Measurement: Lump Sum Payment: Full compensation for cleaning, disinfecting, flushing, startup support, and commissioning of the tank and associated water facilities. This item includes labor, equipment, chemicals, temporary hoses, temporary piping, temporary valves, sampling support, coordination with Owner operations, disposal or management of disinfection water as required by the Contract Documents, final cleaning, startup documentation, and related activities required to place the tank facilities into service.

1.22 Hydrostatic and Water Quality Testing

Measurement: Lump Sum Payment: Full compensation for hydrostatic testing and water quality testing required for the tank and associated piping systems. This item includes water supply coordination, filling, testing, monitoring, leakage observation, pressure testing as applicable, sample collection support, laboratory coordination where required, retesting due to Contractor operations, temporary piping, temporary valves, test equipment, test reports, and incidental work required to complete testing in accordance with the Contract Documents.

1.23 Site Electrical Work

Measurement: Lump Sum Payment: Full compensation for furnishing and installing site electrical work complete in place. This item includes conduit, wiring, grounding, panels, disconnects, lighting, receptacles, equipment connections, power distribution, coordination with the utility provider, trenching, duct banks where shown, pull boxes, electrical supports, identification, testing, startup, and related incidentals required for complete electrical systems unless specifically paid under another bid item.

1.24 SCADA Integration

Measurement: Lump Sum Payment: Full compensation for integrating the tank, valve building, instrumentation, controls, alarms, and related equipment into the Owner's SCADA system. This item includes programming, configuration, communications equipment, coordination with Owner and system integrator, point-to-point testing, signal verification, alarm setup, trend and screen coordination, control narratives implementation, startup support, documentation, training support where required, and appurtenant work required for a complete integration.

END OF SECTION

ADPB1A1.tmp
1.01 Mobilization & Demobilization
1.02 Construction Surveying & Staking
1.03 Traffic Control, Access Control, & Site Security
1.04 Temporary Erosion Control
1.05 Clearing & Grubbing
1.06 Ground Improvement (Per Geotechnical Report & Specification)
1.07 Demolition & Removal of Existing Utilities, Structures
1.08 12" DR11 HDPE Pipe (Tank Inlet)
1.09 12" DR21 HDPE Pipe (Tank Drain)
1.10 16" DR11 HDPE Pipe (Tank Outlet)
1.11 18" DR21 HDPE Pipe (Tank Overflow)
1.12 Site Grading (Fill Import & Compaction)
1.13 0.5 MG Reinforced Concrete Water Storage Tank
1.14 Valve Control Building
1.15 Site Concrete (Pads, Walkways, Entrance Slabs)
1.16 4.5' x 4.5' x 6.5' Tank Drain Valve Box
1.17 3' x 3' Precast Storm Drain Junction Box
1.18 3' x 5' Precast Drain Junction Box
1.19 18" HDPE N12 Dual Wall Storm Drain Pipe
1.20 Tank Mixer
1.21 Tank Cleaning, Disinfection, and Commissioning
1.22 Hydrostatic and Water Quality Testing
1.23 Site Electrical Work
1.24 SCADA Integration