13-5-MP27006-26032100 Approved Plans.pdf

PDF 27 MB Posted

Attached to
DFCM Construction - VBS Construction Stage I - UDC - USCF Water Pump Station Modification & Fire Storage Tank- Project #26032100
Solicitation number
MP27006-Stage 1
Issued by
Utah

About this file

This is an Approved Plans document prepared for a State of Utah Division of Facilities Construction and Management (DFCM) construction project at the Utah Sports Complex Foundation (USCF) campus. The project involves the addition of a dedicated fire water storage tank and new valve building designed to separate the culinary water and fire water systems on the USCF campus. The approved plans establish the technical and design specifications necessary for construction contractors to execute the work in accordance with project requirements. These plans serve as the baseline documentation for the Request for Proposal (RFP) process, providing bidders with detailed architectural and engineering specifications to develop accurate cost proposals and construction schedules.

The project carries a construction cost estimate of $2,500,000.00 and represents a significant infrastructure improvement for campus safety and operational efficiency. The approved plans document functions as a critical reference for all prospective bidders, ensuring consistent interpretation of project scope, design requirements, and technical standards. Contractors submitting proposals for this project must align their bids, timelines, and construction methodologies with the specifications and requirements outlined in the approved plans to be considered responsive to the RFP issued by DFCM.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .