6-2-CS27014-25093250-Approved Plans.pdf
PDF 15 MB Posted
- Solicitation number
- CS27014
- Issued by
- Utah
About this file
Approved Plans Summary
This is an Approved Plans document for the Division of Facilities Construction and Management (DFCM) of the State of Utah related to Project #25093250 at Uintah Basin Technical College's Roosevelt Campus. The project involves the replacement of rooftop units, ducting from units to heat pumps, and controls work as part of the Roosevelt Heat Pumps Phase 2 initiative. This Stage II Invitation to Bid is restricted to contractors who have been prequalified under the Stage I Prequalification process and appear on the DFCM Prequalified Contractors list as of the solicitation date. The construction cost estimate for this project is $400,000.00, and the approved plans serve as the technical specifications and design documentation that prequalified bidders must use to prepare their proposals and cost estimates.
The approved plans document provides the detailed mechanical and controls specifications necessary for contractors to accurately bid on the heating system upgrades at the Roosevelt Campus. As a Stage II solicitation restricted to prequalified mechanical contractors, bidders must demonstrate previous qualification and current eligibility to participate. The plans establish the scope of work, including all rooftop unit replacements, ducting modifications, and associated control system installations required to complete the heat pump phase upgrade project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .