6-2-CS27013-26212230-Approved Plans.pdf

PDF 8 MB Posted

Attached to
DFCM Construction - Prequalified Mechanical Stage II - Utah Schools for the Deaf and Blind - USDB – HVAC Upgrades - Project #26212230
Solicitation number
CS27013
Issued by
Utah

About this file

This document is a set of approved construction plans prepared by Spectrum Engineers for the Utah School for the Deaf and the Blind (USDB) under a Stage II Invitation to Bid issued by the State of Utah Division of Facilities Construction and Management (DFCM). The project involves replacement of an existing air handling unit (AHU) and a variable frequency drive (VFD) serving a heating hot water pump at the facility located at 742 S Harrison Boulevard in Ogden, Utah. The mechanical plans include comprehensive details for AHU demolition and replacement, incorporating a new unit with 21,060 CFM capacity, four supply fans, chilled water and hydronic heating coils, and pre-filters. The project also requires replacement of a failed VFD in the boiler room and installation of associated ductwork, piping, and control system integration with the existing Honeywell Building Automation System. The plans specify that all work must comply with current building codes, seismic requirements, and manufacturer recommendations, with coordination required across all trades. The contractor is responsible for field verification of existing conditions, pressure testing of new hydronic piping, proper insulation installation, system startup and commissioning, and provision of operation and maintenance manuals within 30 days of certificate of occupancy.

The construction cost estimate for this project is $475,000.00. Only contractors who have completed Stage I prequalification under the DFCM Prequalified Contractors program are eligible to bid on this Stage II project. The plans indicate that the project will require after-hours and weekend work with all shutdowns requiring 72 hours advance coordination with the owner. The contractor must maintain detailed as-built redlined record drawings throughout construction and provide the engineer with two weeks of operational trends demonstrating proper equipment performance upon project completion. The mechanical work encompasses Division 22 (plumbing), Division 23 (mechanical), and Division 26 (electrical) responsibilities, with the VFD to be provided by the AHU manufacturer and field-mounted after installation. Acceptable AHU manufacturers include Trane, Daikin, and York, with specific technical requirements outlined in the mechanical schedules including detailed coil specifications, filter ratings, and control sequence of operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2024 Spectrum Engineers, Inc.

SHEET TITLE

DFCM PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

DFCM

E

SPECTRUM PROJECT NO: 260049

DFCM APPROVAL STAMP

A u to d e s k D o c s /2

U

S D

B A

H U

R e p la c e m e n t/

-U S

D B

A H

U R e p la c e m e n t

M e c h .r v t

/9

/2

:3

:5

P

M

RHB

RHB

RHB

26212230

03/10/2026

CD

COVER SHEET

GE001

UTAH SCHOOL

FOR THE DEAF

AND THE

BLIND

AHU

REPLACEMENT

742 S Harrison Blvd, Ogden, UT 84404

MECHANICAL SHEET INDEX

GE001 COVER SHEET

ME001 MECHANICAL COVER SHEET

ME601 MECHANICAL SCHEDULES

MD101 AHU ROOM MECHANICAL DEMOLITION PLAN

MH101 AHU ROOM MECHANICAL REPLACEMENT PLANS

MH102 BOILER ROOM MECHANICAL REPLACEMENT PLANS

EE001 ELECTRICAL PLANS

UTAH SCHOOL FOR THE DEAF AND

BLIND AIR HANDLER REPLACEMENT

DFCM PROJECT NUMBER: 26212230

PROJECT DESCRIPTION:

REPLACEMENT OF EXISTING AIR HANDLING

UNIT AND OF A VFD SERVING A HEATING

HOT WATER PUMP

Mark: Date: Description

4-21-26

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

REVIEWED FOR

CODE COMPLIANCE

THOMAS PETERSON

06/03/2026

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2024 Spectrum Engineers, Inc.

SHEET TITLE

DFCM PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

DFCM

E

SPECTRUM PROJECT NO: 260049

DFCM APPROVAL STAMP

A u to d e s k D o c s /2

U

S D

B A

H U

R e p la c e m e n t/

-U S

D B

A H

U R e p la c e m e n t

M e c h .r v t

/9

/2

:3

:5

P

M

RHB

RHB

RHB

26212230

03/10/2026

CD

MECHANICAL COVER

SHEET

ME001

UTAH SCHOOL

FOR THE DEAF

AND THE

BLIND

AHU

REPLACEMENT

742 S Harrison Blvd, Ogden, UT 84404

ABBREVIATIONS

NOTE: ALL ABBREVIATIONS MAY NOT BE USED.

DEFINITIONS

NOTE: ALL DEFINITIONS MAY NOT BE USED.

INDICATED: THE TERM "INDICATED" REFERS TO GRAPHIC REPRESENTATIONS,

NOTES, OR SCHEDULES ON THE DRAWINGS, OTHER PARAGRAPHS OR

SCHEDULES IN THE SPECIFICATIONS, AND SIMILAR REQUIREMENTS IN THE

CONTRACT DOCUMENTS. WHERE TERMS SUCH AS "SHOWN", "NOTED",

"SCHEDULED", AND "SPECIFIED" ARE USED, IT IS TO HELP THE READER LOCATE

THE REFERENCE, NO LIMITATION ON LOCATION IS INTENDED.

DIRECTED: TERMS SUCH AS "DIRECTED", "REQUESTED", AUTHORIZED",

"SELECTED", "APPROVED", "REQUIRED", AND "PERMITTED" MEAN "DIRECTED BY

THE ENGINEER", "REQUESTED BY THE ENGINEER", AND SIMILAR PHRASES.

APPROVED: THE TERM "APPROVED", WHERE USED IN CONJUNCTION WITH THE

ENGINEER'S ACTION ON THE CONTRACTOR'S SUBMITTALS, APPLICATIONS, AND

REQUESTS, IS LIMITED TO THE ENGINEER'S DUTIES AND RESPONSIBILITIES AS

STATED IN GENERAL AND SUPPLEMENTARY CONDITIONS.

FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO

THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY,

INSTALLATION, AND SIMILAR OPERATIONS."

INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT PROJECT

SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION,

PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING,

PROTECTING, CLEANING, AND SIMILAR OPERATIONS."

PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE

AND READY FOR THE INTENDED USE."

INSTALLER: AN "INSTALLER" IS THE CONTRACTOR OR AN ENTITY ENGAGED BY

THE CONTRACTOR, EITHER AS AN EMPLOYEE, SUBCONTRACTOR, OR SUB-

SUBCONTRACTOR, FOR PERFORMANCE OF A PARTICULAR CONSTRUCTION

ACTIVITY, INCLUDING INSTALLATION, ERECTION, APPLICATION, AND SIMILAR

OPERATIONS. INSTALLERS ARE REQUIRED TO BE EXPERIENCED IN THE

OPERATIONS THEY ARE ENGAGED TO PERFORM.

(E) EXISTING

(F) FUTURE

AC AIR CONDITION(-ING,-ED)

APD AIR PRESSURE DROP

BD BALANCING DAMPER

BHP BRAKE HORSE POWER

BTU BRITISH THERMAL UNIT

BTUH BTU/HOUR

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CV CONTROL VALVE

DB DRY BULB TEMPERATURE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RECIRC

DP DEPTH, DEEP, OR DROP IN PRESSURE

EA EXHAUST AIR

EER ENERGY EFFICIENCY RATIO

EFF EFFICIENCY

ELEC ELECTRIC

ELEV ELEVATION

ENT ENTERING

EVAP EVAPORAT(-E, -ING, -ED, -OR)

EWT ENTERING WATER TEMPERATURE

EXT EXTERNAL

FD FIRE DAMPER

FLA FULL LOAD AMPS

FPI FINS PER INCH

FPM FEET PER MINUTE

FPS FEET PER SECOND

FSD FIRE SMOKE DAMPER

GE GREASE EXHAUST

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HD HEAD

HG MERCURY

HP HORSEPOWER

HR HOUR

HTG HEATING

HZ HERTZ (FREQUENCY)

IN INCH

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LH LATENT HEAT

LRA LOCKED ROTOR AMPS

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

MBH THOUSAND BTU PER HOUR

MCA MINIMUM CIRCUIT AMPS

MFR MANUFACTUR(-ER, -ED)

NC NORMALLY CLOSED OR NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

OZ OUNCE

PD PRESSURE DROP OR DIFFERENCE

PG PROPOLENE GLYCOL

PH PHASE

PPM PARTS PER MILLION

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA PSI ABSOLUTE

PSIG PSI GAUGE

RA RETURN AIR

RECIRC RECIRCULATE (-ER, -ED, -ING)

REFR REFRIGERATION

REQD REQUIRED

RLA RATED LOAD AMPS

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SCFM STANDARD CUBIC FEET PER MINUTE

SCW SOFT COLD WATER

SH SENSIBLE HEAT

SP STATIC PRESSURE

SPEC(S) SPECIFICATION(S)

SQ SQUARE

SS SANITARY SEWER, SOIL, WASTE

STD STANDARD

TA TRANSFER AIR

TD TEMP. DROP OR DIFF.

TEMP TEMPERATURE

TOT TOTAL

TSTAT THERMOSTAT

TYP TYPICAL

V VOLT, VOLTAGE OR VENT

VAC VACUUM

VAV VARIABLE AIR VOLUME

VEL VELOCITY

VENT VENT, VENTILATION

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

VTR VENT THROUGH ROOF

WB WET BULB TEMP

WC WATER COLUMN

WG WATER GAUGE

WPD WATER PRESSURE DROP

WTR WATER

SYMBOL LEGEND - DUCTWORK

DESCRIPTION

NOTE: ALL SYMBOLS MAY NOT BE USED

RECTANGULAR SUPPLY DUCT UP

RECTANGULAR SUPPLY DUCT DOWN

RECTANGULAR RETURN DUCT UP

RECTANGULAR RETURN DUCT DOWN

RECTANGULAR EXHAUST DUCT UP

RECTANGULAR EXHAUST DUCT DOWN

ROUND SUPPLY DUCT UP

ROUND SUPPLY DUCT DOWN

ROUND RETURN DUCT UP

ROUND RETURN DUCT DOWN

ROUND EXHAUST DUCT UP

ROUND EXHAUST DUCT DOWN

OVAL SUPPLY DUCT UP

OVAL SUPPLY DUCT DOWN

OVAL RETURN DUCT UP

OVAL RETURN DUCT DOWN

OVAL EXHAUST DUCT UP

OVAL EXHAUST DUCT DOWN

SPIRAL OVAL DUCT

SPIRAL ROUND DUCT

DUCT INSULATION

DUCT LINING

90° RECTANGULAR ELBOW

WITH TURNING VANES

90° ROUND RADIUS ELBOW

GORED OVAL RADIUS ELBOW

DUCT SIZE OR SHAPE TRANSITION

SYMBOL

PIPING LEGEND

DESCRIPTIONABBREVIATION

NOTE: ALL ABBREVIATIONS MAY NOT BE USED

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

FIRE PROTECTION

HEATING HOT WATER SUPPLY

HEATING HOT WATER RETURN

NITROUS OXIDE

REFRIGERANT LIQUID

REFRIGERANT GAS

SNOW MELT RETURN

SNOW MELT SUPPLY

CHILLED WATER SUPPLY

CHILLED WATER RETURN

COMPRESSED AIR

CONDENSATE DRAIN

GLYCOL SUPPLY

GLYCOL RETURN

MEDICAL AIR

LIQUID PROPANE GAS

NATURAL GAS

OXYGEN

VACUUM

CHWR

CHWS

CA

CD

CWR

CWS

FP

GR

GS

HHWR

HHWS

LPG

MA

NG

NO

O

RL

RG

SMR

SMS

VAC

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

FOR

FOS

FOV

MEDIUM PRESSURE CONDENSATE

HIGH PRESSURE CONDENSATEHPC

MPC

HIGH PRESSURE STEAM

LOW PRESSURE CONDENSATELPC

HPS

LOW PRESSURE STEAM

MEDIUM PRESSURE STEAMMPS

LPS

PUMPED CONDENSATEPC

SYMBOL LEGEND - MISC

DESCRIPTIONSYMBOL

VIEW OR DETAIL INDICATOR: # INDICATES DETAIL NUMBER,

SHEET INDICATES DRAWING SHEET WHERE VIEW OR DETAIL

IS SHOWN.

REFERENCE LINES AND SYMBOLS

ELEVATION OR SECTION INDICATOR: # INDICATES VIEW

NUMBER, SHEET INDICATES DRAWING SHEET WHERE VIEW IS

SHOWN.

NAME

### ROOM / SPACE INDICATOR

# KEYNOTE INDICATOR

# REVISION INDICATOR

XX-##

XX-##

TAG

CFM

PLUMBING FIXTURE INDICATOR

EQUIPMENT INDICATOR

REGISTER, GRILLE, OR DIFFUSER INDICATOR

BREAKLINE

MATCHLINE INDICATOR

CONTRACT LIMIT LINE: DASHDOT, WIDE LINE

NEW CONNECTION TO EXISTING

POINT OF DEMOLITION

OR

MATCH LINE

SEE XX/XXX

SQUARE OR RECTANGULAR

SUPPLY DIFFUSER

SYMBOL LEGEND - MECH

DESCRIPTIONSYMBOL

NOTE: ALL SYMBOLS MAY NOT BE USED

DUCT HIGH EFFICIENCY TAKE OFF

WITH BALANCING DAMPER

SQUARE OR RECTANGULAR

RETURN DIFFUSER

SQUARE OR RECTANGULAR

EXHAUST DIFFUSER

ROUND DIFFUSER

SIDEWALL GRILLE OR REGISTER

BALANCING DAMPER

FIRE DAMPER

FIRE / SMOKE COMBINATION

DAMPER

LINEAR SLOT GRILLE OR DIFFUSER

FLEXIBLE DUCT

C02 CARBON DIOXIDE

T S H THERMOSTAT - SENSOR - HUMIDISTAT

1. THE MECHANICAL DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENT,

& EXTENT OF THE MECHANICAL SYSTEM. BECAUSE OF THE SMALL SCALE OF

THE DRAWINGS, THESE DRAWINGS DO NOT SHOW ALL OFFSETS, BENDS, OR

ELBOWS NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE

PROVIDED. CONTRACTOR SHALL MAKE ALTERATIONS AS MAY BE

NECESSARY TO MAKE THE SYSTEM COMPLETE & OPERATIONAL IN

ACCORDANCE WITH THE DESIGN INTENT.

2. MAJOR DEVIATIONS SUCH AS CHANGES IN SIZES, WEIGHTS, QUANTITIES, OR

MATERIAL REQUIRE PRIOR APPROVAL BY THE DESIGN ENGINEER.

3. THE DRAWINGS & SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT

EACH OTHER & SHALL BE INTERPRETED AS AN INTEGRAL UNIT WITH THE

ITEMS SHOWN ON ONE & NOT THE OTHER BEING FURNISHED & INSTALLED

AS THOUGH SHOWN AND CALLED OUT IN BOTH DOCUMENTS.

4. THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO THE

REQUIREMENTS OF THE MOST RECENTLY ADOPTED BUILDING CODES,

MECHANICAL CODE, PLUMBING CODE, ELECTRICAL CODE, & ALL OTHER

APPLICABLE CITY, COUNTY, STATE, & FEDERAL CODES & REGULATIONS IN

EFFECT.

5. THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO ALL CODES,

RULES, REGULATIONS, & REQUIREMENTS OF THE BUILDING OWNER.

6. ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED TO

CONFORM WITH ANY APPLICABLE LOCAL SEISMIC REQUIREMENTS.

7. PRIOR TO FABRICATION & INSTALLATION OF ANY MECHANICAL COMPONENT

THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL

MECHANICAL WORK WITH ALL OTHER BUILDING TRADES, INCLUDING

BUILDING TRADES HIRED DIRECTLY BY THE OWNER. WHERE CONFLICTS

MAY OCCUR, THEY SHALL BE RESOLVED PRIOR TO INSTALLATION.

8. VERIFY ALL REQUIRED SERVICE CONNECTIONS, INCLUDING ELECTRICAL

CHARACTERISTICS, FOR ALL EQUIPMENT PRIOR TO ORDERING OR

FABRICATING MECHANICAL EQUIPMENT AND COMPONENTS.

9. THE SPACE ABOVE CEILINGS IS LIMITED. CAREFUL COORDINATION IS

REQUIRED WITH ALL TRADES BEFORE ANY PIPE, DUCT, OR EQUIPMENT IS

ORDERED &/OR INSTALLED. ANY CONFLICTS &/OR CHANGES FOUND DURING

INSTALLATION THAT RESULTS FROM THE LACK OF COORDINATION BY THE

CONTRACTORS DURING THE SHOP DRAWING PROCESS ARE THE

RESPONSIBILITY OF THE CONTRACTOR.

10. ALL MECHANICAL INFORMATION IS NOT SHOWN ON THE MECHANICAL

DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION

OF ALL INFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS.

11. THE CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW & USE, WHERE

APPROPRIATE, ALL THE MECHANICAL DETAILS SHOWN ON THE DRAWINGS.

DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH

SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO

INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED DETAILS

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

12. ALL EQUIPMENT SHALL BE INDEPENDENTLY SUPPORTED FROM

STRUCTURAL MEMBERS. STRUCTURAL ELEMENTS SHOWN IN DETAILS MAY

OR MAY NOT PERTAIN TO ANY PORTION OF THE BUILDING. COORDINATE ALL

MOUNTING REQUIREMENTS WITH ARCHITECTURAL & STRUCTURAL

DRAWINGS AND SPECIFICATIONS.

13. ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED IN

ACCORDANCE WITH ALL MANUFACTURER RECOMMENDATIONS.

14. ALL SIMILAR EQUIPMENT SHALL BE OF THE SAME MANUFACTURER. AIR

INLETS & OUTLETS OF SIMILAR TYPES SHALL BE OF THE SAME

MANUFACTURER.

15. ANY PART OF THE MECHANICAL INSTALLATION THAT FAILS, IS DEEMED

UNFIT, OR BECOMES DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO

THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EQUIPMENT

CHECK-IN, SAFEKEEPING, & DAMAGE.

16. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT

LOCATION OF ALL CEILING DIFFUSERS & GRILLES.

17. CONTRACTOR SHALL OPERATE INSTALLED &/OR MODIFIED SYSTEMS &

DEMONSTRATE ALL ASPECTS OF THE SYSTEM TO THE ENGINEER &/OR

OWNER TO PROVE ALL ASSOCIATED SYSTEMS ARE OPERATIONAL.

18. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN A SET OF AS-

BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE. ALL CHANGES

OR DEVIATIONS IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, &

ACCESSORIES SHALL BE RECORDED. THESE REDLINED DRAWINGS SHALL

BE GIVEN TO THE ARCHITECT / ENGINEER AFTER THE FINAL INSPECTION IN

ACCORDANCE WITH PROJECT SPECIFICATIONS.

19. ALL DUCT ELBOWS SHALL BE LONG RADIUS, UNLESS NOTED OTHERWISE.

MECHANICAL GENERAL NOTES

DUCT TO BE DEMOLISHED

SHUT OFF VALVE

SYMBOL LEGEND - PIPING

DESCRIPTIONSYMBOL

NOTE: ALL SYMBOLS MAY NOT BE USED

GATE VALVE

CHECK VALVE

AUTOMATIC 2-WAY VALVE

AUTOMATIC 3-WAY VALVE

GLOBE VALVE

BALL VALVE

RELIEF VALVE

PRESSURE REDUCING VALVE

BUTTERFLY VALVE

SOLENOID VALVE

ANGLE VALVE

VENTURI VALVE

BALANCING OR PLUG COCK

FLOW SETTER

EXPANSION VALVE

GAS COCK

MANUAL AIR VENT

STRAINER

GAUGE COCK

FLEXIBLE CONNECTION

PRESSURE GAUGE

THERMOMETER

PIPE REDUCER

REFRIGERANT SITE GLASS

REFRIGERANT STRAINER

90 DEGREE ELBOW UP

90 DEGREE ELBOW DOWN

90 DEGREE TEE UP

90 DEGREE TEE DOWN

PIPE UNION

PIPE CAP

PIPE ANCHOR

FLOAT AND THERMOSTATIC TRAP

REFRIGERANT FILTER DRIER

M

M

S

GAS METER

Mark: Date: Description

4-21-26

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

REVIEWED FOR

CODE COMPLIANCE

SPP (AI)

OAT (NET)

CLG (AO)

MA LLT (BI)MAT (AI)

PH LAT (AI)

CC LAT (AI)

RAD (AO)

R L

F D

P R

(A O

FIL ALM (AI)

RA SD (HDW)

PH (AO)

PHW T (AI)

CHW T (AI)

OAD (AO)

SAF (BI)

SAF (BO)

SAF (AO)

DAT (AI)

HSP ALM (BI)

HSP INTLK (HDW) DA SP (AI)

RA SD (HDW)

RA SD (HDW)

RA SD (HDW)

RA SD (HDW)

RA

R L

F

VFD

x 4 DA

RA

RA

RA

MECHANICAL ROOM BOUNDARY

AIR HANDLER

O A

RA

Points List: AIR HANDLER UNIT

Point Name POINTS ALARMS

G R

A P

H

IC

A N

A L O

G H

A R

D W

A R

E I

N P

U T

A

I)

B

IN

A R

Y H

A R

D W

A R

E I

N P

U T

B

I)

A N

A L O

G H

A R

D W

A R

E O

U T

P U

T

A O

B

IN

A R

Y H

A R

D W

A R

E O

U T

P U

T

B O

S O

F T

W A

R E

P O

IN

T

S

F T

H A

R D

W A

R E

I N

T E

R L O

C K

H

D W

W

IR

E L

E S

S

W L

S

N E

T W

O R

K

N E

T

H

IG

H A

N A

L O

G L

IM

IT

L O

W A

N A

L O

G L

IM

IT

B

IN

A R

Y

L A

T C

H D

IA

G

N O

S T

IC

S E

N S

O R

F A

IL

C O

M M

U N

IC

A

T

IO

N F

A

IL

COIL LEAVING AIR LOW TEMP

CUTOUT ALARM

LLT

X X

COOLING COIL LEAVING

TEMPERATURE

CC LAT

X X X X X

COOLING OUTPUT COMMAND

CLG

X X

DISCHARGE AIR TEMPERATURE

DAT

X X X X X

DISCHARGE AIR STATIC PRESSURE

LOCAL

DA SP

X X X X X

Sequence of Operation: AIR HANDLER UNIT

Building Automation System Interface:

The Building Automation System (BAS) shall send the controller Occupied Bypass, Pre-Cool, Occupied/Unoccupied and Heat/Cool modes. The BAS shall also send the discharge air temperature setpoint and the duct static pressure setpoint. If a

BAS is not present, or communication is lost with the BAS the controller shall operate using default modes and setpoints.

Occupied:

During occupied periods, the supply fan shall run continuously and the mixed air dampers shall open to maintain minimum ventilation requirements. In the cooling mode the chilled water pump shall modulate to control the discharge air setpoint. In the heating mode the hot water valve shall modulate to control the discharge air setpoint. If the discharge air temperature sensor fails, the cooling and heating shall fallback to control to the active space temperature setpoint and an alarm shall be annunciated at the BAS. the cooling and heating shall fallback to control to the discharge air temperature setpoint of 70 deg F (adj.) and an alarm shall be annunciated at the BAS. If the discharge air temperature sensor fails, and the space temperature sensor fails, the supply fan shall be disabled, the chilled water valve should close, the heating valve should close, the outdoor air should close, and an alarm should annunciate at the BAS.

Unoccupied:

During the unoccupied periods, the supply fan shall be disabled, the relief fan shall be disabled, the outside air damper shall close, the mechanical cooling shall be disabled, the mechanical heating shall be disabled, to conserve energy. the outdoor damper shall modulate if economizing is enabled and remain closed if not economizing, Optimal Start:

The BAS shall monitor the scheduled occupied time, occupied space setpoints and space temperature to calculate when the optimal start occurs.

Optimal Stop:

The BAS shall monitor the scheduled unoccupied time, occupied setpoints and space temperature to calculate when the optimal stop occurs. When the optimal stop mode is active the unit controller shall switch to the unoccupied mode. Outside air damper shall remain enabled to provide minimum ventilation.

Occupied Bypass:

The BAS shall monitor the status of the ON and CANCEL buttons of the space temperature sensor. When an occupied bypass request is received from a space sensor, the unit shall transition from its current occupancy mode to occupied bypass mode and the unit shall maintain the space temperature to the occupied setpoints

(adj.).

Heat/Cool Mode:

When the space temperature rises above the occupied cooling setpoint the mode shall transition to cooling. When the space temperature falls below the occupied heating setpoint the mode shall transition to heating. When the space temperature is below the occupied cooling setpoint and above the occupied heating setpoint the mode shall remain in its last state. If the space temperature sensor fails, the mode shall default to heating and an alarm shall annunciate at the BAS.

Morning Warm-Up Mode:

During optimal start, if the average space temperature is below the occupied heating setpoint a morning warm-up mode shall be activated. When morning warm-up is initiated the unit shall enable the heating and fan(s). The outside air damper shall remain closed. When the space temperature reaches the occupied heating setpoint (adj.), the unit shall transition to the occupied mode.

Daytime Warm-Up Control:

During Occupied periods, when the space temperature is below the Daytime

Warm-up Initiate setpoint, a daytime warm-up sequence shall be activated. The outside air damper shall modulate to maintain minimum ventilation requirements, and the heating shall enable to maintain the discharge air temperature heating setpoint. Daytime Warm-up shall terminate when the average space temperature reaches the Occupied heating setpoint.

Pre-Cool Mode:

During optimal start, if the average space temperature is above the occupied cooling setpoint, pre-cool mode shall be activated. When pre-cool is initiated the unit shall enable the fan and cooling or economizer. The outside air damper shall remain closed, unless economizing. When the space temperature reaches occupied cooling setpoint (adj.), the unit shall transition to the occupied mode.

Supply Fan:

The supply fan shall be off in the unoccupied mode. The supply fan shall be on if the control is heating or cooling in the unoccupied mode. When the controller is in the occupied mode, the supply fan shall operate continuously. The supply fan speed shall be modulated to maintain the duct static pressure setpoint. The duct static pressure setpoint shall be sent by the BAS and is reset between the minimum and maximum static pressure limits to maintain the critical zone VAV air damper in a position between 65% and 75% open. If the supply fan fails to prove status for 30 seconds (adj.), the fan shall remain commanded on, the outside air damper shall close, cooling shall be disabled, all heating shall be disabled, and an alarm shall annunciate at the BAS. Once the fan status is proven on, the alarm on the supply fan shall clear. A hardwired, high static pressure cut-off switch shall be electrically interlocked with the variable speed drive. If the high static pressure cut-off switch is tripped the fan shall be commanded off, heating shall be disabled, cooling should be disabled, and an alarm shall annunciate at the BAS. A manual reset of the high static pressure cut-off switch shall be required to restart the fan.

Relief Damper Control

When the supply fan operating status is confirmed, the relief damper shall modulate to control the building pressure setpoint. When the supply fan status is confirmed off, the relief damper shall close.

Preheat Control:

When the fan is off, if the outdoor air temperature is below 40.0 deg. F (adj.) or the outdoor air temperature sensor is failed, the preheat valve shall modulate to maintain a preheat leaving coil temperature of 45.0 deg. F (adj.).

If the preheat temperature sensor fails and the mixed air temperature is below 45.0 deg. F (adj.) the preheat valve shall be 100% open (adj.). If the preheat temperature sensor fails and the mixed air temperature is above 50.0 deg. F (adj.)

the preheat valve shall be commanded closed. An alarm shall annunciate at the

BAS if the leaving preheat temperature sensor, the mixed air temperature sensor or the outside air temperature sensor are failed.

Low Limit Temperature Control:

The initial damper opening rate shall be limited to 2% per minute (adj.) until the damper has reached its minimum ventilation position. The outside air damper shall modulate to a position less than the minimum damper position if the mixed air temperature drops below 45.0 deg. F (adj.). If the mixed air temperature sensor fails an alarm shall annunciate at the BAS and the outside air damper shall close.

Discharge Air Temperature Control:

The discharge air temperature setpoint shall be reset to the optimal setpoint communicated by the BAS. The Space Temperature BAS and the Space

Temperature Setpoint BAS shall be communicated to the unit controller by the BAS.

The discharge air temperature setpoint shall be reset based upon the deviation of the Space Temperature BAS from the Space Temperature Setpoint BAS.

If the discharge air temperature rises above the maximum limit, a high temperature alarm shall annunciate to the BAS. If the discharge air temperature drops below the minimum limit, a low temperature alarm shall annunciate to the BAS.

Economizer Mode:

The outside air (OA) temperature shall be compared with a reference dry bulb setpoint. The economizer shall enable when the OA temperature is less than reference dry bulb setpoint. The economizer shall be disabled when OA temperature is greater than reference dry bulb setpoint + 2.0 deg. F.

When economizing is enabled and the unit is operating in the cooling mode, the economizer damper shall be modulated between its minimum position and 100% open to maintain the discharge temperature setpoint. The economizer damper shall modulate toward minimum position in the event the mixed air temperature falls below the low temperature limit setting.

Freeze Protection:

A hardwired, low limit temperature switch shall be electrically interlocked with the variable speed drive. If the low limit temperature switch is tripped 38.0 deg. F (adj.), the fan shall be commanded off and the outside air damper shall close. All valves shall be commanded open to 100% open (adjust per climate). An alarm shall annunciate at the BAS and manual reset of the low limit temperature switch shall be required to restart the fan.

Filter Status:

A differential pressure transmitter shall monitor the differential pressure across the filter(s) when the fan is running. If the differential pressure across the filter is higher than the filter alarm setpoint, a dirty filter alarm shall annunciate at the BAS.

Smoke Detector Shutdown:

The unit shall shut down in response to a signal from the smoke detector indicating the presence of smoke. The smoke detector shall be interlocked to the unit through the dry contacts of the smoke detector. A manual reset of the smoke detector shall be required to restart the unit.

FILTER ALARM

FIL ALM

X X

HIGH STATIC ALARM

HSP ALM

X X X X

HIGH STATIC ALARM INTERLOCK

HSP INTLK

X

MIXED AIR DAMPER COMMAND

MAD

X X

MIXED AIR LOW TEMPERATURE

CUTOUT ALARM

MA LLT

X X

MIXED AIR TEMPERATURE LOCAL

MAT

X X X X

OUTDOOR AIR DAMPER COMMAND

OAD

X X

OUTDOOR AIR FLOW

OA FLW

X X

OUTDOOR AIR TEMPERATURE

(COMMUNICATED)

OAT

X X

PREHEAT LEAVING COIL

TEMPERATURE LOCAL

PH LAT

X X X

PREHEAT OUTPUT COMMAND

PH

X X

RELIEF AIR DAMPER COMMAND

RLF DPR

X X

RETURN AIR DAMPER COMMAND

RAD

X X

RETURN SMOKE DETECTOR INPUT

RA SD

X

SPACE STATIC PRESSURE LOCAL

SPP

X X X X

SUPPLY FAN SPEED COMMAND

SAF

X X

SUPPLY FAN START STOP

COMMAND

SAF

X X

SUPPLY FAN STATUS

SAF

X X

SUPPLY FAN 2 SPEED COMMAND

SAF

X X

SUPPLY FAN 2 START STOP

COMMAND

SAF

X X

SUPPLY FAN 2 STATUS

SAF

X X

SUPPLY FAN 3 SPEED COMMAND

SAF

X X

SUPPLY FAN 3 START STOP

COMMAND

SAF

X X

SUPPLY FAN 3 STATUS

SAF

X X

SUPPLY FAN 4 SPEED COMMAND

SAF

X X

SUPPLY FAN 4 START STOP

COMMAND

SAF

X X

SUPPLY FAN 4 STATUS

SAF

X X

BAS COMMUNICATION STATE

BAS COM

X X

DISCHARGE AIR COOLING SETPOINT

DA CL SP

X

DISCHARGE AIR HEATING SETPOINT

DA HT SP

X

MAINTENANCE REQUIRED

MNT REQ

X X

MIXED AIR TEMPERATURE LOW

LIMIT SETPOINT

MA LLT STPT

X

OCCUPIED COOLING SETPOINT

OCC CLG STPT

X X

OCCUPIED HEATING SETPOINT

OCC HTG STPT

X X

SUPPLY FAN FAILURE

SF FAIL

X X X

UNOCCUPIED COOLING SETPOINT

UNOCC CLG STPT

X X

UNOCCUPIED HEATING SETPOINT

UNOCC HTG STPT

X X

LEAVING CHILLED WATER

TEMPERATURE

CHW T

X X

LEAVING PREHEAT WATER

TEMPERATURE

PHW T

X X

LEAVING REHEAT WATER

TEMPERATURE

RHW T

X X

DRAIN PAN

NOTE:

1. COORDINATE TRAP HEIGHT WITH

MANUFACTURER'S RECOMMENDATIONS.

WHERE DISCREPANCY EXISTS,

COORDINATE WITH ENGINEER PRIOR TO

INSTALL.

VACUUM BREAKER OPEN

TO ATMOSPHERE

B A

DRAIN LINE SHALL BE AT LEAST

THE SAME SIZE AS THE NIPPLE

ONTHE DRAIN PAN

PITCH DOWN TOWARD

DRAIN PER IMC

CLEANOUT

ROUTE TO

DRAIN

PROVIDE 1"

AIR GAP

DRAW

THROUGH

BLOW

THROUGH

UNIT TYPE

2"

PLUS X

1"

MIN

X

2 X

A B

WHERE X = STATIC PRESSURE IN PAN

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2024 Spectrum Engineers, Inc.

SHEET TITLE

DFCM PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

DFCM

E

SPECTRUM PROJECT NO: 260049

DFCM APPROVAL STAMP

A u to d e s k D o c s /2

U

S D

B A

H U

R e p la c e m e n t/

-U S

D B

A H

U R e p la c e m e n t

M e c h .r v t

/9

/2

:3

:0

P

M

RHB

RHB

RHB

26212230

03/10/2026

CD

MECHANICAL

SCHEDULES

ME601

UTAH SCHOOL

FOR THE DEAF

AND THE

BLIND

AHU

REPLACEMENT

742 S Harrison Blvd, Ogden, UT 84404

TRANE

DAIKIN

YORK

(1) DOUBLE WALL CONSTRUCTION WITH R-13 INSULATION

(2) 6" INTEGRAL BASE

(3) UL LISTED UNIT

(4) PROVIDE WITH STAINLESS STEEL DRAIN PAN

(5) DUCT CONNECTION TO MATCH EXISTING DUCT LOCATION

(6) PROVIDE WITH FACTORY WIRED OVERLOAD PANEL

(7) VFD TO BE PROVIDED BY MANUFACTURER AND SHIPPED LOOSE FOR FIELD CONNECTION. VFD TO BE MOUNTED ON AHU AFTER AHU IS INSTALLED.

PLUMB = DIVISION 22

MECH = DIVISION 23

ELEC = DIVISION 26

MNFR = MANUFACTURER

ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY:

AHU - SCHEDULE

LABEL

SUPPLY

FAN

LABEL

CHILLED

WATER

COIL

LABEL

HYDRONIC

HEATING

COIL LABEL

FILTERS

LABEL

ELECTRICAL

DISCONNECT

PROVIDED BY

(MECH/ ELEC)

VFD

PROVIDED BY

(MECH/ELEC)

WEIGHT

(LBS) MANUFACTURER MODEL REMARKSVOLTS PHASE Hz kW FLA MOCP

LIGHTING

(Y/N)

CONVENIENCE

OUTLET

(Y/N)

EMERG

POWER

AHU-1 SF-1 CC-1 HC-1 FF-1 460 3 60 19.73 40 90 NO NO NO MECH MANUFACTURER 6,000 TRANE PSCA 1,2,3,4,5,6,7

AHU CHILLED COIL SCHEDULE

LABEL

AHU

LABEL

CHILLED WATER COOLING

CAPACITY

(BTUH)

FLUID

TYPE GPM

NO. OF

ROWS

AIR PD

(IN-WC)

WATER PD

(FT)

EWT

(°F)

LWT

(°F) CONTROL

CC-1 AHU-1 593.9 30% GLYCOL 118 4 0.5 7.8 44 54 EXISTING PUMP

AHU HYDRONIC HEATING COIL SCHEDULE

LABEL

AHU

LABEL

HYDRONIC HEATING

TOTAL

CAPACITY

(BTUH)

FLUID

TYPE GPM

NO. OF

ROWS

AIR PD

(IN-WC)

WATER PD

(FT)

EWT

(°F)

LWT

(°F)

CONTROL

VALVE

HC-1 AHU-1 684.8 30% GLYCOL 34 1 0.08 2.46 180 140 THREE-WAY

AHU PRE-FILTER SCHEDULE

LABEL

AHU

LABEL SIZE

PRE-FILTERS

MERV

RATING TYPE DEPTH

MAX PD

(IN-WC)

FF-1 AHU-1 20"X20" (X12)

20"X24" (X8)

8 PLEATED 2" 0.59

AHU SUPPLY FANS SCHEDULE

LABEL

AHU

LABEL

SUPPLY FANS

TOTAL

AIRFLOW

(CFM)

ESP

(IN-WC) QTY VOLTS PHASE Hz

MOTOR

HP BHP

VFD

PROVIDED BY

(ELEC/MECH)

SF-1 AHU-1 21,060 2.5 4 460 3 60 7.5 24.222 MANUFACTURER

SCALE: 3/16" = 1'-0"1

AHU SCHEMATIC

SCALE: 1/8" = 1'-0"2

CONDENSATE TRAP DETAIL

Mark: Date: Description

4-21-26

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

REVIEWED FOR

CODE COMPLIANCE

JD

JE

MECHANICAL ROOM

J-108 3

5' - 4"1' - 1"

13' - 3"

4"ø CHWR 4"ø CHWS

3"ø HHWR3"ø HHWS

"x

S A

"F O

S A

"x

O

A

MD101

MD101

LEVEL 1

0' - 0"

47 48

LEVEL 2

16' - 4"

MH101

LEVEL 1

0' - 0"

JE

LEVEL 2

16' - 4"

MECHANICAL GENERAL NOTES:

1. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND PLUMBING WITH

ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.

2. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.

3. THIS PROJECT WILL REQUIRE AFTER HOURS AND WEEKEND WORK TO INSTALL AHU OR

MODIFY SYSTEMS . COORDINATE ALL SHUTDOWNS 72 HOURS IN ADVANCE WITH OWNER.

4. CONTROLS TO MATCH EXISTING HONEYWELL CONTROLS. EXISTING CONTROLS ARE OPEN

LICENSED HONEYWELL JACE CONTROLLERS WITH TRIDIUM WORKBENCH WITH ALL TOOLKITS

AND ".JAR" FILES PROPERTY OF THE OWNER. NEW CONTROLS WORK TO ALSO BE OPEN WITH

ALL TOOLKITS AND ".JAR" FILES TO BE PROPERTY OF THIS OWNER. TIE INTO EXISTING

CONTROLS DDC SYSTEM AND UPDATED GRAPHICS. PROVIDE ENGINEER WITH 2 WEEKS OF

TRENDS SHOWING PROPER OPERATION OF EQUIPMENT UPON COMPLETION OF PROJECT.

5. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE RESPONSIBILITY OF

THE CONTROLS CONTRACTOR. RACEWAYS SHALL CONFORM TO THE FOLLOWING ELECTRICAL

SPECIFICATIONS; HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS, RACEWAYS AND

BOXES FOR ELECTRICAL SYSTEMS AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS.

6. CONTRACTOR SHALL FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO ORDERING OR

FABRICATING. ADDITIONAL COST WILL NOT BE ALLOWED FOR CONTRACTOR'S FAILURE TO

BECOME FAMILIAR WITH EXISTING SITE CONDITIONS.

7. PRESSURE TEST ANY NEW HYDRONIC PIPING. USE AMBIENT TEMPERATURE WATER UNLESS

THERE IS RISK OF FREEZING. WHILE FILLING SYSTEM USING DRAINS AND VENTS TO ENSURE

NO AIR IN SYSTEM. ISOLATE EXPANSION TANK(S) AND EXISTING EQUIPMENT. SUBJECT PIPING SYSTEM TO 1.5 TIMES THE SYSTEM'S WORKING PRESSURE FOR 20 MINUTES. EXAMINE PIPING, JOINTS, AND CONNECTIONS FOR LEAKAGE. ELIMINATE LEAKS BY TIGHTENING, REPAIRING, OR

REPLACING COMPONENTS, AND REPEAT HYDROSTATIC TEST UNTIL THERE ARE NO LEAKS.

PREPARE WRITTEN REPORT OF TESTING.

8. INSULATE ALL NEW HYDRONIC PIPING BY FULLY ENCLOSING PIPING IN INSULATION AND

PROVIDING SEALED VAPOR BARRIER. ALL PIPING OVER 2" SHALL BE INSULATED WITH RESIN-

BONDED FIBERGLASS WITH A FOIL AND KRAFT PAPER VAPOR BARRIER WITH A FLAME/SMOKE

SPREAD INDEX BETTER THAN 25/50. INSULATION IS SUBJECT TO INSPECTION BY

COMMISSIONING AGENT AND OR ENGINEER FOR COMPLIANCE.

9. BALL VALVES SHALL BE FULL PORT WITH BRONZE BODY AND BRASS BALL. PROVIDE WITH

HANDLE/STEM EXTENSIONS FOR PROPER FUNCTION WHEN FULLY INSULATED. EXTENSIONS

TO BE SEALED AND VAPOR PROOF.

10. INSTALL INSULATION OVER FITTINGS, VALVES, STRAINERS, FLANGES, UNIONS, AND OTHER

SPECIALTIES WITH CONTINUOUS THERMAL AND VAPOR-RETARDER INTEGRITY. STRAINERS,

CONTROL VALVES, AND BALANCING VALVES SHALL HAVE REMOVABLE INSULATION WITH

LABEL INDICATED WHAT TYPE OF PIPE ACCESSORY IS BELOW INSULATION. INSULATION SHALL

NOT IMPEDE PROPER OPERATION OF ACCESSORY.

11. PROVIDE PRESSURE DIFFERENTIAL INSTRUMENTATION ACROSS FILTER BANK FOR AHU'S

OVER 10,000 CFM.

12. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT INCLUDING STARTUP OF ANY

FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR COMMUNICATION TO BMS.

13. PROVIDE OPERATION AND MAINTENANCE MANUALS (O&M) WITHIN 30 DAYS OF CERTIFICATE

OF OCCUPANCY FOR ALL EQUIPMENT IN DIGITAL FORMAT TO ENGINEER FOR REVIEW. O&M'S

SHALL INCLUDE DOCUMENTATION OF ALL WARRANTIES, REPORTS AND TESTS, RECORD

DRAWINGS, CONTROLS SEQUENCE OF OPERATIONS WITH DIAGRAMS, & EQUIPMENT

INFORMATION. EQUIPMENT INFORMATION INCLUDES MAKE & MODEL, WIRING, PIPING,

STARTUP, SHUTDOWN, TROUBLE SHOOTING SYSTEM BALANCING REPORT, FINAL

COMMISSIONING REPORT AND MAINTENANCE PROCEDURES.

14. PIPING AND DUCTWORK SHALL NOT BE SUPPORTED FROM THE ROOF DECK, JOIST BRIDGING

OR OTHER PIPES. HANG PIPES FROM BEAMS, JOIST OR SUPPLEMENTARY STRUCTURAL

MEMBERS. WHERE POSSIBLE INSTALL ALL PIPING AND DUCTWORK WITHIN 12" FROM

SUPPORTING STRUCTURE.

15. MECHANICAL PIPING SCHEDULE:

• HYDRONIC PIPING 3" AND UNDER = TYPE L COPPER - BRAZED JOINTS

• HYDRONIC PIPING OVER 3" = SCHEDULE 40 STEEL PIPE - WROUGHT STEEL FITTINGS

WELDED JOINTS OR POLYPROPYLENE FUSION WELDED

• CONDENSATE = TYPE M COPPER – BRAZED JOINTS

AREA OF WORK

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2024 Spectrum Engineers, Inc.

SHEET TITLE

DFCM PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

DFCM

E

SPECTRUM PROJECT NO: 260049

DFCM APPROVAL STAMP

A u to d e s k D o c s /2

U

S D

B A

H U

R e p la c e m e n t/

-U S

D B

A H

U R e p la c e m e n t

M e c h .r v t

/9

/2

:3

:0

P

M

RHB

RHB

RHB

26212230

03/10/2026

CD

AHU ROOM

MECHANICAL

DEMOLITION PLAN

MD101

UTAH SCHOOL

FOR THE DEAF

AND THE

BLIND

AHU

REPLACEMENT

742 S Harrison Blvd, Ogden, UT 84404

SCALE: 1/2" = 1'-0"1

AHU ROOM DEMOLITION FLOOR PLAN

SCALE:4

3D AHU DEMOLITION VIEW

SCALE: 1/4" = 1'-0"2

AHU ROOM N/S DEMOLITION SECTION

SCALE: 1/4" = 1'-0"3

AHU ROOM E/W DEMOLITION SECTION

1 REMOVE EXISTING AIR HANDLING UNIT. PROTECT EXISTING DUCTWORK,

PIPING, ETC.

2 REMOVE EXISTING OUTSIDE AIR TRANSITION FROM PENTHOUSE DUCT TO

AIR HANDLER CONNECTION.

3 REMOVE APPROXIMATELY 1' OF SUPPLY DUCTWORK OFF OF AIR HANDLING

UNIT.

4 EXISTING RETURN DUCT WITH FIRE SMOKE DAMPER TO REMAIN.

5 EXISTING HOT WATER UNIT HEATER TO REMAIN.

6 EXISTING HOT WATER HEATING PIPING AND THREE-WAY VALVE TO REMAIN.

7 EXISTING CHILLED WATER PIPING AND PUMP TO REMAIN.

8 EXISTING RELIEF DUCT AND DAMPER TO REMAIN.

SHEET KEYNOTES

SCALE: NTS5

KEYPLAN

Mark: Date: Description

4-21-26

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

REVIEWED FOR

CODE COMPLIANCE

LEVEL 1

0' - 0"

JDJE

LEVEL 2

16' - 4"

MH101

AHU-1 1

LEVEL 1

0' - 0"

47 48

LEVEL 2

16' - 4"

MH101

AHU-1 1

JD

JE

MECHANICAL ROOM

J-108

MH101

MH101

5' - 4"1' - 1"

13' - 3"

4"ø CHWR 4"ø CHWS

3"ø HHWR3"ø HHWS

"x

S A

"F O

S A

"x

O

A

AHU-1 1

MECHANICAL GENERAL NOTES:

1. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND PLUMBING WITH

ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.

2. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.

3. THIS PROJECT WILL REQUIRE AFTER HOURS AND WEEKEND WORK TO INSTALL AHU OR

MODIFY SYSTEMS . COORDINATE ALL SHUTDOWNS 72 HOURS IN ADVANCE WITH OWNER.

4. CONTROLS TO MATCH EXISTING HONEYWELL CONTROLS. EXISTING CONTROLS ARE OPEN

LICENSED HONEYWELL JACE CONTROLLERS WITH TRIDIUM WORKBENCH WITH ALL TOOLKITS

AND ".JAR" FILES PROPERTY OF THE OWNER. NEW CONTROLS WORK TO ALSO BE OPEN WITH

ALL TOOLKITS AND ".JAR" FILES TO BE PROPERTY OF THIS OWNER. TIE INTO EXISTING

CONTROLS DDC SYSTEM AND UPDATED GRAPHICS. PROVIDE ENGINEER WITH 2 WEEKS OF

TRENDS SHOWING PROPER OPERATION OF EQUIPMENT UPON COMPLETION OF PROJECT.

5. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE RESPONSIBILITY OF

THE CONTROLS CONTRACTOR. RACEWAYS SHALL CONFORM TO THE FOLLOWING ELECTRICAL

SPECIFICATIONS; HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS, RACEWAYS AND

BOXES FOR ELECTRICAL SYSTEMS AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS.

6. CONTRACTOR SHALL FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO ORDERING OR

FABRICATING. ADDITIONAL COST WILL NOT BE ALLOWED FOR CONTRACTOR'S FAILURE TO

BECOME FAMILIAR WITH EXISTING SITE CONDITIONS.

7. PRESSURE TEST ANY NEW HYDRONIC PIPING. USE AMBIENT TEMPERATURE WATER UNLESS

THERE IS RISK OF FREEZING. WHILE FILLING SYSTEM USING DRAINS AND VENTS TO ENSURE

NO AIR IN SYSTEM. ISOLATE EXPANSION TANK(S) AND EXISTING EQUIPMENT. SUBJECT PIPING SYSTEM TO 1.5 TIMES THE SYSTEM'S WORKING PRESSURE FOR 20 MINUTES. EXAMINE PIPING, JOINTS, AND CONNECTIONS FOR LEAKAGE. ELIMINATE LEAKS BY TIGHTENING, REPAIRING, OR

REPLACING COMPONENTS, AND REPEAT HYDROSTATIC TEST UNTIL THERE ARE NO LEAKS.

PREPARE WRITTEN REPORT OF TESTING.

8. INSULATE ALL NEW HYDRONIC PIPING BY FULLY ENCLOSING PIPING IN INSULATION AND

PROVIDING SEALED VAPOR BARRIER. ALL PIPING OVER 2" SHALL BE INSULATED WITH RESIN-

BONDED FIBERGLASS WITH A FOIL AND KRAFT PAPER VAPOR BARRIER WITH A FLAME/SMOKE

SPREAD INDEX BETTER THAN 25/50. INSULATION IS SUBJECT TO INSPECTION BY

COMMISSIONING AGENT AND OR ENGINEER FOR COMPLIANCE.

9. BALL VALVES SHALL BE FULL PORT WITH BRONZE BODY AND BRASS BALL. PROVIDE WITH

HANDLE/STEM EXTENSIONS FOR PROPER FUNCTION WHEN FULLY INSULATED. EXTENSIONS

TO BE SEALED AND VAPOR PROOF.

10. INSTALL INSULATION OVER FITTINGS, VALVES, STRAINERS, FLANGES, UNIONS, AND OTHER

SPECIALTIES WITH CONTINUOUS THERMAL AND VAPOR-RETARDER INTEGRITY. STRAINERS,

CONTROL VALVES, AND BALANCING VALVES SHALL HAVE REMOVABLE INSULATION WITH

LABEL INDICATED WHAT TYPE OF PIPE ACCESSORY IS BELOW INSULATION. INSULATION SHALL

NOT IMPEDE PROPER OPERATION OF ACCESSORY.

11. PROVIDE PRESSURE DIFFERENTIAL INSTRUMENTATION ACROSS FILTER BANK FOR AHU'S

OVER 10,000 CFM.

12. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT INCLUDING STARTUP OF ANY

FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR COMMUNICATION TO BMS.

13. PROVIDE OPERATION AND MAINTENANCE MANUALS (O&M) WITHIN 30 DAYS OF CERTIFICATE

OF OCCUPANCY FOR ALL EQUIPMENT IN DIGITAL FORMAT TO ENGINEER FOR REVIEW. O&M'S

SHALL INCLUDE DOCUMENTATION OF ALL WARRANTIES, REPORTS AND TESTS, RECORD

DRAWINGS, CONTROLS SEQUENCE OF OPERATIONS WITH DIAGRAMS, & EQUIPMENT

INFORMATION. EQUIPMENT INFORMATION INCLUDES MAKE & MODEL, WIRING, PIPING,

STARTUP, SHUTDOWN, TROUBLE SHOOTING SYSTEM BALANCING REPORT, FINAL

COMMISSIONING REPORT AND MAINTENANCE PROCEDURES.

14. PIPING AND DUCTWORK SHALL NOT BE SUPPORTED FROM THE ROOF DECK, JOIST BRIDGING

OR OTHER PIPES. HANG PIPES FROM BEAMS, JOIST OR SUPPLEMENTARY STRUCTURAL

MEMBERS. WHERE POSSIBLE INSTALL ALL PIPING AND DUCTWORK WITHIN 12" FROM

SUPPORTING STRUCTURE.

15. MECHANICAL PIPING SCHEDULE:

• HYDRONIC PIPING 3" AND UNDER = TYPE L COPPER - BRAZED JOINTS

• HYDRONIC PIPING OVER 3" = SCHEDULE 40 STEEL PIPE - WROUGHT STEEL FITTINGS

WELDED JOINTS OR POLYPROPYLENE FUSION WELDED

• CONDENSATE = TYPE M COPPER – BRAZED JOINTS

AREA OF WORK

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2024 Spectrum Engineers, Inc.

SHEET TITLE

DFCM PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

DFCM

E

SPECTRUM PROJECT NO: 260049

DFCM APPROVAL STAMP

A u to d e s k D o c s /2

U

S D

B A

H U

R e p la c e m e n t/

-U S

D B

A H

U R e p la c e m e n t

M e c h .r v t

/9

/2

:3

:1

P

M

RHB

RHB

RHB

26212230

03/10/2026

CD

AHU ROOM

MECHANICAL

REPLACEMENT PLANS

MH101

UTAH SCHOOL

FOR THE DEAF

AND THE

BLIND

AHU

REPLACEMENT

742 S Harrison Blvd, Ogden, UT 84404

SCALE: 1/4" = 1'-0"3

AHU ROOM E/W SECTION

SCALE: 1/4" = 1'-0"2

AHU ROOM N/S SECTION

SCALE: 1/2" = 1'-0"1

AHU ROOM FLOOR PLAN

SCALE:4

3D AHU VIEW

1 PROVIDE NEW AIR HANDLING UNIT. COORDINATE SHIPPING SPLITS WITH

HALLWAY WIDTH, DOORWAYS, AND OTHER EXISTING OBSTRUCTIONS. NEW

UNIT MUST FIT ON EXISTING HOUSEKEEPING PAD. COORDINATE EXISTING

DUCT AND PIPING CONNECTIONS WITH NEW UNIT PRIOR TO ORDERING.

2 PROVIDE NEW TRANSITION FROM OUTSIDE AIR CONNECTION ON AIR

HANDLING UNIT TO OUTSIDE AIR DUCT THROUGH ROOF.

3 PROVIDE NEW SUPPLY DUCT FROM AIR HANDLER CONNECTION TO EXISTING

40"X87" DUCT.

4 PROVIDE NEW HEATING WATER AND CHILLED WATER PIPING FROM

EXISTING PIPING TO COILS.

SHEET KEYNOTES

SCALE: 1" = 80'-0"5

NEW AHU KEYPLAN

Mark: Date: Description

4-21-26

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

REVIEWED FOR

CODE COMPLIANCE

MECHANICAL GENERAL NOTES:

1. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND PLUMBING WITH

ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.

2. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.

3. THIS PROJECT WILL REQUIRE AFTER HOURS AND WEEKEND WORK TO INSTALL AHU OR

MODIFY SYSTEMS . COORDINATE ALL SHUTDOWNS 72 HOURS IN ADVANCE WITH OWNER.

4. CONTROLS TO MATCH EXISTING HONEYWELL CONTROLS. EXISTING CONTROLS ARE OPEN

LICENSED HONEYWELL JACE CONTROLLERS WITH TRIDIUM WORKBENCH WITH ALL TOOLKITS

AND ".JAR" FILES PROPERTY OF THE OWNER. NEW CONTROLS WORK TO ALSO BE OPEN WITH

ALL TOOLKITS AND ".JAR" FILES TO BE PROPERTY OF THIS OWNER. TIE INTO EXISTING

CONTROLS DDC SYSTEM AND UPDATED GRAPHICS. PROVIDE ENGINEER WITH 2 WEEKS OF

TRENDS SHOWING PROPER OPERATION OF EQUIPMENT UPON COMPLETION OF PROJECT.

5. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE RESPONSIBILITY OF

THE CONTROLS CONTRACTOR. RACEWAYS SHALL CONFORM TO THE FOLLOWING ELECTRICAL

SPECIFICATIONS; HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS, RACEWAYS AND

BOXES FOR ELECTRICAL SYSTEMS AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS.

6. CONTRACTOR SHALL FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO ORDERING OR

FABRICATING. ADDITIONAL COST WILL NOT BE ALLOWED FOR CONTRACTOR'S FAILURE TO

BECOME FAMILIAR WITH EXISTING SITE CONDITIONS.

7. PRESSURE TEST ANY NEW HYDRONIC PIPING. USE AMBIENT TEMPERATURE WATER UNLESS

THERE IS RISK OF FREEZING. WHILE FILLING SYSTEM USING DRAINS AND VENTS TO ENSURE

NO AIR IN SYSTEM. ISOLATE EXPANSION TANK(S) AND EXISTING EQUIPMENT. SUBJECT PIPING SYSTEM TO 1.5 TIMES THE SYSTEM'S WORKING PRESSURE FOR 20 MINUTES. EXAMINE PIPING, JOINTS, AND CONNECTIONS FOR LEAKAGE. ELIMINATE LEAKS BY TIGHTENING, REPAIRING, OR

REPLACING COMPONENTS, AND REPEAT HYDROSTATIC TEST UNTIL THERE ARE NO LEAKS.

PREPARE WRITTEN REPORT OF TESTING.

8. INSULATE ALL NEW HYDRONIC PIPING BY FULLY ENCLOSING PIPING IN INSULATION AND

PROVIDING SEALED VAPOR BARRIER. ALL PIPING OVER 2" SHALL BE INSULATED WITH RESIN-

BONDED FIBERGLASS WITH A FOIL AND KRAFT PAPER VAPOR BARRIER WITH A FLAME/SMOKE

SPREAD INDEX BETTER THAN 25/50. INSULATION IS SUBJECT TO INSPECTION BY

COMMISSIONING AGENT AND OR ENGINEER FOR COMPLIANCE.

9. BALL VALVES SHALL BE FULL PORT WITH BRONZE BODY AND BRASS BALL. PROVIDE WITH

HANDLE/STEM EXTENSIONS FOR PROPER FUNCTION WHEN FULLY INSULATED. EXTENSIONS

TO BE SEALED AND VAPOR PROOF.

10. INSTALL INSULATION OVER FITTINGS, VALVES, STRAINERS, FLANGES, UNIONS, AND OTHER

SPECIALTIES WITH CONTINUOUS THERMAL AND VAPOR-RETARDER INTEGRITY. STRAINERS,

CONTROL VALVES, AND BALANCING VALVES SHALL HAVE REMOVABLE INSULATION WITH

LABEL INDICATED WHAT TYPE OF PIPE ACCESSORY IS BELOW INSULATION. INSULATION SHALL

NOT IMPEDE PROPER OPERATION OF ACCESSORY.

11. PROVIDE PRESSURE DIFFERENTIAL INSTRUMENTATION ACROSS FILTER BANK FOR AHU'S

OVER 10,000 CFM.

12. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT INCLUDING STARTUP OF ANY

FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR COMMUNICATION TO BMS.

13. PROVIDE OPERATION AND MAINTENANCE MANUALS (O&M) WITHIN 30 DAYS OF CERTIFICATE

OF OCCUPANCY FOR ALL EQUIPMENT IN DIGITAL FORMAT TO ENGINEER FOR REVIEW. O&M'S

SHALL INCLUDE DOCUMENTATION OF ALL WARRANTIES, REPORTS AND TESTS, RECORD

DRAWINGS, CONTROLS SEQUENCE OF OPERATIONS WITH DIAGRAMS, & EQUIPMENT

INFORMATION. EQUIPMENT INFORMATION INCLUDES MAKE & MODEL, WIRING, PIPING,

STARTUP, SHUTDOWN, TROUBLE SHOOTING SYSTEM BALANCING REPORT, FINAL

COMMISSIONING REPORT AND MAINTENANCE PROCEDURES.

14. PIPING AND DUCTWORK SHALL NOT BE SUPPORTED FROM THE ROOF DECK, JOIST BRIDGING

OR OTHER PIPES. HANG PIPES FROM BEAMS, JOIST OR SUPPLEMENTARY STRUCTURAL

MEMBERS. WHERE POSSIBLE INSTALL ALL PIPING AND DUCTWORK WITHIN 12" FROM

SUPPORTING STRUCTURE.

15. MECHANICAL PIPING SCHEDULE:

• HYDRONIC PIPING 3" AND UNDER = TYPE L COPPER - BRAZED JOINTS

• HYDRONIC PIPING OVER 3" = SCHEDULE 40 STEEL PIPE - WROUGHT STEEL FITTINGS

WELDED JOINTS OR POLYPROPYLENE FUSION WELDED

• CONDENSATE = TYPE M COPPER – BRAZED JOINTS

AREA OF WORK

1 2

F

G

H

E

BOILER ROOM

CHILLER ROOM

(E)VFD-5

(E)P-5

(E)P-6

(E)P-7

(E)VFD-6

1 2

F

G

H

E

BOILER ROOM

CHILLER ROOM

(E)P-5

(E)P-6

(E)P-7

(E)VFD-6

(E)VFD-5

VFD-7 4

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2024 Spectrum Engineers, Inc.

SHEET TITLE

DFCM PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

DFCM

E

SPECTRUM PROJECT NO: 260049

DFCM APPROVAL STAMP

A u to d e s k D o c s /2

U

S D

B A

H U

R e p la c e m e n t/

-U S

D B

A H

U R e p la c e m e n t

M e c h .r v t

/9

/2

:2

:1

P

M

RHB

RHB

RHB

26212230

03/10/2026

CD

BOILER ROOM

MECHANICAL

REPLACEMENT PLANS

MH102

UTAH SCHOOL

FOR THE DEAF

AND THE

BLIND

AHU

REPLACEMENT

742 S Harrison Blvd, Ogden, UT 84404

1 EXISTING VFD SERVING 3 HP PUMP TO BE REPLACED. VFD HAS FAILED DUE

TO CONDENSATION.

2 EXISTING PUMP TO REMAIN.

3 EXISTING VFD TO REMAIN.

4 PROVIDE NEW VFD. PROVIDE 1" RIGID INSULATION BETWEEN VFD AND

EXTERIOR WALL.

5 PROVIDE INSULATION BETWEEN EXISTING VFD AND WALL.

SHEET KEYNOTES

SCALE: 1" = 80'-0"3

VFD KEYPLAN

SCALE: 1/4" = 1'-0"1

BOILER ROOM DEMOLITION PLAN

SCALE: 1/4" = 1'-0"2

BOILER ROOM NEW PLAN

VARIABLE FREQUENCY DRIVE SCHEDULE

LABEL SERVES

LOAD DATA

WIRE AND

CONDUIT SIZE

OVERCURRENT

PROTECTION

DEVICE

DISCONNECT STARTER

MANUFACTURER MODEL REMARKSHP kW

OUTPUT

(A) VOLTAGE PHASE Hz DEVICE DEVICE SIZES

SELECTOR

SWITCH

PILOT

LAMP

NORMALLY

OPEN

NORMALLY

CLOSED

PHASE

FAILURE

RELAY

VFD-7 P-7 3 2.2 4.8 480 3 60 3 #12, #12 GR 0.75"

CND

20/3 CB 30A/39 FRS-10 VFD 5 --- R,G 2 2 YES YASKAWA HV6OU4005CFA 1,2

1. NEMA 1.

2. PROVIDE DUAL-REDUNDANT 100% RATED VFD

Mark: Date: Description

4-21-26

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

REVIEWED FOR

CODE COMPLIANCE

JD

JE

"H9"

TYP

TYP

JD

JE

H9

AHU-1

"H9"

TYP

TYP

AREA OF WORK

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2024 Spectrum Engineers, Inc.

SHEET TITLE

DFCM PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

DFCM

E

SPECTRUM PROJECT NO: 260049

DFCM APPROVAL STAMP

A u to d e s k D o c s /2

U

S D

B A

H U

R e p la c e m e n t/

-U S

D B

A H

U R e p la c e m e n t

M e c h .r v t

/9

/2

:3

:2

P

M

TDS

TDS

TDS

26212230

03/10/2026

CD

ELECTRICAL PLANS

EE001

UTAH SCHOOL

FOR THE DEAF

AND THE

BLIND

AHU

REPLACEMENT

742 S Harrison Blvd, Ogden, UT 84404

SCALE: 1/4" = 1'-0"A4

AHU ROOM ELECTRICAL DEMOLITION FLOOR PLAN

SCALE: 1/4" = 1'-0"A2

AHU ROOM ELECTRICAL POWER PLAN

GENERAL SHEET NOTES

SHEET KEYNOTES

1 DISCONNECT AND REMOVE EXISTING 70A/3P ELECTRICAL CONNECTIONS TO AIR

HANDLER. EXISTING CIRCUIT MAY BE REUSED FOR NEW AIR HANDLER.

2 CONNECT POWER TO REPLACED AIR HANDLER UNIT. CONNECT TO THE VFD

FURNISHED WITH THE EQUIPMENT. EXTEND EXISTING CIRCUIT TO NEW LOCATION AS

REQUIRED. ASSUME 3 #4, #8 GR IN 1.25" CND FOR CIRCUIT EXTENSION.

3 DISCONNECT AND REMOVE EXISTING DUCT DETECTORS FROM AIR HANDLER TO BE

REMOVED. REINSTALL DUCT DETECTORS AND SAMPLING TUBES IN SAME LOCATION

IN NEW AIR HANDLER. FIELD VERIFY EXACT LOCATIONS AND REINSTALLATION

REQUIREMENTS.

REFERENCE AND LINE SYMBOLS

DETAIL INDICATOR: A5 INDICATES DETAIL NUMBER, E-501

INDICATES DRAWING SHEET WHERE DETAIL IS SHOWN.

A5

E-501

ELEVATION OR SECTION INDICATOR, EXTERIOR: A5 INDICATES

ELEVATION OR SECTION NUMBER, E-201 INDICATES DRAWING

SHEET WHERE ELEVATION OR SECTION IS SHOWN.

A5

E-201

ELEVATION OR SECTION INDICATOR, INTERIOR: A5 INDICATES

ELEVATION OR SECTION NUMBER, E-201 INDICATES DRAWING

SHEET WHERE ELEVATION OR SECTION IS SHOWN.

A5

E-201

ROOM IDENTIFIER WITH ROOM NAME AND NUMBER.

ROOM NAME

KEYNOTE INDICATOR.1

REVISION INDICATOR.1

BREAK, STRAIGHT: TO BREAK PARTS OF DRAWING

BREAK, ROUND

NEW LINE: MEDIUM LINE.

HIDDEN FEATURES LINE: HIDDEN, THIN LINE

EXISTING TO REMAIN LINE: THIN LINE.

DEMOLITION LINE: DASHED, MEDIUM LINE

MECHANICAL EQUIPMENT INDICATOR. "X-X" INDICATES

EQUIPMENT MARK SHOWN ON EQUIPMENT SCHEDULE. "XMDP"

IDENTIFIES PANEL EQUIPMENT IS CIRCUITED TO. REFER TO

EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION.

XMDP

X-X

MONITOR MODULE.MM

DETECTOR, SMOKE, DUCT WITH HOUSING AND SAMPLING TUBE.

SD

SMOKE DAMPER. 120V POWER FROM ELECTRICAL SYSTEM.

FSD

COMBINATION FIRE/SMOKE DAMPER. 120V POWER

FROM ELECTRICAL SYSTEM.

DISCONNECT SWITCH, FUSED.

DISCONNECT SWITCH, UNFUSED.

PANELBOARD CABINET, FLUSH MOUNTED.

PANELBOARD CABINET, SURFACE MOUNTED, 1 SECTION.

PANELBOARD CABINET, SURFACE MOUNTED, 2 SECTION.

DP#__

DISTRIBUTION PANEL OR SWITCHBOARD.

SWITCH, TOGGLE MOTOR STARTER WITH OVERLOAD

PROTECTION.

ST

TRANSFORMER (SEE ONE-LINE FOR SIZE)

MECHANICAL EQUIPMENT CONNECTION. REFER TO EQUIPMENT

SCHEDULE FOR REQUIREMENTS.

SYMBOL DESCRIPTION

SYMBOLS LEGEND

E - DIVISION 26

Q - FURNISHED WITH EQUIPMENT, INSTALLED BY DIV.26

1. PROVIDE MANUAL STARTER WITH THERMAL OVERLOAD AND RELAY

FOR ATC/BAS CONTROL.

2. PROVIDE FUSED DISCONNECT ELEVATOR POWER MODULE WITH

SHUNT TRIP.

3. INDOOR UNITS FED FROM OUTDOOR UNIT. PROVIDE DISCONNECTS

FOR BOTH.

1. LOCATE ELECTRICAL EQUIPMENT IN ACCESSIBLE LOCATION, SUCH THAT IT IS WITHIN SIGHT OF THE EQUIPMENT IT IS

SERVING, AND COMPLIES WITH N.E.C. REQUIRED CLEARANCES.

2. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE AND SIZE FEEDER, STARTER, DISCONNECT AND OVERCURRENT PROTECTION IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OF ACTUAL EQUIPMENT SUPPLIED.

3. ELECTRICAL CONTRACTOR SHALL REVIEW OTHER DIVISION DRAWINGS FOR ANY ADDITIONAL REQUIREMENTS

PRIOR TO BID.

4. ELECTRICAL CONTRACTOR SHALL REVIEW OTHER DIVISION SUBMITTALS FOR ANY EQUIPMENT REQUIRING CONNECTION

BY ELECTRICAL CONTRACTOR AND COORDINATE ALL REQUIREMENTS PRIOR TO ROUGH-IN.

EQUIPMENT SCHEDULE KEY NOTES: GENERAL NOTES:

EQUIPMENT SCHEDULE

LABEL QTY DESCRIPTION

LOAD DATA

WIRE AND CONDUIT

SIZE

OCPD DISCONNECT MOTOR CONTROLLER NEMA

ENCLOSURE

RATING NOTESHP kW MCA FLA V PH DEVICE FED FROM PROVIDED BY DEVICE PROVIDED BY DEVICE SIZES

AHU-1 1 AIR HANDLER 30 - - 39.2 480 3 3 #4, #8 GR

1.25" CND

70/3

CB (EX)

H9 Q VFD Q VFD 30 HP -

SCALE: 1" = 80'-0"1

KEY PLAN

Mark: Date: Description

4-21-26

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

REVIEWED FOR

CODE COMPLIANCE

GE001 - COVER SHEET
ME001 - MECHANICAL COVER SHEET
ME601 - MECHANICAL SCHEDULES
MD101 - AHU ROOM MECHANICAL DEMOLITION PLAN
MH101 - AHU ROOM MECHANICAL REPLACEMENT PLANS
MH102 - BOILER ROOM MECHANICAL REPLACEMENT PLANS
EE001 - ELECTRICAL PLANS