6-2-CS27013-26212230-Approved Plans.pdf
PDF 8 MB Posted
- Solicitation number
- CS27013
- Issued by
- Utah
About this file
This document is a set of approved construction plans prepared by Spectrum Engineers for the Utah School for the Deaf and the Blind (USDB) under a Stage II Invitation to Bid issued by the State of Utah Division of Facilities Construction and Management (DFCM). The project involves replacement of an existing air handling unit (AHU) and a variable frequency drive (VFD) serving a heating hot water pump at the facility located at 742 S Harrison Boulevard in Ogden, Utah. The mechanical plans include comprehensive details for AHU demolition and replacement, incorporating a new unit with 21,060 CFM capacity, four supply fans, chilled water and hydronic heating coils, and pre-filters. The project also requires replacement of a failed VFD in the boiler room and installation of associated ductwork, piping, and control system integration with the existing Honeywell Building Automation System. The plans specify that all work must comply with current building codes, seismic requirements, and manufacturer recommendations, with coordination required across all trades. The contractor is responsible for field verification of existing conditions, pressure testing of new hydronic piping, proper insulation installation, system startup and commissioning, and provision of operation and maintenance manuals within 30 days of certificate of occupancy.
The construction cost estimate for this project is $475,000.00. Only contractors who have completed Stage I prequalification under the DFCM Prequalified Contractors program are eligible to bid on this Stage II project. The plans indicate that the project will require after-hours and weekend work with all shutdowns requiring 72 hours advance coordination with the owner. The contractor must maintain detailed as-built redlined record drawings throughout construction and provide the engineer with two weeks of operational trends demonstrating proper equipment performance upon project completion. The mechanical work encompasses Division 22 (plumbing), Division 23 (mechanical), and Division 26 (electrical) responsibilities, with the VFD to be provided by the AHU manufacturer and field-mounted after installation. Acceptable AHU manufacturers include Trane, Daikin, and York, with specific technical requirements outlined in the mechanical schedules including detailed coil specifications, filter ratings, and control sequence of operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
C
A
B
2 3
D
E
1 2 3
C
4 5
2024 Spectrum Engineers, Inc.
SHEET TITLE
DFCM PROJECT NO:
DRAWN BY:
CHECKED BY:
SIGNATURE:
RECORD DRAWING DATE:
DESIGNED BY:
A
ISSUE:
DATE:
B
4 5
D
DFCM
E
SPECTRUM PROJECT NO: 260049
DFCM APPROVAL STAMP
A u to d e s k D o c s /2
U
S D
B A
H U
R e p la c e m e n t/
-U S
D B
A H
U R e p la c e m e n t
M e c h .r v t
/9
/2
:3
:5
P
M
RHB
RHB
RHB
26212230
03/10/2026
CD
COVER SHEET
GE001
UTAH SCHOOL
FOR THE DEAF
AND THE
BLIND
AHU
REPLACEMENT
742 S Harrison Blvd, Ogden, UT 84404
MECHANICAL SHEET INDEX
GE001 COVER SHEET
ME001 MECHANICAL COVER SHEET
ME601 MECHANICAL SCHEDULES
MD101 AHU ROOM MECHANICAL DEMOLITION PLAN
MH101 AHU ROOM MECHANICAL REPLACEMENT PLANS
MH102 BOILER ROOM MECHANICAL REPLACEMENT PLANS
EE001 ELECTRICAL PLANS
UTAH SCHOOL FOR THE DEAF AND
BLIND AIR HANDLER REPLACEMENT
DFCM PROJECT NUMBER: 26212230
PROJECT DESCRIPTION:
REPLACEMENT OF EXISTING AIR HANDLING
UNIT AND OF A VFD SERVING A HEATING
HOT WATER PUMP
Mark: Date: Description
4-21-26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
06/03/2026
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
C
A
B
2 3
D
E
1 2 3
C
4 5
2024 Spectrum Engineers, Inc.
SHEET TITLE
DFCM PROJECT NO:
DRAWN BY:
CHECKED BY:
SIGNATURE:
RECORD DRAWING DATE:
DESIGNED BY:
A
ISSUE:
DATE:
B
4 5
D
DFCM
E
SPECTRUM PROJECT NO: 260049
DFCM APPROVAL STAMP
A u to d e s k D o c s /2
U
S D
B A
H U
R e p la c e m e n t/
-U S
D B
A H
U R e p la c e m e n t
M e c h .r v t
/9
/2
:3
:5
P
M
RHB
RHB
RHB
26212230
03/10/2026
CD
MECHANICAL COVER
SHEET
ME001
UTAH SCHOOL
FOR THE DEAF
AND THE
BLIND
AHU
REPLACEMENT
742 S Harrison Blvd, Ogden, UT 84404
ABBREVIATIONS
NOTE: ALL ABBREVIATIONS MAY NOT BE USED.
DEFINITIONS
NOTE: ALL DEFINITIONS MAY NOT BE USED.
INDICATED: THE TERM "INDICATED" REFERS TO GRAPHIC REPRESENTATIONS,
NOTES, OR SCHEDULES ON THE DRAWINGS, OTHER PARAGRAPHS OR
SCHEDULES IN THE SPECIFICATIONS, AND SIMILAR REQUIREMENTS IN THE
CONTRACT DOCUMENTS. WHERE TERMS SUCH AS "SHOWN", "NOTED",
"SCHEDULED", AND "SPECIFIED" ARE USED, IT IS TO HELP THE READER LOCATE
THE REFERENCE, NO LIMITATION ON LOCATION IS INTENDED.
DIRECTED: TERMS SUCH AS "DIRECTED", "REQUESTED", AUTHORIZED",
"SELECTED", "APPROVED", "REQUIRED", AND "PERMITTED" MEAN "DIRECTED BY
THE ENGINEER", "REQUESTED BY THE ENGINEER", AND SIMILAR PHRASES.
APPROVED: THE TERM "APPROVED", WHERE USED IN CONJUNCTION WITH THE
ENGINEER'S ACTION ON THE CONTRACTOR'S SUBMITTALS, APPLICATIONS, AND
REQUESTS, IS LIMITED TO THE ENGINEER'S DUTIES AND RESPONSIBILITIES AS
STATED IN GENERAL AND SUPPLEMENTARY CONDITIONS.
FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO
THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY,
INSTALLATION, AND SIMILAR OPERATIONS."
INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT PROJECT
SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION,
PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING,
PROTECTING, CLEANING, AND SIMILAR OPERATIONS."
PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE
AND READY FOR THE INTENDED USE."
INSTALLER: AN "INSTALLER" IS THE CONTRACTOR OR AN ENTITY ENGAGED BY
THE CONTRACTOR, EITHER AS AN EMPLOYEE, SUBCONTRACTOR, OR SUB-
SUBCONTRACTOR, FOR PERFORMANCE OF A PARTICULAR CONSTRUCTION
ACTIVITY, INCLUDING INSTALLATION, ERECTION, APPLICATION, AND SIMILAR
OPERATIONS. INSTALLERS ARE REQUIRED TO BE EXPERIENCED IN THE
OPERATIONS THEY ARE ENGAGED TO PERFORM.
(E) EXISTING
(F) FUTURE
AC AIR CONDITION(-ING,-ED)
APD AIR PRESSURE DROP
BD BALANCING DAMPER
BHP BRAKE HORSE POWER
BTU BRITISH THERMAL UNIT
BTUH BTU/HOUR
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CV CONTROL VALVE
DB DRY BULB TEMPERATURE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RECIRC
DP DEPTH, DEEP, OR DROP IN PRESSURE
EA EXHAUST AIR
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
ELEC ELECTRIC
ELEV ELEVATION
ENT ENTERING
EVAP EVAPORAT(-E, -ING, -ED, -OR)
EWT ENTERING WATER TEMPERATURE
EXT EXTERNAL
FD FIRE DAMPER
FLA FULL LOAD AMPS
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FSD FIRE SMOKE DAMPER
GE GREASE EXHAUST
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HD HEAD
HG MERCURY
HP HORSEPOWER
HR HOUR
HTG HEATING
HZ HERTZ (FREQUENCY)
IN INCH
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LH LATENT HEAT
LRA LOCKED ROTOR AMPS
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
MBH THOUSAND BTU PER HOUR
MCA MINIMUM CIRCUIT AMPS
MFR MANUFACTUR(-ER, -ED)
NC NORMALLY CLOSED OR NOISE CRITERIA
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
OZ OUNCE
PD PRESSURE DROP OR DIFFERENCE
PG PROPOLENE GLYCOL
PH PHASE
PPM PARTS PER MILLION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA PSI ABSOLUTE
PSIG PSI GAUGE
RA RETURN AIR
RECIRC RECIRCULATE (-ER, -ED, -ING)
REFR REFRIGERATION
REQD REQUIRED
RLA RATED LOAD AMPS
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SCFM STANDARD CUBIC FEET PER MINUTE
SCW SOFT COLD WATER
SH SENSIBLE HEAT
SP STATIC PRESSURE
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SS SANITARY SEWER, SOIL, WASTE
STD STANDARD
TA TRANSFER AIR
TD TEMP. DROP OR DIFF.
TEMP TEMPERATURE
TOT TOTAL
TSTAT THERMOSTAT
TYP TYPICAL
V VOLT, VOLTAGE OR VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VEL VELOCITY
VENT VENT, VENTILATION
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THROUGH ROOF
WB WET BULB TEMP
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DROP
WTR WATER
SYMBOL LEGEND - DUCTWORK
DESCRIPTION
NOTE: ALL SYMBOLS MAY NOT BE USED
RECTANGULAR SUPPLY DUCT UP
RECTANGULAR SUPPLY DUCT DOWN
RECTANGULAR RETURN DUCT UP
RECTANGULAR RETURN DUCT DOWN
RECTANGULAR EXHAUST DUCT UP
RECTANGULAR EXHAUST DUCT DOWN
ROUND SUPPLY DUCT UP
ROUND SUPPLY DUCT DOWN
ROUND RETURN DUCT UP
ROUND RETURN DUCT DOWN
ROUND EXHAUST DUCT UP
ROUND EXHAUST DUCT DOWN
OVAL SUPPLY DUCT UP
OVAL SUPPLY DUCT DOWN
OVAL RETURN DUCT UP
OVAL RETURN DUCT DOWN
OVAL EXHAUST DUCT UP
OVAL EXHAUST DUCT DOWN
SPIRAL OVAL DUCT
SPIRAL ROUND DUCT
DUCT INSULATION
DUCT LINING
90° RECTANGULAR ELBOW
WITH TURNING VANES
90° ROUND RADIUS ELBOW
GORED OVAL RADIUS ELBOW
DUCT SIZE OR SHAPE TRANSITION
SYMBOL
PIPING LEGEND
DESCRIPTIONABBREVIATION
NOTE: ALL ABBREVIATIONS MAY NOT BE USED
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
FIRE PROTECTION
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
NITROUS OXIDE
REFRIGERANT LIQUID
REFRIGERANT GAS
SNOW MELT RETURN
SNOW MELT SUPPLY
CHILLED WATER SUPPLY
CHILLED WATER RETURN
COMPRESSED AIR
CONDENSATE DRAIN
GLYCOL SUPPLY
GLYCOL RETURN
MEDICAL AIR
LIQUID PROPANE GAS
NATURAL GAS
OXYGEN
VACUUM
CHWR
CHWS
CA
CD
CWR
CWS
FP
GR
GS
HHWR
HHWS
LPG
MA
NG
NO
O
RL
RG
SMR
SMS
VAC
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
FOR
FOS
FOV
MEDIUM PRESSURE CONDENSATE
HIGH PRESSURE CONDENSATEHPC
MPC
HIGH PRESSURE STEAM
LOW PRESSURE CONDENSATELPC
HPS
LOW PRESSURE STEAM
MEDIUM PRESSURE STEAMMPS
LPS
PUMPED CONDENSATEPC
SYMBOL LEGEND - MISC
DESCRIPTIONSYMBOL
VIEW OR DETAIL INDICATOR: # INDICATES DETAIL NUMBER,
SHEET INDICATES DRAWING SHEET WHERE VIEW OR DETAIL
IS SHOWN.
REFERENCE LINES AND SYMBOLS
ELEVATION OR SECTION INDICATOR: # INDICATES VIEW
NUMBER, SHEET INDICATES DRAWING SHEET WHERE VIEW IS
SHOWN.
NAME
### ROOM / SPACE INDICATOR
# KEYNOTE INDICATOR
# REVISION INDICATOR
XX-##
XX-##
TAG
CFM
PLUMBING FIXTURE INDICATOR
EQUIPMENT INDICATOR
REGISTER, GRILLE, OR DIFFUSER INDICATOR
BREAKLINE
MATCHLINE INDICATOR
CONTRACT LIMIT LINE: DASHDOT, WIDE LINE
NEW CONNECTION TO EXISTING
POINT OF DEMOLITION
OR
MATCH LINE
SEE XX/XXX
SQUARE OR RECTANGULAR
SUPPLY DIFFUSER
SYMBOL LEGEND - MECH
DESCRIPTIONSYMBOL
NOTE: ALL SYMBOLS MAY NOT BE USED
DUCT HIGH EFFICIENCY TAKE OFF
WITH BALANCING DAMPER
SQUARE OR RECTANGULAR
RETURN DIFFUSER
SQUARE OR RECTANGULAR
EXHAUST DIFFUSER
ROUND DIFFUSER
SIDEWALL GRILLE OR REGISTER
BALANCING DAMPER
FIRE DAMPER
FIRE / SMOKE COMBINATION
DAMPER
LINEAR SLOT GRILLE OR DIFFUSER
FLEXIBLE DUCT
C02 CARBON DIOXIDE
T S H THERMOSTAT - SENSOR - HUMIDISTAT
1. THE MECHANICAL DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENT,
& EXTENT OF THE MECHANICAL SYSTEM. BECAUSE OF THE SMALL SCALE OF
THE DRAWINGS, THESE DRAWINGS DO NOT SHOW ALL OFFSETS, BENDS, OR
ELBOWS NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE
PROVIDED. CONTRACTOR SHALL MAKE ALTERATIONS AS MAY BE
NECESSARY TO MAKE THE SYSTEM COMPLETE & OPERATIONAL IN
ACCORDANCE WITH THE DESIGN INTENT.
2. MAJOR DEVIATIONS SUCH AS CHANGES IN SIZES, WEIGHTS, QUANTITIES, OR
MATERIAL REQUIRE PRIOR APPROVAL BY THE DESIGN ENGINEER.
3. THE DRAWINGS & SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT
EACH OTHER & SHALL BE INTERPRETED AS AN INTEGRAL UNIT WITH THE
ITEMS SHOWN ON ONE & NOT THE OTHER BEING FURNISHED & INSTALLED
AS THOUGH SHOWN AND CALLED OUT IN BOTH DOCUMENTS.
4. THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO THE
REQUIREMENTS OF THE MOST RECENTLY ADOPTED BUILDING CODES,
MECHANICAL CODE, PLUMBING CODE, ELECTRICAL CODE, & ALL OTHER
APPLICABLE CITY, COUNTY, STATE, & FEDERAL CODES & REGULATIONS IN
EFFECT.
5. THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO ALL CODES,
RULES, REGULATIONS, & REQUIREMENTS OF THE BUILDING OWNER.
6. ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED TO
CONFORM WITH ANY APPLICABLE LOCAL SEISMIC REQUIREMENTS.
7. PRIOR TO FABRICATION & INSTALLATION OF ANY MECHANICAL COMPONENT
THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL
MECHANICAL WORK WITH ALL OTHER BUILDING TRADES, INCLUDING
BUILDING TRADES HIRED DIRECTLY BY THE OWNER. WHERE CONFLICTS
MAY OCCUR, THEY SHALL BE RESOLVED PRIOR TO INSTALLATION.
8. VERIFY ALL REQUIRED SERVICE CONNECTIONS, INCLUDING ELECTRICAL
CHARACTERISTICS, FOR ALL EQUIPMENT PRIOR TO ORDERING OR
FABRICATING MECHANICAL EQUIPMENT AND COMPONENTS.
9. THE SPACE ABOVE CEILINGS IS LIMITED. CAREFUL COORDINATION IS
REQUIRED WITH ALL TRADES BEFORE ANY PIPE, DUCT, OR EQUIPMENT IS
ORDERED &/OR INSTALLED. ANY CONFLICTS &/OR CHANGES FOUND DURING
INSTALLATION THAT RESULTS FROM THE LACK OF COORDINATION BY THE
CONTRACTORS DURING THE SHOP DRAWING PROCESS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
10. ALL MECHANICAL INFORMATION IS NOT SHOWN ON THE MECHANICAL
DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION
OF ALL INFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS.
11. THE CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW & USE, WHERE
APPROPRIATE, ALL THE MECHANICAL DETAILS SHOWN ON THE DRAWINGS.
DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH
SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO
INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED DETAILS
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
12. ALL EQUIPMENT SHALL BE INDEPENDENTLY SUPPORTED FROM
STRUCTURAL MEMBERS. STRUCTURAL ELEMENTS SHOWN IN DETAILS MAY
OR MAY NOT PERTAIN TO ANY PORTION OF THE BUILDING. COORDINATE ALL
MOUNTING REQUIREMENTS WITH ARCHITECTURAL & STRUCTURAL
DRAWINGS AND SPECIFICATIONS.
13. ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED IN
ACCORDANCE WITH ALL MANUFACTURER RECOMMENDATIONS.
14. ALL SIMILAR EQUIPMENT SHALL BE OF THE SAME MANUFACTURER. AIR
INLETS & OUTLETS OF SIMILAR TYPES SHALL BE OF THE SAME
MANUFACTURER.
15. ANY PART OF THE MECHANICAL INSTALLATION THAT FAILS, IS DEEMED
UNFIT, OR BECOMES DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO
THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EQUIPMENT
CHECK-IN, SAFEKEEPING, & DAMAGE.
16. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT
LOCATION OF ALL CEILING DIFFUSERS & GRILLES.
17. CONTRACTOR SHALL OPERATE INSTALLED &/OR MODIFIED SYSTEMS &
DEMONSTRATE ALL ASPECTS OF THE SYSTEM TO THE ENGINEER &/OR
OWNER TO PROVE ALL ASSOCIATED SYSTEMS ARE OPERATIONAL.
18. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN A SET OF AS-
BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE. ALL CHANGES
OR DEVIATIONS IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, &
ACCESSORIES SHALL BE RECORDED. THESE REDLINED DRAWINGS SHALL
BE GIVEN TO THE ARCHITECT / ENGINEER AFTER THE FINAL INSPECTION IN
ACCORDANCE WITH PROJECT SPECIFICATIONS.
19. ALL DUCT ELBOWS SHALL BE LONG RADIUS, UNLESS NOTED OTHERWISE.
MECHANICAL GENERAL NOTES
DUCT TO BE DEMOLISHED
SHUT OFF VALVE
SYMBOL LEGEND - PIPING
DESCRIPTIONSYMBOL
NOTE: ALL SYMBOLS MAY NOT BE USED
GATE VALVE
CHECK VALVE
AUTOMATIC 2-WAY VALVE
AUTOMATIC 3-WAY VALVE
GLOBE VALVE
BALL VALVE
RELIEF VALVE
PRESSURE REDUCING VALVE
BUTTERFLY VALVE
SOLENOID VALVE
ANGLE VALVE
VENTURI VALVE
BALANCING OR PLUG COCK
FLOW SETTER
EXPANSION VALVE
GAS COCK
MANUAL AIR VENT
STRAINER
GAUGE COCK
FLEXIBLE CONNECTION
PRESSURE GAUGE
THERMOMETER
PIPE REDUCER
REFRIGERANT SITE GLASS
REFRIGERANT STRAINER
90 DEGREE ELBOW UP
90 DEGREE ELBOW DOWN
90 DEGREE TEE UP
90 DEGREE TEE DOWN
PIPE UNION
PIPE CAP
PIPE ANCHOR
FLOAT AND THERMOSTATIC TRAP
REFRIGERANT FILTER DRIER
M
M
S
GAS METER
Mark: Date: Description
4-21-26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
SPP (AI)
OAT (NET)
CLG (AO)
MA LLT (BI)MAT (AI)
PH LAT (AI)
CC LAT (AI)
RAD (AO)
R L
F D
P R
(A O
FIL ALM (AI)
RA SD (HDW)
PH (AO)
PHW T (AI)
CHW T (AI)
OAD (AO)
SAF (BI)
SAF (BO)
SAF (AO)
DAT (AI)
HSP ALM (BI)
HSP INTLK (HDW) DA SP (AI)
RA SD (HDW)
RA SD (HDW)
RA SD (HDW)
RA SD (HDW)
RA
R L
F
VFD
x 4 DA
RA
RA
RA
MECHANICAL ROOM BOUNDARY
AIR HANDLER
O A
RA
Points List: AIR HANDLER UNIT
Point Name POINTS ALARMS
G R
A P
H
IC
A N
A L O
G H
A R
D W
A R
E I
N P
U T
A
I)
B
IN
A R
Y H
A R
D W
A R
E I
N P
U T
B
I)
A N
A L O
G H
A R
D W
A R
E O
U T
P U
T
A O
B
IN
A R
Y H
A R
D W
A R
E O
U T
P U
T
B O
S O
F T
W A
R E
P O
IN
T
S
F T
H A
R D
W A
R E
I N
T E
R L O
C K
H
D W
W
IR
E L
E S
S
W L
S
N E
T W
O R
K
N E
T
H
IG
H A
N A
L O
G L
IM
IT
L O
W A
N A
L O
G L
IM
IT
B
IN
A R
Y
L A
T C
H D
IA
G
N O
S T
IC
S E
N S
O R
F A
IL
C O
M M
U N
IC
A
T
IO
N F
A
IL
COIL LEAVING AIR LOW TEMP
CUTOUT ALARM
LLT
X X
COOLING COIL LEAVING
TEMPERATURE
CC LAT
X X X X X
COOLING OUTPUT COMMAND
CLG
X X
DISCHARGE AIR TEMPERATURE
DAT
X X X X X
DISCHARGE AIR STATIC PRESSURE
LOCAL
DA SP
X X X X X
Sequence of Operation: AIR HANDLER UNIT
Building Automation System Interface:
The Building Automation System (BAS) shall send the controller Occupied Bypass, Pre-Cool, Occupied/Unoccupied and Heat/Cool modes. The BAS shall also send the discharge air temperature setpoint and the duct static pressure setpoint. If a
BAS is not present, or communication is lost with the BAS the controller shall operate using default modes and setpoints.
Occupied:
During occupied periods, the supply fan shall run continuously and the mixed air dampers shall open to maintain minimum ventilation requirements. In the cooling mode the chilled water pump shall modulate to control the discharge air setpoint. In the heating mode the hot water valve shall modulate to control the discharge air setpoint. If the discharge air temperature sensor fails, the cooling and heating shall fallback to control to the active space temperature setpoint and an alarm shall be annunciated at the BAS. the cooling and heating shall fallback to control to the discharge air temperature setpoint of 70 deg F (adj.) and an alarm shall be annunciated at the BAS. If the discharge air temperature sensor fails, and the space temperature sensor fails, the supply fan shall be disabled, the chilled water valve should close, the heating valve should close, the outdoor air should close, and an alarm should annunciate at the BAS.
Unoccupied:
During the unoccupied periods, the supply fan shall be disabled, the relief fan shall be disabled, the outside air damper shall close, the mechanical cooling shall be disabled, the mechanical heating shall be disabled, to conserve energy. the outdoor damper shall modulate if economizing is enabled and remain closed if not economizing, Optimal Start:
The BAS shall monitor the scheduled occupied time, occupied space setpoints and space temperature to calculate when the optimal start occurs.
Optimal Stop:
The BAS shall monitor the scheduled unoccupied time, occupied setpoints and space temperature to calculate when the optimal stop occurs. When the optimal stop mode is active the unit controller shall switch to the unoccupied mode. Outside air damper shall remain enabled to provide minimum ventilation.
Occupied Bypass:
The BAS shall monitor the status of the ON and CANCEL buttons of the space temperature sensor. When an occupied bypass request is received from a space sensor, the unit shall transition from its current occupancy mode to occupied bypass mode and the unit shall maintain the space temperature to the occupied setpoints
(adj.).
Heat/Cool Mode:
When the space temperature rises above the occupied cooling setpoint the mode shall transition to cooling. When the space temperature falls below the occupied heating setpoint the mode shall transition to heating. When the space temperature is below the occupied cooling setpoint and above the occupied heating setpoint the mode shall remain in its last state. If the space temperature sensor fails, the mode shall default to heating and an alarm shall annunciate at the BAS.
Morning Warm-Up Mode:
During optimal start, if the average space temperature is below the occupied heating setpoint a morning warm-up mode shall be activated. When morning warm-up is initiated the unit shall enable the heating and fan(s). The outside air damper shall remain closed. When the space temperature reaches the occupied heating setpoint (adj.), the unit shall transition to the occupied mode.
Daytime Warm-Up Control:
During Occupied periods, when the space temperature is below the Daytime
Warm-up Initiate setpoint, a daytime warm-up sequence shall be activated. The outside air damper shall modulate to maintain minimum ventilation requirements, and the heating shall enable to maintain the discharge air temperature heating setpoint. Daytime Warm-up shall terminate when the average space temperature reaches the Occupied heating setpoint.
Pre-Cool Mode:
During optimal start, if the average space temperature is above the occupied cooling setpoint, pre-cool mode shall be activated. When pre-cool is initiated the unit shall enable the fan and cooling or economizer. The outside air damper shall remain closed, unless economizing. When the space temperature reaches occupied cooling setpoint (adj.), the unit shall transition to the occupied mode.
Supply Fan:
The supply fan shall be off in the unoccupied mode. The supply fan shall be on if the control is heating or cooling in the unoccupied mode. When the controller is in the occupied mode, the supply fan shall operate continuously. The supply fan speed shall be modulated to maintain the duct static pressure setpoint. The duct static pressure setpoint shall be sent by the BAS and is reset between the minimum and maximum static pressure limits to maintain the critical zone VAV air damper in a position between 65% and 75% open. If the supply fan fails to prove status for 30 seconds (adj.), the fan shall remain commanded on, the outside air damper shall close, cooling shall be disabled, all heating shall be disabled, and an alarm shall annunciate at the BAS. Once the fan status is proven on, the alarm on the supply fan shall clear. A hardwired, high static pressure cut-off switch shall be electrically interlocked with the variable speed drive. If the high static pressure cut-off switch is tripped the fan shall be commanded off, heating shall be disabled, cooling should be disabled, and an alarm shall annunciate at the BAS. A manual reset of the high static pressure cut-off switch shall be required to restart the fan.
Relief Damper Control
When the supply fan operating status is confirmed, the relief damper shall modulate to control the building pressure setpoint. When the supply fan status is confirmed off, the relief damper shall close.
Preheat Control:
When the fan is off, if the outdoor air temperature is below 40.0 deg. F (adj.) or the outdoor air temperature sensor is failed, the preheat valve shall modulate to maintain a preheat leaving coil temperature of 45.0 deg. F (adj.).
If the preheat temperature sensor fails and the mixed air temperature is below 45.0 deg. F (adj.) the preheat valve shall be 100% open (adj.). If the preheat temperature sensor fails and the mixed air temperature is above 50.0 deg. F (adj.)
the preheat valve shall be commanded closed. An alarm shall annunciate at the
BAS if the leaving preheat temperature sensor, the mixed air temperature sensor or the outside air temperature sensor are failed.
Low Limit Temperature Control:
The initial damper opening rate shall be limited to 2% per minute (adj.) until the damper has reached its minimum ventilation position. The outside air damper shall modulate to a position less than the minimum damper position if the mixed air temperature drops below 45.0 deg. F (adj.). If the mixed air temperature sensor fails an alarm shall annunciate at the BAS and the outside air damper shall close.
Discharge Air Temperature Control:
The discharge air temperature setpoint shall be reset to the optimal setpoint communicated by the BAS. The Space Temperature BAS and the Space
Temperature Setpoint BAS shall be communicated to the unit controller by the BAS.
The discharge air temperature setpoint shall be reset based upon the deviation of the Space Temperature BAS from the Space Temperature Setpoint BAS.
If the discharge air temperature rises above the maximum limit, a high temperature alarm shall annunciate to the BAS. If the discharge air temperature drops below the minimum limit, a low temperature alarm shall annunciate to the BAS.
Economizer Mode:
The outside air (OA) temperature shall be compared with a reference dry bulb setpoint. The economizer shall enable when the OA temperature is less than reference dry bulb setpoint. The economizer shall be disabled when OA temperature is greater than reference dry bulb setpoint + 2.0 deg. F.
When economizing is enabled and the unit is operating in the cooling mode, the economizer damper shall be modulated between its minimum position and 100% open to maintain the discharge temperature setpoint. The economizer damper shall modulate toward minimum position in the event the mixed air temperature falls below the low temperature limit setting.
Freeze Protection:
A hardwired, low limit temperature switch shall be electrically interlocked with the variable speed drive. If the low limit temperature switch is tripped 38.0 deg. F (adj.), the fan shall be commanded off and the outside air damper shall close. All valves shall be commanded open to 100% open (adjust per climate). An alarm shall annunciate at the BAS and manual reset of the low limit temperature switch shall be required to restart the fan.
Filter Status:
A differential pressure transmitter shall monitor the differential pressure across the filter(s) when the fan is running. If the differential pressure across the filter is higher than the filter alarm setpoint, a dirty filter alarm shall annunciate at the BAS.
Smoke Detector Shutdown:
The unit shall shut down in response to a signal from the smoke detector indicating the presence of smoke. The smoke detector shall be interlocked to the unit through the dry contacts of the smoke detector. A manual reset of the smoke detector shall be required to restart the unit.
FILTER ALARM
FIL ALM
X X
HIGH STATIC ALARM
HSP ALM
X X X X
HIGH STATIC ALARM INTERLOCK
HSP INTLK
X
MIXED AIR DAMPER COMMAND
MAD
X X
MIXED AIR LOW TEMPERATURE
CUTOUT ALARM
MA LLT
X X
MIXED AIR TEMPERATURE LOCAL
MAT
X X X X
OUTDOOR AIR DAMPER COMMAND
OAD
X X
OUTDOOR AIR FLOW
OA FLW
X X
OUTDOOR AIR TEMPERATURE
(COMMUNICATED)
OAT
X X
PREHEAT LEAVING COIL
TEMPERATURE LOCAL
PH LAT
X X X
PREHEAT OUTPUT COMMAND
PH
X X
RELIEF AIR DAMPER COMMAND
RLF DPR
X X
RETURN AIR DAMPER COMMAND
RAD
X X
RETURN SMOKE DETECTOR INPUT
RA SD
X
SPACE STATIC PRESSURE LOCAL
SPP
X X X X
SUPPLY FAN SPEED COMMAND
SAF
X X
SUPPLY FAN START STOP
COMMAND
SAF
X X
SUPPLY FAN STATUS
SAF
X X
SUPPLY FAN 2 SPEED COMMAND
SAF
X X
SUPPLY FAN 2 START STOP
COMMAND
SAF
X X
SUPPLY FAN 2 STATUS
SAF
X X
SUPPLY FAN 3 SPEED COMMAND
SAF
X X
SUPPLY FAN 3 START STOP
COMMAND
SAF
X X
SUPPLY FAN 3 STATUS
SAF
X X
SUPPLY FAN 4 SPEED COMMAND
SAF
X X
SUPPLY FAN 4 START STOP
COMMAND
SAF
X X
SUPPLY FAN 4 STATUS
SAF
X X
BAS COMMUNICATION STATE
BAS COM
X X
DISCHARGE AIR COOLING SETPOINT
DA CL SP
X
DISCHARGE AIR HEATING SETPOINT
DA HT SP
X
MAINTENANCE REQUIRED
MNT REQ
X X
MIXED AIR TEMPERATURE LOW
LIMIT SETPOINT
MA LLT STPT
X
OCCUPIED COOLING SETPOINT
OCC CLG STPT
X X
OCCUPIED HEATING SETPOINT
OCC HTG STPT
X X
SUPPLY FAN FAILURE
SF FAIL
X X X
UNOCCUPIED COOLING SETPOINT
UNOCC CLG STPT
X X
UNOCCUPIED HEATING SETPOINT
UNOCC HTG STPT
X X
LEAVING CHILLED WATER
TEMPERATURE
CHW T
X X
LEAVING PREHEAT WATER
TEMPERATURE
PHW T
X X
LEAVING REHEAT WATER
TEMPERATURE
RHW T
X X
DRAIN PAN
NOTE:
1. COORDINATE TRAP HEIGHT WITH
MANUFACTURER'S RECOMMENDATIONS.
WHERE DISCREPANCY EXISTS,
COORDINATE WITH ENGINEER PRIOR TO
INSTALL.
VACUUM BREAKER OPEN
TO ATMOSPHERE
B A
DRAIN LINE SHALL BE AT LEAST
THE SAME SIZE AS THE NIPPLE
ONTHE DRAIN PAN
PITCH DOWN TOWARD
DRAIN PER IMC
CLEANOUT
ROUTE TO
DRAIN
PROVIDE 1"
AIR GAP
DRAW
THROUGH
BLOW
THROUGH
UNIT TYPE
2"
PLUS X
1"
MIN
X
2 X
A B
WHERE X = STATIC PRESSURE IN PAN
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
C
A
B
2 3
D
E
1 2 3
C
4 5
2024 Spectrum Engineers, Inc.
SHEET TITLE
DFCM PROJECT NO:
DRAWN BY:
CHECKED BY:
SIGNATURE:
RECORD DRAWING DATE:
DESIGNED BY:
A
ISSUE:
DATE:
B
4 5
D
DFCM
E
SPECTRUM PROJECT NO: 260049
DFCM APPROVAL STAMP
A u to d e s k D o c s /2
U
S D
B A
H U
R e p la c e m e n t/
-U S
D B
A H
U R e p la c e m e n t
M e c h .r v t
/9
/2
:3
:0
P
M
RHB
RHB
RHB
26212230
03/10/2026
CD
MECHANICAL
SCHEDULES
ME601
UTAH SCHOOL
FOR THE DEAF
AND THE
BLIND
AHU
REPLACEMENT
742 S Harrison Blvd, Ogden, UT 84404
TRANE
DAIKIN
YORK
(1) DOUBLE WALL CONSTRUCTION WITH R-13 INSULATION
(2) 6" INTEGRAL BASE
(3) UL LISTED UNIT
(4) PROVIDE WITH STAINLESS STEEL DRAIN PAN
(5) DUCT CONNECTION TO MATCH EXISTING DUCT LOCATION
(6) PROVIDE WITH FACTORY WIRED OVERLOAD PANEL
(7) VFD TO BE PROVIDED BY MANUFACTURER AND SHIPPED LOOSE FOR FIELD CONNECTION. VFD TO BE MOUNTED ON AHU AFTER AHU IS INSTALLED.
PLUMB = DIVISION 22
MECH = DIVISION 23
ELEC = DIVISION 26
MNFR = MANUFACTURER
ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY:
AHU - SCHEDULE
LABEL
SUPPLY
FAN
LABEL
CHILLED
WATER
COIL
LABEL
HYDRONIC
HEATING
COIL LABEL
FILTERS
LABEL
ELECTRICAL
DISCONNECT
PROVIDED BY
(MECH/ ELEC)
VFD
PROVIDED BY
(MECH/ELEC)
WEIGHT
(LBS) MANUFACTURER MODEL REMARKSVOLTS PHASE Hz kW FLA MOCP
LIGHTING
(Y/N)
CONVENIENCE
OUTLET
(Y/N)
EMERG
POWER
AHU-1 SF-1 CC-1 HC-1 FF-1 460 3 60 19.73 40 90 NO NO NO MECH MANUFACTURER 6,000 TRANE PSCA 1,2,3,4,5,6,7
AHU CHILLED COIL SCHEDULE
LABEL
AHU
LABEL
CHILLED WATER COOLING
CAPACITY
(BTUH)
FLUID
TYPE GPM
NO. OF
ROWS
AIR PD
(IN-WC)
WATER PD
(FT)
EWT
(°F)
LWT
(°F) CONTROL
CC-1 AHU-1 593.9 30% GLYCOL 118 4 0.5 7.8 44 54 EXISTING PUMP
AHU HYDRONIC HEATING COIL SCHEDULE
LABEL
AHU
LABEL
HYDRONIC HEATING
TOTAL
CAPACITY
(BTUH)
FLUID
TYPE GPM
NO. OF
ROWS
AIR PD
(IN-WC)
WATER PD
(FT)
EWT
(°F)
LWT
(°F)
CONTROL
VALVE
HC-1 AHU-1 684.8 30% GLYCOL 34 1 0.08 2.46 180 140 THREE-WAY
AHU PRE-FILTER SCHEDULE
LABEL
AHU
LABEL SIZE
PRE-FILTERS
MERV
RATING TYPE DEPTH
MAX PD
(IN-WC)
FF-1 AHU-1 20"X20" (X12)
20"X24" (X8)
8 PLEATED 2" 0.59
AHU SUPPLY FANS SCHEDULE
LABEL
AHU
LABEL
SUPPLY FANS
TOTAL
AIRFLOW
(CFM)
ESP
(IN-WC) QTY VOLTS PHASE Hz
MOTOR
HP BHP
VFD
PROVIDED BY
(ELEC/MECH)
SF-1 AHU-1 21,060 2.5 4 460 3 60 7.5 24.222 MANUFACTURER
SCALE: 3/16" = 1'-0"1
AHU SCHEMATIC
SCALE: 1/8" = 1'-0"2
CONDENSATE TRAP DETAIL
Mark: Date: Description
4-21-26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
JD
JE
MECHANICAL ROOM
J-108 3
5' - 4"1' - 1"
13' - 3"
4"ø CHWR 4"ø CHWS
3"ø HHWR3"ø HHWS
"x
S A
"F O
S A
"x
O
A
MD101
MD101
LEVEL 1
0' - 0"
47 48
LEVEL 2
16' - 4"
MH101
LEVEL 1
0' - 0"
JE
LEVEL 2
16' - 4"
MECHANICAL GENERAL NOTES:
1. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND PLUMBING WITH
ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.
2. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.
3. THIS PROJECT WILL REQUIRE AFTER HOURS AND WEEKEND WORK TO INSTALL AHU OR
MODIFY SYSTEMS . COORDINATE ALL SHUTDOWNS 72 HOURS IN ADVANCE WITH OWNER.
4. CONTROLS TO MATCH EXISTING HONEYWELL CONTROLS. EXISTING CONTROLS ARE OPEN
LICENSED HONEYWELL JACE CONTROLLERS WITH TRIDIUM WORKBENCH WITH ALL TOOLKITS
AND ".JAR" FILES PROPERTY OF THE OWNER. NEW CONTROLS WORK TO ALSO BE OPEN WITH
ALL TOOLKITS AND ".JAR" FILES TO BE PROPERTY OF THIS OWNER. TIE INTO EXISTING
CONTROLS DDC SYSTEM AND UPDATED GRAPHICS. PROVIDE ENGINEER WITH 2 WEEKS OF
TRENDS SHOWING PROPER OPERATION OF EQUIPMENT UPON COMPLETION OF PROJECT.
5. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE RESPONSIBILITY OF
THE CONTROLS CONTRACTOR. RACEWAYS SHALL CONFORM TO THE FOLLOWING ELECTRICAL
SPECIFICATIONS; HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS, RACEWAYS AND
BOXES FOR ELECTRICAL SYSTEMS AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS.
6. CONTRACTOR SHALL FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO ORDERING OR
FABRICATING. ADDITIONAL COST WILL NOT BE ALLOWED FOR CONTRACTOR'S FAILURE TO
BECOME FAMILIAR WITH EXISTING SITE CONDITIONS.
7. PRESSURE TEST ANY NEW HYDRONIC PIPING. USE AMBIENT TEMPERATURE WATER UNLESS
THERE IS RISK OF FREEZING. WHILE FILLING SYSTEM USING DRAINS AND VENTS TO ENSURE
NO AIR IN SYSTEM. ISOLATE EXPANSION TANK(S) AND EXISTING EQUIPMENT. SUBJECT PIPING SYSTEM TO 1.5 TIMES THE SYSTEM'S WORKING PRESSURE FOR 20 MINUTES. EXAMINE PIPING, JOINTS, AND CONNECTIONS FOR LEAKAGE. ELIMINATE LEAKS BY TIGHTENING, REPAIRING, OR
REPLACING COMPONENTS, AND REPEAT HYDROSTATIC TEST UNTIL THERE ARE NO LEAKS.
PREPARE WRITTEN REPORT OF TESTING.
8. INSULATE ALL NEW HYDRONIC PIPING BY FULLY ENCLOSING PIPING IN INSULATION AND
PROVIDING SEALED VAPOR BARRIER. ALL PIPING OVER 2" SHALL BE INSULATED WITH RESIN-
BONDED FIBERGLASS WITH A FOIL AND KRAFT PAPER VAPOR BARRIER WITH A FLAME/SMOKE
SPREAD INDEX BETTER THAN 25/50. INSULATION IS SUBJECT TO INSPECTION BY
COMMISSIONING AGENT AND OR ENGINEER FOR COMPLIANCE.
9. BALL VALVES SHALL BE FULL PORT WITH BRONZE BODY AND BRASS BALL. PROVIDE WITH
HANDLE/STEM EXTENSIONS FOR PROPER FUNCTION WHEN FULLY INSULATED. EXTENSIONS
TO BE SEALED AND VAPOR PROOF.
10. INSTALL INSULATION OVER FITTINGS, VALVES, STRAINERS, FLANGES, UNIONS, AND OTHER
SPECIALTIES WITH CONTINUOUS THERMAL AND VAPOR-RETARDER INTEGRITY. STRAINERS,
CONTROL VALVES, AND BALANCING VALVES SHALL HAVE REMOVABLE INSULATION WITH
LABEL INDICATED WHAT TYPE OF PIPE ACCESSORY IS BELOW INSULATION. INSULATION SHALL
NOT IMPEDE PROPER OPERATION OF ACCESSORY.
11. PROVIDE PRESSURE DIFFERENTIAL INSTRUMENTATION ACROSS FILTER BANK FOR AHU'S
OVER 10,000 CFM.
12. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT INCLUDING STARTUP OF ANY
FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR COMMUNICATION TO BMS.
13. PROVIDE OPERATION AND MAINTENANCE MANUALS (O&M) WITHIN 30 DAYS OF CERTIFICATE
OF OCCUPANCY FOR ALL EQUIPMENT IN DIGITAL FORMAT TO ENGINEER FOR REVIEW. O&M'S
SHALL INCLUDE DOCUMENTATION OF ALL WARRANTIES, REPORTS AND TESTS, RECORD
DRAWINGS, CONTROLS SEQUENCE OF OPERATIONS WITH DIAGRAMS, & EQUIPMENT
INFORMATION. EQUIPMENT INFORMATION INCLUDES MAKE & MODEL, WIRING, PIPING,
STARTUP, SHUTDOWN, TROUBLE SHOOTING SYSTEM BALANCING REPORT, FINAL
COMMISSIONING REPORT AND MAINTENANCE PROCEDURES.
14. PIPING AND DUCTWORK SHALL NOT BE SUPPORTED FROM THE ROOF DECK, JOIST BRIDGING
OR OTHER PIPES. HANG PIPES FROM BEAMS, JOIST OR SUPPLEMENTARY STRUCTURAL
MEMBERS. WHERE POSSIBLE INSTALL ALL PIPING AND DUCTWORK WITHIN 12" FROM
SUPPORTING STRUCTURE.
15. MECHANICAL PIPING SCHEDULE:
• HYDRONIC PIPING 3" AND UNDER = TYPE L COPPER - BRAZED JOINTS
• HYDRONIC PIPING OVER 3" = SCHEDULE 40 STEEL PIPE - WROUGHT STEEL FITTINGS
WELDED JOINTS OR POLYPROPYLENE FUSION WELDED
• CONDENSATE = TYPE M COPPER – BRAZED JOINTS
AREA OF WORK
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
C
A
B
2 3
D
E
1 2 3
C
4 5
2024 Spectrum Engineers, Inc.
SHEET TITLE
DFCM PROJECT NO:
DRAWN BY:
CHECKED BY:
SIGNATURE:
RECORD DRAWING DATE:
DESIGNED BY:
A
ISSUE:
DATE:
B
4 5
D
DFCM
E
SPECTRUM PROJECT NO: 260049
DFCM APPROVAL STAMP
A u to d e s k D o c s /2
U
S D
B A
H U
R e p la c e m e n t/
-U S
D B
A H
U R e p la c e m e n t
M e c h .r v t
/9
/2
:3
:0
P
M
RHB
RHB
RHB
26212230
03/10/2026
CD
AHU ROOM
MECHANICAL
DEMOLITION PLAN
MD101
UTAH SCHOOL
FOR THE DEAF
AND THE
BLIND
AHU
REPLACEMENT
742 S Harrison Blvd, Ogden, UT 84404
SCALE: 1/2" = 1'-0"1
AHU ROOM DEMOLITION FLOOR PLAN
SCALE:4
3D AHU DEMOLITION VIEW
SCALE: 1/4" = 1'-0"2
AHU ROOM N/S DEMOLITION SECTION
SCALE: 1/4" = 1'-0"3
AHU ROOM E/W DEMOLITION SECTION
1 REMOVE EXISTING AIR HANDLING UNIT. PROTECT EXISTING DUCTWORK,
PIPING, ETC.
2 REMOVE EXISTING OUTSIDE AIR TRANSITION FROM PENTHOUSE DUCT TO
AIR HANDLER CONNECTION.
3 REMOVE APPROXIMATELY 1' OF SUPPLY DUCTWORK OFF OF AIR HANDLING
UNIT.
4 EXISTING RETURN DUCT WITH FIRE SMOKE DAMPER TO REMAIN.
5 EXISTING HOT WATER UNIT HEATER TO REMAIN.
6 EXISTING HOT WATER HEATING PIPING AND THREE-WAY VALVE TO REMAIN.
7 EXISTING CHILLED WATER PIPING AND PUMP TO REMAIN.
8 EXISTING RELIEF DUCT AND DAMPER TO REMAIN.
SHEET KEYNOTES
SCALE: NTS5
KEYPLAN
Mark: Date: Description
4-21-26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
LEVEL 1
0' - 0"
JDJE
LEVEL 2
16' - 4"
MH101
AHU-1 1
LEVEL 1
0' - 0"
47 48
LEVEL 2
16' - 4"
MH101
AHU-1 1
JD
JE
MECHANICAL ROOM
J-108
MH101
MH101
5' - 4"1' - 1"
13' - 3"
4"ø CHWR 4"ø CHWS
3"ø HHWR3"ø HHWS
"x
S A
"F O
S A
"x
O
A
AHU-1 1
MECHANICAL GENERAL NOTES:
1. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND PLUMBING WITH
ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.
2. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.
3. THIS PROJECT WILL REQUIRE AFTER HOURS AND WEEKEND WORK TO INSTALL AHU OR
MODIFY SYSTEMS . COORDINATE ALL SHUTDOWNS 72 HOURS IN ADVANCE WITH OWNER.
4. CONTROLS TO MATCH EXISTING HONEYWELL CONTROLS. EXISTING CONTROLS ARE OPEN
LICENSED HONEYWELL JACE CONTROLLERS WITH TRIDIUM WORKBENCH WITH ALL TOOLKITS
AND ".JAR" FILES PROPERTY OF THE OWNER. NEW CONTROLS WORK TO ALSO BE OPEN WITH
ALL TOOLKITS AND ".JAR" FILES TO BE PROPERTY OF THIS OWNER. TIE INTO EXISTING
CONTROLS DDC SYSTEM AND UPDATED GRAPHICS. PROVIDE ENGINEER WITH 2 WEEKS OF
TRENDS SHOWING PROPER OPERATION OF EQUIPMENT UPON COMPLETION OF PROJECT.
5. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE RESPONSIBILITY OF
THE CONTROLS CONTRACTOR. RACEWAYS SHALL CONFORM TO THE FOLLOWING ELECTRICAL
SPECIFICATIONS; HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS, RACEWAYS AND
BOXES FOR ELECTRICAL SYSTEMS AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS.
6. CONTRACTOR SHALL FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO ORDERING OR
FABRICATING. ADDITIONAL COST WILL NOT BE ALLOWED FOR CONTRACTOR'S FAILURE TO
BECOME FAMILIAR WITH EXISTING SITE CONDITIONS.
7. PRESSURE TEST ANY NEW HYDRONIC PIPING. USE AMBIENT TEMPERATURE WATER UNLESS
THERE IS RISK OF FREEZING. WHILE FILLING SYSTEM USING DRAINS AND VENTS TO ENSURE
NO AIR IN SYSTEM. ISOLATE EXPANSION TANK(S) AND EXISTING EQUIPMENT. SUBJECT PIPING SYSTEM TO 1.5 TIMES THE SYSTEM'S WORKING PRESSURE FOR 20 MINUTES. EXAMINE PIPING, JOINTS, AND CONNECTIONS FOR LEAKAGE. ELIMINATE LEAKS BY TIGHTENING, REPAIRING, OR
REPLACING COMPONENTS, AND REPEAT HYDROSTATIC TEST UNTIL THERE ARE NO LEAKS.
PREPARE WRITTEN REPORT OF TESTING.
8. INSULATE ALL NEW HYDRONIC PIPING BY FULLY ENCLOSING PIPING IN INSULATION AND
PROVIDING SEALED VAPOR BARRIER. ALL PIPING OVER 2" SHALL BE INSULATED WITH RESIN-
BONDED FIBERGLASS WITH A FOIL AND KRAFT PAPER VAPOR BARRIER WITH A FLAME/SMOKE
SPREAD INDEX BETTER THAN 25/50. INSULATION IS SUBJECT TO INSPECTION BY
COMMISSIONING AGENT AND OR ENGINEER FOR COMPLIANCE.
9. BALL VALVES SHALL BE FULL PORT WITH BRONZE BODY AND BRASS BALL. PROVIDE WITH
HANDLE/STEM EXTENSIONS FOR PROPER FUNCTION WHEN FULLY INSULATED. EXTENSIONS
TO BE SEALED AND VAPOR PROOF.
10. INSTALL INSULATION OVER FITTINGS, VALVES, STRAINERS, FLANGES, UNIONS, AND OTHER
SPECIALTIES WITH CONTINUOUS THERMAL AND VAPOR-RETARDER INTEGRITY. STRAINERS,
CONTROL VALVES, AND BALANCING VALVES SHALL HAVE REMOVABLE INSULATION WITH
LABEL INDICATED WHAT TYPE OF PIPE ACCESSORY IS BELOW INSULATION. INSULATION SHALL
NOT IMPEDE PROPER OPERATION OF ACCESSORY.
11. PROVIDE PRESSURE DIFFERENTIAL INSTRUMENTATION ACROSS FILTER BANK FOR AHU'S
OVER 10,000 CFM.
12. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT INCLUDING STARTUP OF ANY
FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR COMMUNICATION TO BMS.
13. PROVIDE OPERATION AND MAINTENANCE MANUALS (O&M) WITHIN 30 DAYS OF CERTIFICATE
OF OCCUPANCY FOR ALL EQUIPMENT IN DIGITAL FORMAT TO ENGINEER FOR REVIEW. O&M'S
SHALL INCLUDE DOCUMENTATION OF ALL WARRANTIES, REPORTS AND TESTS, RECORD
DRAWINGS, CONTROLS SEQUENCE OF OPERATIONS WITH DIAGRAMS, & EQUIPMENT
INFORMATION. EQUIPMENT INFORMATION INCLUDES MAKE & MODEL, WIRING, PIPING,
STARTUP, SHUTDOWN, TROUBLE SHOOTING SYSTEM BALANCING REPORT, FINAL
COMMISSIONING REPORT AND MAINTENANCE PROCEDURES.
14. PIPING AND DUCTWORK SHALL NOT BE SUPPORTED FROM THE ROOF DECK, JOIST BRIDGING
OR OTHER PIPES. HANG PIPES FROM BEAMS, JOIST OR SUPPLEMENTARY STRUCTURAL
MEMBERS. WHERE POSSIBLE INSTALL ALL PIPING AND DUCTWORK WITHIN 12" FROM
SUPPORTING STRUCTURE.
15. MECHANICAL PIPING SCHEDULE:
• HYDRONIC PIPING 3" AND UNDER = TYPE L COPPER - BRAZED JOINTS
• HYDRONIC PIPING OVER 3" = SCHEDULE 40 STEEL PIPE - WROUGHT STEEL FITTINGS
WELDED JOINTS OR POLYPROPYLENE FUSION WELDED
• CONDENSATE = TYPE M COPPER – BRAZED JOINTS
AREA OF WORK
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
C
A
B
2 3
D
E
1 2 3
C
4 5
2024 Spectrum Engineers, Inc.
SHEET TITLE
DFCM PROJECT NO:
DRAWN BY:
CHECKED BY:
SIGNATURE:
RECORD DRAWING DATE:
DESIGNED BY:
A
ISSUE:
DATE:
B
4 5
D
DFCM
E
SPECTRUM PROJECT NO: 260049
DFCM APPROVAL STAMP
A u to d e s k D o c s /2
U
S D
B A
H U
R e p la c e m e n t/
-U S
D B
A H
U R e p la c e m e n t
M e c h .r v t
/9
/2
:3
:1
P
M
RHB
RHB
RHB
26212230
03/10/2026
CD
AHU ROOM
MECHANICAL
REPLACEMENT PLANS
MH101
UTAH SCHOOL
FOR THE DEAF
AND THE
BLIND
AHU
REPLACEMENT
742 S Harrison Blvd, Ogden, UT 84404
SCALE: 1/4" = 1'-0"3
AHU ROOM E/W SECTION
SCALE: 1/4" = 1'-0"2
AHU ROOM N/S SECTION
SCALE: 1/2" = 1'-0"1
AHU ROOM FLOOR PLAN
SCALE:4
3D AHU VIEW
1 PROVIDE NEW AIR HANDLING UNIT. COORDINATE SHIPPING SPLITS WITH
HALLWAY WIDTH, DOORWAYS, AND OTHER EXISTING OBSTRUCTIONS. NEW
UNIT MUST FIT ON EXISTING HOUSEKEEPING PAD. COORDINATE EXISTING
DUCT AND PIPING CONNECTIONS WITH NEW UNIT PRIOR TO ORDERING.
2 PROVIDE NEW TRANSITION FROM OUTSIDE AIR CONNECTION ON AIR
HANDLING UNIT TO OUTSIDE AIR DUCT THROUGH ROOF.
3 PROVIDE NEW SUPPLY DUCT FROM AIR HANDLER CONNECTION TO EXISTING
40"X87" DUCT.
4 PROVIDE NEW HEATING WATER AND CHILLED WATER PIPING FROM
EXISTING PIPING TO COILS.
SHEET KEYNOTES
SCALE: 1" = 80'-0"5
NEW AHU KEYPLAN
Mark: Date: Description
4-21-26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
MECHANICAL GENERAL NOTES:
1. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND PLUMBING WITH
ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.
2. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.
3. THIS PROJECT WILL REQUIRE AFTER HOURS AND WEEKEND WORK TO INSTALL AHU OR
MODIFY SYSTEMS . COORDINATE ALL SHUTDOWNS 72 HOURS IN ADVANCE WITH OWNER.
4. CONTROLS TO MATCH EXISTING HONEYWELL CONTROLS. EXISTING CONTROLS ARE OPEN
LICENSED HONEYWELL JACE CONTROLLERS WITH TRIDIUM WORKBENCH WITH ALL TOOLKITS
AND ".JAR" FILES PROPERTY OF THE OWNER. NEW CONTROLS WORK TO ALSO BE OPEN WITH
ALL TOOLKITS AND ".JAR" FILES TO BE PROPERTY OF THIS OWNER. TIE INTO EXISTING
CONTROLS DDC SYSTEM AND UPDATED GRAPHICS. PROVIDE ENGINEER WITH 2 WEEKS OF
TRENDS SHOWING PROPER OPERATION OF EQUIPMENT UPON COMPLETION OF PROJECT.
5. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE RESPONSIBILITY OF
THE CONTROLS CONTRACTOR. RACEWAYS SHALL CONFORM TO THE FOLLOWING ELECTRICAL
SPECIFICATIONS; HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS, RACEWAYS AND
BOXES FOR ELECTRICAL SYSTEMS AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS.
6. CONTRACTOR SHALL FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO ORDERING OR
FABRICATING. ADDITIONAL COST WILL NOT BE ALLOWED FOR CONTRACTOR'S FAILURE TO
BECOME FAMILIAR WITH EXISTING SITE CONDITIONS.
7. PRESSURE TEST ANY NEW HYDRONIC PIPING. USE AMBIENT TEMPERATURE WATER UNLESS
THERE IS RISK OF FREEZING. WHILE FILLING SYSTEM USING DRAINS AND VENTS TO ENSURE
NO AIR IN SYSTEM. ISOLATE EXPANSION TANK(S) AND EXISTING EQUIPMENT. SUBJECT PIPING SYSTEM TO 1.5 TIMES THE SYSTEM'S WORKING PRESSURE FOR 20 MINUTES. EXAMINE PIPING, JOINTS, AND CONNECTIONS FOR LEAKAGE. ELIMINATE LEAKS BY TIGHTENING, REPAIRING, OR
REPLACING COMPONENTS, AND REPEAT HYDROSTATIC TEST UNTIL THERE ARE NO LEAKS.
PREPARE WRITTEN REPORT OF TESTING.
8. INSULATE ALL NEW HYDRONIC PIPING BY FULLY ENCLOSING PIPING IN INSULATION AND
PROVIDING SEALED VAPOR BARRIER. ALL PIPING OVER 2" SHALL BE INSULATED WITH RESIN-
BONDED FIBERGLASS WITH A FOIL AND KRAFT PAPER VAPOR BARRIER WITH A FLAME/SMOKE
SPREAD INDEX BETTER THAN 25/50. INSULATION IS SUBJECT TO INSPECTION BY
COMMISSIONING AGENT AND OR ENGINEER FOR COMPLIANCE.
9. BALL VALVES SHALL BE FULL PORT WITH BRONZE BODY AND BRASS BALL. PROVIDE WITH
HANDLE/STEM EXTENSIONS FOR PROPER FUNCTION WHEN FULLY INSULATED. EXTENSIONS
TO BE SEALED AND VAPOR PROOF.
10. INSTALL INSULATION OVER FITTINGS, VALVES, STRAINERS, FLANGES, UNIONS, AND OTHER
SPECIALTIES WITH CONTINUOUS THERMAL AND VAPOR-RETARDER INTEGRITY. STRAINERS,
CONTROL VALVES, AND BALANCING VALVES SHALL HAVE REMOVABLE INSULATION WITH
LABEL INDICATED WHAT TYPE OF PIPE ACCESSORY IS BELOW INSULATION. INSULATION SHALL
NOT IMPEDE PROPER OPERATION OF ACCESSORY.
11. PROVIDE PRESSURE DIFFERENTIAL INSTRUMENTATION ACROSS FILTER BANK FOR AHU'S
OVER 10,000 CFM.
12. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT INCLUDING STARTUP OF ANY
FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR COMMUNICATION TO BMS.
13. PROVIDE OPERATION AND MAINTENANCE MANUALS (O&M) WITHIN 30 DAYS OF CERTIFICATE
OF OCCUPANCY FOR ALL EQUIPMENT IN DIGITAL FORMAT TO ENGINEER FOR REVIEW. O&M'S
SHALL INCLUDE DOCUMENTATION OF ALL WARRANTIES, REPORTS AND TESTS, RECORD
DRAWINGS, CONTROLS SEQUENCE OF OPERATIONS WITH DIAGRAMS, & EQUIPMENT
INFORMATION. EQUIPMENT INFORMATION INCLUDES MAKE & MODEL, WIRING, PIPING,
STARTUP, SHUTDOWN, TROUBLE SHOOTING SYSTEM BALANCING REPORT, FINAL
COMMISSIONING REPORT AND MAINTENANCE PROCEDURES.
14. PIPING AND DUCTWORK SHALL NOT BE SUPPORTED FROM THE ROOF DECK, JOIST BRIDGING
OR OTHER PIPES. HANG PIPES FROM BEAMS, JOIST OR SUPPLEMENTARY STRUCTURAL
MEMBERS. WHERE POSSIBLE INSTALL ALL PIPING AND DUCTWORK WITHIN 12" FROM
SUPPORTING STRUCTURE.
15. MECHANICAL PIPING SCHEDULE:
• HYDRONIC PIPING 3" AND UNDER = TYPE L COPPER - BRAZED JOINTS
• HYDRONIC PIPING OVER 3" = SCHEDULE 40 STEEL PIPE - WROUGHT STEEL FITTINGS
WELDED JOINTS OR POLYPROPYLENE FUSION WELDED
• CONDENSATE = TYPE M COPPER – BRAZED JOINTS
AREA OF WORK
1 2
F
G
H
E
BOILER ROOM
CHILLER ROOM
(E)VFD-5
(E)P-5
(E)P-6
(E)P-7
(E)VFD-6
1 2
F
G
H
E
BOILER ROOM
CHILLER ROOM
(E)P-5
(E)P-6
(E)P-7
(E)VFD-6
(E)VFD-5
VFD-7 4
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
C
A
B
2 3
D
E
1 2 3
C
4 5
2024 Spectrum Engineers, Inc.
SHEET TITLE
DFCM PROJECT NO:
DRAWN BY:
CHECKED BY:
SIGNATURE:
RECORD DRAWING DATE:
DESIGNED BY:
A
ISSUE:
DATE:
B
4 5
D
DFCM
E
SPECTRUM PROJECT NO: 260049
DFCM APPROVAL STAMP
A u to d e s k D o c s /2
U
S D
B A
H U
R e p la c e m e n t/
-U S
D B
A H
U R e p la c e m e n t
M e c h .r v t
/9
/2
:2
:1
P
M
RHB
RHB
RHB
26212230
03/10/2026
CD
BOILER ROOM
MECHANICAL
REPLACEMENT PLANS
MH102
UTAH SCHOOL
FOR THE DEAF
AND THE
BLIND
AHU
REPLACEMENT
742 S Harrison Blvd, Ogden, UT 84404
1 EXISTING VFD SERVING 3 HP PUMP TO BE REPLACED. VFD HAS FAILED DUE
TO CONDENSATION.
2 EXISTING PUMP TO REMAIN.
3 EXISTING VFD TO REMAIN.
4 PROVIDE NEW VFD. PROVIDE 1" RIGID INSULATION BETWEEN VFD AND
EXTERIOR WALL.
5 PROVIDE INSULATION BETWEEN EXISTING VFD AND WALL.
SHEET KEYNOTES
SCALE: 1" = 80'-0"3
VFD KEYPLAN
SCALE: 1/4" = 1'-0"1
BOILER ROOM DEMOLITION PLAN
SCALE: 1/4" = 1'-0"2
BOILER ROOM NEW PLAN
VARIABLE FREQUENCY DRIVE SCHEDULE
LABEL SERVES
LOAD DATA
WIRE AND
CONDUIT SIZE
OVERCURRENT
PROTECTION
DEVICE
DISCONNECT STARTER
MANUFACTURER MODEL REMARKSHP kW
OUTPUT
(A) VOLTAGE PHASE Hz DEVICE DEVICE SIZES
SELECTOR
SWITCH
PILOT
LAMP
NORMALLY
OPEN
NORMALLY
CLOSED
PHASE
FAILURE
RELAY
VFD-7 P-7 3 2.2 4.8 480 3 60 3 #12, #12 GR 0.75"
CND
20/3 CB 30A/39 FRS-10 VFD 5 --- R,G 2 2 YES YASKAWA HV6OU4005CFA 1,2
1. NEMA 1.
2. PROVIDE DUAL-REDUNDANT 100% RATED VFD
Mark: Date: Description
4-21-26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
JD
JE
"H9"
TYP
TYP
JD
JE
H9
AHU-1
"H9"
TYP
TYP
AREA OF WORK
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
C
A
B
2 3
D
E
1 2 3
C
4 5
2024 Spectrum Engineers, Inc.
SHEET TITLE
DFCM PROJECT NO:
DRAWN BY:
CHECKED BY:
SIGNATURE:
RECORD DRAWING DATE:
DESIGNED BY:
A
ISSUE:
DATE:
B
4 5
D
DFCM
E
SPECTRUM PROJECT NO: 260049
DFCM APPROVAL STAMP
A u to d e s k D o c s /2
U
S D
B A
H U
R e p la c e m e n t/
-U S
D B
A H
U R e p la c e m e n t
M e c h .r v t
/9
/2
:3
:2
P
M
TDS
TDS
TDS
26212230
03/10/2026
CD
ELECTRICAL PLANS
EE001
UTAH SCHOOL
FOR THE DEAF
AND THE
BLIND
AHU
REPLACEMENT
742 S Harrison Blvd, Ogden, UT 84404
SCALE: 1/4" = 1'-0"A4
AHU ROOM ELECTRICAL DEMOLITION FLOOR PLAN
SCALE: 1/4" = 1'-0"A2
AHU ROOM ELECTRICAL POWER PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
1 DISCONNECT AND REMOVE EXISTING 70A/3P ELECTRICAL CONNECTIONS TO AIR
HANDLER. EXISTING CIRCUIT MAY BE REUSED FOR NEW AIR HANDLER.
2 CONNECT POWER TO REPLACED AIR HANDLER UNIT. CONNECT TO THE VFD
FURNISHED WITH THE EQUIPMENT. EXTEND EXISTING CIRCUIT TO NEW LOCATION AS
REQUIRED. ASSUME 3 #4, #8 GR IN 1.25" CND FOR CIRCUIT EXTENSION.
3 DISCONNECT AND REMOVE EXISTING DUCT DETECTORS FROM AIR HANDLER TO BE
REMOVED. REINSTALL DUCT DETECTORS AND SAMPLING TUBES IN SAME LOCATION
IN NEW AIR HANDLER. FIELD VERIFY EXACT LOCATIONS AND REINSTALLATION
REQUIREMENTS.
REFERENCE AND LINE SYMBOLS
DETAIL INDICATOR: A5 INDICATES DETAIL NUMBER, E-501
INDICATES DRAWING SHEET WHERE DETAIL IS SHOWN.
A5
E-501
ELEVATION OR SECTION INDICATOR, EXTERIOR: A5 INDICATES
ELEVATION OR SECTION NUMBER, E-201 INDICATES DRAWING
SHEET WHERE ELEVATION OR SECTION IS SHOWN.
A5
E-201
ELEVATION OR SECTION INDICATOR, INTERIOR: A5 INDICATES
ELEVATION OR SECTION NUMBER, E-201 INDICATES DRAWING
SHEET WHERE ELEVATION OR SECTION IS SHOWN.
A5
E-201
ROOM IDENTIFIER WITH ROOM NAME AND NUMBER.
ROOM NAME
KEYNOTE INDICATOR.1
REVISION INDICATOR.1
BREAK, STRAIGHT: TO BREAK PARTS OF DRAWING
BREAK, ROUND
NEW LINE: MEDIUM LINE.
HIDDEN FEATURES LINE: HIDDEN, THIN LINE
EXISTING TO REMAIN LINE: THIN LINE.
DEMOLITION LINE: DASHED, MEDIUM LINE
MECHANICAL EQUIPMENT INDICATOR. "X-X" INDICATES
EQUIPMENT MARK SHOWN ON EQUIPMENT SCHEDULE. "XMDP"
IDENTIFIES PANEL EQUIPMENT IS CIRCUITED TO. REFER TO
EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION.
XMDP
X-X
MONITOR MODULE.MM
DETECTOR, SMOKE, DUCT WITH HOUSING AND SAMPLING TUBE.
SD
SMOKE DAMPER. 120V POWER FROM ELECTRICAL SYSTEM.
FSD
COMBINATION FIRE/SMOKE DAMPER. 120V POWER
FROM ELECTRICAL SYSTEM.
DISCONNECT SWITCH, FUSED.
DISCONNECT SWITCH, UNFUSED.
PANELBOARD CABINET, FLUSH MOUNTED.
PANELBOARD CABINET, SURFACE MOUNTED, 1 SECTION.
PANELBOARD CABINET, SURFACE MOUNTED, 2 SECTION.
DP#__
DISTRIBUTION PANEL OR SWITCHBOARD.
SWITCH, TOGGLE MOTOR STARTER WITH OVERLOAD
PROTECTION.
ST
TRANSFORMER (SEE ONE-LINE FOR SIZE)
MECHANICAL EQUIPMENT CONNECTION. REFER TO EQUIPMENT
SCHEDULE FOR REQUIREMENTS.
SYMBOL DESCRIPTION
SYMBOLS LEGEND
E - DIVISION 26
Q - FURNISHED WITH EQUIPMENT, INSTALLED BY DIV.26
1. PROVIDE MANUAL STARTER WITH THERMAL OVERLOAD AND RELAY
FOR ATC/BAS CONTROL.
2. PROVIDE FUSED DISCONNECT ELEVATOR POWER MODULE WITH
SHUNT TRIP.
3. INDOOR UNITS FED FROM OUTDOOR UNIT. PROVIDE DISCONNECTS
FOR BOTH.
1. LOCATE ELECTRICAL EQUIPMENT IN ACCESSIBLE LOCATION, SUCH THAT IT IS WITHIN SIGHT OF THE EQUIPMENT IT IS
SERVING, AND COMPLIES WITH N.E.C. REQUIRED CLEARANCES.
2. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE AND SIZE FEEDER, STARTER, DISCONNECT AND OVERCURRENT PROTECTION IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OF ACTUAL EQUIPMENT SUPPLIED.
3. ELECTRICAL CONTRACTOR SHALL REVIEW OTHER DIVISION DRAWINGS FOR ANY ADDITIONAL REQUIREMENTS
PRIOR TO BID.
4. ELECTRICAL CONTRACTOR SHALL REVIEW OTHER DIVISION SUBMITTALS FOR ANY EQUIPMENT REQUIRING CONNECTION
BY ELECTRICAL CONTRACTOR AND COORDINATE ALL REQUIREMENTS PRIOR TO ROUGH-IN.
EQUIPMENT SCHEDULE KEY NOTES: GENERAL NOTES:
EQUIPMENT SCHEDULE
LABEL QTY DESCRIPTION
LOAD DATA
WIRE AND CONDUIT
SIZE
OCPD DISCONNECT MOTOR CONTROLLER NEMA
ENCLOSURE
RATING NOTESHP kW MCA FLA V PH DEVICE FED FROM PROVIDED BY DEVICE PROVIDED BY DEVICE SIZES
AHU-1 1 AIR HANDLER 30 - - 39.2 480 3 3 #4, #8 GR
1.25" CND
70/3
CB (EX)
H9 Q VFD Q VFD 30 HP -
SCALE: 1" = 80'-0"1
KEY PLAN
Mark: Date: Description
4-21-26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
| GE001 - COVER SHEET |
| ME001 - MECHANICAL COVER SHEET |
| ME601 - MECHANICAL SCHEDULES |
| MD101 - AHU ROOM MECHANICAL DEMOLITION PLAN |
| MH101 - AHU ROOM MECHANICAL REPLACEMENT PLANS |
| MH102 - BOILER ROOM MECHANICAL REPLACEMENT PLANS |
| EE001 - ELECTRICAL PLANS |
File details come from the government source that posted it. Updated .