Addendum 0001.doc

DOC document 389 KB Posted

Attached to
Dry Room Dehumidifier
Solicitation number
5-B175-Q-00386-00
Issued by

About this file

Addendum 0001 is a modification document for a solicitation (No. 5-B175-Q-00386-00) issued by Argonne National Laboratory, a Department of Energy laboratory, for a dehumidification system for a dry room intended to house lithium battery research and development. The addendum extends the proposal submission deadline to March 31, 2025, at 5:00 PM CST and provides clarifications to vendor questions, including confirmation that the system uses direct expansion units with electric heat, and that a vestibule is provided by Kysor Panel Systems to prevent moisture infiltration.

Key submission requirements include completing the ANL-70 Request for Quotation, providing the country of origin for the quoted item, submitting Representations & Certifications (ANL-70B), reviewing ANL-71 Commercial Terms and Conditions, and reviewing the detailed specifications for the dehumidification system. Potential vendors are instructed to submit proposals and direct any questions to Jenna Doria at jdoria@anl.gov, with a question submission deadline of March 25, 2025, at 12:00 PM CST.

View the file

Other files

File Type Posted
ANL-70B Reps and Certs Long-14-FEB-2025.PDF PDF
ANL-70 Request for Quotation.doc DOC document
Appendix A-71COM-13-FEB-2023.PDF PDF
ANL Dryroom Drawing.pdf.pdf PDF
Specifications.docx.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jenna Doria Procurement 3 Office of the Chief Financial Officer

Procurement Department

Argonne National Laboratory

9700 South Cass Avenue, Bldg. 201

Lemont, IL 60439

(630)252-6988 jdoria@anl.gov

03/27/2025

TO ALL OFFERORS:

Subject:

Addendum 0001 Request for FORMDROPDOWN No. 5-B175-Q-00386-00 Addendum No. 0001 Attached herewith for your information and use in preparing your proposal for subject project is one (1) copy of Addendum No. 0001.

Kindly acknowledge receipt of this Addendum by signing and returning one (1) copy of this letter.

Please email receipt to Procurement at jdoria@anl.gov.

Sincerely, Jenna Doria Procurement 3 Procurement Department

Receipt Acknowledged:

Company:

By:

cc:

File

CF

Addendum No.

TO

REQUEST FOR FORMDROPDOWN

5-B175-Q-00386-00

FOR

Argonne National Laboratory

BLDG. 201 OCF

9700 S. Cass Ave.

Lemont, IL 60439

03/27/2025 This addendum is being issued to modify the subject as follows:

1. To extend the proposal due date to 03/31/2025, 5:00 PM CST

2. To provide a response to the questions below. Response is in red.

a) What are the temperatures of the chilled and hot water? System does not use chilled water but direct expansion units. Heat is electric.

b) What is the temperature of the chilled water, and does it contain glycol? No chilled water

c) Is there a vestibule provided by Kysor Panel Systems for room entry to prevent moisture infiltration? Yes, there is a vestibule

U. S. Department of Energy laboratory managed by UChicago Argonne, LLC

File details come from the government source that posted it. Updated .