This is a Construction Scope of Work for a Direct Digital Control (DDC) HVAC system upgrade at Lebanon VA Medical Center in Lebanon, Pennsylvania. The project number is 595-26-105, with all submittals due 60 days after Notice to Proceed (NTP) and construction completion required by day 330. Matthew Donmoyer is the Contracting Officer's Representative.

The contractor must replace all Delta Controls building automation system components in Building 1 with Distech Controls equipment integrated onto the existing campus-wide Tridium Niagara server. Work includes replacing pneumatic controls with DDC controls across multiple systems: hot water, chilled water, low-pressure steam heat exchangers, and numerous VAV boxes, fan coil units, blower coils, and radiant heat panels distributed across six floors and specialized areas (Radiology, Kitchen, Laboratory, etc.). The contractor must also replace approximately 500 existing wall radiant heat pneumatic steam valves with DDC electronic steam valves. The BACnet/IP communication infrastructure and network switches are already installed and operational. The contractor shall reuse existing operational end-devices (sensors, switches, etc.) and create a deficiency log for inoperable equipment. All work must comply with NFPA, EPA, and VA requirements, include phased construction to maintain building operations and heating/cooling throughout the project, and be coordinated with hospital staff during normal and after-hours. The contractor must provide comprehensive control drawings, sequence of operations, and submit meeting minutes within three calendar days of each Project Team meeting. Construction must begin by day 120 and all submittals are due by day 60.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lebanon VA Medical Center Lebanon, PA 17042

Construction Scope of Work

Upgrade DDC HVAC Controls Bldg 1

595-26-105

All submittals provided to the government by: 60 days after Notice to Proceed (NTP) issued Construction Complete by: 330 days after NTP issued Contracting Officer: TBD

Contracting Officers Representative (COR) Matthew Donmoyer

• The contractor shall furnish all Management, Supervision, Labor, Transportation, Equipment and Materials and perform work to include demolition, general construction, alterations, mechanical and electrical work, and certain other items as required by project drawings and specifications to complete this scope of work for Project No. 595-26-105 Upgrade DDC Controls Building 1. The project scope is to replace Building 1 Direct Digital Controls (DDC) and Pneumatic Controls with new Direct Digital Controls and integrate them onto the existing campus wide Distech Tridium Niagara server. Project shall be completed in accordance with VA Criteria and Specifications, NFPA (National Fire Protection Association), and EPA (Environmental Protection Agency) requirements.

• Offeror shall be prepared for a 330-day schedule as indicated below in the Project

Schedule. Offeror shall be required to perform some work during normal business hours and some work after hours so as not to interfere with the operations of the hospital. Working hours shall be at the discretion of the government. Offeror may propose an alternate schedule, in addition to the 330-day schedule, which will be reviewed by the VA. Schedules shall indicate the following:

o Phasing plans for coordination of activities taking place in offices evening shift.

o Construction services including:

• Mobilization

• Demolition

• Controller replacement, steam valve replacement

• Procurement and installation of equipment

• Provisions for overtime or shift work shall be included in the contract offer.

-- Project Scope --

The project to upgrade the DDC controls in building 1 shall include the following:

• Replace all components of the Delta Controls building automation system in

Building 1 with Distech Controls with integration onto existing Tridium Niagara building automation server.

o Hot Water System o Chilled Water System o Low Pressure Steam heat exchangers o Ground floor system router

▪ (3) Blower coils - South entrance

▪ (7) VAV boxes - Pathology o First Floor – Pneumatic Change over

▪ Fan Coil Units – Admin suite/corridors (11)

▪ Blower Coils – (21) o Second Floor Router

▪ (33) VAV boxes – A-Wing & B-Wing

▪ (14) VAV boxes – Oncology C-Wing

▪ (16) Radiant Heat Panels – Oncology C-Wing Chemo Beds o Third Floor Router

▪ (15) Fan Coils A-Side

▪ (27) Reheat Coils B-Side o Fourth Floor Router

▪ (39) Reheat Coils A-Side

▪ (21) Fan Coils B-Side o Fifth Floor Router

▪ (37) Fan Coil Units o Kitchen Room Router 125B o Radiology AHU-1/Hot Water Reheat

▪ VAV boxes (26)

▪ Radiology reheat pump system (1) o Radiology AHU-2

▪ VAV boxes (11) o AC-1 (A-Side) o AC-2 (B-Side) o AC-3 (Outside on roof) o AC-4 (old SPS) o AC-5/Reheat 6th Floor

▪ (18) VAV boxes

▪ (1) Sixth floor reheat heat exchanger o AC-6 (Serves room 453) o AC-7 (Kitchen) o AC-8 (Kitchen prep offices)

▪ VAV boxes (9) o AC-9 (Elevator) o AC-11 o AC-12

▪ VAV box (1)

▪ Reheat coils (4) o AC-14 CT Scan Outside Ground o ERU-1 New Laboratory

▪ VAV boxes (18) o AHU-1 Front Entrance by carport o RTU-1 Rehabilitation suite

▪ VAV boxes (37)

• Replace existing wall radiant heat pneumatic steam valves with DDC electronic steam valves (Base qty. of 500) o Wiremold from ceiling to wall radiator o Controlled by associated room controller o Price per radiant heater valve replacement for adding or deducting of original count of 500

• Bacnet/IP communication buss has been installed by in-house VA electric shop

• All Bacnet /IP communication risers are installed to include network switches and are currently operational on the campus Distech Controls Tridium server.

• All existing equipment end-devices (sensors, limit switches, pressure switches, air flow monitoring, etc.) may be reused if operational. If any are inoperable, create deficiencies log for in-house VA HVAC shop replacement.

• Conduct site investigations during submittal process to verify existing conditions

• Provide a full set of building automation control drawings to include flow diagrams, sequence of operations, valve schedule, control panel layout, wiring diagram detail, points list, and bill of materials during the submittal process and update as an as-built at the end of the project

• Make sequence of operations changes to incorporate energy savings and to update for building usage changes. Provide documentation to support these changes during the submittal process

• Replace unions, nipples on both sides of steam valve, utilize existing hand valve

• Replace any deteriorated wiring. Existing wiring can be used if it meets NEC standards

• Existing plenum free aired wiring can remain if being reused

• Do not use existing boxes or controllers as Junction Boxes. They all shall be removed

• Any factory controls where necessary to meet modern standards and must integrate via Bacnet/IP or Bacnet/MSTP into new Distech Tridium server.

• All work shall comply with the National Fire Protection Association (NFPA) 70

(National Electrical Code), 70B, 70E, 72, 99, 101, and 13, the VA Electrical, HVAC and Plumbing cal Manuals and Occupational Safety and Health Administration (OSHA) regulations.

• Everything that controls, consumes, or can consume electric shall have a label.

Label shall have circuit identification, panel it is fed from, and where the panel is located.

• Installation will be required to occur during times that will minimize impact to the patients, staff and hospital in general.

• Collaboration between contractor, COR and Lebanon VAMC Air Conditioning shop will be greatly encouraged during the project.

• Construction shall be addressed in phases to allow operations to continue during construction. Heating and cooling shall always be maintained for the building. Phasing shall be determined at the initial project schedule for review.

Phasing must work within budget and allow the VA to continue operations at minimal interference

-- Project Schedule --

EXPECTATION: Submit review packages so they are received on the noted day

SUBMISSIONS:

Submit review packages so they are received on the noted day (calendar days after NTP) or earlier:

All submittals required by specification sections and this SOW ............... 60 days

Begin Construction on or before .............................................................. 120 days

Complete Construction on or before ........................................................ 330 days

Note: The issuance of the Notice to Proceed (NTP) for construction period will be at the first Project Team (PT) Meeting. The Construction Contractor shall be required to attend and take minutes of each PT meeting. Minutes shall be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting for approval and to be added to the official contract file.

ATTACHMENT “A”

Specifications (All downloadable from the VA Technical Information Library

(www.cfm.va.gov/TIL) unless otherwise noted)

01 00 00 Lebanon General Requirements (attached) 01 35 26 Lebanon Safety Requirements (attached)

01 33 23 Shop Drawings, Product Data, and Samples 01 45 00 Quality Control 01 45 29 Testing Laboratory Services 01 91 00 General Commissioning Requirements

02 41 00 Demolition 07 84 00 Firestopping 23 05 11 Common Work Results for HVAC 23 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 11 HVAC Insulation 23 08 00 Commissioning of HVAC Systems 23 09 23 Direct-Digital Control System for HVAC (attached) 26 05 11 Requirement for Electrical Installations

26 05 19 Low-Voltage Electrical power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems

Existing Floor and Mechanical Plans http://www.cfm.va.gov/TIL