565-20-203 Specifications.pdf

PDF 14 MB Posted

Attached to
Z2DZ--Renovation for Welcome Center Federal contract opportunity
Solicitation number
36C24623B0061
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This file contains specifications for a federal solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The solicitation number is 36C24623B0061 and seeks renovation services for a Welcome Center. Products and services required include general construction and renovation work. The response deadline is not specified in the attached file. The anticipated award date is also not included. Pricing terms and whether there are any set-asides were not disclosed. Additional details on the scope of work, evaluation criteria, and terms and conditions would be needed to fully understand requirements.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Charlotte Engineers, LLP 5838 Monroe Road Charlotte, NC 28212

Welcome Center and Patient Support Renovation Fayetteville VA Medical Center

Fayetteville, NC

VA Project No.: 565-20-203

Final Submission Specifications

February 9, 2023

Fayetteville VAMC VA Project 565-20-203

Welcome Center Renovation 02-09-2023

2300 Ramsey Street ISSUED FOR CONSTRUCTION

Fayetteville, NC 28301

CERTIFICATIONS PAGE

Architect and Coordinating Professional:

Typed or Printed Name: Thomas Olesak

License Number: 18157

Professional Engineer: (Mechanical and

Plumbing)

Typed or Printed Name: Gregory A. Turner

License Number: 031465

Professional Engineer: (Fire)

Typed or Printed Name: John R. Callahan

License Number: 031042

Date: 02/09/2023

2300 Ramsey Street ISSUED FOR CONSTRUCTION

Fayetteville, NC 28301

Professional Engineer: (Electrical)

Typed or Printed Name: John C. Edwards

License Number: 048055

Professional Engineer: (Structural)

Typed or Printed Name: Mark Steven Rickher

License Number:m15464

Professional Engineer: (Civil)

Typed or Printed Name: Gary R. Johnson

License Number: 051283

- - - END - - -

565-20-203 Issued for Construction Renovation Welcome Center and Patient Support VAMC Fayetteville, NC 02/09/2023

TABLE OF CONTENTS

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 05-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 01-21 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 01-21 02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 84 16 Tubes and Batteries

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21 03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 01-21 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 01-21

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 36 00 Composite Metal Decking 01-21 05 50 00 Metal Fabrications 08-18

VAMC Fayetteville, NC 02/09/2023

TABLE OF CONTENTS

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 08 00 Facility Exterior Closure Commissioning 01-21 07 13 52 Modified Bituminous Sheet Waterproofing 01-21 07 21 13 Thermal Insulation 01-21 07 21 119 Foamed In Place Insulation 07 22 00 Roof and Deck Insulation 01-21 07 24 00 Exterior Insulation and Finish Systems 01-21 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 14 23 Impact Resistant Doors 08 31 13 Access Doors and Frames 01-21 08 33 13 Coiling Counter Doors 01-21 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 71 00 Door Hardware 01-21 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21 08 87 00 Architectural Window Films

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 00 Specialty Moldings and Trims 09 30 13 Ceramic/Porcelain Tiling 01-21 09 50 00 Acoustical Metal Ceilings 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 67 23 Resinous Flooring 09 68 00 Carpeting 01-21 09 70 00 Wall Finishes 09 72 16 Vinyl-Coated Fabric Wall Covering 01-21

VAMC Fayetteville, NC 02/09/2023

TABLE OF CONTENTS

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21 10 21 13 Toilet Compartments 01-21 10 26 00 Wall and Door Protection 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework 09-15 12 36 00 Countertops 12-18

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15 22 40 00 Plumbing Fixtures 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 04-22 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 02-20

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 04-22 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 02-20 23 22 13 Steam and Condensate Heating Piping 08-22 23 23 00 Refrigerant Piping 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20

VAMC Fayetteville, NC 02/09/2023

TABLE OF CONTENTS

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

23 40 00 HVAC Air Cleaning Devices 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 11-22 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 51 16 Public Address and Mass Notification Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

28 05 26 Grounding and Bonding for Electronic Safety and Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork 07-16

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 90 00 Planting 08-16

VAMC Fayetteville, NC 02/09/2023

TABLE OF CONTENTS

00 01 10-5

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 33 - UTILITIES

33 10 00 Water Utilities 03-17 33 40 00 Storm Sewer Utilities 12-17

2300 Ramsey Street ISSUED FOR CONSTRUCTION Fayetteville, NC 28301

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GI000 COVER SHEET

GI001 SHEET INDEX

GI002 ABBREVIATIONS

GI101 BASEMENT LEVEL LIFE SAFETY PLAN

GI111 FIRST LEVEL LIFE SAFETY PLAN

GC001 INFECTION CONTROL GENERAL NOTES AND DETAILS

GC101 BASEMENT LEVEL INFETION CONTROL AND PHASING

PLAN

GC111 FIRST LEVEL INFECTION CONTROL AND PHASING PLAN

V101 EXISTING CONDITIONS

D101 DEMOLITION PLAN

CS101 SITE PLAN

CG101 GRADING, UTILITY, & EROSION CONTROL PLAN

C501 DETAILS

LP101 PLANTING PLAN

S001 GENERAL NOTES

S002 GENERAL NOTES

S003 TYPICAL DETAILS

S004 TYPICAL DETAILS

S005 TYPICAL DETAILS

S101 FOUNDATION PLAN

S102 ROOF FRAMING PLAN

S301 FOUNDATION SECTIONS AND DETAILS

S401 FRAMING SECTIONS AND DETAILS

AD101 BASEMENT LEVEL DEMOLITION PLAN

AD111 FIRST LEVEL DEMOLITION PLAN

AD520 DEMOLITION – EXISTING CONDITION PHOTOGRAPHS

AE101 BASEMENT LEVEL FLOOR PLAN

AE102 BASEMENT LEVEL DIMENSION PLAN

AE111 FIRST LEVEL FLOOR PLAN

AC101 BASEMENT LEVEL REFLECTED CEILING PLAN

2300 Ramsey Street ISSUED FOR CONSTRUCTION Fayetteville, NC 28301

00 01 15 - 2

AE113 ROOF PLAN

AE201 EXTERIOR ELEVATIONS

AE211 INTERIOR ELEVATIONS

AE301 BUILDING SECTIONS

AE311 WALL SECTIONS

AE411 ENLARGED PLANS & ELEVATIONS

AE412 ENLARGED PLANS & ELEVATIONS

AE501 EXTERIOR PLAN DETAILS

AE520 EXTERIOR SECTION DETAILS

AE530 ROOF DETAILS

AE540 INTERIOR PLAN DETAILS

AE541 INTERIOR PLAN DETAILS

AE550 INTERIOR SECTION DETAILS

AE551 INTERIOR SECTION DETAILS

AE560 CEILING DETAILS

AE601 INTERIOR PARTITION TYPES & EXTERIOR WALL TYPES

AE602 DOOR SCHEDULE AND ELEVATIONS

AE640 MOUNTING HEIGHTS

AF111 BASEMENT LEVEL FLOOR FINISH PLAN

AF112 BASEMENT LEVEL WALL FINISH PLAN

AF600 MATERIAL AND ROOM FINISH SCHEDULE

AW111 BASEMENT LEVEL WAYFINDING PLAN & SIGNAGE

MESSAGE SCHEDULE

AW601 SIGNAGE DETAILS

QH111 BASEMENT LEVEL EQUIPMENT PLAN

QH411 ENLARGED EQUIPMENT PLANS

M001 MECHANICAL – SYMBOLS, NOTES & DRAWING INDEX

M002 MECHANICAL – DETAILS

M003 MECHANICAL – SCHEDULES

M004 MECHANICAL – AHU SCHEDULES

MD1B01 MECHANICAL – DEMOLITION – DUCTWORK – BASEMENT

MD1B02 MECHANICAL – DEMOLITION – PIPING – BASEMENT

MD1C01 MECHANICAL – DEMOLTION – DUCTWORK – CRAWLSPACE

MD1C02 MECHANICAL – DEMOLITION – PIPING – CRAWLSPACE

MD1L101 MECHANICAL – DEMOLITION – DUCTWORK – FIRST

FLOOR

MH1B01 MECHANICAL – NEW WORK – DUCTWORK – BASEMENT

2300 Ramsey Street ISSUED FOR CONSTRUCTION Fayetteville, NC 28301

00 01 15 - 3

MH1B02 MECHANICAL – NEW WORK – DUCTWORK – BASEMENT –

AREA A

MH1B03 MECHANICAL – NEW WORK – DUCTWORK – BASEMENT –

AREA B

MH1B04 MECHANICAL – NEW WORK – DUCTWORK – MECHANICAL

ENCLOSURE

MH1L101 MECHANICAL – NEW WORK – DUCTWORK – FIRST FLOOR

MP1B01 MECHANICAL – NEW WORK – PIPINT – BASEMENT

FA001 FIRE ALARM – SYMBOLS, NOTES & DRAWING INDEX

FA002 FIRE ALARM – DETAILS & DEMOLITION NOTES

FA003 FIRE ALARM – DEMOLITION NOTES & UL DETAILS

FA1B01 FIRE ALARM – DEMOLITION – BASEMENT

FA1B02 FIRE ALARM – NEW WORK – BASEMENT

FX001 FIRE SUPPRESSION – SYMBOLS, NOTES & DRAWING

INDEX

FX002 FIRE SUPPRESSION - DETAILS

FX003 FIRE SUPPRESSION - DETAILS

FX004 FIRE SUPPRESSION – IMPAIRMENT AND TEMPORARY

SUPPRESSION REQUIREMENTS

FX005 FIRE SUPPRESSION – UL DETAILS

FX1B01 FIRE SUPPRESSION – DEMOLITION – BASEMENT

FX1B02 FIRE SUPRRESSION – NEW WORK – BASEMENT

FX1B03 FIRE HYDRANT ELEVATION VIEW

P001 PLUMBING – SYMBOLS, NOTES & DRAWINGS INDEX

P002 PLUMBING – DETAILS

PD1B01 PLUMBING – DEMOLITION – BASEMENT – SANITARY

WASTE

PD1C01 PLUMBING – DEMOLITION – BASEMENT – WATER PIPING

PD1D01 PLUMBING – DEMOLITION – BASEMENT – MEDICAL GAS

PP1B01 PLUMBING – NEW WORK – BASEMENT – SANITARY WASTE

PP1C01 PLUMBING – NEW WORK – SANITARY WASTE –

ISOMETRIC

PP1D01 PLUMBING – NEW WORK – BASEMENT – WATER PIPING

PP1E01 PLUMBING – NEW WORK – WATER PIPING – ISOMETRIC

E001 ELECTRICAL – SYMBOLS, NOTES & DRAWING INDEX

E002 ELECTRICAL – DETAILS

E003 ELECTRICAL – LIGHTNING DETAILS

E004 ELECTRICAL – POWER RISER AND SCHEDULES

ED1B01 ELECTRICAL – DEMOLITION – BASEMENT

2300 Ramsey Street ISSUED FOR CONSTRUCTION Fayetteville, NC 28301

00 01 15 - 4

EL1B01 ELECTRICAL – NEW WORK – BASEMENT – LIGHTING

EP1B01 ELECTRICAL – NEW WORK – BASEMENT – POWER

EP1B02 ELECTRICAL – NEW WORK – PARTIAL SITE PLAN –

POWER

EP1L101 ELECTRICAL – NEW WORK – FIRST FLOOR – POWER

T001 TELECOMMUNICATIONS – SYMBOLS, NOTES & DRAWING

INDEX

T002 TELECOMMUNICATIONS – DETAILS

T003 TELECOMMUNICATIONS – DETAILS

TD1B01 TELECOMMUNICATIONS – DEMOLITION – BASEMENT

TS1B02 TELECOMMUNICATIONS – NEW WORK – BASEMENT

- - - END - - -

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for VA Project #

565-20-203 Renovation Welcome Center and Patient Support as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the Medical Center Contracting Offers Representative (COR).

C. As Engineers and Architects for the project, Charlotte Engineers

5838 Monroe Road, Charlotte, NC 28212, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the

Government without affirmations by Contracting Officer or their duly authorized representative.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, BASE BID: Work includes demolition and general construction, alterations, walks, grading, drainage, addition, and related construction to Building 1 as described with the contract documents.

B. DEDUCT ALTERNATES: The following deduct alternates are applicable to the project. These deduct alternates may, or may not, be

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -2 accepted by the VA. The savings associated with each item is to be offered as a deduction, or subtraction from the base bid should it be accepted. The number assigned, and the order which the deduct alternates would potentially be accepted by the VA is as listed below.

C. DEDUCT ALTERNATE NO.1: Elimination of opening / passage from Mech

B87 to Mechanical B86

D. DEDUCT ALTERNATE NO.2: Elimination of all work associated with the renovation / removal / replacement of the Canopy at the exterior of the building entrance (plan West of VESTIBULE B70).

E. DEDUCT ALTERNATE NO 3: Elimination of built in/ casework desk(s) at INFO DESK B73 (TWO 2 DESKS), ROI WORK AREA B68 (2 DESKS), RECEPTION B65. At ROI WORK AREA B68, provide Overhead Coiling

Doors that extend to floor.

F. DEDUCT ALTERNATE NO 4: Eliminate Hollow Metal borrowed lights at rooms; HEALTH BENEFITS B27, HEALTH BENEFITS B28, PAT ADV B29 and

PAT ADV B30.

G. DEDUCT ALTERNATE NO 5: Eliminate handrail / crash rail at rooms

HEALTH BENEFITS B27, HEALTH BENEFITS B28, PAT ADV B29 and PAT ADV

B30 on LOBBY B60W side of partition.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at

Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -3

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the

Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See

Section 08 71 00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -4 information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting

Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of

Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the

VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted

24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -5

2. A limited number of(2 to 5) permits shall be issued for

General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center

Facility Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the

Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the

Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the

Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as shown on the drawings or as determined by the COR .

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -6

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by

Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to

Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR .

All such actions shall be coordinated with the COR or Utility

Company involved:

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -7

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to: All construction and repair related to site elements, temporary site conditions and site grading, paving and utilities. All construction and repair activities associated with the renovation occurring in a portion of

Building 1.

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the

Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor, as follows:

Phase I: Placement of Temporary AHU, removal of exterior duct work and disconnection of existing AHU and infill of window openings at locations of removed ductwork.

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -8

Phase II: Renovation of portion of Building 1

J. Building Number 1 “A” Wing will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical

Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by

Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m

(seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum

375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.

L. When a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -9

1. Contractor shall maintain a minimum temperature of 4 degrees C

(40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

M. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR .

Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -10 interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical

Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

O. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -11

Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

P. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply

Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -12 furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by

Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS"

(FAR 52.236-2) and "CHANGES" (FAR 52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by

Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -13

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by

COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -14 those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The

Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -15 patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems

(including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"

(FAR 52.236-2).

1.11 PHYSICAL DATA – SOIL CONDITIONS

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by

Terracon, 2401 Brentwood Road, Suite 107, Raleigh, North

Carolina 27604.

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings. Logs of subsurface exploration are shown diagrammatically in report.

C. A copy of the soil report is attached as an Appendix to the

Specifications and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -16 logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.12 PROFESSIONAL SURVEYING SERVICES

A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the

Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.13 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work.

The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the

Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through

Contractor's negligence before their removal is authorized, the

Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the

Contractor.

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -17 and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark

(through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article

"Professional Surveying Services".

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -18 within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.15 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of

Construction in Building 1 at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -19

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Names, addresses and phone numbers of sources of spare parts.

f. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

g. Starting point and duration of warranty period.

h. Summary of maintenance procedures required to continue the warranty in force.

i. Cross-reference to specific pertinent Operation and

Maintenance manuals.

j. Organizations, names and phone numbers of persons to call for warranty service.

k. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -20

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the

Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the

Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the

Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section.

Communication procedures for Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a

VAMC Fayetteville, NC 02/09/2023

GENERAL REQUIREMENTS

01 00 00 -21 licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the

Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the

Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service

Requirements:

E. Following oral or written notification by the Contracting

Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction

Warranty Service Priority List” and the three categories of priorities listed…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .