565-20-203 Issued For Construction Drawing Set - Pages 54-106.pdf
PDF 32 MB Posted
- Attached to
- Z2DZ--Renovation for Welcome Center Federal contract opportunity
- Solicitation number
- 36C24623B0061
About this file
This document provides details for a federal construction drawing set related to solicitation number 36C24623B0061 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The solicitation is for a renovation project titled "Z2DZ--Renovation for Welcome Center" and involves construction and design services for renovations to an existing welcome center facility. Key details include a 32MB drawing set covering pages 54 through 106 to provide necessary visual specifications, a response due date consistent with standard FAR part 52.214-3 requirements, and award timing and pricing in line with standard federal construction contracts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract - 36C24623B0061.pdf | ||
| AMENDMENT 0005 36C24623B0061.pdf | ||
| Amendment 0004 - 36C24623B0061.pdf | ||
| Site Visit Attendees - Renovate Welcome Center.pdf | ||
| 10 Final Geotechnical Report - January 2023.pdf | ||
| Amendment 0003 - 36C24623B0061.pdf | ||
| 565-20-203 Issued For Construction Drawing Set - Pages 1-53.pdf | ||
| Amendment 0002 - 36C24623B0061.pdf | ||
| Asbestos _ HazMat Summary - April 2021.pdf | ||
| Amendment 0001 - 36C24623B0061.pdf | ||
| Existing 44-CDP switchboard.jpeg | JPEG file | |
| Interior Panels - Bldg 44.jpeg | JPEG file | |
| Crawlspace Asbestos _ HazMat Summary - September 2022.pdf | ||
| 565-20-203 Issued For Construction Drawing Set B.pdf | ||
| 565-20-203 Issued For Construction Drawing Set A.pdf | ||
| 36C24623B0061_1 solicitation.pdf | ||
| 36C24623B0061_1.docx | DOCX document | |
| 565-20-203 Specifications.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
N S
T R
U C
T
IO
N L
IM
IT
S
C O
N S
T R
U C
T
IO
N L
IM
IT
S
C O
N S
T R
U C
T
IO
N
LI
M
IT
S
B71
SECURITY
SCREENING
B70
VESTIBULE
B60W
LOBBY
B72
STORAGE
B73
INFO DESK
B35
STAIR
B60E
CORRIDORB60X
ELEVATOR
LOBBY
B31
PAT
ESCORT
B30
PAT ADV
B29
PAT ADV
B28
HEALTH
BENEFITS
B27
HEALTH
BENEFITS
B69
WAITING
B60S
CORRIDOR
B68
ROI WORK
AREA
B66A
VOLUNTEER
OFFICE
B65
RECEPTION
B64
VOLUNTEER
LOUNGE
B63
VOLUNTEER
STORAGE
B62
VSO
CONSULT
B61
VSO OFFICE
B25A
PUBLIC
AFFAIRS
STUDIO
B26
ELECTRICAL
B25
PUBLIC
AFFAIRS
ROOM
B24
TRAVEL
B24A
TRAVEL
CLERK
B37
CARE IN
COMMUNITY
B36
WOMEN'S
TOILET
B38
MEN'S
TOILET
B85
LINEN
CHUTE
XX100
QH411
QH411
QH411
QH411
QH411
QH411
M1801
F2000
F3200
M2055
A1040
F2000
A1015
M1801 F3200
M0512 A5212
M0507
F2000
M1801
A1020
F3200
M1801
F3200
A1015
F2000
M1801
F3200
A1015
A1015
M1801
F2000
F3200
F3200 F2000
M1801A1015
M1801
A1015
A1015
M1801
F3200
F2000 A1015
M1801
F3200
F2000
A1015
M1801
F2000
F2000
A1015M1801
F2000
A1015
M1801
A1015
M1801
F2000
M1801
A1015
M1801
A1015
F2000
F2000
F3200
F3200
F3200
F2000
M1801
F3200
A1015
M1801
M1801
M1801
A1015
M1801
M1801
A1015
M1801
A1015
F2000
F2000
F2000
M1801
A1015
B23
HAC
A5145
A5145 A5145
M4710
M4705
A5145
CONSTRUCTION LIMITS
B86
MECHANICAL
B78
MECH
B79D
EXAM
B79A
WAITING
B79E
EXAM
B79J
EXAM
B79K
EXAM
B22
LOCKERS
ROOM
ELECTRICAL
B21
OFFICE
M2055
M2055
M2055
B79C
CONSULT
B79B
RECEPTION
B79F
TEAMLET
AREA
B79I
EXAM
CB-115
CIRCULATION
B79H
EXAM
B79G
FLEX WORK
AREA
CB-113
AREAWAY
XX100
F2000
M1801
A1015
(2)
(2) (2)
A5145 (2)
A1012
A1020
VA ACQUISITION CODE LEGEND
CONTRACTOR FURNISHED AND INSTALLED CC
VA FURNISHED - CONTRACTOR INSTALLED VC
V V
VC(CF)
VA FURNISHED AND INSTALLED
VA FURNISHED - CONTRACTOR INSTALLED WITH CONSTRUCTION FUNDS
V V(CF)VA FURNISHED - VA INSTALLED WITH CONSTRUCTION FUNDS
RRELOCATED
SEE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL CONTRACTOR FURNISHED
AND CONTRACTOR INSTALLED (CC) EQUIPMENT NOT INDICATED ON EQUIPMENT
SCHEDULE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Engineering Discipline:
Charlotte Engineers LLP 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000
Architecture Discipline:
Anderson Engineering of NC, PLLC 13605 1st Avenue North, Suite 100 Plymouth, MN 55441 P: 763.412.4000 | F: 763.412.4090
Anderson Project #:
02/09/2023
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/2
/2
:2
:4
P
M
QH111
BASEMENT LEVEL EQUIPMENT
PLAN
Renovation Welcome Center and Patient Support
VAMC Fayetteville, NC
565-20-203
02/09/2023 MK GJB
16054
16054
1/8" = 1'-0"
FIRST LEVEL EQUIPMENT PLAN
EQUIPMENT SCHEDULE
EQUIPMENT
# EQUIPMENT NAME
ACQUISITIO
N CODE QTY
A1012 TELEPHONE, WALL MOUNTED, 1 LINE, 12X12 2
A1015 TELEPHONE, DESK, MULTILINE 12X12 V V 22
A1020 TELEPHONE, CONFERENCING SYSTEM V V 2
A1030 LOCKER, 2 PERSON, OVER UNDER V V 3
A1040 TELEPHONE, WALL MOUNTED, 1 LINE, WITH SPEAKER V V 1
A4995 TABLE, DIAPER CHANGING, WALL MOUNTED CC 2
A5075 SOAP DISPENSER V V 5
A5077 DISPENSER, HAND SANITIZER, HANDS FREE V V 1
A5080 PAPER TOWEL DISPENSER CC 1
A5082 HANDS FREE PAPER TOWEL DISPENSER CC 2
A5090 DISPOSAL, SANITARY NAPKIN V V 2
A5107 DISPENSER, GLOVE, WALL MOUNT CC 1
A5135 MOP SHELF AND HOLDER V V 1
A5145 HOOK, GARMENT, DOUBLE CC 12
A5200 DISPENSER, TOILET TISSUE, SS, 2-ROLL, SURFACE MOUNTED CC 3
A5212 BRACKET, TELEVISION, WALL MOUNTED, CC 1
F2000 BASKET, WASTEPAPER ROUND, METAL V V 24
F3055 WHITEBOARD, WITH SLIDING PANELS V V 1
F3200 CLOCK, BATTERY 12 IN DIA V V 16
M0500 MONITOR, CCTV V V 1
M0507 VIDEO TELECONFERENCING SYSTEM V V 1
M0512 TELEVISION, HDTV, LARGE SCREEN, 60IN V V 1
M1801 COMPUTER WITH FLAT MONITOR V V 28
M2055 SHELVING, STORAGE, WIRE, CRS, WITH ADJUSTABLE SHELVES V V 6
M4705 WHEELCHAIR, PATIENT TRANSPORT, FOLDING V V 1
M4710 WHEELCHAIR, PATIENT, BARIATRIC, TRANSPORT, FOLDING V V 1
XX100 COPIER, FLOOR V V 2
Revisions: Date:
REVISION 0 02-09-2023
AE412
B71
SECURITY
SCREENING
B60W
LOBBY
B70
VESTIBULE
F2000 M1801
F3200 M0500
AE412
B73
INFO DESK
B72
STORAGE
B60W
LOBBY
A1015
B71
SECURITY
SCREENING
M1801 A1015
M2055
M
M1801
AE411 11
B36
WOMEN'S
TOILET
B60E
CORRIDOR
AE411
A5200
A5090
A5200
A5090
A5082
A4995
AE411 19
AE41114
B38
MEN'S
TOILET
B60E
CORRIDOR
A5200
A5082
A4995
AE41118
B64
VOLUNTEER
LOUNGE
B60S
CORRIDOR
B65
RECEPTION
A5145
A5145
A1012
F3055
F2000
A1030
F3200
A1030
A1030
AE412
7 B23
HAC
B60E
CORRIDOR
B24A
TRAVEL
CLERK
A5075
A5077
A5080
A5107
VA ACQUISITION CODE LEGEND
CONTRACTOR FURNISHED AND INSTALLED CC
VA FURNISHED - CONTRACTOR INSTALLED VC
V V
VC(CF)
VA FURNISHED AND INSTALLED
VA FURNISHED - CONTRACTOR INSTALLED WITH CONSTRUCTION FUNDS
V V(CF)VA FURNISHED - VA INSTALLED WITH CONSTRUCTION FUNDS
RRELOCATED
SEE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL CONTRACTOR FURNISHED
AND CONTRACTOR INSTALLED (CC) EQUIPMENT NOT INDICATED ON EQUIPMENT
SCHEDULE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Engineering Discipline:
Charlotte Engineers LLP 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000
Architecture Discipline:
Anderson Engineering of NC, PLLC 13605 1st Avenue North, Suite 100 Plymouth, MN 55441 P: 763.412.4000 | F: 763.412.4090
Anderson Project #:
02/09/2023
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/2
/2
:2
:4
P
M
QH411
ENLARGED EQUIPMENT PLANS Renovation Welcome Center and Patient Support
VAMC Fayetteville, NC
565-20-203
02/09/2023 MK GJB
16054
16054
1/4" = 1'-0"1
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"2
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"3
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"4
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
1/4" = 1'-0"
ENLARGED EQUIPMENT PLAN
EQUIPMENT SCHEDULE
EQUIPMENT
# EQUIPMENT NAME
ACQUISITIO
N CODE QTY
A1012 TELEPHONE, WALL MOUNTED, 1 LINE, 12X12 2
A1015 TELEPHONE, DESK, MULTILINE 12X12 V V 22
A1020 TELEPHONE, CONFERENCING SYSTEM V V 2
A1030 LOCKER, 2 PERSON, OVER UNDER V V 3
A1040 TELEPHONE, WALL MOUNTED, 1 LINE, WITH SPEAKER V V 1
A4995 TABLE, DIAPER CHANGING, WALL MOUNTED CC 2
A5075 SOAP DISPENSER V V 5
A5077 DISPENSER, HAND SANITIZER, HANDS FREE V V 1
A5080 PAPER TOWEL DISPENSER CC 1
A5082 HANDS FREE PAPER TOWEL DISPENSER CC 2
A5090 DISPOSAL, SANITARY NAPKIN V V 2
A5107 DISPENSER, GLOVE, WALL MOUNT CC 1
A5135 MOP SHELF AND HOLDER V V 1
A5145 HOOK, GARMENT, DOUBLE CC 12
A5200 DISPENSER, TOILET TISSUE, SS, 2-ROLL, SURFACE MOUNTED CC 3
A5212 BRACKET, TELEVISION, WALL MOUNTED, CC 1
F2000 BASKET, WASTEPAPER ROUND, METAL V V 24
F3055 WHITEBOARD, WITH SLIDING PANELS V V 1
F3200 CLOCK, BATTERY 12 IN DIA V V 16
M0500 MONITOR, CCTV V V 1
M0507 VIDEO TELECONFERENCING SYSTEM V V 1
M0512 TELEVISION, HDTV, LARGE SCREEN, 60IN V V 1
M1801 COMPUTER WITH FLAT MONITOR V V 28
M2055 SHELVING, STORAGE, WIRE, CRS, WITH ADJUSTABLE SHELVES V V 6
M4705 WHEELCHAIR, PATIENT TRANSPORT, FOLDING V V 1
M4710 WHEELCHAIR, PATIENT, BARIATRIC, TRANSPORT, FOLDING V V 1
XX100 COPIER, FLOOR V V 2
REVISION 0 02-09-2023
,8 ,9 ,1 h w r e h e a t
A. ALL DUCTS, PIPE, AND EQUIPMENT SHALL BE LATERALLY RESTRAINED TO
COMPLY WITH STATE BUILDING CODE.
B. BEFORE FABRICATING ANY SHEET METAL DUCTWORK, COORDINATE LOCATION
AND SIZE WITH SPRINKLER & PLUMBING PIPING, CONDUITS, LIGHT FIXTURES,
STRUCTURAL, ETC. PLANS ARE SCHEMATIC AND ARE NOT SHOP DRAWINGS.
SUBMIT DUCTWORK COORDINATION DRAWINGS, AS SPECIFIED.
C. BEFORE SUBMITTING SHOP DRAWINGS, COORDINATE VOLTAGES AVAILABLE FOR
MECHANICAL EQUIPMENT AND PROVISION OF ALL STARTERS AND DISCONNECT
SWITCHES WITH ELECTRICAL CONTRACTOR.
D. MECHANICAL CONTRACTOR SHALL MAKE PROVISIONS FOR PROVIDING A
CONDENSATE DRAIN TRAP A MINIMUM OF 4" DEEP OR 1/2" PLUS THE STATIC
PRESSURE OF THE UNIT SUPPLY FAN.
E. ALL EQUIPMENT SHALL BE U.L. LISTED.
F. THE ELECTRICAL CONTRACTOR SHALL CONNECT ALL MECHANICAL EQUIPMENT;
PROVIDE DISCONNECTS, WIRING AND CONDUIT, INSTALL STARTERS, AND MOUNT
AND WIRE VFD, UNLESS OTHERWISE NOTED.
G. FIRE AND SMOKE DAMPERS SHALL BE INSTALLED IN COMPLETE ACCORDANCE
WITH THE MFR'S. U.L. LISTING AND INSTALLATION INSTRUCTIONS. FIRE AND
SMOKE DAMPERS SHALL HAVE SPECIFIC U.L. LISTING FOR THE CONSTRUCTION
IN WHICH THEY ARE INSTALLED.
H. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH
OTHER TRADES TO ELIMINATE CONFLICT WITH OTHER TRADES. ANY WORK
INSTALLED BY THIS CONTRACTOR THAT RESULTS IN CONFLICT, DUE TO LACK
OF COORDINATION BETWEEN TRADES, SHALL BE CHANGED AS DIRECTED BY
THE ARCHITECT/ENGINEER WITHOUT ADDITIONAL COMPENSATION TO THE
CONTRACTOR.
I. SMOKE DETECTORS SHALL BE FURNISHED BY ELECTRICAL CONTRACTOR AND
INSTALLED BY THE MECHANICAL CONTRACTOR. PROVIDE DUCT ACCESS DOOR
AT EACH DETECTOR. INSTALL DETECTORS IN COMPLETE ACCORDANCE WITH
THE MANUFACTURER'S INSTRUCTIONS.
J.
K.
MECHANICAL CONTRACTOR SHALL COORDINATE ROUTING OF DUCTWORK TO
ENSURE DUCTWORK DOES NOT PASS OVER ELECTRICAL PANELS.
L.
THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. THE
SCALE, WHEN INDICATED IS INTENDED FOR GENERAL REFERENCE ONLY.
M.
ALL SHUTDOWNS SHALL BE COORDINATED AND APPROVED THROUGH THE
OWNERS REPRESENTATIVE AND WILL REQUIRE ADVANCE NOTICE OF TWO WEEKS.
THIS TIME LENGTH MAY BE LONGER OR SHORTER FOR SOME SHUTDOWNS
AND SHALL BE AT THE OWNERS DISCRETION.
N.
PROVIDE ESCUTCHEON PLATES WHERE DUCTS PENETRATE CEILINGS OR WALLS
IN AREAS EXPOSED TO VIEW. ESCUTCHEONS FOR DUCTS SHALL BE
CONSTRUCTED OF SAME MATERIAL AS DUCT. PIPE ESCUTCHEONS SHALL BE
CHROME-PLATED BRASS.
O.
P.
PROVIDE REMOVABLE ACCESS DOORS AT ALL MOTOR OPERATED DAMPERS,
FIRE DAMPERS, SMOKE DAMPERS, DUCT COILS, SMOKE DETECTORS, AND
SIMILAR ITEMS REQUIRING MAINTENANCE OR ADJUSTMENT.
PROVIDE FIRE CAULKING OR OTHER APPROVED FIRESTOP SYSTEM AT ALL
MECHANICAL PIPING PENETRATIONS OF RATED ASSEMBLY WITHIN THE LIMITS OF
CONSTRUCTION (NEW AND EXISTING).
MAXIMUM ACCEPTABLE SOUND LEVELS
TYPE OF ROOM NC LEVEL
CORRIDORS (PUBLIC) 35
LOBBIES, WAITING AREAS 35
OFFICES, LARGE OPEN (3 OR MORE OCCUPANTS) 35
OFFICES, SMALL PRIVATE (2 OR FEWER OCCUPANTS) 30
DIRECT EXPANSIONDX
TEMPERATURE SENSOR
UNDERWRITER'S LABORATORIES
UNLESS OTHERWISE NOTED
SYMBOL OR SYMMETRICAL
TEST, ADJUST, BALANCE
TRANSFER DUCT
SUPPLY REGISTER
STANDARD CUBIC FEET PER MINUTE
SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
STATIC PRESSURE
VENT THRU ROOF
VARIABLE SPEED
YARD CLEAN OUT
WEATHER PROOF
VARIABLE FREQUENCY DRIVE
VARIABLE VOLUME
WET BULB TEMPERATUREWb
GP
INSUL
INV
LAT
LB/HR
KW
HTG
HVAC
HOA
HORZ
H'STAT
HR
HP
HD
GPH
GPM
HC
IB
IN
ID
HEATING, VENTILATING, AND AIR CONDITIONING
INVERTED BUCKET
INSIDE DIAMETER
LEAVING AIR TEMPERATURE
POUNDS PER HOUR
INSULATED
INVERT
KILOWATT
HEATING
INCH
HEAT DETECTOR
HAND-OFF-AUTOMATIC
HORSEPOWER
GALLONS PER HOUR
GALLONS PER MINUTE
HUMIDITY CONTROLLER
HORIZONTAL
HUMIDISTAT
HOUR
GUIDE POINT
YCO
WP
WG WATER GAGE
FCV
GALV
GC
GAL
FSD
FT
FV
FS
FPC
FPM
FPS
FOB
FP
FO
FLEX
FLG
FLR-FLR
FD
FACP
F&T
F.D.
FC
EQUIP
ESP
EWT
EXH
ER
EC
EFF
ELEC
EL
EQ
EAT
EA
F
EJ
FIRE PROTECTION CONTRACTOR
FEET PER SECOND
FLOW SWITCH/SENSOR
GENERAL CONTRACTOR
COMBINATION FIRE/SMOKE DAMPER
FEET PER MINUTE
FEET
GALVANIZED
GALLON(S)
FLOW VALVE
FLOW CONTROL VALVE
FLOOR TO FLOOR HEIGHT
FIRE PROTECTI0N
FLAT ON BOTTOM
FLANGE
FLAT OVAL
FIRE DAMPER
FLEX
VERT
W/
W/O
VFD
VTR
VOL
VS
VP
VLV
WITHOUT
WITH
VERTICAL
VOLUME
VENT POINT
VALVE
THRU
T'STAT
UL
V
UON
TYP
TOP
TS
TOS
TOD
THERMOSTAT
TYPICAL
THROUGH
TOP OF DUCT
TOP OF STEEL
TOP OF PIPE
EXHAUST REGISTER
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
FIRE ALARM CONTROL PANEL
FLOAT AND THERMOSTATIC
FLOW CONTROLLER
FAHRENHEIT
FLOOR DRAIN
EXHAUST
ENTERING AIR TEMPERATURE
ELECTRICAL CONTRACTOR
EXPANSION JOINT
ELEVATION
ELECTRICAL
EQUAL
EQUIPMENT
EXHAUST AIR
EFFICIENCY
SPRINKLERSPR
STRUCT
TAB
T/D
SYM
SYS
STL
STM
SR
SQ
STRUCTURAL
SYSTEM
STEEL
STEAM
SQUARE
SMACNA
SPEC
SECT
SCFM
SP
SCH
SD
SA
SECTION
SPECIFICATION
SMOKE DAMPER
SCHEDULE
SUPPLY AIR
LOW SIDE WALL EXHAUST REGISTER
LEAVING WATER TEMPERATURE
RELATIVE HUMIDITY
REVOLUTIONS PER MINUTE
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH GAGE
REFLECTED CEILING PLAN
POLYVINYL CHLORIDE
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
PRESSURE REDUCING STATION
PLUMBING CONTRACTOR
OUTSIDE DIAMETER
MOTOR OPERATED DAMPER
NATIONAL ELECTRIC CODE
NATIONAL ELECTRICAL MANUFACTURER'S
NATIONAL FIRE PROTECTION ASSOCIATION
NET POSITIVE SUCTION HEAD
NOT IN CONTRACT
NORMALLY OPEN
NORMALLY CLOSED
MECHANICAL CONTRACTOR
MANUAL AIR VENT
MANUAL DAMPER
MANUFACTURERMFR
ARCH ARCHITECTURAL
DWG
DWV
Db
DEG(°)
DPR
DTF
DP
DN
CU.FT.
CTR
CU.YD.
DD
CU
CONN
CONT
CONTR
COP
CONST
COORD
CFH
CFM
CLG
CONC
CO
ASHRAE
BFP
BDD
ASME
BHP
AUTO
BOP
BOD
BTUH
BTU
BOS
BV
C
CUBIC YARD
DRAIN, WASTE, AND VENT
DOWN THRU FLOOR
DUCT MOUNTED SMOKE DETECTOR
DRAIN POINT
DRAWING
DAMPER
DRY BULB TEMPERATURE
DEGREE(S)
DOWN
COEFFICIENT OF PERFORMANCE
CONSTRUCTION
COPPER
CUBIC FEET
CENTER
CONNECTION
CONTINUATION
CONTRACTOR
COORDINATE
RECIRC
REINF
REQD
RH
RPM
RM
REV
RD
RA
RCP
REQUIRED
ROOM
REVISION
RETURN AIR
RECIRCULATING
REINFORCING
ROUND
PLBG
PSIG
QTY
PVC
PSI
PSIA
PRV
PRS
PL
QUANTITY
PILOT LIGHT
PLUMBING
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
CONSTANT VOLUME
CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
BRITISH THERMAL UNIT PER HOUR
BRITISH THERMAL UNIT
BOTTOM OF STEEL
BUTTERFLY VALVE
CEILING
CLEAN OUT
CONCRETE
BACKFLOW PREVENTER
BOTTOM OF PIPE
BOTTOM OF DUCT
BACKDRAFT DAMPER
AND AIR CONDITIONING ENGINEERS
BOILER HORSEPOWER OR BRAKE HORSEPOWER
AUTOMATIC
NIC
OPNG
NPSH
OA
P.C.
OD
OC
NTS
NO.
NO
OUTSIDE AIR
ON CENTER
OPENING
NOT TO SCALE
NUMBER
NFPA
NEMA
NC
NEC
MOD
MTD
MIN
MH
ASSOCIATION
MOUNTED
MINIMUM
MANHOLE
AD
AFMS
ALUM
AFF
AC/HR
AP
ANSI
APPROX
AMCA
ABV.CLG.
AIR MOVEMENT AND CONTROL ASSOCIATION
AMERICAN NATIONAL STANTDARDS INSTITUTE
ANCHOR POINT
AIR FLOW MONITORING STATION
ACCESS DOOR
ABOVE FINISHED FLOOR
AIR CHANGES PER HOUR
ALUMINUM
APPROXIMATE
ABOVE CEILING
POUNDS OR NUMBER
ROUND, DIAMETER OR PHASE
LSWER
MEZZ
MECH
MFG
MD
MAX
MC
MBH
MAV
MEZZANINE
MANUFACTURING
MECHANICAL
MAXIMUM
BTUH x 1000
LF
LP
LWT
LINEAR FEET
LOW PRESSURE
FSS FUSED SAFETY SWITCH
S/S STAINLESS STEEL
RVNR REDUCED VOLTAGE, NON-REVERSING, MAGNETIC
FVNR FULL VOLTAGE, NON-REVERSING, MAGNETIC
MRS MOTOR RATED SWITCH
W WATTS
ACU-1 AIR CONDITIONING UNIT & TAG
AHU-1 AIR HANDLING UNIT & TAG
CC COOLING COIL
CP-1 CONDENSATE PUMP & TAG
DB DECIBELS
Dp DEWPOINT TEMPERATURE
EDH ELECTRIC COIL DUCT HEATER
CUH-1 CABINET UNIT HEATER & TAG
CU-1 CONDENSING UNIT & TAG
CW COLD WATER (DOMESTIC)
EER ENERGY EFFICIENCY RATIO
EF-1 EXHAUST FAN & TAG
E or EX. EXISTING
FCU-1 FAN COIL UNIT & TAG
H&V-1 HEATING AND VENTILATING UNIT & TAG
NOT ALL ABBREVIATIONS
SHOWN IN THIS LIST WERE
UTILIZED FOR THIS PROJECT.
AMERICAN SOCIETY OF HEATING, REFRIGERATING,
AFLD AUTOMATIC FLOW LIMITING DEVICE
NOT APPLICABLEN/A
SIESMICALLY SUPPORT DUCTWORK, AIR HANDLING UNIT, PIPING, ETC. AS
NEEDED AND SHOWN ON M-003.
GENERAL PROJECT NOTESMECHANICAL ABBREVIATIONS( NOTE: SYMBOLS WITHIN THIS SCHEDULE ARE REPRESENTATIVE OF THOSE TYPICALLY FOUND ON THE DRAWINGS. ALL SYMBOLS MAY NOT APPEAR ON THIS SET OF DRAWINGS. )MECHANICAL SYMBOLS
DUCTWORKVALVES
GAUGE CONNECTION ONLY
PLUG VALVE WITH PRESSURE
GLOBE VALVE
THREE WAY VALVE
AUTOMATIC CONTROL VALVE
ANGLE VALVE
BALL VALVE
ISOLATION VALVE
CHECK VALVE
BUTTERFLY VALVE
TRIPLE DUTY VALVE
CONTROL VALVE
PRESSURE INDEPENDANT
ACCESSORIES
THERMOMETER WELL AND CAP ONLY
THERMOMETER WITH WELL
UNION
LINE PRESSURE RELIEF VALVE
PRESSURE GAGE WITH COCK
MANUAL AIR VENT POINT ON PIPE
LOW PRESSURE TRAP ASSEMBLY
MEDIUM PRESSURE
AUTOMATIC FLOW LIMITING DEVICE
REDUCED PRESSURE
PIPE UP
PIPE DOWN
STRAINER
BACKFLOW PREVENTER
(SEE SPECS)
FLOW SWITCH
TRAP ASSEMBLY
DIRECTION OF FLOW
FLOW CONTROL DEVICE
ECCENTRIC REDUCER
DRAIN POINT OF PIPE
DIRECTION OF SLOPE
ANCHOR POINT
CONCENTRIC REDUCER
FLOW METER
PRESSURE AND TEMP. TEST PORT
FM
MISCELLANEOUS
DRAWING NUMBER WHERE SECTION
DUCT SYMBOL: FLAT OVAL
EMERGENCY STOP SWITCH
DIRECTION OF AIR FLOW
CONNECT TO EXISTING SYMBOL
12x10 DUCT SYMBOL: RECTANGULAR
THERMOSTAT
IS LOCATED
T
FLOOR DRAIN
SECTION NUMBER
HUMIDISTATH
ESS
CFM
ARROW AND CFM
DUCT SYMBOL: ROUND12∅
12/12
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
M4.1
M4
SIDEWALL RETURN REGISTER
CEILING RETURN GRILLE/
SIDEWALL EXHAUST REGISTER
CEILING EXHAUST GRILLE/
DUCTWORK W/O DUCTLINER
SIDEWALL SUPPLY REGISTER
CEILING SUPPLY DIFFUSER/
TRANSITION
OVAL TRANSITION
SQUARE TO ROUND/
CONICAL TAKEOFF
RECTANGULAR DUCT
MITERED TAKEOFF
(SEE SCH)
(SEE SCH)
REGISTER (SEE SCH)
(SEE SCH)
REGISTER (SEE SCH)
REGISTER (SEE SCH)
EXHAUST DUCT UP
SUPPLY AND RETURN SIMILAR
RETURN DUCT DOWN
SUPPLY AND EXHAUST SIMILAR
SUPPLY DUCT, UP THROUGH ROOF
RETURN AND EXHAUST SIMILAR
EQUIPMENT
MOTOR OPERATED DAMPER
DAMPER WITH ACCESS DOOR
COMBINATION FIRE/SMOKE
DOOR
ACCESS DOOR
DETECTOR WITH ACCESS
DUCT MOUNTED SMOKE
SMOKE DAMPER WITH
WITH ACCESS DOOR
MANUAL DAMPER
ACCESS DOOR
FIRE DAMPER WITH
HUMIDIFIER WITH ACCESS
DOOR
AIR FLOW
MONITORING STATION
DUCT MOUNTED COIL
DUCT MOUNTED COIL
(ELECTRIC)
(HOT WATER OR STEAM COIL)
AIR VALVE
FSD
SD
M
FD
DD
NO SCALE
500 CFM
1 - 4 - XC
VARIABLE OR CONSTANT VOLUME BOX WITH REHEAT
1 GPM
BOX NUMBER (C OR V INDICATES
HOT WATER GPM
CONSTANT OR VARIABLE FLOW)
VARIABLE OR CONSTANT REGULATOR
ACCESS DOOR
SUPPLY CFM
REHEAT COIL
FLOOR
AIR HANDLING UNIT NUMBER
PIPING
MEDIUM PRESSURE STEAM CONDENSATE (60 PSI)
LOW PRESSURE STEAM SUPPLY (15 PSI)
LOW PRESSURE STEAM CONDENSATE (15 PSI)
MEDIUM PRESSURE STEAM SUPPLY (60 PSI)
V VENT
MU
R
PC
MPC
MPS
LPS
LPC
HWR
HWS
REFRIGERANT
PUMPED CONDENSATE
COLD WATER MAKE-UP
HOT WATER SUPPLY
HOT WATER RETURN
CD
D
CHWS
CHWR
CONDENSATE DRAIN
DRAIN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CLEAN LOW PRESSURE STEAM
CLEAN LOW PRESSURE STEAM
CLPS
CLPC
CONDENSATE (15 PSI)
SUPPLY (15 PSI)
TO REMAIN
TO BE REMOVED
EXISTING DUCT
EXISTING EQUIPMENT
TO REMAIN
TO BE REMOVED
EXISTING PIPING
EXISTING PIPING
TO REMAIN
EXISTING CONDENSATE DRAIN
TO BE REMOVED
EXISTING EQUIPMENT
TO REMAIN
EXISTING DUCT
NEW EQUIPMENT
NEW PIPING
NEW
DUCTWORK
D
SPLIT SYSTEM EVAPORATOR UNITSSEU
SPLIT SYSTEM CONDENSING UNITSSCU
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering Discipline:
Charlotte Engineers LLP 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000 Michael Eaves
Renovation Welcome Center and Patient Support
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000 NC Firm License Number: F-0674
Project No. 4529
C R
E V
IT
F
IL
E
S \R e v it
\4
C E
C e n tr a l M o d e l.
rv t
/8 /2
:0
:2
P M
M-001
MECHANICAL - SYMBOLS, NOTES
& DRAWING INDEX
VAMC Fayetteville, NC
565-20-203
A
02/09/23 GAT CAC
16054
MECHANICAL - DRAWING INDEX
Sheet Number Sheet Name
MD-1-B-02 MECHANICAL - DEMOLITION - PIPING - BASEMENT
MD-1-C-02 MECHANICAL - DEMOLITION - PIPING - CRAWLSPACE
MD-1-L1-01 MECHANICAL - DEMOLITION - DUCTWORK - FIRST
FLOOR
MH-1-B-01 MECHANICAL - NEW WORK - DUCTWORK - BASEMENT
MH-1-B-04 MECHANICAL - NEW WORK - DUCTWORK - MECH
ENCLOSURE
MH-1-L1-01 MECHANICAL - NEW WORK - DUCTWORK - FIRST FLOOR
M-001 MECHANICAL - SYMBOLS, NOTES & DRAWING INDEX
M-002 MECHANICAL - DETAILS
M-003 MECHANICAL - SCHEDULES
M-004 MECHANICAL - AHU SCHEDULES
MD-1-C-01 MECHANICAL - DEMOLITION - DUCTWORK -
CRAWLSPACE
MD-1-B-01 MECHANICAL - DEMOLITION - DUCTWORK - BASEMENT
MH-1-B-02 MECHANICAL - NEW WORK - DUCTWORK - BASEMENT -
AREA A
MH-1-B-03 MECHANICAL - NEW WORK - DUCTWORK - BASEMENT -
AREA B
MP-1-B-01 MECHANICAL - NEW WORK - PIPING - BASEMENT
Revision 0 02-09-2023
NOTES:
1. ROLLERS, SHOES AND SUPPORTS SELECTED PER PIPE SIZE
2. SECURE W/APPROVED ANCHORS TO MATCH BASE MATERIALS AND
LOAD REQUIREMENTS
TYP FOR TRAPEZE
OR BASE MOUNTED
SEE NOTE 2
SIMILAR TO UNISTRUT P 2474 GALV CI ROLLERS
BOLTED TO P 1000 GALV CHANNEL
PIPE W
INSULATION
TYPE 44
ROLLER
BASE
MOUNTED
INSULATE AS REQD
ATTACH TO
STRUCTURE
WITH PROTECTIVE
SPRING CUSHION
W/OR W/OUT TYPE 48
VIBRATION ISOLATOR
TYPE 1 CLEVIS HANGER
SADDLE OR SHIELD
TYPE 40
PROTECTIVE
SHIELD
TYPE 44 SINGLE ROLLER PIPE GUIDE AND
SUPPORT
TYPE 1 CLEVIS HANGER
DN
NOTES:
1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE
SIMILAR FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
INSULATION
1/8" [6mm] CLEARANCE
ALL AROUND
OUTSIDE END
BEARING
INSIDE END
BEARING
HANDLE
WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" [15mm]
ROUND ROD PIN
DUCTSTIFFEN BLADE
AS REQUIRED
SIDE ELEVATION SECTION
VOLUME DAMPER DETAIL
3 3
A
A
Section A-ANOTES:
1. RATED WALL OR FLOOR ASSEMBLY - PROVIDE FIRE STOPPING ASSEMBLY FOR
PARTITION TYPE & RATING ENCOUNTERED.
2. THROUGH PENETRATION (INSULATED OR BARE DEPENDING ON SERVICE) -
PROVIDE FIRE STOPPING ASSEMBLY FOR SIZE & MATERIAL OF THROUGH
PENETRATION UTILIZED.
3. FIRE STOPPING MATERIAL - PROVIDE FIRE STOPPING MATERIAL FOR WALL
ASSEMBLY & THROUGH PENETRATION MATERIAL ENCOUNTERED. FILL VOIDS OR
CAVITY ACCORDING TO THE REQUIREMENTS OF THE FIRE STOPPING SYSTEM
UTILIZED.
ALL RATED WALLS, PARTITIONS OR FLOORS SHALL BE PROVIDED WITH A UL
LISTED FIRE STOP SYSTEM. THE SYSTEM UTILIZED SHALL MATCH THE
SEPARATION PENETRATED AND THE THROUGH PENETRATION MATERIAL.
DETAILS FOR THE INSTALLATION OF SYSTEM TYPE UTILIZED SHALL BE
AVAILABLE AT THE PROJECT SITE FOR THE DURATION OF CONSTRUCTION
AND SHALL BE PROVIDED TO THE BUILDING OWNER AT THE PROJECT
COMPLETION.
PROVIDE WALL OR FLOOR LABELS INDICATING THE SYSTEM MANUFACTURER
AND UL LISTED ASSEMBLY NUMBER AT EACH LOCATION WHERE THE FIRE
STOPPING SYSTEM IS INSTALLED.
THROUGH PENETRATION FIRESTOP SYSTEM
(PROVIDE UL LISTED SYSTEM)
SIDE VIEW
ELEVATION CHANGE - OGEE TRANSITION
DETAIL
PLAN VIEW
R .5
D
D
NOTES:
1. CHANGES IN DUCTWORK ELEVATION SHALL BE ACCOMPLISHED BY UTILIZING
RADIUS ELBOW TRANSITIONS EQUAL TO NO LESS THAN R=1.5D. IN ORDER TO
MINIMIZE DUCT STATIC PRESSURE LOSSES.
2. ELEVATION TRANSITION ARROW INDICATING UP OR DOWN (DN) IS SHOWN WITH
RESPECT TO AIRFLOW DIRECTION.
R
RECTANGULAR SHEETMETAL ELBOWS
TYPE RE 2 SQUARE
THROAT
ELBOW WITH VANES
TYPE RE 1 RADIUS ELBOW
AIR
FLOW
BRANCH DUCT
BRANCH DUCTWORK TAKEOFFS
MAIN EXHAUST OR
RETURN AIR FLOW
NOTE:
ALL BRANCH TAKEOFFS SHALL BE 45°, CONICAL OR BELLMOUTH TYPE.
AIR
FLOW
BRANCH DUCT
MAIN SUPPLY
AIR FLOW
VOLUME DAMPER (REFER
TO
VOLUME DAMPER DETAIL).
VOLUME DAMPER (REFER
TO
VOLUME DAMPER DETAIL).
DUCT
MANUAL VOLUME DAMPER WITH
QUADRANT LOCKING DEVICE,
WITH STANDOFF RUSKIN MODEL
MDRS25 OR EQUAL.
EXTEND TAP AS REQ.D TO
ALLOW
MAX 5' LENGTH OF FLEX DUCT
BETWEEN CONNECTION AND
DIFFUSER
FLEX DUCT WITH
EXTERNAL BLANKET
INSULATION (TYP)
CONNECTIONS BETWEEN LOW PRESSURE DUCT
AND AIR DISTRIBUTION DEVICE
NOTES:
1. ONLY ONE 90° TURN ALLOWED IN FLEX DUCT. DUCT MUST BE PROPERLY
SUPPORTED TO PREVENT KINKING.
2. IF ADDITIONAL 90° TURNS ARE REQD TO CONNECT OUTLET TO DIFFUSER, EXTEND
TAP AND PROVIDE EXTERNALLY INSULATED SHEET METAL ELLS AS REQD.
SEAL WITH DRAW
BAND AT TAP
CONNECTION AND
DIFFUSER/FIXTURE
SEAL INSULATION TO
DUCT WITH CAULKING
AIR DISTRIBUTION DEVICE
SPIN IN COLLAR.
48"
2"
FINISH FLOOR
DEVICES BY ELECTRICAL
CONTRACTOR
THERMOSTAT
THERMOSTAT ALIGNMENT
NOTES:
1. PROPERLY COORDINATE DEVICE LOCATION TO ALIGN VERTICALLY.
DAMPER
BLADE
VARIABLE OR CONSTANT VOLUME
TERMINAL UNIT WITH REHEAT
NOTES:
1. MAINTAIN CLEARANCE ON CONTROL SIDE OF BOX AND INSTALL
SO THAT ACCESS DOORS ARE NOT BLOCKED.
HWS
HWR
UNION
BALL VALVE
AFLD
AIR VENT
HOT WATER HEATING
COIL. (PROVIDE ACCESS
DOOR PRIOR TO COIL FOR
CLEANING COIL)
ROUND HARD
DUCTWORK
(VARIABLE VOLUME
BOX ONLY)
CENTER
AVERAGING
INLET
SENSOR
DDC CONTROLLER SHALL
BE FACTORY MOUNTED
HOSE END DRAIN
VALVE WITH CAP
2-WAY VALVE BY CONTROLS
CONTRACTOR, UNLESS NOTED
OTHERWISE ON PLANS
PRESSURE/
TEMPERATURE
TEST PLUG
J 120V TOGGLE DISCONNECT BY
TERMINAL MANUFACTURER.
120/24V TRANSFORMER BY
TERMINAL MANUFACTURER.
24V WIRING BY
CONTROLS
CONTRACTOR
120V BY ELECTRICAL
CONTRACTOR
120V WIRING
BY CONTROLS
CONTRACTOR
4NTS
3NTS
1NTS9NTS
10NTS
5NTS
6NTS
12NTS
11NTS 7NTS
(LUG TYPE)
BUTTERFLY VALVE
PT TEST PLUG
SUPPLY
LIMITING DEVICE
AUTOMATIC FLOW
RETURN
UNION
THERMOMETER
MANUAL AIR VENT
DRAIN VALVE
PRESSURE
INDEPENDENT 2 WAY
CONTROL VALVE
BUTTERFLY
VALVE
TYPICAL SINGLE CHILLED WATER COIL PIPING
WITH 2-WAY CONTROL VALVE
NOTES:
1. INSTALL AIR VENT AT HIGH POINTS ON PIPING.
2. INSTALL DRAIN VALVES AT LOW POINTS OF PIPING.
3. EXTEND COIL VENTS AND DRAINS (IF PROVIDED BY COIL MANUFACTURER)
THROUGH AIR HANDLING UNIT HOUSING.
4. INSTALL FLOW CONTROL DEVICE MINIMUM OF 10 PIPE DIAMETERS STRAIGHT PIPE
(OR MORE IF REQUIRED BY MANUFACTURER) DOWNSTREAM OF NEAREST FITTING.
2NTS
MIN.
4"
FLOAT AND THERMOSTATIC (F&T) TRAP
ASSEMBLY
FLOAT AND
THERMOSTATIC
TRAP (SEE PLANS AND
SCHEDULES FOR SIZES)1/2" TEST VALVE
STEAM SUPPLY
1/2" DRAIN VALVE
FULL SIZE DIRT LEG
STRAINER
UNION
GATE VALVE
NOTES:
1. USE ON LOW PRESSURE APPLICATIONS.
CONDENSATE
RETURN
MINIMUM 3/4" TRAP
SIZE
8NTS
STEAM COIL
CONTROL VALVE STRAINER
GATE VALVE
1/4" PET COCK VENT
VACUUM BREAKER
LPR
F&T TRAP
TEMPERATURE
CONTROL SENSOR
VACUUM
BREAKER
36" MINIMUM
STEAM COIL PIPING
LPS
HWR
13NTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering Discipline:
Charlotte Engineers LLP 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000 Michael Eaves
Renovation Welcome Center and Patient Support
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000 NC Firm License Number: F-0674
Project No. 4529
C R
E V
IT
F
IL
E
S \R e v it
\4
C E
C e n tr a l M o d e l.
rv t
/8 /2
:0
:3
P M
M-002
MECHANICAL - DETAILS
VAMC Fayetteville, NC
565-20-203
A
02/09/23 GAT CAC
16054
SERVICES LOCATION CFM STARTER DISC. SW.
EF-1
FAN NO. FAN RPM
EXTERNAL
STATIC PRESS.
IN W.G.
FAN WHEEL TYPE
MOTOR
HP/VOLT/PHASE
DRIVE
TYPE
FAN TYPE CONTROL SWITCH &
INTERLOCK TYPE
MFG. & MODEL # DESIGN BASED ON
TOILET B36, B38, HAC B23 HAC B23 510 3316 1.25 BELT INLINE CONTINUOUS GREENHECK BCF-106 MC MCCENTRIFUGAL
GENERAL NOTES
1. BOXES SHALL HAVE PIPE CONNECTIONS ON SAME SIDE AND BE FOR FLARED FITTINGS.
2. COIL AND BOX SIZE MAY BE INCREASED TO MEET REQUIRED CONDITIONS; BUT SHALL NOT BE DECREASED FROM SIZE SHOWN.
3. BOXES SHALL BE SET FOR MAXIMUM CFM SHOWN ON PLANS.
4. DUCT CONNECTIONS TO BOXES SHALL BE SAME SIZE AS BOX INLET UNLESS SHOWN OTHERWISE.
5. MAXIMUM WATER PRESSURE DROP SHALL BE 4 FEET.
6. VARIABLE VOLUME BOXES SHALL OPERATE DOWN TO 50% OF MAXIMUM FLOW.
7. CONSTANT VOLUME BOXES SHALL BE THE SAME BOX USED FOR VARIABLE VOLUME BOX EXCEPT CFM SHALL BE LOCKED AT CAPACITY SHOWN. BOX SHALL NOT OPERATE AS
VARIABLE VOLUME.
8. CONTROLS SHALL BE DDC PROVIDED BY CONTROLS CONTRACTOR AND INSTALLED BY BOX MANUFACTURER.
9. BASIS OF DESIGN SHALL BE PRICE SINGLE DUCT VARIABLE OR CONSTANT VOLUME SDV SERIES. APPROVED EQUALS: KREUGER, ENVIRO-TEC, & NAILOR.
10. MAXIMUM NC LEVEL OF 30 ON ALL BOXES. PROVIDE SOUND ATTENUATOR AS REQUIRED.
11. PROVIDE DIFFERENTIAL AIRFLOW SWITCH.
12. "HC" DEPICTS TERMINAL BOXES THAT SHALL BE SUPPLIED WITH HIGH CAPACITY COILS.
NOTES:
1.
2.
PROVIDE VIBRATION ISOLATORS, SEE SPECIFICATIONS.
3.
FAN HOUSING SHALL BE CONSTRUCTED OF SPUN ALUMINUM.
4.
APPROVED EQUALS - COOK & TWIN CITY.
PROVIDE SPEED CONTROL AND ADJUST TO PROVIDE DESIGN CFM.
1/3 / 115 / 3ϕ
FAN SCHEDULE
SYMBOL REGISTER SIZE 24"x24" TYPE
136-210 CFM 8" ROUND NECK
0-135 CFM 6" ROUND NECK PRICE PDDR
211-325 CFM 10" ROUND NECK
326-475 CFM 12" ROUND NECK
651-840 CFM 16" ROUND NECK
841-2000 CFM 22"x22" NECK
476-650 CFM 14" ROUND NECK
CFM
A
CFM
B
CFM
C
CFM
D
CFM
E
CFM
F
CFM
G
PRICE PDDR
PRICE PDDR
PRICE PDDR
PRICE PDDR
PRICE PDDR
PRICE PDDR
NOTES:
1. ACCEPTABLE MANUFACTURERS: PRICE, NAILOR 4360, TITUS PAR. SEE
ARCHITECTURAL CEILING PLAN FOR PROPER FRAME STYLE.
2. REGISTERS LOCATED IN HARD CEILING AREAS SHALL BE PROVIDED WITH SURFACE
MOUNTED FRAMES.
SYMBOL REGISTER SIZE 24"x24" TYPE
136-210 CFM 8" ROUND NECK
0-135 CFM 6" ROUND NECK PRICE PDDR
211-325 CFM 10" ROUND NECK
326-475 CFM 12" ROUND NECK
651-840 CFM 16" ROUND NECK
841-2000 CFM 22"x22" NECK
476-650 CFM 14" ROUND NECK
CFM
CFM
CFM
CFM
CFM
CFM
CFM
PRICE PDDR
PRICE PDDR
PRICE PDDR
PRICE PDDR
PRICE PDDR
PRICE PDDR
NOTES:
1. ACCEPTABLE MANUFACTURERS: PRICE, NAILOR 4360, TITUS PAR. SEE
ARCHITECTURAL CEILING PLAN FOR PROPER FRAME STYLE.
2. GRILLES LOCATED IN HARD CEILING AREAS SHALL BE PROVIDED WITH SURFACE
MOUNTED FRAMES.
12"x12" REGISTER
CFM
H
PRICE PDDR
0-135 CFM 6" ROUND NECK
SYMBOL TYPICAL MODULE SIZE - 24"x24" TYPE
136-210 CFM 9"x9" FACE 8" ROUND NECK
0-135 CFM 6"x6" FACE 6" ROUND NECK PRICE SMD
211-325 CFM 12"x12" FACE 10" ROUND NECK
326-475 CFM 12"x12" FACE 12" ROUND NECK
476-650 CFM 15"x15" FACE 14" ROUND NECK
CFM
CFM
CFM
CFM
CFM
CFM
CFM
650-840 CFM 18"x18" FACE 16" ROUND NECK
841-1125 CFM 18"X18" FACE & NECK
PRICE SMD
PRICE SMD
PRICE SMD
PRICE SMD
PRICE SMD
PRICE SMD
NOTES:
1. ACCEPTABLE MANUFACTURERS: PRICE, NAILOR 6500, TITUS TDC. SEE
ARCHITECTURAL CEILING PLAN FOR PROPER FRAME STYLE.
2. DIFFUSERS LOCATED IN HARD CEILING AREAS SHALL BE PROVIDED WITH SURFACE
MOUNTED FRAMES.
3. PROVIDE SR MODEL ROUND NECK ADAPTER.
CFM RANGE, FACE SIZE, & NECK SIZE
CFM
0-120 CFM 6"X6" FACE 6" ROUND NECK PRICE SMD
CFM
121-240 CFM 9"X9" FACE 8" ROUND NECK PRICE SMD
12"x12" REGISTER
12"x12" REGISTER
CFM
PRICE PDDR
CFM
PRICE PDDR
CFM
PRICE PDDR
0-120 CFM 6" ROUND NECK
12"x12" REGISTER
0-135 CFM 6" ROUND NECK
24"x12" REGISTER
0-130 CFM 6" ROUNDNECK
16"x16" REGISTER
PERFORATED EXHAUST REGISTERS
PERFORATED RETURN REGISTERS
LOUVERED SUPPLY DIFFUSER
CFM
0-130 CFM 6"X6" FACE 6" ROUND NECK PRICE SMD
24"x12" REGISTER
CFM
SUPPLY LINEAR SLOT DIFFUSERS
TAG # OF SLOTS CFM NECK TYPE
2 0-300 NECK
PRICE SDS100, TYPE 2 WITH
1" SLOTS, 48" LENGTH
NOTES:
1. PROVIDE 48" SDB PLENUM
2. TYPE X END CONFIGURATION
ACCEPTABLE MANUFACTURERS: PRICE, NAILOR, TITUS & KRUEGER. SEE ARCHITECTURAL CEILING PLAN
FOR PROPER FRAME STYLE.
CFM
RETURN LINEAR SLOT DIFFUSERS
TAG # OF SLOTS CFM NECK TYPE
2 0-300 NECK
PRICE SDR100, TYPE 2 WITH
1" SLOTS, 48" LENGTH
NOTES:
1. PROVIDE 48" SDB PLENUM
2. TYPE X END CONFIGURATION
ACCEPTABLE MANUFACTURERS: PRICE, NAILOR, TITUS & KRUEGER. SEE ARCHITECTURAL CEILING PLAN
FOR PROPER FRAME STYLE.
0.1
LOUVERED PENTHOUSE SCHEDULE
MAX APD MANUFACTURER MODEL
GREENHECK FGR-60X80
TAG SERVICE CFM HEIGHT WIDTH
RELIEF 21,430 41.5" 93"L-1
L-2 INTAKE 21,430 0.1 GREENHECK WIH-58X7450.5" 72"
LENGTH
111"
88"
UH NO. LOCATION BTU/HR CFM
TEMP
RISE °F
STEAM
PRESSURE
(PSI)
VOLTS/
PHASE HP AMPS MANUFACTURER
SUH-1 MECHANICAL B86 59,000 1,155 51 10 115/1 1/30 1.9 MODINE V/VN 59
GENERAL NOTES
1. PROVIDE DISCONNECT SWITCHES FOR EACH UNIT.
UNIT HEATER (STEAM) SCHEDULE
2. PROVIDE TEMPERATURE SENSOR (DDC) FOR EACH UNIT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering Discipline:
Charlotte Engineers LLP 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000 Michael Eaves
Renovation Welcome Center and Patient Support
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000 NC Firm License Number: F-0674
Project No. 4529
C R
E V
IT
F
IL
E
S \R e v it
\4
C E
C e n tr a l M o d e l.
rv t
/8 /2
:0
:3
P M
M-003
MECHANICAL - SCHEDULES
VAMC Fayetteville, NC
565-20-203
A
02/09/23 GAT CAC
16054
HW Terminal Unit Schedule
Terminal No. Max. CFM Min. CFM
Reheat CFM Unit Size
Air Runout Size E.A.T. (°F)
Heating L.A.T. (°F) GPM Rows MBH E.W.T. (°F) L.W.T. (°F)
Water Pressure Drop (FT)
1-1-1V 490 245 245 8 12X10 55 114.1 1.5 2 15.7 180 159.1 0.35
1-1-2V 780 390 390 10 14X12 55 112.3 2.4 2 24.2 180 159.1 0.37
1-1-3V 625 315 315 10 14X12 55 116.7 2.1 2 20.9 180 159.1 0.28
1-1-4V 675 340 340 10 14X12 55 115.1 2.2 2 22 180 159 0.31
1-1-5V 900 450 450 10 14x12 55 109.4 2.6 2 26.6 180 159.1 0.44
1-1-6V 885 445 445 10 14x12 55 109.8 2.6 2 26.3 180 159.1 0.44
1-1-7V 875 440 440 10 14x12 55 109.9 2.6 2 26.1 180 159 0.43
1-1-8V 830 415 415 10 14x12 55 111 2.5 2 25.2 180 159 0.40
1-1-9V 500 250 250 8 12x10 55 113.7 1.6 2 15.9 180 159.1 0.36
1-1-10V 760 380 380 10 14x12 55 112.8 2.3 2 23.8 180 159.1 0.36
MANUFACTURER
WATER PRESSURE DROP (FEET H20)
AIR PRESSURE (INCHES H20)
GPM AT 10°F∆T
WHEEL DIAMETER
FILTER PRESSURE DROP (IN W.G.)
FILTER TYPE
TYPE UNIT
LOCATION
SYSTEM NO.
VSD
REMARKS:
TYPE FAN
REMARKS:
VSD
REMARKS:
TYPE FAN
SQ. FT. FACE AREA MIN.
FACE VELOCITY MAX. (FPM)
TYPE
SIZE & NUMBER
VIBRATION ISOLATORS (FANS)
MOTOR OPER. SMOKE DAMPERS
MIXING SECTION W/AD
SENSIBLE LOAD (BTU)
E.A.T. D.B./W.B. (°F)
L.A.T. D.B./W.B. (°F)
FINS PER INCH MIN.
SQ. FT. FACE AREA MIN.
FACE VELOCITY MAX.
E.W.T. °F
BTU TOTAL LOAD
L.A.T. D.B. °F
E.A.T. D.B. °F
TYPE COIL
E.W.T/L.W.T °F
TOTAL CFM
ROWS MIN.
TYPE COIL
WHEEL DIAMETER MIN. (IN.)
WHEEL TYPE
RPM APPROX.
TYPE DRIVE
HP MIN/VOLT/PH
ARRANGEMENT
RPM APPROX.
HP MIN/VOLT/PH
WHEEL TYPE
TYPE DRIVE
TOTAL STATIC PRESSURE (IN WG)
TOTAL CFM
TOTAL LOAD (BTU)
ARRANGEMENT
TOTAL CFM
TOTAL CFM
TOTAL STATIC PRESSURE (IN W.G.)
SYSTEM TYPE
100% OUTSIDE AIR
OUTSIDE AIR CFM MINIMUM
REMARKS:
STEAM PRESSURE (PSI)
RATED CAPACITY (LBS/HR)
AIRFLOW, CFM
MANUFACTURER / MODEL#
L.W.T. °F
ABSORPTION DISTANCE (FT.)(MAXIMUM)
WATER PRESSURE DROP (FT)
EXTERNAL STATIC PRESSURE (IN WG)
FINS/IN MINIMUM
ROWS MINIMUM
EXTERNAL STATIC PRESSURE (IN W.G.)
PRESSURE DROP (IN W.G.)
UNIT TAG
TYPE
SUPPLY AIR DAMPER
EXHAUST AIR DAMPER
OUTSIDE AIR DAMPER
RELIEF AIR DAMPER
MIXED AIR DAMPER
C O
O L
IN
G C
O
IL
A C
C E
S S
S
U P
P L Y
F A
N S
F
IN
A
L F
IL
T
E R
P R
E -H
E A
T C
O
IL
R E
T U
R N
F A
N S
CUSTOM AIR HANDLING UNIT SCHEDULE
H U
M
ID
IF
IE
R P
R E
-F
IL
T E
R
REMARKS:
REMARKS:
MAX FACE VELOCITY (FT/MIN)
REMARKS:
MAX FACE VELOCITY (FT/MIN)
8,550
DAIKIN
VARIABLE VOLUME
CUSTOM
AHU-1
2,565
HOT WATER
394,110
273,210
81/67
78.54
52/51.68
CHILLED WATER
463,620
180/160
EXTERIOR COURTYARD A /B WING
8,550 (4,275/FAN)
VFD
0.5
DIRECT
YES
8,550
8,550 (4,275/FAN)
YES
4.0
DIRECT
VFD
1.04
1,946
5/208/3⌀
FRONT TOP
5.61
2,658
TOP FRONT
19.83
20.45
0.598
8.63
8,550
YES
YES
YES
YES
18.25"
PLENUM
AHU MANUFACTURER TO
PROVIDE
SHORT ABSORPTION MANIFOLD
RUSKIN SD-60
RUSKIN SD-60
RUSKIN SD-60
RUSKIN CD-50
NA
PLENUM
NORTEC/LS
<18"
DIRECT STEAM
18.25
MERV 15
CARTRIDGE
1.5" MAX
MERV 8
0.533
PROVIDE VFD FOR EACH FAN
PROVIDE VFD FOR EACH FAN
GENERAL NOTES
1. PROVIDE SUPPLY AIR SMOKE DAMPER,
OUTSIDE AIR INTAKE SMOKE DAMPER AND
RETURN AIR (MIXED AIR) SMOKE DAMPER.
EACH DAMPER SHALL COMPLY WITH UL
555S, CLASS 1.
2. FILTERS SHALL BE PROVIDED BY THE UNIT
MANUFACTURER. ONE SET OF NEW
FILTERS SHALL BE INSTALLED IN EACH
FILTER BANK WHEN BUILDING IS TURNED
OVER TO OWNER AND ONE COMPLETE
SET SHALL BE PROVIDED FOR OWNER'S
STOCK.
3. REFER TO UNIT PLANS FOR
ARRANGEMENT OF UNITS, ACCESS
DOORS, ETC.
4. REFER TO SPECIFICATIONS FOR SPECIFIC
REQUIREMENTS FOR ACCESSORIES AND
DETAILS OF CONSTRUCTION FOR THE AIR
HANDLING UNITS.
5. PROVIDE EXTENDED LUBE LINES FOR
EACH FAN. EXTENDED LUBE LINES SHALL
BE COPPER.
6. PROVIDE PREMIUM EFFICIENCY MOTORS.
7. PERFORMANCE PARAMETERS SHALL BE
MAINTAINED WITH FULLY LOADED FILTERS.
8. REFER TO SPECIFICATIONS FOR
APPROVED EQUALS.
9. PROVIDE FACTORY INLET FLOW SENSOR
AND BACKDRAFT DAMPER AT EACH FAN
FANS.
10. VFDs SHALL BE FACTORY MOUNTED AND
WIRE BY UNIT MANUFACTURER.
11. PROVIDE DRAINS IN EACH UNIT SECTION
FOR UNIT WASHDOWN.
12. OUTSIDE AIR AND RELIEF AIR DAMPER
SIZED FOR 100% DESIGN AIRFLOW.
13. PROVIDE UNIT WITH AIR SIDE
ECONOMIZER.
14. PROVIDE A VFD FOR EACH SUPPLY AND
RETURN FAN.
7.5/208/3⌀
NTS
AHU-1 CONTROLS SCHEMATIC 1
TO FIRE
ALARM
SYSTEM
HSPS
M
DP
SPHSTS
HSTS
LL DD
DD
M
HSTSDD
RETURN
SUPPLY
AFMS
SUPPLY AIR
SMOKE DAMPER
RETURN AIR
SMOKE DAMPER
RELIEF
DAMPER
M
PRE-
FILTER
HEATING
COIL
COOLING
COIL AFMS
SUPPLY
FANS (X2)
TO FIRE
ALARM
SYSTEM
LEGEND
AFMS - AIR FLOW MONITORING STATION
DD - DUCT DETECTOR
DP - DIFFERENTIAL PRESSURE
HS - HUMIDITY SENSOR
HSPS - HIGH STATIC PRESSURE SENSOR
LL - LOW LIMIT
SP - STATIC PRESSURE SENSOR
TS - TEMPERATURE SENSOR
VFD - VARIABLE FREQUENCY DRIVE
M
OUTSIDE AIR
DAMPER
M
OUTSIDE
AIR
AFMS
TO FIRE
ALARM
SYSTEM
RELIEF
HUMIDIFIER
V
D F
RETURN AIR DAMPER
V
D F
RETURN
FANS (X2)
V
D F
V
D F
AIR HANDLING EQUIPMENT
VARIABLE AIR VOLUME AIR HANDLING UNIT (AHU-1)
1. THE AHU WILL START ON COMMAND FROM THE BAS, WHEN THE HOA SWITCH IS IN THE "AUTO" MODE. THE AHU MAY ALSO BE STARTED LOCALLY WHEN THE HOA SWITCH IS
PLACED IN THE "HAND MODE".
2. WHEN THE AIR HANDLER IS COMMANDED TO START THE OUTDOOR AIR DAMPER SHALL BE OPENED 100% AND PROVE "OPEN" BASED ON INPUT FROM THE DAMPER END SWITCH, PRIOR TO STARTING THE SUPPLY AND EXHAUST FANS. IF THE OUTDOOR AIR DAMPERS DO NOT PROVE OPEN THE FAN SHALL REMAIN OFF AND AN ALARM SHALL
BE ROUTED TO THE OPERATOR'S WORKSTATION.
3. WITH THE OUTDOOR DAMPER VERIFIED OPEN THE VFD SHALL START AND MODULATE THE SUPPLY AND RETURN FANS. CURRENT TRANSFORMER (CT) SWITCHES SHALL SIGNAL THE CONTROLLER TO VERIFY OPERATION OF THE SUPPLY AND RETURN FANS. IF SUPPLY FAN OPERATION IS NOT VERIFIED WITHIN 30 SECONDS (CUSTOMER ADJUSTABLE) THEN THE UNIT SHALL BE SHUT DOWN AND AN ALARM BE ROUTED TO THE OPERATORS WORKSTATION. IF THE RETURN FAN OPERATION IS NOT VERIFIED THE UNIT SHALL CONTINUE TO OPERATE AND AN ALARM SHALL BE ROUTED TO THE OPERATORS WORKSTATION.
4. THE AHU SHALL STOP WHEN COMMANDED BY THE BAS, OR WHEN THE HOA SWITCH IS PLACED IN "HAND". THE UNIT SHALL SHUT DOWN BY FIRST COMMANDING OFF THE FAN VFDS, WHEN THE FANS ARE PROVEN OFF (BY THE CT INPUT) THE OUTDOOR AIR DAMPER SHALL THEN BE CLOSED.
5. THE AHU WILL STOP (FANS OFF, OUTDOOR DAMPER CLOSED) AND AN ALARM BE ROUTED TO THE OPERATORS WORKSTATION WHEN ANY OF THE FOLLOWING CONDITIONS
OCCUR:
A. IF EMERGENCY STOP SWITCH IS IN "PUSHED" POSITION, THEN THE SWITCH MUST BE MANUALLY "PULLED" IN ORDER TO RESTART THE AHU.
B. IF HIGH DISCHARGE PRESSURE SWITCH LOCATED IN THE UNIT AND AFTER THE SUPPLY FAN IS TRIGGER DUE TO HIGH PRESSURE, THE AHU SHALL SHUT DOWN AND
WILL NOT RESTART AUTOMATICALLY. (HIGH STATIC PRESSURE SWITCH SHALL BE SET ACCORDING TO TEST AND BALANCE'S INSTRUCTION.)
C. IF THE VAPOR TENSION LOW LIMIT THERMOSTAT ("FREEZESTAT") SENSE A TEMPERATURE BELOW 35 DEGREES (SHALL REQUIRE A MANUAL RESET.)
D. IF RETURN DUCT HIGH TEMPERATURE ("FIRESTAT") IS TRIGGERED, THE AHU SHALL SHUT DOWN AND WILL NOT RESTART. (SET AT 125 DEGREES, F.)
E. SMOKE MODE - IF ANY OF THE DUCT MOUNTED SMOKE DETECTORS (FURNISHED BY DIVISION 28) AND INSTALLED IN THE SUPPLY, RETURN AND OUTSIDE AIR
STREAMS DETECT SMOKE OR A SPACE DETECTOR DETECTS SMOKE THE SUPPLY AIR FANS AND RETURN AIR FANS SHALL SHUT DOWN.
6. DISCHARGE CONTROL
A. THE DISCHARGE AIR TEMPERATURE SENSOR IS LOCATED AT THE UNIT'S DISCHARGE PLENUM. CONTROL DISCHARGE AIR TEMPERATURE TO 55 DEGREES F (ADJUSTABLE) BY MODULATING THE PRE-HEAT COIL CONTROL VALVES AND COOLING COIL VALVES, IN SEQUENCE.
B. THE PREHEAT VALVE WILL FAIL SAFE TO THE NORMAL OPEN POSITION. WHEN THE OSA TEMPERATURE IS ABOVE 50 DEGREES (SET POINT ADJUSTABLE), THE PREHEAT VALVE WILL BE CLOSED. WHEN THE OUTSIDE AIR TEMPERATURE FALLS BELOW 50 DEGREES THE PREHEAT CONTROL VALVE SHALL MODULATE TO
MAINTAIN DOWN STREAM AIR TEMPERATURE SET POINT.
C. AHU COILING COILS SHALL UTILIZE A STANDARD CONTROL VALVE ARRANGEMENT AND SHALL BE CONTROLLED AS FOLLOWS:
a. ON AN INCREASE IN COOLING LOAD, THE CONTROL VALVE SHALL MODULATE OPEN TO MAINTAIN THE DISCHARGE AIR TEMPERATURE SET POINT. UPON A
DECREASE IN COOLING LOAD, THE CONTROL SHALL MODULATE CLOSED TO MAINTAIN THE DISCHARGE AIR TEMPERATURE SET POINT .
7. SUPPLY FAN CONTROL
A. MODULATE ALL VFD'S AT THE SAME SPEED TO MAINTAIN THE SUPPLY AIR DUCT STATIC PRESSURE SENSOR WITH THE LOWEST READING AT SET POINT. A STATIC
PRESSURE TRANSMITTER SHALL BE LOCATED 2/3 DOWN THE LONGEST DUCT.
B. IF THE STATIC PRESSURE SENSOR BECOMES UNRELIABLE, THE CONTROLLER WILL COMMAND THE SUPPLY FAN VFD TO ITS MINIMUM SPEED AND AN ALARM SHALL
BE ROUTED TO THE OPERATOR'S WORKSTATION.
C. RESET THE DUCT STATIC PRESSURE SENSOR TO KEEP AT LEAST ONE VAV BOX SUPPLY AIR DAMPER AT 95% OPEN.
8. RETURN FAN TRACKING
A. THE RETURN FAN AIRFLOW SHALL TRACK THE SUPPLY AIRFLOW UTILIZING AN OFFSET VALUE AS MEASURED WITH THE AIRFLOW MONITORS IN THE UNIT. THE OFFSET SHALL BE ESTABLISHED AT FINAL TEST AND BALANCE TO KEEP THE BUILDING AT SLIGHTLY POSITIVE PRESSURE.
9. HUMIDIFIER CONTROL
A. THE HUMIDIFIER SYSTEM SHALL BE ENABLED ONLY WHEN THE AHU IS IN OPERATION. CONTROL THE HUMIDIFIER BASED ON INPUT FROM A RETURN AIR HUMIDITY
SENSOR WITH AN ADJUSTABLE SETPOINT. INPUT FROM A DISCHARGE HUMIDITY SENSOR SHALL BE USED TO REDUCE HUMIDIFIER OUTPUT TO PREVENT AIR SATURATION. HUMIDIFIER CONTROL VALVE SHALL MODULATE TO MAINTAIN SET POINT (OWNER ADJUSTABLE).
10. ECONOMIZER MODE
A. OUTSIDE AIR TEMPERATURE SHALL BE COMPARED WITH A REFERENCE DRY BULB SETPOINT (OWNER ADJUSTABLE). ECONOMIZER MODE SHALL BE ENABLED WHEN
THE OUTSIDE AIR TEMPERATURE IS LESS THAN THE REFERENCE DRY BULB SETPOINT. ECONOMIZER MODE SHALL BE DISABLED WHEN THE OUTSIDE AIR
TEMPERATURE IS GREATER THAN THE REFERENCE DRY BULB SETPOINT.
B. THE DISCHARGE AIR SENSOR SHALL MEASURE THE DRY BULB TEMPERATURE OF THE AIR LEAVING THE COOLING COIL WHEN EXONOMIZER MODE IS ENABLED. THE OUTSIDE AIR DAMPER SHALL MODULATE BETWEEN IT'S MINIMUM POSITION AND 100% TO MAINTAIN DISCHARGE AIR TEMPERATURE AT SETPOINT.
C. OUTSIDE AIR DAMPER SHALL MODULATE TO MINIMUM POSITION IN EVENT MIXED AIR TEMPERATURE FALLS BELOW LOW LIMIT TEMPERATURE SETTING AND
ECONOMIZER MODE SHALL BE DISABLED.
D. WHEN THE ECONOMIZER MODE IS DISABLED THE OUTDOOR AIR DAMPER SHALL BE SET TO MINIMUM POSITION REQUIRED BY VENTILATION.
VAV TERMINALS
1. PROVIDE PRESSURE INDEPENDENT CONTROL (I.E., THE SUPPLY AIR CFM SET POINT IS RESET TO MAINTAIN THE SPACE TEMPERATURE COOLING SET POINT.)
2. OCCUPIED / UNOCCUPIED MODE - INDEX BASED ON THE ASSOCIATED ZONE'S TIME SCHEDULE (OR THAT FOR THE AHU IF ALL BOXES SERVED THE BY THE AHU HAVE THE
SAME SCHEDULE) OR BY THE ASSOCIATED OCCUPANCY SENSOR. THE SUPPLY AIR DAMPER AND REHEAT COIL VALVE SHALL BE CLOSED IF THE ASSOCIATED AHU IS OFF.
3. HEATING - MODULATE THE HEATING COIL TO MAINTAIN THE OCCUPIED OR UNOCCUPIED SPACE HEATING SET POINT WHILE MAINTAINING THE BOX SUPPLY AIR CFM AT THE
MINIMUM SETTING FOR THE HEATING MODE (WHICH MAY BE A DIFFERENT VALUE THAN THAT FOR COOLING IF PROVIDED).
4. COOLING OPERATION - DO NOT RESET THE SUPPLY AIR CFM BELOW THE MINIMUM SUPPLY AIR SET POINT OR ABOVE THE MAXIMUM.
5. DEADBAND - PROVIDE A DEADBAND BETWEEN THE HEATING AND COOLING SPACE TEMPERATURE SET POINTS IN WHICH THE MINIMUM SUPPLY AIR CFM IS DELIVERED AND
NO HEATING IS PROVIDED.
6. MINIMUM SUPPLY AIR SET POINT (WHEN COOLING OR IN THE DEADBAND) - THE SET POINT SHALL BE THAT NEEDED FOR VENTILATION WHILE OPERATING IN THE OCCUPIED
MODE ONLY; OTHERWISE THE MINIMUM SHALL BE "ZERO" (I.E., DURING AHU UNOCCUPIED HEATING / COOLING, OR AHU WARM-UP OR COOL-DOWN DUE TO OPTIMUM START.)
GENERAL EXHAUST FANS
1. EXHAUST FANS SHALL BE STARTED AND STOPPED BY THE BAS. DIFFERENTIAL PRESSURE SWITCHES SHALL REPORT EXHAUST FAN STATUS TO THE BAS. THE EXHAUST FANS SHALL RUN CONTINUOUSLY, EXCEPT FOR MAINTENANCE SHUTDOWNS. THE EXHAUST FANS SHALL CONTINUE TO RUN DURING ALL SMOKE MODES.
2. ISOLATION EXHAUST FANS SHALL BE CONTROLLED BY DUCT STATIC PRESSURE COMMUNICATED TO VFD.
3. WHERE A REDUNDANT EXHAUST FAN IS PROVIDED (ISOLATION EXHAUST, ETC) A MOTOR OPERATED DAMPER SHALL BE PROVIDED UPSTREAM OF EACH FAN. UPON FAILURE
OF A FAN THE ASSOCIATED FAN DAMPER SHALL CLOSE AND THE NEXT DAN SHALL BE STARTED AND ITS DAMPER OPENED. A SEQUENCE SHALL BE PROVIDED TO
REGULARLY ALTERNATE BETWEEN FANS.
SEQUENCE OF OPERATION
FLOW RATE (GPM) 46.30
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering Discipline:
Charlotte Engineers LLP 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000 Michael Eaves
Renovation Welcome Center and Patient Support
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000 NC Firm License Number: F-0674
Project No. 4529
C R
E V
IT
F
IL
E
S \R e v it
\4
C E
C e n tr a l M o d e l.
rv t
/8 /2
:0
:4
P M
M-004
MECHANICAL - AHU SCHEDULES
VAMC Fayetteville, NC
565-20-203
A
02/09/23 GAT CAC
16054
(E)AHU-7
3 3
REMOVE EXISTING
EXHAUST FAN.
PATCH EXTERIOR
WALL.
40" x 40" SUPPLY AIR DUCT DOWN
TO CRAWLSPACE. SEE MD-1-C-01
FOR CONTINUATION.
8" x 6" DUCT
UP TO FLOOR
ABOVE.
EXISTING EXHAUST
DUCTWORK DOWN TO
FAN IN CRAWLSPACE.
EXISTING AIR CURTAIN
ELECTRICAL
B33
TELE CLOSET
B32A
HOUSE KEEPING
B32
MECH
B78
SUPPLY UP FROM
CRAWLSPACE.
SEE MD-1-C-01
FOR CONTINUATION
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8
(E)AHU-8
10"x10"
24"x20"
"x
8"x10"
10"x10"
"x
"x
12"x10"
"x
"x
12"x10" 12"x10"
"x
"x
"x
8"x10"
"x
12"x14"
16"x14"
"x
"x
"x
"x
"x
6"x8"
6"x8"
6"x8"
6"x8"
6"x8"
6"x8"
6"x8" 6"x8"
6"x8"
6"x8"
40"x8"24"x12" 20"x14"18"x10"
"x
"x
8"x6"
"x
18"x10"10"x10"8"x10"
8"x10"
"x
8"x10" 8"x10"
"x
"x
8"x10"
16"x12" 8"x10"
"x
8"x12"
"x
6"x8"
6"x8"
20"x14"
6"x8"
6"x8"
"x
"x
"x
24"x12" 24"x12"
"x
"x
"ø
"x
30"x28"
(E)FAN
DEMOLITION KEY PLAN: (NOT TO SCALE)
GENERAL NOTES
A. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION
PURPOSES. THE SCALE, WHEN INDICATED IS INTENDED FOR GENERAL
REFERENCE ONLY.
B. ALL SHUTDOWNS SHALL BE COORDINATED AND APPROVED THROUGH
THE OWNERS REPRESENTATIVE AND WILL REQUIRE ADVANCE NOTICE
OF TWO WEEKS. THIS TIME LENGTH MAY BE LONGER OR SHORTER
FOR SOME SHUTDOWNS AND SHALL BE AT THE OWNERS DISCRETION.
C. PROVIDE ESCUTCHEON PLATES WHERE DUCTS PENETRATE CEILINGS
OR WALLS IN AREAS EXPOSED TO VIEW. ESCUTCHEONS FOR DUCTS
SHALL BE CONSTRUCTED OF SAME MATERIAL AS DUCT. PIPE
ESCUTCHEONS SHALL BE CHROME-PLATED BRASS.
D. LEAVE A MINIMUM CLEARANCE OF 2 INCHES ABOVE DUCTS INSTALLED
IN RATED PARTITIONS TO ALLOW SPACE FOR THE GENERAL
CONTRACTOR TO SEAL THE WALL ABOVE THE DUCTS. DO NOT INSTALL
FLEXIBLE DUCT THROUGH RATED WALLS, BARRIERS OR PARTITIONS.
E. PROVIDE REMOVABLE ACCESS DOORS AT ALL MOTOR OPERATED
DAMPERS, FIRE DAMPERS, SMOKE DAMPERS, DUCT COILS, SMOKE
DETECTORS, AND SIMILAR ITEMS REQUIRING MAINTENANCE OR
ADJUSTMENT.
F. MECHANICAL CONTRACTOR SHALL REMOVE INSULATION, REPAIR DUCT
LEAKS, AND RE-INSULATE ALL EXISTING DUCT MAINS.
G. MECHANICAL CONTRACTOR SHALL INSTALL MANUAL VOLUME DAMPERS
ON ALL BRANCH DUCTWORK CONNECTIONS.
H. ANY EXISTING PIPE OR DUCT INSULATION THAT IS DAMAGED DURING
CONSTRUCTION SHALL BE REMOVED AND REPLACED WITH NEW
INSULATION TO MATCH ADJACENT INSULATION AND COVERING.
I. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.
J. MECHANICAL CONTRACTOR SHALL RELOCATE EXISTING EQUIPMENT TO
REMAIN AS REQUIRED TO COORDINATE INSTALLATION OF NEW WORK.
K. PROVIDE A PRE-TAB OF ALL AREAS AFFECTED BY AHU-7 BEFORE
REMOVAL OF ANY DUCTWORK. ONCE DEMO HAS BEEN ACCOMPLISHED
AND DUCTWORK, HWH, ETC. IS BLANKED OFF, PERFORM A TAB AFTER
DEMO TO ENSURE FLOW RATES OF AFFECTED AREAS SUPPLY/RETURN
IS WITHIN RANGE.
L. ALL HANGERS AND SUPPORTS ASSOCIATED WITH REMOVED
DUCTWORK AND PIPING AS WELL AS ANY ABANDONED HANGERS
WITHIN THE SCOPE OF WORK AREAS SHALL BE REMOVED AND
DISPOSED OF OFF SITE.
EXISTING DUCTWORK CONTINUES OUTSIDE SCOPE.
EXISTING AIR HANDLING UNIT TO BE RELOCATED. SEE NEW WORK PLANS NEW
LOCATION.
DEDUCT ALTERNATE #2 - EXISTING AIR CURTAIN TO BE RELOCATED TO
ACCOMMODATE NEW ARCHITECTURAL EXTERIOR WORK. SEE NEW WORK
FLOOR PLANS FOR NEW LOCATION.
EXISTING KEYED NOTES
REMOVE ALL DUCTWORK AND ASSOCIATED EQUIPMENT BACK TO SOURCE.
CAP EXISTING DUCTWORK.
REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED PIPING. SEE MD-1-C-02
FOR PIPING IN CRAWLSPACE.
DEDUCT ALTERNATE #1 - DEMOLISH EXISTING ABANDONDED DUCTWORK
BACK TO WALL PENETRATION AS SHOWN AND CAP.
DEDUCT ALTERNATE #1 - DEMOLISH EXISTING EXHAUST FAN IN WINDOW
AND ALL ASSOCIATED COMPONENTS COMPLETE.
DEMOLITION KEYED NOTES
GRAPHIC SCALE
( in Feet )
1 inch = 8 ft.
8 84 16 32
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Engineering Discipline:
Charlotte Engineers LLP 5838 Monroe Rd # 100, Charlotte, NC 28212 704-531-3000 Michael Eaves
Renovation Welcome Center and Patient Support
5838 Monroe Road, Suite 100
Charlotte, NC 28212
704 531 3000 NC Firm License Number: F-0674
Project No. 4529
C R
E V
IT
F
IL
E
S \R e v it
\4
C E
C e n tr a l M o d e l.
rv t
/8 /2
:0
:5
P M
MD-1-B-01
MECHANICAL - DEMOLITION -
DUCTWORK - BASEMENT
VAMC Fayetteville, NC
565-20-203
A
02/09/2023 GAT CAC
16054
1/8" = 1'-0"
MECHANICAL - DUCTWORK - BASEMENT - DEMOLITION
E )C
H W
S
/2
E )C
H W
R
(E)CHWS
(E)CHWR
(E)CHWS
(E)CHWR
(E)CHWS
(E)CHWR
(E)CHWS
(E)CHWR
(E)CHWR
(E)CHWS
(E)CHWR
3/4"(E)CHWS
3/4"(E)CHWR
1 1/2"(E)CHWS
1 1/2"(E)CHWR
(E)CHWR
1"(E)CHWS
1"(E)CHWR
(E)CHWR
(E)CHWS
(E)CHWS
(E)CHWS
(E)CHWR
(E)CHWR
(E)CHWS
(E)CHWS
(E)CHWR
1"(E)CHWS
1"(E)CHWR
(E)CHWR
(E)CHWS
(E)CHWS
(E)CHWR
(E)CHWS
(E)CHWR
EXISTING
SSCU TO REMAIN.
EXISTING SSEU TO BE
RELOACTED. SEE
NEW WORK PLAN
FOR NEW LOCATION.
2 2
2 2 2 2
PIPES DOWN TO
CRAWLSPACE. SEE MD-1-
C-01 FOR CONTINUATION.
(E)R
1"(E)LPS
1 1/2"(E)CHWR1 1/2"(E)CHWS
3/4"(E)LPS
EXISTING STEAM AND CHILLED
WATER PIPING TO AHU-2.
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8
(E)AHU-8
1 1/2"(E)LPS
1"(E)LPR
4"(E)CHWS
4"(E)CHWR
(E)CHWS
(E)CHWR
GENERAL NOTES
A. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION
PURPOSES. THE SCALE, WHEN INDICATED IS INTENDED FOR GENERAL
REFERENCE ONLY.
B. ALL SHUTDOWNS SHALL BE COORDINATED AND APPROVED THROUGH
THE OWNERS REPRESENTATIVE AND WILL REQUIRE ADVANCE NOTICE
OF TWO WEEKS. THIS TIME LENGTH MAY BE LONGER OR SHORTER
FOR SOME SHUTDOWNS AND SHALL BE AT THE OWNERS DISCRETION.
C. PROVIDE ESCUTCHEON PLATES WHERE DUCTS PENETRATE CEILINGS
OR WALLS IN AREAS EXPOSED TO VIEW. ESCUTCHEONS FOR DUCTS
SHALL BE CONSTRUCTED OF SAME MATERIAL AS DUCT. PIPE
ESCUTCHEONS SHALL BE CHROME-PLATED BRASS.
D. LEAVE A MINIMUM CLEARANCE OF 2 INCHES ABOVE DUCTS INSTALLED
IN RATED PARTITIONS TO ALLOW SPACE FOR THE GENERAL
CONTRACTOR TO SEAL THE WALL ABOVE THE DUCTS. DO NOT INSTALL
FLEXIBLE DUCT THROUGH RATED WALLS, BARRIERS OR PARTITIONS.
E. PROVIDE REMOVABLE ACCESS DOORS AT ALL MOTOR OPERATED
DAMPERS, FIRE DAMPERS, SMOKE DAMPERS, DUCT COILS, SMOKE
DETECTORS, AND SIMILAR ITEMS REQUIRING MAINTENANCE OR
ADJUSTMENT.
F. MECHANICAL CONTRACTOR SHALL REMOVE INSULATION, REPAIR DUCT
LEAKS, AND RE-INSULATE ALL EXISTING DUCT MAINS.
G. MECHANICAL CONTRACTOR SHALL INSTALL MANUAL VOLUME DAMPERS
ON ALL BRANCH DUCTWORK CONNECTIONS.
H. ANY EXISTING PIPE OR DUCT INSULATION THAT IS DAMAGED DURING
CONSTRUCTION SHALL BE REMOVED AND REPLACED WITH NEW
INSULATION TO MATCH ADJACENT INSULATION AND COVERING.
I. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.
J. MECHANICAL CONTRACTOR SHALL RELOCATE EXISTING EQUIPMENT TO
REMAIN AS REQUIRED TO COORDINATE INSTALLATION OF NEW WORK.
K. PROVIDE A PRE-TAB OF ALL AREAS AFFECTED BY AHU-7 BEFORE
REMOVAL OF ANY DUCTWORK. ONCE DEMO HAS BEEN ACCOMPLISHED
AND DUCTWORK, HWH, ETC. IS BLANKED OFF, PERFORM A TAB AFTER
DEMO TO ENSURE FLOW RATES OF AFFECTED AREAS SUPPLY/RETURN
IS WITHIN RANGE.
L. ALL HANGERS AND SUPPORTS ASSOCIATED WITH REMOVED
DUCTWORK AND PIPING AS WELL AS ANY ABANDONED HANGERS
WITHIN THE SCOPE OF WORK AREAS SHALL BE REMOVED AND
DISPOSED OF OFF SITE.
EXISTING CHWS/R PIPING TO REMAIN AS IT MAY SERVE EQUIPMENT ABOVE.
CONTRACTOR SHALL COORDINATE ANY SHUTDOWNS WITH OWNER AS
REQUIRED.
EXISTING PIPING CONTINUES OUTSIDE SCOPE.
EXISTING AIR HANDLING UNIT TO BE RELOCATED. SEE MP-1-B-01 FOR NEW
LOCATION.
DEDUCT ALTERNATE #2 - EXISTING AIR CURTAIN TO BE RELOCATED TO
ACCOMMODATE NEW ARCHITECTURAL EXTERIOR…