Amendment 0004 - 36C24623B0061.pdf
PDF 187 KB Posted
- Attached to
- Z2DZ--Renovation for Welcome Center Federal contract opportunity
- Solicitation number
- 36C24623B0061
About this file
This document is an amendment to a solicitation for the renovation of a welcome center. The amendment provides responses to 37 questions from vendors, extends the bid due date to October 18, 2023 at 1:00 PM Eastern Time, and clarifies product definitions. The renovation is for the Welcome Center located at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. Products clarified include glass wall panels, lightplane panels, and casework. The amendment also attaches a geotechnical report and site visit sign-in sheet.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0005 36C24623B0061.pdf | ||
| Bid Abstract - 36C24623B0061.pdf | ||
| Site Visit Attendees - Renovate Welcome Center.pdf | ||
| 10 Final Geotechnical Report - January 2023.pdf | ||
| Amendment 0003 - 36C24623B0061.pdf | ||
| 565-20-203 Issued For Construction Drawing Set - Pages 54-106.pdf | ||
| 565-20-203 Issued For Construction Drawing Set - Pages 1-53.pdf | ||
| Amendment 0002 - 36C24623B0061.pdf | ||
| Asbestos _ HazMat Summary - April 2021.pdf | ||
| Amendment 0001 - 36C24623B0061.pdf | ||
| Crawlspace Asbestos _ HazMat Summary - September 2022.pdf | ||
| Existing 44-CDP switchboard.jpeg | JPEG file | |
| Interior Panels - Bldg 44.jpeg | JPEG file | |
| 565-20-203 Issued For Construction Drawing Set A.pdf | ||
| 565-20-203 Issued For Construction Drawing Set B.pdf | ||
| 36C24623B0061_1 solicitation.pdf | ||
| 36C24623B0061_1.docx | DOCX document | |
| 565-20-203 Specifications.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
565-20-203
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
To all Offerors/Bidders
36C24623B0061
08-02-2023
X
X X
Wednesday, October 18, 2023, 1:00 PM ET
X
The purpose of this Amendment is to provide Government responses to all Follow-Up Questions received from Vendors, and to extend the due date and time for receipt of bids and bid opening.
1. See the following pages and attachment for all Government responses. Questions and responses are numbered to continue from Amendment 0002. There are a total of 37 numbered questions and responses.
2. The Site Visit Sign-In Sheet is attached.
3. The due date and time for receipt of bids has been extended. Bids are due prior to the start of the Bid Opening at:
Wednesday, October 18, 2023, at 1:00 PM ET
4. Please acknowledge this and any other Amendments to this solicitation by completing Block 18 of the SF 1442 on your submitted offer.
Daniel Dove Contracting Officer
36C24623B0061 – Renovation of Welcome Center Amendment 0004 - Responses to Follow-Up Vendor Questions (NOTE: Question Numbering continued from Amendment 0002)
31. There was not a geotechnical report included in the bid documents for review but is indicated to be available per Sheet S0.01 Note 4.1.
Response: Please refer to the Final Geotechnical Report attached to this Amendment.
32. Referencing Specification Section 31 20 11, paragraph 1.4.a indicates that this site is considered an UNCLASSIFED. However, in paragraph 3.2.E indicates when unsuitable material is encountered and removed, the contract price and time will be adjusted in accordance with Articles, DIFFERING SITE CONDITIONS, CHANGES and CHANGES- SUPPLEMENT of the GENERAL CONDITIONS as applicable. Adjustments to be based on meters (yardage) in cut section only. Please clarify the classification of the site.
Response: The site is considered to be UNCLASSIFIED. Any unsuitable material that is encountered and removed will be addressed using the Differing Site Conditions and Changes Clauses after contract award.
33. There is some confusion regarding the definitions for DG-1 and GL-1. DG-1 is defined on the Material Schedule (AF600) as part of the wall cladding (Forms + Surfaces’ Level E Wall Cladding Capture Panel); however, details 11 & 12 on AE211 use “GL-1” to refer to the lightplane panels used at the Level E Wall Cladding Capture Panel.
Response: Revise DG-1 to GL-1 at all locations.
34. GL-1 is also used for Reception B65 (9/AE211), but the cross-section for this (6/AE551) states “finish____” for this panel. That same cross-section (6/AE551) is used on 4/AE411 where the panel there is called out as DG-1. GL-1 is found nowhere else in the specifications or plans in order to know what this is.
Response: Revise DG-1 to GL-1 at all locations. At 6/AE551, revise “Finish______” to GL-1.
35. Additionally, “DG-1” is used on the casework at Lobby B60W (1/AE211) and ROI Check-In
B67A (4/AE411).
Response: Revise DG-1 to GL-1 at all locations.
36. The definition for DG-1 per the material schedule makes it seem incompatible with the casework since it is a component of the Level E Wall Cladding Capture Panel.
Response: Revise DG-1 to GL-1 at all locations. DG-1 is a sheet of glass that can be used with the Level-E wall cladding system (backlit at elevator lobbies) or without (at reception desks).
37. DG-2 appears to be used on at B73 (on location between desks, and another between B73 and B60W Lobby per 1/AE412 and subsequent details all aligning). Can you provide clarity on the definitions and uses for DG-1, DG-2, and GL-1?
Response: Revise DG-1 to GL-1 at all locations. DG-2 is a separate product entirely – see Specification Section 08 81 00.
<See attached document: 10 Final Geotechnical Report - January 2023>
<See attached document: Site Visit Attendees - Renovate Welcome Center>
File details come from the government source that posted it. Updated .