About this file
This document is a comprehensive set of architectural and engineering drawings for the Upgrade Elevators Phase 2 project at the New Jersey VA Medical Center in East Orange. The project involves modernizing elevator systems in Buildings 1, 2, 5, and 7, including elevator cabs, machine rooms, electrical systems, mechanical systems, and fire protection infrastructure. Specific upgrades include installing new dome cameras, LED lighting, fire alarm devices, electrical panels, split system HVAC units, sump pumps, and reconfiguring elevator controls and power systems across multiple building levels.
The project covers 11 elevators total: Building 1 has elevators P7, P8, P11, P12, S13, P16, and P17; Building 2 has elevator P1; Building 5 has elevator P1; and Building 7 has elevator S1. Detailed architectural and engineering plans provide comprehensive documentation for demolition, new equipment installation, electrical and mechanical modifications, and coordination requirements. The drawings are dated May 14, 2025, and represent 100% construction documents for the VA project, with the solicitation number 36C24225B0046 and project number 561-21-301.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Special Notice 36C24225C0046 0009.pdf | ||
| Special Notice 36C24225B0046 0008.pdf | ||
| 36C24225C0046 Amendment 0007.pdf | ||
| 36C24225C0046 Amendment 0006.pdf | ||
| 36C24225C0046 Amendment 0005.pdf | ||
| 36C24225C0046 Amendment 0005.pdf | ||
| 561-21-301 Site Visit.pdf | ||
| 36C24225C0046 Amendment 0004.pdf | ||
| 36C24225C0046 Amendment 0003.pdf | ||
| 36C24225C0046 Amendment 0002.pdf | ||
| 36C24225C0046 Amendment 0001.pdf | ||
| Wage Determination.pdf | ||
| Buy American Certificate.pdf | ||
| 22-105 Specs 100 SS 20250808.pdf | ||
| 561-21-301 Brand Name or Equal.zip | ZIP file | |
| 852.219-75 Limitation on Subcontracting.pdf | ||
| 36C24225B0046 Upgrade Elevators Phase II.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
/1
/2
:5
:2
A
M C
U s e rs
\c k u rk u l\ D o c u m e n ts \A
-1
V A
E a s t O ra n g e
-U p g r
E le v P h .2
-N J c k u rk u lG V
Y H
.r v t
G-001
COVER
1 3CET
UPGRADE ELEVATORS PH2
NEW JERSEY VA MEDICAL CENTER -
EAST ORANGE CAMPUS
385 TREMONT AVE
EAST ORANGE, NJ 07018 MAY 14, 2025
100% CONSTRUCTION DOCUMENTS
561-21-30122-105
UPGRADE ELEVATORS PH2
NEW JERSEY VA MEDICAL CENTER - EAST ORANGE CAMPUS
385 TREMONT AVE
EAST ORANGE, NJ 07018
VA PROJECT #: 561-21-301
WVS
DRAWING LIST
GENERAL
G-001 COVER 1 3
G-002 CAMPUS SITE PLAN 2 3
G-003 ICRA INFORMATION, DETAILS AND LIFE SAFTEY INFORMATION 3 3
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 22
1.A100 OVERALL FLOOR PLAN - BLDG 1 - LEVEL B 2 22
1.A101 OVERALL BLDG 1 FLOOR PLAN - FOURTH FLOOR 3 22
1.A102 OVERALL FLOOR PLAN - BLDG 1 - FIFTH FLOOR 4 22
1.A103 OVERALL BLDG 1 ROOF PLAN 5 22
1.A104 OVERALL BLDG 1 PLAN - PENTHOUSE A 6 22
1.A105 OVERALL BLDG 1 PLAN - PENTHOUSE B 7 22
1.A401 BLDG 1 - ENLARGED PLANS - ELEV P12, S13, P16, P17 8 22
1.A402 BLDG 1 - ENLARGED PLANS - ELEV P7, P8 9 22
1.A403 BLDG 1 - ENLARGED PLANS - ELEV P11 10 22
1.A404 BLDG 1 - ENLARGED REFLECTED CEILING PLANS 11 22
2.A101 BLDG 2 - ELEV P1 12 22
5.A101 BLDG 5 - ELEV P1 13 22
7.A101 BLDG 7 - ELEV S1 14 22
A-301 ELEVATOR SCHEMATIC SECTIONS, TYPICAL DETAILS 15 22
A-701 BUILDING 1 SERVICE ELEVATOR S13 PLAN, RCP AND ELEVATIONS 16 22
A-702 BUILDING 1 PASSENGER ELEVATORS P12, P16 AND P17 PLAN, RCP AND ELEVATIONS 17 22
A-703 BUILDING 2 PASSENGER ELEVATOR P1 PLAN, RCP AND ELEVATIONS 18 22
A-704 BUILDING 7 SERVICE ELEVATOR S1 PLAN, RCP AND ELEVATIONS 19 22
A-705 BUILDING 1 PASSENGER ELEVATORS P7 AND P8 PLAN AND ELEVATIONS 20 22
A-706 BUILDING 1 PASSENGER ELEVATOR P11 PLAN AND ELEVATIONS 21 22
A-707 BUILDING 5 PASSENGER ELEVATOR P1 PLAN AND ELEVATIONS 22 22
MECHANICAL
M-001 FIRE SUPPRESSION GENERAL INFORMATION 1 10
M-002 PLUMBING GENERAL INFORMATION, DETAILS, AND SCHEDULES 2 10
M-003 MECHANICAL GENERAL INFORMATION AND SCHEDULES 3 10
1.M101 BUILDING 1 - ENLARGED PLANS - ELEV P7, P8 4 10
1.M102 BUILDING 1 - ENLARGED PLANS - ELEV P12, S13, P16, P17 5 10
1.M103 BUILDING 1 - ENLARGED PLANS - ELEV P11 6 10
2.M101 BUILDING 2 - ENLARGED PLANS - ELEV P1 7 10
5.M101 BUILDING 5 - ENLARGED PLANS - ELEV P1 8 10
7.M101 BUILDING 7 - ENLARGED PLANS - ELEV S1 9 10
M-501 MECHANICAL DETAILS 10 10
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 18
E-002 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 2 18
E-003 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 3 18
1.E101 BLDG 1 - OVERALL ELECTRICAL FLOOR PLANS 4 18
1.E401 BLDG 1 - MACHINE ROOM 1-6 LIGHTING PLANS 5 18
1.E402 BLDG 1 - ENLARGED PLANS - ELEV P12, S13, P16, & P17 6 18
1.E403 BLDG 1 - PENTHOUSE - ENLARGED PLANS & SINGLE LINE - ELEV P12, S13, P16, & P17
MACHINE ROOM
7 18
1.E404 BLDG 1 - ENLARGED PLANS - ELEV P7 & P8 8 18
1.E405 BLDG 1 - ENLARGED PLANS & SINGLE LINE - ELEV P7 & P8 MACHINE ROOM 9 18
1.E406 BLDG 1 - ENLARGED PLANS - ELEV P11 10 18
1.E407 BLDG 1 - FIFTH FLOOR - ENLARGED PLANS & SINGLE LINE - ELEV P11 11 18
2.E101 BLDG 2 - ELEV P1 PLANS 12 18
2.E102 BLDG 2 - ELEV MACHINE ROOM P1 ENLARGED PLANS AND RISERS 13 18
5.E101 BLDG 5 - ELEV P1 PLANS 14 18
7.E101 BLDG 7 - ELEV S1 PLANS 15 18
E-501 ELECTRICAL DETAILS 16 18
E-600 BUILDING 1, 2, 5, & 7 - ELEVATOR RISER DIAGRAMS 17 18
E-601 ELECTRICAL SCHEDULES 18 18
BUILDINGS IN SCOPE - UPGRADE ELEVATORS PHASE 2 PROJECT LOCATION
N N
Docusign Envelope ID: BB3FBA17-0013-4617-ABC5-C24406F61483
5/19/2025
HEYWOOD AVE
S
CE
N
TE
R S
T
R O
SS
S
T
TREMONT AVE
MCKAY AVE
LINDSLEY PL
ABBOTSFORD AVE
D E
R B
Y S
T
LANARK AVE
V A
IL
S
T
FINLAY PL
STIRLING AVE
PA
RK
IN
G
ST
EP
H
EN
G R
EG
G
D R
ST
EP
H
EN
G R
EG
G
D R
JACK JACOBS CIRCLE
N
IC
H O
LA
S
O R
ES
KO
S T
JO
H
N M
EAG
HER RD
BU
CHA
D R
FRANKLIN SIGLER LN
H
AM
IL
TO
N R
D
PA
RK
IN
G
PARKING
PARKING
PARKING
PARKING
PARKING
PA
RK
IN
G
PARKIN
G
BLDG. #1
MAIN
HOSPITAL
BLD
G.
#2
BLDG.
#3
BLDG.
#5
BLDG. #6
BLDG.
#7
BLDG. #8
BLDG.
#11
BLDG. #18
BLDG.
#15b
BLDG.
#15
BLDG. #17
BLDG.
#16
BLDG. #4
BLDG.
#15a
BLDG. #24
BLDG.
#5a
MAIN ENTRANCE
LEGEND
BUILDINGS WITH ELEVATORS IN
SCOPE OF WORK
CONTRACTOR PARKING
AREA. REFER TO KEYNOTES FOR
MORE INFORMATION
CONTRACTOR STAGING
AREA. REFER TO KEYNOTES FOR
MORE INFORMATION
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:2
A
M C
U s e rs
\c k u rk u l\ D o c u m e n ts \A
-1
V A
E a s t O ra n g e
-U p g r
E le v P h .2
-N J c k u rk u lG V
Y H
.r v t
G-002
CAMPUS SITE PLAN
2 3CET
UPGRADE ELEVATORS PH2
NEW JERSEY VA MEDICAL CENTER -
EAST ORANGE CAMPUS
385 TREMONT AVE
EAST ORANGE, NJ 07018 MAY 14, 2025
100% CONSTRUCTION DOCUMENTS
561-21-30122-105
WVS
Scale: 1" = 60'-0"
CAMPUS SITE PLAN
NORTH
0 6030 120
1. CONTRACTOR TO VERIFY PARKING LOCATIONS AND
RESTRICTIONS WITH VA AND C.O.R.
2. CONTRACTOR TO PROVIDE TRANSPORTATION TO
AND FROM PARKING AREA TO BUILDING ONE IF
DEEMED NECESSARY.
3. CONTRACTOR TO COORDINATE STAGING/LAYDOWN
AREA WITH VA AND C.O.R.
4. CONTRACTOR TO VERIFY BADGING REQUIREMENTS
WITH VA AND C.O.R. PRIOR TO SUBMITTING BID.
1 BLDG. 1 MAIN ENTRANCE
2 CONTRACTOR PARKING AREA, TO BE
COORDINATED WITH COR PRIOR TO
SUBMITTING BID
3 CONTRACTOR STAGING AREA ONLY USABLE
BY PERMISSION FROM COR
4 CONTRACTOR STAGING AREA.
5 DUMPSTER LOCATION
6 DROP OFF MATERIAL LOCATION
7 COORDINATE USE OF LOADING DOCK HOURS
0700 TO 1900
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
2-HR PARTITION
*PAINT TO MATCH EXISTING WALLS
UL U419
EXISTING FLOOR
UNDERSIDE OF
STRUCTURE ABOVE
(2X) GYP. BD.
BOTH SIDES
FIRE RETARDANT, PRESSURE
TREATED PLYWOOD, DO
NOT ADHERE OR FASTEN
TO EXISTING FLOOR
ILSM TEMPORARY BARRIER TAG
PROJECT: UPGRADE ELEVATORS PH2
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
UPGRADE ELEVATORS PH2
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. PROVIDE STICKY MATS AT BARRIER ENTRANCE SPACES AND CHANGE DAILY OR MORE OFTEN
AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS
PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING
SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER
THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT
OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED
BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE
USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN
NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF
THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-
CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR TO VERIFY AND ACKNOWLEDGE TO CONTRACTOR WHETHER
THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE
ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR
MUST FLOW FROM CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE
TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-
CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST
TO PREVENT CONTAMINATION OF THE DUCTS.
3. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY
AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
5. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
ICRA NOTES:
ICRA CLASS OF
PRECAUTIONS
CONSTRUCTION
ACTIVITY
PATIENT RISK
GROUP
LEVEL OF PRECAUTION
PROJECT AREA
FLOORBUILDING
C
B
A
SECOND
THIRD
FOURTH
FIFTH
SIXTH
SEVENTH
EIGHTH
NINTH1
TYPE C CLASS II
TYPE C LOW
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TENTH TYPE C
TYPE C
TYPE C
TYPE C
ELEVENTH
TWELFTH1
THIRTEENTH1
PATIENT AREAS
WEEKEND UNRESTRICTEDWORK HOURS
8AM - 4:30PM 8AM - 4:30PM
TOOL NOISE HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
PER WORK AREA HOURS
DUST: HAND SAW CUTTING
ALLOWED
LOW
1 FIRST TYPE C LOW PER WORK AREA HOURS PER WORK AREA HOURS
ELEVATORS P7, P8
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
8AM - 4:30PM 8AM - 4:30PM
CLASS II
CLASS II
CLASS II
CLASS II
CLASS III
CLASS III
CLASS II
CLASS II
CLASS II
CLASS II
CLASS IV
CLASS III
CLASS II
CLASS II
LOW
LOW
HIGH
MEDIUM
LOW
LOW
LOW
LOW
HIGHEST
HIGH
LOW
LOW
CLASS IILOW
GENERAL REQ'S ALL ELEVATORS IN SCOPE
ELEVATOR P2
2 B
2 1
2 2
2 3
ELEVATOR P5
5 1
5 2
ELEVATOR S7
7 B
7 1
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
TYPE C CLASS IILOW
TYPE C CLASS IILOW
TYPE C CLASS IILOW
TYPE C CLASS IILOW
TYPE C CLASS IILOW
TYPE C CLASS IILOW
TYPE C CLASS IIIMEDIUM
TYPE C CLASS IIIMEDIUM
TYPE C CLASS II
TYPE C LOW
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
TYPE C
LOW
TYPE C LOW
ELEVATORS P12, S13, P16, P17
CLASS II
CLASS II
CLASS II
CLASS II
CLASS II
CLASS II
CLASS III
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
CLASS II
CLASS II
CLASS II
CLASS II
CLASS II
CLASS II
CLASS II
CLASS II
C
B
A
SECOND
THIRD
FOURTH
FIFTH
SIXTH
SEVENTH
EIGHTH
NINTH1
TENTH
ELEVENTH
TWELFTH1
THIRTEENTH1
1 FIRST
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
PER WORK AREA HOURS PER WORK AREA HOURS8AM - 4:30PM 8AM - 4:30PM
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Physical and Occupational Therapy
- Outpatient Clinics
- Waiting Rooms
- Sleep Lab
- Mental Health (outpatient only)
- Prosthetics / Orthotics
- Domicillary
- Other
- Office Areas;
- Out Doors;
- Electrical or Mechanical Rooms
- Social Work;
- Retail Store;
- Stage, Recreation, Theater
- Stairwells
- Conference Rooms;
- Other
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Emergency Room
- Kitchen or Food Preparation/Dining/Canteen
- Echocardiography
- Radiology/MRI
- Respiratory Therapy
- Nuclear Medicine
- Senior Mental Health (In Patient or Senior)
- Community Living Center (CLC)
- Clean Supply
- Other
- Cardiac Cath
- EP Lab or Cardiology
- Sterile Processing Service (SPS)
- All inpatient medical or surgical units
- Care Units: PACU, MICU, SICU, TCU
- Spinal Cord injury (SCI)
- Negative pressure isolation rooms
- Outpatient chemotherapy or Oncology areas
- Operating Rooms
- Endoscopy
- Dialysis
- Bronchoscopy
- Pharmacy
- Clinical Laboratories
- Other
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILING
FLEX DUCT
EXISTING CEILING
NON RATED
ICRA BARRIER
POST ICRA, ILSM,
FIRE INSPECTION
SHEETS VISIBLE TO
PUBLIC
ADJUSTABLE
PORTION OF
BARRIER SYSTEM
BASIS OF DESIGN:
STARC SYSTEMS OR
EDGEGAURD OR EQUAL
1 A
S E
E S
C H
E D
U L E
2" SEE SCHEDULE 2"
S E
E S
C H
E D
U L E
SEE SCHEDULE
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:2
A
M C
U s e rs
\c k u rk u l\ D o c u m e n ts \A
-1
V A
E a s t O ra n g e
-U p g r
E le v P h .2
-N J c k u rk u lG V
Y H
.r v t
G-003
ICRA INFORMATION, DETAILS AND LIFE
SAFTEY INFORMATION
3 3CET
UPGRADE ELEVATORS PH2
NEW JERSEY VA MEDICAL CENTER -
EAST ORANGE CAMPUS
385 TREMONT AVE
EAST ORANGE, NJ 07018 MAY 14, 2025
100% CONSTRUCTION DOCUMENTS
561-21-30122-105
WVS
Scale: 3/4" = 1'-0"
HARD BARRIER
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: 1/4" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 1/2" = 1'-0"
NON-RATED TEMPORARY ENCLOSURE ENTRY ELEVATION
A. CONTRACTOR SHALL VISIT ALL AREAS OF WORK,
INCLUDING WALKING THE SITE, MEASURING EXISTING
DIMENSIONS AND OBSERVING EXISTING CONDITIONS
BEFORE BEGINNING WORK, ORDERING MATERIALS,
OR STARTING ANY CONSTRUCTION. CONTRACTOR TO
FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE
CONDITION PRIOR TO START OF WORK AND
ORDERING OF MATERIALS.
B. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS
WHENEVER POSSIBLE. SEE DIVISION 1
SPECIFICATIONS
C. CONTRACTOR TO PROTECT AREA ADJACENT TO THE
DEMOLITION AND NEW CONSTRUCTION WORK TO
PREVENT DAMAGES. (IF DAMAGED, REPAIR, PATCH,
REPLACE, OR SAND SMOOTH AND TO MATCH
EXISTING ADJACENT MATERIALS.)
D. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY
WHEN DISCREPANCIES TO THE DRAWINGS ARE
FOUND IN THE FIELD.
E. CONTRACTOR TO INSTALL TEMPORARY DIGITAL
MANOMETER TO MONITOR AND ENSURE PRESSURE
LEVEL TO MEET VA GUIDELINE WITHIN
CONSTRUCTION AREA. (CONTRACTOR TO VERIFY
LOCATIONS) WITH VA COR PRIOR TO INSTALLATION.
F. VA RESERVES THE RIGHT TO REQUEST HARD
BARRIER ENCLOSURES AT HIGH-VOLUME LOCATIONS
PER THEIR DISCRETION. CONTRACTOR RESPONSIBLE
FOR PLANNING AHEAD AND ACCOUNTING FOR AT
LEAST 5 HARD ENCLOSURES, SEE DOOR AND FRAME
INFORMATION THIS SHEET.
* OBTAIN INFECTION CONTROL PERMIT BEFORE
CONSTRUCTION BEGINS.
COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT
CONTROL CUBE METHOD BEFORE CONSTRUCTION
BEGINS.
SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES
COMPLETELY.
DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PROJECT IS INSPECTED BY THE
OWNER'S SAFETY/ IP AND FACILITIES MANAGEMENT
DEPARTMENT AND AFTER PROFESSIONAL CLEAN BY
GC.
COVER TRANSPORT RECEPTACLES OR CARTS. SEAL
COVER/LID WITH TAPE.
VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS. WET MOP AREA WITH DISINFECTANT.
COVER ALL RETURNS AND SUPPLY DUCTS AT
DIFFUSERS WITH FILTER MEDIA OR BLANK OFF
ENTIRELY. RESTORE NORMAL HVAC OPERATION IN
IMPACTED AREA AFTER ENCLOSURE IS REMOVED.
KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL
TIMES.
CONTRACTOR TO CLEAN THE CONSTRUCTION AREA,
AND PREPARE FOR SAFETY AND INFECTION
CONTROL'S INSPECTION AND FINAL CLEANING BY VA
ECM STAFF.
VA INFECTION CONTROL STAFF WILL PERFORM FINAL
VERIFICATION OF CLEANING AND SANITATION.
GENERAL NOTES:
INFECTION CONTROL RISK
ASSESSMENT NOTES:
NFPA 101 - CHAPTER 43 BUILDING REHABILITATION
43.1.1 CLASSIFICATION OF REHABILITATION WORK - REPAIR
43.4.2 CAPACITY OF MEANS OF EGRESS. THIS PROJECT DOES NOT CHANGE OR ALTER EXISTING
OCCUPANT LOAD OR MEANS OF EGRESS. THE EGRESS CAPACITY SHALL HAVE BEEN
PREVIOUSLY APPROVED AS BEING ADEQUATE.
HARD BARRIER ICRA ENCLOSURE DOOR SCHEDULE
DOOR NO.
DOOR DOOR FRAME FIRE
RATING HDWR SET REMARKSWIDTH HEIGHT THICK ELEV MAT'L ELEV
HARDWARE SET 1.0
3 HINGES
1 DUST PROOF STRIKE PLATE
1 CYLINDRICAL LOCK
1 DOOR CLOSER
2 KICK PLATES
1 GASKETING
MANUFACTURER'S
CORBIN RUSSWIN
MCKINNEY
PEMKO
ROCKWOOD
SARGENT
CO
MK
PE
RO
SA
TA2714
28LC-7G04 LP
DC6210XA11
K1050F
S888 X HEAD & JAMBS
32D
26D
32D
MK
RO
CO
RO
PE
REMARKS:
HARDWARE MANUFACTURER'S LISTED AS BASIS OF DESIGN. ALTERNATE
MANUFACTURERS ACCEPTABLE, SUBJECT TO REVIEW BY ARCHITECT AND C.O.R.
FOR EQUAL QUALITY COMPLIANCE.
CORE TO SUPPORT THAT WHICH ARE USED AT THIS FACILITY, COORDINATE WITH
C.O.R.
IF HOISTWAY DOORS ARE LEFT OPEN LONGER THAN (1) 8 HOUR SHIFT, RATED HARD
BARRIERS ARE REQUIRED WITH RATED DOORS (SEE SCHEDULE THIS SHEET) RATED
HARD BARRIERS CAN ALSO BE USED AT VARIOUS LOCATIONS PER CONTRACTORS
DISCRETION.
NOTE 1 3'-0" 7'-0" 1 3/4" A HM 1 90 MIN. 1.0
ICRA DOOR AND FRAME
NOTES 1, 2
NOTE 1:
ALL DOORS LOCATED IN HARD BARRIERS. HARD BARRIERS REQUIRED IF HOISTWAY
DOORS ARE OPEN FOR MORE THAN ONE 8 HOUR SHIFT. THE VA MAY REQUEST
HARD BARRIERS AT CERTAIN LOCATIONS FOR REASONS OTHER THAN FIRE
RESISTANCE (DURABILITY, HEAVY TRAFFIC AREAS, SENSITIVE DEPARTMENT, ETC...)
NOTE 2:
DOOR ONLY REQUIRES 45 MIN RATING IF LOCATED IN 1 HOUR RATED HARD
PARTITION.
SA
HM
MAT'L
S SS S
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SST STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE WINDOW TYPE
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
2. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
3. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
4. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
5. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
6. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
7. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
8. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS.
9. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
10. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS WITHIN THE SCOPE OF WORK.
10. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
11. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
12. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
13. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORESEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
14. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
1. ELEVATORS LOBBIES ARE TO REMAIN OPERATIONAL THROUGHOUT THE CONSTRUCTION OF THIS PROJECT.
2. COORDINATE LOCATIONS OF TEMPORARY ICRA ENCLOSURES WITH COR PRIOR TO CONSTRUCTING
ENCLOSURE.
3. CONTRACTOR SHALL COORDINATE THE SHUT DOWN OF EACH ELEVATOR WITH THE COR PRIOR TO SHUT
DOWN.
4. CONTRACTOR SHALL ENSURE THAT RATED ICRA BARRIERS GO TO STRUCTURAL DECK OR RATED CEILING.
WHERE EXISTING WALLS DO NOT GO TO DECK OR HARD CEILING. RETURN ICRA WALLS TO PROVIDE A PROPER
ENCLOSURE.
5. CONTRACTOR SHALL ENSURE ALL TEMPORARY ENCLOSURES ARE CONSTRUCTED AND INSTALLED TO PREVENT INFECTIOUS MATERIAL TO TRANSFER FROM ONE SPACE TO ANOTHER. PROVIDE ENOUGH SPACE FOR CONSTRUCTION WORK TO TAKE PLACE. CONTRACTOR MAY USE A REUSABLE TEMPORARY ICRA BARRIER
(EX. STARC SYSTEM TEMPORARY WALL SYSTEMS.)
6. CONTRACTOR SHALL ENSURE THAT THE EGRESS STAIRWAYS REMAIN CLEAR OF CONSTRUCTION MATERIAL, EQUIPMENT AND DEBRIS. NOTHING WILL BE STORED IN STAIRWAY OR STAIR VESTIBULE AT ANYTIME DURING
CONSTRUCTION
7. CONTRACTOR TO INSTALL AIR PRESSURE MONITOR OUTSIDE OF SPACES UNDER CONSTRUCTION. A SAFETY REPRESENTATIVE SHALL HAVE ACCESS TO MONITOR WITHOUT ENTERING SPACES UNDER CONSTRUCTION.
8. CONTRACTOR SHALL COMPLETE PHASE IN ITS ENTIRETY BEFORE STARTING A NEW PHASE.
9. HEAVY EQUIPMENT HOISTING FROM 13TH FLOOR TO PENTHOUSES TO TAKE PLACE OFF HOURS.
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
0 4 8 16
#.A###
BUILDING #
DISCIPLINE SHEET NUMBER
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
ELEVATOR CAB FINISH MATERIAL LEGEND
NOTE: ELEVATOR CONTROL PER ELEVATOR SPECIFICATION DIVISION 14
PL-1
PROVIDE FINISHES LISTED AS BASIS OF DESIGN OR APPROVED EQUAL
PL-2
TZT-1
HANDRAILS
SST-1
PLASTIC LAMINATE - NEVAMAR, SANTA ROSA PLUM TREE WZ2001
PLASTIC LAMINATE - NEVAMAR, BLACK SE101
TERRAZZO TILE - FLOORAZZO, GEM COLLECTION, GRAND CANYON, 2'X2'
FLAT, 3/8” x 3” WITH STRAIGHT ENDS, #4 STAINLESS STEEL
STAINLESS STEEL, TYPE 304, #4 FINISH, GRAIN TO RUN VERTICALLY
CRASHRAILS FLAT, 3/8” x 8” WITH STRAIGHT ENDS, #4 STAINLESS STEEL
EP-1 EPOXY PAINT, SHERWIN WILLIAMS, PRO INDUSTRIAL HIGH PERFORMANCE EPOXY, MPI GLOSS LEVEL 3, SW7005 PURE WHITE
DP-1 ALUMINUM DIAMOND PLATE, 6061 MILL FINISH, .250 (1/4") THICK
EPB-1 CONTINUE EPF-1 UP WALL 6" OR TO MATCH HEIGHT OF EXISTING BASE
FLOORS
WALLS
SST-2 STAINLESS STEEL, TYPE 304, #8 FINISH, GRAIN FROM FRONT OF CAB TO REAR
CEILINGS
EPF-1 EPOXY FLOOR - SHERWIN WILLIAMS/GENERAL POLYMERS, MACROPOXY 646 PRIMER, GP4850 POLYASPARTIC TOPCOAT WITH SKID INHIBITING ADDITIVE/COLOR TO BE GREY THROUGHOUT WITH SAFETY YELLOW AT EQUIPMENT PADS
P-1 PAINT, SHERWIN WILLIAMS, PRO INDUSTRIAL HIGH PERFORMANCE, MPI GLOSS LEVEL 5, COLOR TO MATCH EXISTING
1. REFERENCE ROOM FINISH SCHEDULES AND FINISH MATERIAL LEGEND FOR MORE INFORMATION.
2. REFERENCE REFLECTED CEILING PLANS FOR ADDITIONAL CEILING INFO.
3. PREPARE ALL FLOOR AND CAB, WALL CONSTRUCTION, NEW AND/OR EXISTING, TO RECEIVE NEW FINISHES IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL
FINISHES.
4. PRIOR TO INSTALLATION OF NEW FINISHES, CONTRACTOR SHALL INSPECT ALL SUBSTRATES. IF A SUBSTRATE IS UNACCEPTABLE, THE CONTRACTOR SHALL REPLACE. PROCEEDING WITH THE INSTALLATION OF FINISHES
WILL BE INDICATION THAT THE INSTALLER / FINISHER ACCEPTS CONDITION OF SUBSTRATE.
5. USE MANUFACTURER'S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES.
6. ALL FLOORING TRANSITIONS SHALL COMPLY WITH ADA GUIDELINES. FLOORING CONTRACTOR TO SUBMIT A DIAGRAM SHOWING FLOORING TRANSITION LOCATIONS FOR DESIGNERS APPROVAL PRIOR TO INSTALLATION.
7. ALL FLOOR TRANSITIONS BETWEEN DISALIKE MATERIALS SHALL BE STAINLESS STEEL METAL TRIM AND TO BE
LOCATED AT CENTERLINE OF DOOR WHEN IN CLOSED POSITION
8. ALL PAINTED WALLS TO BE PAINTED EP-1(UNO).
9. ALL CEILINGS TO REMAIN EXISTING (UNO).
10. ALL METAL DOORS AND FRAMES AT MACHINE/SECONDARY ROOMS TO BE PAINTED P-1 (UNO).
11. ALL PAINTED SURFACES SHALL RECEIVE A MINIMUM OF (1) ONE BASE COAT AND (2) TWO FINISH COATS.
12. USE MPI GLOSS LEVEL 3 PAINT FOR ALL WALLS (UNO). USE MPI GLOSS LEVEL 5 PAINT FOR ALL WET AREA
WALLS, METAL DOORS AND METAL FRAMES (UNO).
13. CAULK AROUND ALL ELEVATORS.
14. HOLD BACK HANDRAIL AND CRASH RAILS 2" FROM CORNERS.
15. TURN BACK HANDRAILS AND CRASH RAILS AT ELEVATOR ENTRANCES.
16. CONTRACTOR TO PROVIDE 350 S.F. OF ADDITIONAL ELEVATOR CAB FLOORING TZT-1 MATERIAL TO THE VA.
X
X
X
X
X
REMARKS:
2. REPLACE THE FOLLOWING DEVICES IN PLACE: MAIN & AUXILIARY CAR OPERATING PANELS; HALL CONTROL STATIONS; CAR POSITION INDICATORS; HALL DIRECTIONAL LANTERNS; AND HALL POSITION INDICATOR.
1. THE NEW FLOORING SHALL BE CAULKED WITH SILICONE AROUND THE INTERIOR PERIMETER TO LIMIT WATER INFILTRATION TO THE CAB PLATFORM.
* ELEVATORS WERE MODERNIZED IN 2003
** ELEVATORS WERE MODERNIZED IN 1995
22-105 EAST ORANGE VA MEDICAL CENTER - UPGRADE ELEVATORS
BLDG.
PASSENGER ELEVATOR INFORMATIONCAPACITY ELEVATOR
ELEV. WIDTH DEPTH (LBS)
SPEED
(FPM)
DOOR
TYPE MANUF./YEAR
TWO
SPEED
WESTINGHOUSE
(**1952)
ARMOR
(*1952)
ELEVATOR
CAB DESIGN
ELEVATOR TYPE
HYDRAULIC TRACTION
C,B,A,1,2,3,4,5,6, 7,8,9,10,11,12,13
NO. OF FLOORS
SERVED
OPENINGS
FRONT "ONLY" FRONT & BACK
P-7
P-8
P-12
S-13
P-16
P-17
VIF
VIF
VIF
VIF
VIF
VIF
VIF
VIF
VIF
VIF
VIF
VIF
4,000
4,000
4,0004,000
4,000
4,000
4,000
PASSENGER
SERVICE
X
X
X
X
X
X
C,B,A,1,2,3,4,5,6, 7,8,9,10,11,12,13
B,A,1,2,3,4,5,6,7, 8,9,10,11,12,13
B,A,1,2,3,4,5,6,7, 8,9,10,11,12,13
B,A,1,2,3,4,5,6,7, 8,9,10,11,12,13
B,A,1,2,3,4,5,6,7, 8,9,10,11,12,13
X
ELEVATOR SCHEDULE
ELEVATOR
RE-NUMBER
TWO
SPEED
TWO
SPEED
TWO
SPEED
TWO
SPEED
TWO
SPEED
REPLACE
FLOOR
REPLACE
BASE
REPLACE
WALL PNLS
REPLACE
CEILING
PROVIDE (2)
HANDRAILS
PROVIDE (1)
CRASH RAIL REMARKS
NO
NO
NO
NO
NO
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
NO NO
NO
YES
YES
YES
YES
NO
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
WESTINGHOUSE
(**1952)
ARMOR
(*1952)
ARMOR
(*1952)
ARMOR
(*1952)
1,2
1,2
1,2
1,2
1,2
1,2
P-12
P-15
S-17
VIF VIF
VIF VIF
VIF VIF
B,1,2,3
1,2
B,1
X
X
X
NO
NO
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES NO NO NO YES
2,000 100 WESTINGHOUSE
(**1952)
XMULTIPLE
(1992)
2,000 100
X4,000 100 MULTIPLE
(1994)
SINGLE
SPEED
X
TWO
SPEED
TWO
SPEED
1,2
1,2
1,2
PASSENGER
PASSENGER
PASSENGER
PASSENGER
PASSENGER
PASSENGER
SERVICE
HOLLISTER
WHITNEY (1995)
PASSENGER
1 P-11 VIF VIF 4,000 200 TWO
SPEED
X
B,A,1,2,3 X NO YES YES NO NO NO YES 1,2
3/8" 3/8"1'-6"
1 3/4"
1 3/4"1'-6 3/4"
E
Q
S P
A C
E S
V A
R
IE
S
A
B
1 1/4" 1 1/4"
V
A R
IE
S
1"
VARIES F.V.
SECTION - A
#1
#4
3 3
3/8" x 2 1/2" STEEL BAR
PIT LADDER KEYNOTES
L2 1/2 x 2 1/2 x 2" WITH HOLE FOR 1/2"
ANCHOR BOLT TO PIT FLOOR
WELD ALL AROUND
COORDINATE WITH G.C.
3/4" ROUND NON-SLIP STEEL BAR RUNGS
3/8" x 3" BENT PLATE, WELD TO VERT.
RUNGS
WELD NON-SLIP STEEL RUNGS ALL
AROUND TO VERTICAL STEEL BARS
FABRICATED PIT LADDER TO BE SHOP
PRIMED. COORDINATE LOCATIONS WITH
ELEVATOR VENDOR FOR CODE COMPLIANCE,
SUBMITTAL REQUIRED.
NO FIELD FINISH PAINTING PERMITTED.
FINISH FLOOR
PIT F.F.
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
EXISTING WINDOW TO REMAIN
NEW WORK LEGEND
NEW WALL
NEW DOOR
NEW WINDOW
DELETE ALL ASSOCIATED WORK FOR ELEVATOR MODERNIZATION IN BUILDING 5. THIS INCLUDES ALL ELEVATOR WORK, GENERAL TRADES, FIRE PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL AND
TECHNOLOGY WORK.
THIS BID DEDUCT INCLUDES BID DEDUCT ALTERNATE 1 AND DELETES ALL ASSOCIATED WORK FOR ELEVATOR MODERNIZATION IN BUILDING 2. THIS INCLUDES ALL ELEVATOR WORK, GENERAL TRADES, FIRE PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL AND TECHNOLOGY WORK.
THIS BID DEDUCT INCLUDES BID DEDUCT ALTERNATE 1 AND 2 AND DELETES ALL ASSOCIATED WORK FOR ELEVATOR MODERNIZATION IN BUILDING 7. THIS INCLUDES ALL ELEVATOR WORK, GENERAL TRADES, FIRE
PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL AND TECHNOLOGY WORK.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:2
A
M C
U s e rs
\c k u rk u l\ D o c u m e n ts \A
-1
V A
E a s t O ra n g e
-U p g r
E le v P h .2
-N J c k u rk u lG V
Y H
.r v t
A-001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 22CET
UPGRADE ELEVATORS PH2
NEW JERSEY VA MEDICAL CENTER -
EAST ORANGE CAMPUS
385 TREMONT AVE
EAST ORANGE, NJ 07018 MAY 14, 2025
100% CONSTRUCTION DOCUMENTS
561-21-30122-105
WVS
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND GENERAL NOTES
DEMOLITION NOTES
ELEVATOR GENERAL NOTES
GENERAL SYMBOL LEGEND
SHEET DESIGNATION LEGEND WALL RATING LEGEND
FINISH GENERAL NOTESBUILDING 1 ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS CEILING
EAST NORTH SOUTH WEST FINISH
PENTHOUSE
PHA-2B ELEVATOR MACHINE ROOM EPF-1 EPB-1 EP-1 EP-1 EP-1 EP-1 ETR
PHA-103B ELEVATOR MACHINE ROOM EPF-1 EPB-1 EP-1 EP-1 EP-1 EP-1 ETR
PHA-103C SECONDARY EPF-1 EPB-1 EP-1 EP-1 EP-1 EP-1 EP-1
PHA-2C SECONDARY EPF-1 EPB-1 EP-1 EP-1 EP-1 EP-1 EP-1
BLDG 1 - A FLOOR
A-EL13 ELEVATOR S13 DP-1 SST-1 SST-1 SST-1 SST-1 SST-1 SST-2
A-EL12 ELEVATOR P12 TZT-1 SST-1 PL-1&2 PL-1&2 PL-1&2 PL-1&2 SST-2
A-EL17 ELEVATOR P17 TZT-1 SST-1 PL-1&2 PL-1&2 PL-1&2 PL-1&2 SST-2
A-EL16 ELEVATOR P16 TZT-1 SST-1 PL-1&2 PL-1&2 PL-1&2 PL-1&2 SST-2
BLDG 1 - B FLOOR
B-EL11 ELEVATOR P11 TZT-1 SST-1 ETR ETR ETR ETR ETR
B-EL7 ELEVATOR P7 TZT-1 SST-1 ETR ETR ETR ETR ETR
B-EL8 ELEVATOR P8 TZT-1 SST-1 ETR ETR ETR ETR ETR
BUILDING 2 ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS CEILING
EAST NORTH SOUTH WEST FINISH
FIRST FLOOR
2-102A ELEVATOR P1 TZT-1 SST-1 PL-1&2 PL-1&2 PL-1&2 PL-1&2 SST-2
2-401 ELEVATOR MACHINE ROOM EPF-1 EPB-1 EP-1 EP-1 EP-1 EP-1 ETR
Scale: 1/2" = 1'-0"
PIT LADDER DETAIL
BUILDING 5 ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS CEILING
EAST NORTH SOUTH WEST FINISH
FIRST FLOOR
5-1-108 ELEVATOR MACHINE ROOM EPF-1 EPB-1 EP-1 EP-1 EP-1 EP-1 ETR
5-1-100B ELEVATOR P1 TZT-1 SST-1 ETR ETR ETR ETR ETR
BUILDING 7 ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS CEILING
EAST NORTH
SOUT
H WEST FINISH
FIRST FLOOR
B-177 ELEVATOR MACHINE ROOM EPF-1 EPB-1 EP-1 EP-1 EP-1 EP-1 ETR
B-ELEV1 ELEVATOR S1 DP-1 SST-1 SST-1 SST-1 SST-1 SST-1 SST-2
BID DEDUCT ALTERNATES
BIO-MED
OFFICE
BIO-MED
OFFICE
CONFERENCE
ROOM
B-154G
B-154F
B-154E
CRAWL SPACE
BIO-MED
OFFICE
BIO-MED
OFFICE
BIO-MED
OFFICE
B -1
C O
R R
ID
O
R
BIO-MED
OFFICE
BIO-MED
OFFICE
B-C
STAIR TOWER
B-S3
STAIR 3
ELEVATOR 11
B-SHAFT7
SHAFTWAY
ELEVATOR
LOBBY
B-151
CORRIDOR
VIEWING
ROOMSTAGING
ROOM
BODY
BOX
MORGUE,
AUTOPSY SUITE
B-148A
MALE
TOILETPATHOLOGY
STORAGE
B -1
C L O
S E
T
ELECTRIC
B-147B
LOCKER
B-144B
CORRIDOR
HOLDING
AREA
NITROUS
OXIDE
CORRIDOR
LOADING
DOCK
STORAGESTORAGESTORAGESTORAGE
POLICE
OFFICE
WAREHOUSE
RECEIVING
B -1
C
C O
R R
ID
O
R
WALKIN
REFRIG
B-SHAFT3
SHAFTWAY
CART
WASH
POSTAGE
EQUIPMENT
MALE
TOILET
FEMALE
TOILET
LUNCH
ROOM
WAREHOUSE
B-155B
TOILET
B-156
ARMORY
CHIEF
POLICE
SUPERVISOR
OFFICE
SHOP
SUPERVISOR
OFFICE
PAPER
STORAGE
MECHANICAL
ROOM
REPRODUCTION
ROOM
ROOM
SUPERVISOR
OFFICE
GENERAL
STORAGE
B-ELEV6
ELEVATOR
B-ELEV5
ELEVATOR
B-ELEV2
ELEVATOR
B-ELEV1
ELEVATOR
B-ELEV4
ELEVATOR
B-ELEV3
ELEVATOR
ELECTRIC
ELEVATOR
LOBBYELEVATOR
LOBBY
LINEN
CHUTE
B-SHAFT5
SHAFTWAY
KITCHEN
STORAGE
B-182
TOILET
B-S2
STAIR 2
B -E
-1
B-183B
CORRIDOR
B-180
BIOMED
STORAGE
BMS
STORAGE
TOOL
ROOM
B-187
BMS
OFFICE
B-189
BMS
STORAGE
B-191
STORAGE
CARPENTER
SHOP
MACHINE
SHOP
B-191B
STAIR
MACHINE
SHOP
CONTROL
ROOM
STORAGE
ROOM
B-158C
MSDS-SPD
STOCK
ROOM
SHOP
B-173A
CORRIDOR
B-176B
CORRIDOR
LINEN
ROOM
B-134B
TOILET
B-134A
CLOSET
B-133
CORRIDOR
B-128A
WALK-IN
COOLER
B-135
CLOSET
ELECTRIC
B-SHAFT8
SHAFTWAY
STORES
STORAGE
LINEN
ROOM
B-S5
STAIR 5
B-118
REFRIG
B -1
C O
R R
ID
O
R
B-119
REFRIG B-120
REFRIG
FOOD
SERVICE
FOOD
SERVICE
B -1
C O
R R
ID
O
R
GENERAL
STORAGE
DIET.
OFFICE
LINEN
CHUTE
B-181A
CORRIDOR
B-135C
CORRIDOR
B -1
C
C O
R R
ID
O
R
TRASH
COMPACTOR
B -1
F
C O
R R
ID
O
R
B -1
A
C O
R R
ID
O
R
B-152
VESTIBULE
BIO-MED
OFFICE
B-144
B-134C
OFFICE
B-134
OFFICE
PHARMACY
CACHE
I.V.
STORAGE
BREAK
ROOM
BMS
STORAGE
B-186E
VACUUM
CRAWL SPACE
B-185A
TOILET
LOCK
SHOP
B-104 PAINT
PLUMBING
SHOP
PLUMBING
SHOP
B -1
D
S T
O R
A G
E
B -1
C
S T
O R
A G
E
B-102A
OFFICE
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
HAC
B-148
B-145
B-150
NEW
B-147
B-154B
B-154C
B-154D
B-154H
B-154I
ELECTRIC
B-155A
CYLINDERCYLINDERCYLINDERCYLINDER
B-E-107
B-144A
B-171
B-170
B-174
B-158
B-151A
B-141A
B-188
B-185
INGREDIENT
B-181
B-186
B-158A
B-183
B-190
B-101
B-177
B-176C B-176D
B-E-105
DUMB/
WAITER
B-175B
DUMB/
WAITER
B-175A
DISCREPANCYB-142A
B-172
B-173
B-174B
B-176
B-141
B-134D
B-136A B-136
B-E-108
B-137B
B-139
B-112F
B-165A B-165
B-116
SUPERVISOR
B-115
STORAGE
B-114
B-112
SUPERVISOR
B-150A B-150B
VIEWING
AREA
B-SHAFT2
SHAFTWAY
B-SHAFT1
SHAFTWAY
B-ELEV10
ELEV
B-ELEV9
ELEV
B -1
B
S T
O R
A G
E
B -S
H A
F T
S H
A F
T W
A Y
ELEVATOR 12
ELEVATOR 13
ELEVATOR 17
ELEVATOR 16
B-ELEV8
ELEV
B-ELEV7
ELEV
B-SHAFT4
SHAFTWAY
B-102
SHOP
B-103
B-102B
B-155
B-154A
GUN
ROOM
B-156A
ELECTRICAL
B-155C
BREAK
ROOM
B-144G
POLICE
OFFICE
B-144B
POLICE
OFFICE
B-144F
B-144E
EVIDENCE
POLICE
RECEPTION
B-144C
B-144D
CORRIDOR
B-140B
NEEDLE
AIR
IN-TAKE
FRESH
B-174D
B-128
MECHANICAL
ROOM
BMS
STORAGE
B-401
ELECTRICAL
CLOSET
B-102B
CANTEEN
STORAGE
B-108
A/C
CLOSET
B-109
E L E
C T
R
IC
B-186A B-186B
B-186C
B-186D
TRASH
COMPACTOR
B-139A
B-181A
PROCESS
B-137A
B-141BB-141CB-141DB-141E
B-140A
ROOM G
A
T E
B-177A
B-177B
STERILE
B-158
E X
T E
N D
E D
D O
C K
B-174A
WALKIN
REFRIG
B-128B
FREEZER
B-128D
O.R. A/C
DIETETICS
OFFICE
B-S6
STAIR 6
SHOP
MECHANICAL
ROOM
STORAGE CLOSET
B-110
KITCHEN
B-110B
B-110A ELECTRICAL
B-128C
B-111
CHIEF
B-E-109
B-110C
DISHWASHER
UTILITY
B-119C
ELEVATOR
LOBBY
CONSTRUCTION ROUTE - CONSTRUCTION
MATERIALS ROUTE
(MAIN BLDG ENTRANCE ON "A" FLOOR)
LEGEND
CONSTRUCTION EGRESS ROUTE
1.A401
4 _____ 1.A401
1.A402
2 _____ 1.A402
3 _____ 1.A402
1.A401
1.A403
1 _____ 1.A403
2 _____ 1.A403
1 2 3
1 2 3
1 2 3
2 CREWS AT A TIME. WORKING ON ELEVATORS IN
SEQUENCE AS FOLLOWS
FIRST
ONE CREW BUILDING 1, S13, ONE CREW BUILDING 1, P11
SECOND
ONE CREW BUILDING 1, P16, ONE CREW BUILDING 1, P17
THIRD
ONE CREW BUILDING 1, P12, ONE CREW BUILDING 2, P1
FOURTH
ONE CREW BUILDING 1, P7, ONE CREW BUILDING 5, P1
FIFTH
ONE CREW BUILDING 1, P8, ONE CREW BUILDING 7, S1
WORK MAY NOT COMMENCE ON SUBSEQUENT
ELEVATORS UNTIL WORK IS TOTALLY COMPLETE AND
FINAL ACCEPTED BY A/E AND HOSPITAL
PROJECT COMPLETION
SEQUENCING:
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:2
A
M C
U s e rs
\c k u rk u l\ D o c u m e n ts \A
-1
V A
E a s t O ra n g e
-U p g r
E le v P h .2
-N J c k u rk u lG V
Y H
.r v t
1.A100
OVERALL FLOOR PLAN - BLDG 1 -
LEVEL B
2 22CET
UPGRADE ELEVATORS PH2
NEW JERSEY VA MEDICAL CENTER -
EAST ORANGE CAMPUS
385 TREMONT AVE
EAST ORANGE, NJ 07018 MAY 14, 2025
100% CONSTRUCTION DOCUMENTS
561-21-30122-105
WVS
NORTH0 8 16 32
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
5A
6 7
15B
BUILDING
A. CONTRACTOR TO PROTECT EXISTING CONDITIONS TO
REMAIN FROM DAMAGE DURING DEMOLITION.
B. ALL CONSTRUCTION DEBRIS IS TO BE REMOVED
FROM SITE EACH DAY AND DISPOSED OF PROPERLY
PER CONTRACT REQUIREMENTS.
C. CONTRACTOR TO PROVIDE PROTECTIVE BARRIERS,
WARNING SIGNS AND TEMPORARY PATHWAYS IN
AREAS THAT WILL BE OPERATING DURING THE
CONSTRUCTION PHASE.
D. PROVIDE DUST AND DEBRIS BARRIER IN
ACCORDANCE WITH ICRA REQUIREMENT.
E. CONTRACTOR TO PATCH ANY AREAS THAT WERE
DAMAGED DURING DEMOLITION TO MATCH EXISTING.
F. CONTRACTOR TO ENSURE TO NOT DAMAGE RATED
SHAFT WALLS OR FIRE / SMOKE RATED PARTITIONS.
ANY RATED WALLS DAMAGED DURING
CONSTRUCTION ARE TO BE REPAIRED PER RATED
PARTITION REQUIREMENTS.
G. VERIFY ALL EXISTING CONDITIONS PRIOR TO
BEGINNING WORK. NOTIFY THE COR OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH
DEMOLITION.
H. REFER TO MECHANICAL, ELECTRICAL, PLUMBING AND
TECHNOLOGY DOCUMENTS FOR RESPECTIVE
DEMOLITION AND NEW WORK INFORMATION.
I. IF THE USE OF TEMPORARY BARRIERS IS
NECESSARY, RATING OF ENCLOSURE IS TO MATCH
THAT OF RATED ADJACENT WALLS.
J. SUBMIT ALL SUBMITTALS WITHIN 90 DAYS AFTER
AWARD.
K. PROVIDE NOTICE WITHIN 90 DAYS IF APPROVED
EQUIPMENT HAS BEEN DISCONTINUED.
L. ON SITE START DATE TO BE DETERMINED ONCE ALL
APPROVED EQUIPMENT AND MATERIAL HAS BEEN
RECEIVED BY CONTRACTOR.
Scale: 1/16" = 1'-0"
OVERALL FLOOR PLAN - BLDG 1 - LEVEL B
1 CONTRACTOR TO PROVIDE UPDATED
SUBMITTAL LOGS MONTHLY
2 PROJECT SCHEDULES TO BE SUBMITTED
WITH NOTICE TO PROCEED DATE LISTED
3 PROJECT SCHEDULES TO BE UPDATED
MONTHLY
4-201T
TOILET
(E) HC
45 SF
4-199D
(E) HAC
20 SF
4-199D
CORRIDOR
4-202
UTILITY
(E)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .