539-18-101 CD Bid Drawings (8-21-2020).pdf

PDF 37 MB Posted

Attached to
Z1DA--Improve Exhaust System 539-18-101 Federal contract opportunity
Solicitation number
36C25020B0068
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This federal contract opportunity is for project #539-20-211 to correct deficiencies at the Veterans Administration Cincinnati VAMC. The solicitation will be released on or about August 10, 2020 via SAM.gov as IFB 36C25020B0068 for approximately $500,000 to $1,000,000. The project scope involves improving an exhaust system and must be completed within 180 calendar days of notice to proceed. The NAICS code is 238220 for building equipment contractors and the business size standard is $16.5 million or less to qualify as small. This opportunity is a 100% set-aside for SDVOSB small businesses who must be registered and verified in VIP and SAM databases. Offerors must ensure their registrations are accurate and not expired prior to award. Interested vendors should register in the notice, and provide safety, environmental, and experience modification records prior to construction contract award. The Department of Veterans Affairs Veterans Health Administration VISN 10 is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Improve Exhaust System 539-18-101, newest first.
File Type Posted
36C25020B0068 0003.docx DOCX document
539-18-101 ADDENDUM 3 WRITE UP.pdf PDF
539-18-101 Addendum 3 Dwgs.pdf PDF
Addendum 2 Drawings Revisions are clouded.pdf PDF
36C25020B0068 0002.docx DOCX document
Location of temporary door storage.pdf PDF
Addendum 2 Specifictions Revisons write up.pdf PDF
Corbin Russwin Locksets Sole Source Justification Redacted.pdf PDF
S04 Site Visit Sign in Sheet.pdf PDF
01 00 00 ADDENDUM 2.pdf PDF
Revise Bid Schedule Statement of Bid Items.docx DOCX document
36C25020B0068 0001.docx DOCX document
Wage Determination OH20200082.pdf PDF
S02 RFI Form.docx DOCX document
S02 Contractor EMR Certification Form.docx DOCX document
36C25020B0068.docx DOCX document
539-18-101 CD Bid Specifications (8-21-2020).pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPNuclear Stor.

Receiving & Breakout

Stor.

Stor. Office

Ref. Eq.

Subsistence

Elec.

Supply Storage

Authoriz.

Clerk

Sig

Elec.

Engineering Office

Eng. Stor.

Fire Alarm Control

Corridor

Corridor

Stair

Transfor Room

Autopsy

M. Tlt.

HAC F. Tlt. Storage

Gross Specimen Storage

Transfer Room

Co

Mech.

Room

UP

UP

DN

UP

UP

UP UP

UP

UP

DN

UP

UP

DN

UP

UP

UP

DN

UP

UP

UP

DN

UP

DN

UPDN

UP

DN

UP

UP

UP

UP

UP

Office

Office

Telephone Triage

Electrical Closet

Electric Closet

Dietetics Kitchen

Clothing Rm.

Autopsy

M. Tlt.

HAC F. Tlt. Storage

Gross Specimen Storage

Transfer Room

Viewing Room

Gas Stor.

Gas Stor.

Pest

Control

Corridor

Stor.

Hazard

Chem. Stor.

Elec.

Soil Linen

Drug Stor.

Alc. Vault

Narc. Vault

Elec.

Mech.

Room

Stair 2

Corridor

Mech. Stor.

Ref. Equip.

Rm.

Mech. Rm

Forms Rm.

Service Lobby

Shred Rm.

Nuclear Stor.

Stor.

PM&R Stor.

Elec.

Loading Dock

Supply Receiving

Stor.

Office Canteen

Stor.

Warehouse

Mail Rm.

Clerk Office

Receiving & Breakout

Stor.

Stor. Office

Ref. Eq.

Subsistence

Elec.

Supply Storage

Emergency Generator

Transformer Room

Electric Room

Elec. Shop

Elec. Office

Elec. Shop BioMed Chief

BioMed Rep. Shop

Biomedical Engineering

Stair 4

Biomedical Eng.

BioMed Work Area BioMed

Stor.

Super. Fee

Service

Stor.

Authoriz.

Clerk

Lock smith

Locksmith

Elec.

Corridor

Lead, Voucher

C&P Clerks F. Tlt.

M&R Stor.

Fitness Center

C&P

Comp. & Pension

M. Tlt.

Stair 3

Sig

Tele.

Soil. Linen

Library

Library

Elec.

Engineering Office

Storage

Eng. Stor.

Fire Alarm Control

Off.

Off.

Stair 7

Pharmacy Stor.

Corridor

Mechanical Room

Silver Rcvry.

Electric Switchgear

Mechanical Room

Mech. StorMedical Record

Stor.

Corridor

Elec. Rm.

Pharm Cache Rm.

PBS

Storage

Stair 6

Audiology Waiting

Mech.

Toilet

Toilet

Storage

ExamExam Exam

Clean Supplies

Ent. Minor

Workroom

Nurse

Office

Ent. Chk In/Out

Exam

Stor. Exam

Speech Hrng Aid Repair

Hrng Aid Fitting

Off.

Sig.

Office Office Aud Booth

Aud. booth

Office

Office

Office Aud Booth

Aud Booth

Mechanical Room

Stair 9

Chief

Files

Health Information

Management

Asst.Office Chief Police

Service

Tlt.

Off.

Adm. Asst.

Elev. Mech.

RmStorage

Off.

Off.Chief EMS

Office Break Room

EMS Cart Rm.

IRM

Storage

Elec.

Case Man.

EMS Super

Off.

Chief EMS

Off.

EMS Off.

Canteen

Stor.Fan Rm.

F. Tlt.

Locker Room

Non-Res.

Lounge

Controlled Substance Program Manager

Stair 5

Office

Coding Department

M. Tlt.

F. Tlt.

Eng. Stor.

Stair 1

Tlt.

Corridor

Freezer

Freezer

Freezer

Freezer

Freezer

Misc.

Kitchen

Freezer

HAC

HAC

HAC

Tele. Equip.

Rm.

Dry Goods/Paper

Storage Office

Male Toilet

Female Toilet

Assistant Office Chief Office Office

Break Room

Supply Warehouse

Aud Booth

Aud BoothAud Booth

Aud Booth

A/C

Stair

Tele. HAC Elec.

Office

Office

Elevator Equipment

Room

Gas Meter Room

Soil Lin

Office

Office Office

Gen. Stor.

EMS

Storage

Supply Warehouse

Storage

Office

Storage

Stair 11

Transformer Room

Misc.

Kitchen

Ground Crew

Supply Ground Crew Ofice

Ground Crew

Mechanical Room

Storage

ACS

Specialty

Care Waiting

BIOMED

STORAGE

Canteen Storage

C019

C026 C028

Toilet

Toilet

Storage

ExamExam Exam

Clean Supplies

Ent. Minor

Workroom

Nurse

Exam

Stor. Exam

Speech Hrng Aid Repair

Hrng Aid Fitting

Off.

Mechanical Room

C019

C026 C028

BASEMENT FLOOR PLANS

A100

SCALE:

A022, A022C 1/8"= 1'-0"

SCALE:

A004B

1/8"= 1'-0" SCALE:

EXISTING BASEMENT FLOOR PLAN

1/32"= 1'-0"

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

06/10/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

PARTIAL FLOOR PLAN

PARTIAL FLOOR PLAN

SCALE:

C019, C026, C028 1/8"= 1'-0"

PARTIAL FLOOR PLAN

Chief Office

Prog. Asst.

HAC

Vestibule

Patient Waiting

Treatment

Isolation One

Patient Toilet

Isolation Two

Nurse Station

Soiled Holding

Patient ToiletMeds/Nutrition

Clean Linen

Corridor

Clean Supply

SPS

Storage Staff Toilet

Exam Room

Triage

Stor.

Heart Exam

Heart Exam 2 Restroom Heart Exam

Employee Health

Conference Room

OfficeExam

Exam

PEC

PEC PEC

Corridor

Clerk

Room

Exam Room

HAC

PEA

Exam Exam

Exam Exam

Tlt

Stor Corridor

Office

UP

UP

DN DN

DN

DN

UP

UP

UP

UP

DN

UP

UP

DN

DN

DN

DN DN

UPDN UP

DN

DN UP

DN

UP

DN

DN

Mens Restroom

Dir.

Conference

Room

Office

Office

Secretary Office

Associate Dir. Office

Director's Office

Chief of Staff

Sec. Chief of Staff

Adm Asst.

HAC

Adm Asst.

QA

Manager

Sec. & Waiting

Risk Management

Asst Chief Social Work S.W. Off. S.W. Off.

Staff Dir.

Asst.

Stor

Public Affairs

Adm. Asst.

Chief Soc.

Work

Tele

Director Public Affairs Office

Med Staff Coor.

Staff Dir.

Asst.

Clos

Elec.

Clos

Office

Office ExamSCI

Pharmacy

SCI Social Worker

Office

Toilet

Exam

Stor

Storage Exam

Stair 4

Exam Waiting

Area

Corridor

Stor

Tele Clos

Secretary

Off.

Off.

Off.

Off.

Off.

Occ.

Therapy

Kit.

Multi-Purpose

Off.

Off.

Group Rm.

Group Room

Adm. Asst.

Office

Stor.

Stor. Stor.

Men's Restroom

Stair 2

Quality Assurance AACOS

F. Tlt.

Service Lobby

KIT.

Food Service

Volunteer

Dry StorageWalk-In Ref.

Walk-In Ref.

HAC

Trash Chute

Corridor

Elec.

Dry Stor.

Pizza Shop

Canteen Dining

HAC

Retail Store

Mech.

Office Clerical

Elec.

Stockroom

Vending

Audiology Clinic

F. Tlt.

Tlt.

Tele.

RN Intake

Oxygen Physical

Therapy/Occupational Therapy

Speech Pathology

Speech Pathology Neuropsychology

Electrical Closet

Nave Vestry

Stor

Chancel

Chap. Clin.

Pastoral

Education

Chaplain Assistant Chief Chaplain Chaplain

Corridor

Corridor

Pharmacy SpecialistStorageNP / ExamSocial WorkPhysician/ExamReceptionWaiting Storage

Stor.

SVC.

Officer

SVC.

Officer

SVC.

Officer

SVC.

Officer

SVC.

Officer

SVC.

Officer

Waiting Room

Audiology

Corridor

Corridor

Off.Adm. Asst.Off.Off.Off.Procedure Receiving

Pharmacy

Off. Secure Dispensing

Vault

Waiting Consult

Elec.Pharmacy

Dispensing

Sec.

Voluntary Service Office

Storage

Agent Cashier

Agent Cashier

Agent Cashier

Transport

Voluntary Service

Corridor

Volunteer Office

Volunteer Office

Sig.

Stair 1

Decedent Affairs Conf. Room

Nurse Pract.

Nurse Pract.

Eligibility Off.

Clos

Clos.

F. Tlt.

Personnel Health

Personal Health

Person.

Hlth.

Off. Off.

Social Work

SVC

Off.

Exam

Signal

Tele.

Stair 5

M. Tlt.

Nursing Lounge

Elec.

HAC

F. Tlt.

Phys.

Phys.

Phys.

Phys.

Nurse Manager

Chief Nurse OfficeChief Office

Prog. Asst.

Waiting

Physician Office

Phys.

Stor.

Elec.

Tlt.

Stair 9

On Call

Tlt.

Sig.

Cl. Stor.

Cl. Lin.

Pub. Tlt.

Emergency

Secl. Secl.

Minor Surgery

Triage

Chief Off.

Soil. Util.

PCMM

Coordinator

Quality Manager

Squad Stor.

Heart Exam

Heart Exam 2 Restroom Heart Exam

Corridor

M. Tlt.

F. Tlt.

Employee Health

Conference Room

OfficeExam

Exam

Police

Employee I.D.

Off.

Off.

Lkrs.

Tlt Evidence

Armory

Stor.

Waiting

PEC

PEC PEC Off. PEC

Holding M. Tlt.F. Tlt.

Holding

Corridor

Stair 6

Clerk

Waiting Room

Exam Room

HAC

PEA

Exam Exam

Elec.

Exam

Alcove

Exam

ExamExam Exam

Tlt

Stor Corridor

PIV

Registrar Pain School

Elec.

Elec.

Compund

Stair 7

Tlt.

Work Rm.

Clinical Pharm.

RN

Exam

Exam

Exam

Exam

Exam

Exam

Exam

Exam

Exam

Meds

Exam

Exam

Exam

Office

Clinicians Break Rm.

Women's Lockers F. Tlt.

Men's Lockers

M. Tlt.

Program Assistant

Care Coordination

Pharmacist Counselor

Changing Room-MRI

Reception

Social Worker

RN

Tlt.

Office

Exam

Wrk. St.

HAC

Exam

Neg. Press.

Exam

Exam

Exam

Neg. Press.

Exam

Exam

Exam

Ante

Procedure

Elec.

Stor.

Tele.

Neg. Press.

Soiled Utility

Exam

Exam

Exam

Exam

Exam

Office

Exam

Exam

Exam

Procedure

Office

Office

Storage

Work Area

Pharmacist Counselor

Reception

Clinical Pharm.

RN

Nutrition

Office

Exam

Work St.

Tlt.

Exam

Elec.

Exam

Exam

Exam

Exam

Exam

Exam

Meds

Elec.

Exam

Linen

Procedure

HAC

Exam

Tele.

Exam

Stor.

Voluntary ServiceMech.

ATM

Break Room

OfficeOfficeOfficeExamExamExam

Exam

Exam

Tlt.

Office Office Exam

Office

Work Area

Clos.

InfoOffice

F. Tlt.

Storage

Blood Draw Rm.

RN Work Area Intake

Exam

Exam

Exam Corridor

Waiting Room

Entry

Corridor

Corridor

Corridor

Corridor

Corridor

Corridor

Vestibule

Stair 10

Kit.

Corridor

Waiting Area

Waiting Room

Stair 3

Corridor

Sig

Storage

Recreation

Stor.

Office

Conference

Blessed Sacrament

Office

Interview Room

Storage

Entry

M. Med.

Stor.

Elec.

M. Med.

Stor.

M. Med.

Stor.

Stor.

Med. Media

Toilet

Storage Film Room

Medical Illust.

Closet

Storage

Entry

HAC

Stair 11

Stair 8

Clerical

Decon Trailer

Water Treatment

Shared Office

Office

PEC PEC

Closet

Volunteer Storage

Trailer

Desk

Corridor

Corridor

Corridor

Corridor

Corridor

Pharmacist Counselor

PIV

Registrar

Closet

Consult/Conference Office

Office

Office

Office

Volunteer Lounge

Office

Corridor

Vestibule

Patient Waiting

Treatment

Isolation One

Patient Toilet

Isolation Two

Nurse Station

Soiled Holding

Patient ToiletMeds/Nutrition

Clean Linen

Corridor

Womens Locker

Mens Locker

Electric Room

Signal Closet

Staff Toilet

Staff Lounge

Equipment Repair

Corridor

Office

Clean Supply

SPS

Storage Staff Toilet

Exam Room

FIRST FLOOR PLANS

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

06/10/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A101

SCALE:

A1006, A1004 1/8"=1'-0"

SCALE:

C107, C108 1/8"=1'-0"

SCALE:

EXISTING FIRST FLOOR PLAN

1/32"=1'-0"

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

2. NOT USED

3. EXISTING AUTOMATIC SLIDING DOOR.

CONTRACTOR TO PROVIDE NEOPRENE SEAL

AROUND PERIMETER OF DOOR LEAF

DN

UP

DN

UP

DN

UP

Lab

Recep.

Stor.

Digital Chest Rm.

Dressing Rm.

Speech Pathlgy.

Rehab Care Line

Elec.

HAC

Staff Tlt.

PT Storage

Hydrotheraphy

Exam/Treatment / Exercise

Room

Physical Ther.

Supervisor

Elec. Corridor

Light Box Room

SCI Exam

Stor.

Stair 2

Oxygen Storage

Therapy Supervisor

Ante RoomDirty Room

Equip Wash

Mechanical Room

Compressor Room

Soiled Receiving &

Decontamination

Equipment Storage and Testing

Storage

Eto. Room

Mech.

Office

Dressing Rm.

OfficeLKRS.

Shower

Elec.

Service Lobby

Trash Chute

Lounge

Training Room

HAC

Office Corrido

Stair 4

Anatomic Pathology

Gross Room Office

Special Staining

Histology Processing Supervisor

Histology Sig.

Te

TB/ MYC

LabTB/ MYC.

Lab

ISO ISO

Tele.

Lab

Cold Rm.

Ante

Dispatch Area

Clean Supplies

F. Tlt.

M. Lkrs.

Slide Stor.

F. Lkrs.

Dir. Off.

Off.

Elec.

Corridor

Off.

Off.

Pathology Off.

Micro Reading

Break Room

HACCorridor

Stair 3

Corridor

Storage

Chage AreaWomen

A/C Shaft

A102B14

UP

DN

DN

DN

DN

UP

DN

UP

UP

DN UP DN

DN UP

UP

DN

UP

UP

Stair 10

Lab

Recep. Imaging Recep.

Stor.

Digital Chest Rm.

Dressing Rm.

Speech Pathlgy.

Rehab Care Line

Man Rehab Care Line

Staff

Occupational Therapy

EMG Lab

Rehab Exam

Rehab Exam

Elec.

HAC

Staff Tlt.

PT Storage

Hydrotheraphy

Exam/Treatment / Exercise

Room

Physical Ther.

Supervisor

Adl. ClinicEMG Lab

Elec. Corridor

Light Box Room

SCI Exam

Stor.

Stair 2

Oxygen Storage

Therapy Supervisor

Ante Room

Stor.

Dirty Room

Equip Wash

Mechanical Room

Compressor Room

Soiled Receiving &

Decontamination

Equipment Storage and Testing

Storage

Eto. Room

Mech.

Office

Dressing Rm.

OfficeLKRS.

Shower

Elec.

Service Lobby

Trash Chute

Lounge

Training Room

HAC

Office

Nuclear Med. Sec.

Waiting

Reading

Work Rm.

CAT Scan Room

Gamma Camera

Uptake Prep Bay

Uptake Area

Uptake Prep Room

PET/CT

Scanner

Echo Room Echo Room Echo Rm

Cath Lab

Stor.

I.V. Prep Rm.

Elec.

Control Room

Tlt.

Tele.

File Rm.

Chief Off.

Reading Rm.

Chief Off.

Break Room

Stair 1

Signal Closet

M. Tlt.

Tlt.

G.P.

Radiography

Control

Storage

Stair 5

Reading Room

Gamma Camera

Hot Lab

Stor.

X-Ray Room

Control

Clos

Clos

Ultrasound

Corridor

Elec.

Corridor

Viewing

Reading Room

Reading Room

Adm.

Chief Radiology

Adm. Asst.

Off.

Resident Reading Room

Reading Room

Reading Room

Tlt.

Pat. Rm.

Ultrasound Stor

Tlt.

Break Rm.

Elec.

HAC

Digital

Radiography

Control

Student Off.

Office

Patient Toilet

Control

BE

Fluororoom

Storage

Work Rm. Cl. Supp.

Clean Equipment

Sig. Clos.

Clean Supply Room

M. Lkrs.

Tlt.

Staff Lounge

F. Lkrs.

Tlt.

Conf.

RN

Manager

Elec.

HAC

On Call

Tlt.

Stair 9

Off. Off.

Pat. Room Pat. Room Pat. Room

Pat Rm.

Pressure

Pat Rm.

Neg.

Pressure

Pat Rm.

Neg.

Pressure

Pat. Rm.

Neg.

Pressure

Pat. Rm

Pat. Rm.

Pat. Rm.

Neg.

Pressure

Pat. Rm.Pat. Rm.Pat. Rm.

Grieve/ Consult.

Off.

Meds.

Nurse Station

Staff Tlt.

Lin.

G.P.

Radiography

Tlt.

Trans.

Soil.

Stair 4

Anatomic Pathology

Gross Room Office

Special Staining

Histology Processing Supervisor

Histology Sig. Clos.

Tele.

Off.

Sec.

Operatory

Operatory

Dental Lab

Stor.

Dental Operatory

Dental Hygeine

Oral Surg.

Dental X Ray Room

Off.

Corridor

Lab Office

TB/ MYC

LabTB/ MYC.

Lab

ISO ISO

Tele.

Lab

Cold Rm.

Ante

Dispatch Area

Clean Supplies

F. Tlt.

M. Lkrs.

Slide Stor.

F. Lkrs.

Dir. Off.

Off.

Elec.

Corridor

Off.

Off.

Pathology Off.

Micro Reading

Break Room

HACCorridor

Corridor

Stair 3

Waiting Rm.

Oral Surg.

Off.

Stor.

Elec.

Off.

Tele.

Office Lab Lab

Off.

Cancer RegistryChiefOff.

Prep Rm.

Control

Cardiac Cath Lab

Tlt. Waiting Stair 6

Tele.

Stor. Elec.

Lockers

Lab Lounge

Hemo Stor.

Mech.

Lkrs.

Chemistry Hemotology

Lab

Blood Draw

Blood Bank

StorageHAC Storage

Conference Rm.

Off.

Break Rm.

HAC

Off.Off.Off.Off.Off.

Stor.

ExamEKG Rm.Tlt.

Scope Wash

Soil Ut.

Clean Linen Observ.

Transfer

Radiology Spec Rm.

Scrub Area

Cath Lab Control

Equip

Prep Mon

Sterile Supply

Vestibule

Control Rm.

Bone Density Lab

Tlt.

Tlt.

CT Scanner

Sec.Off.Off.

Chief Off.

Clos

Files

Mech.

Special Chem. Toxicology

Tele

Elec.

Stor.

Shwr

Tlt.

Off.

Off.

Soiled Ut.

Cold Stor.

Stair 8

Womens

Mens

Elec.

Blood Draw

Work Rm.

HAC

Exam

Intake

Exam

Stor.

Exam

Stor.

Exam

Exam

Exam

Exam

Exam

Waiting Alcove Exam

Exam

Exam Tlt.Gas Stor

Lin.Supply

Staff Tlt.SoilExamTlt.

Exam

ExamExam

Exam Exam

Exam

Exam Exam

Exam Exam

Exam Exam

Signal

Office

Exam Exam

ExamExam

ExamExam

ExamExam

Work Alcove

Work Alcove

ExamExam

ExamLinBreak Rm.

Soiled Utility

Elec.

Corridor

Corridor

Utility Room

Office

Reception

Waiting

Storage

Storage

Stair

Closet

CT Room #2

Stair 11

Clean Supply

Storage

PACS Read

S.P. Control

Special Procedures

MRI

Component

MRI Room

MRI

Equipment Storage

MRI

Equipment

MRI EMS

Corridor

Waiting

Dressing Room

Chage Area

Toilet

Elec.

Signal

Men Staff

Women Staff

CT Control

Adm.

Equip.

CT Room #1

S.P.

Equipment

CT Prep

Toilet Storage

Office

IR Reading

Office

CT Office

Toilet

Storage

A/C Shaft

A/C Shaft

A/C Shaft

Mechanical

TOP VIEW

STAFF SIDE

SIDE VIEW

SPECIFICATIONS:

SECTIONS: HEAVY DUTY EXTRUDED ALUMINUM 6063-T6.

FRAME: DEPTH OF 4 1/2".

CENTER SITELINE: 1 1/2" FRAME.

TOP RAIL, BOTTOM RAIL, CENTER AND END STILES: 15/16".

THUMBTURN LOCK INCLUDED.

PROVIDE SEALS

MECHANICS: HEAVY DUTY BALL BEARING CARRIER FOR

SLIDING WINDOW.

GLAZING: 1/2" TEMPERED

FINISH: SATIN ANODIZED

3'-0" +/- VIF

1'-0""

2"

SECOND FLOOR PLANS

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

06/10/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A102

SCALE:

EXISTING SECOND FLOOR PLAN

1/32"= 1'-0"

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

SCALE:

ELEVATION

NTS

SCALE:

B201, B208A, B210B, B210C, B210D, B210E, B211, B215, B217, B218 1/8"= 1'-0"

A203, A222E, A223, A235A, A236A

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

2. REMOVE AND REPLACE EXISTING WINDOW

SEALS

3. REMOVE EXISTING CEILING SYSTEM AND

REPLACE GRID AND CEILING TILE.

4. NOT USED.

5. NOT USED

6. REMOVE EXISTING STERILIZER THRU-WALL UNIT

AND DISPOSE OFF SITE. INFILL WALL TO MATCH

EXISTING, PATCH WALL CEILING AND FLOOR TO

MATCH EXISTING AFTER DEMOLITION.

7. REMOVE EXISTING ALUMINUM SLIDING WINDOW

AND REPLACE WITH NEW SELF CLOSING SINGLE

SLIDER WINDOW WITH STAINLESS STEEL SILL

SCALE:

SLIDING DOOR ELEVATION

NTS

CAT Scan Room

Gamma Camera

Uptake Prep Bay

Uptake Area

Uptake Prep Room

PET/CT

Scanner m

Cath Lab

Stor.

I.V. Prep Rm.

Elec.

Control Room

Tlt.

Tele.

G.P.

Storage

Stair 5

Reading Room

Gamma Camera

Hot Lab

Stor.

X-Ray Room

Clos

Pat. Rm.Pat. Rm.Pat. Rm.

Grieve/ Consult.

G.P.Trans.

Prep Rm.

Control

Cardiac Cath Lab

Tlt. Waiting

Stor.

Lockers

Hemo Stor.

Off.

Break Rm.

HAC

Off.Off.Off.Off.Off.

Stor.

ExamEKG Rm.Tlt.

Scope Wash

Soil Ut.

Clean Linen Observ.

Transfer

Radiology Spec Rm.

Scrub Area

Cath Lab Control

Equip

Prep Mon

Sterile Supply

Vestibule

Control Rm.

Bone Density Lab

Tlt.

Tlt.

CT Scanner

Closet

Occupational Therapy

CT Room #2

Stair 11

Clean Supply

Storage S.P. Control

Special Procedures

MRI

Component

CT Control

Adm.

Equip.

CT Room #1

S.P.

Equipment

CT Prep

Toilet Storage

Office

CT Office

Stair 10

Elec.

Work Rm.

HAC

Exam

Intake

Exam

Stor.

Exam

Stor.

Exam

Exam

Exam

Exam

Exam

Waiting Alcove Exam

Exam

Exam Tlt.Gas Stor

Lin.Supply

Staff Tlt.Soil

Exam Exam

ExamExam

ExamExam

ExamExam

Work Alcove

Work Alcove

ExamExam

ExamLinBreak Rm.

Corridor ception iting

Storage

BE

Fluororoom

Cl. Supp.

Clean Equipment los.

Off.

Staff Tlt.

Lin.

Soiled Utility

SECOND FLOOR PLANS

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

06/10/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A102B

SCALE:

C205, C210, C211, C212, C214B, C216A, C216F C216H, C216L C216O, C221, C225 1/8"= 1'-0"

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE

SEALS. REUSE EXISTING FRAME.

2. REMOVE AND REPLACE EXISTING WINDOW SEALS

3. NOT USED

4. SEAL ALL EDGES OF CEILING TILE.

PARTIAL FLOOR PLAN

SCALE:

A2013, A2014, A2015, A2016 1/8"= 1'-0"

PARTIAL FLOOR PLAN

SCALE:

C2009, C2025, C2031, C2033 1/8"= 1'-0"

PARTIAL FLOOR PLAN

SCALE:

A295, A296

UP

Service LobbyM. Locker

F. Locker

Corridor

RO DI

WaterDe-Gown

Gowning Rm.

De-Con Prep/Pack

HAC

HAC

Office

Office

Storage

Office Conf Rm.

Vendor Drop Off

Cool Down Cart

Steam Equip Rm.

Open Office

Ante Rm/ Clean Exit

Elec

Asst. Chief Diet.

St

St

Corrid

Word Proc. Off.

Chief Nurse

Research Off.

Off.

Sig.

Stair 3

Corridor

HAC

Db. Wtr

Tr. Ch.

Elec

Room

Room

Patient Rm. Patient Rm Patiet Rm

Meds.

Clean Supp.

Patient Rm.

Electrical

TeleCorridor

UP

UP

UP

UP

UP

UP

UP

UP

DN

DN

DN

DNUP

DN UP

DN

UP

UPDN

DN

Isolation Procedure

Rm.

Fluoro

Procedure Rm.

Corridor

Procedure Rm.

Wash Room Physician

Work Room

Scope Storage

Ante Rm.

Scope Cleaning

Procedure Rm. Procedure

Rm.

Prep/Recovery Rm.

Clean Supply

Isolation Prep/Recovery

Rm.

Prep/Recovery Rm.

Prep/Recovery Rm.

Isolation Prep/Recovery

Rm.

Prep/Recovery Rm.

Prep/Recovery Rm.

Prep/Recovery Rm.

Staff Break Rm.

Staff Toilet

Patient Toilet Rm.

Storage

Signal Clos.

Patient Toilet Rm.

Prep/Recovery Rm.

Prep/Recovery Rm. Post-Op

Elec. Supplies / Equipment

Consult.

Lobby

Waiting

Staff Lounge

Stair 10

Staff Work Rm.

SPD Case Cart

O.R. #7

O.R.

Storage

Anesthesia Work Rm.

Men's Locker

O.R. 1

O.R. 2

O.R. Alcove O.R. Alcove

O.R. AlcoveLight Rm.

O.R. 3

O.R. 4

Clean Core

Elec.

O.R. 5

O.R. 6

Mech.

Corridor

Women's Locker

HAC

Office

Cysto O.R.

Cysto O.R.

M. Shower W. Shower

Sub-Waiting

Work Rm.

Nurse Station

Sterile Core

Frozen Section

Utility

Office

Elec.

Tele.

Corridor

Entry

A/C Shaft

Soiled Utility

Men's

Women's

Pat. Tlt.

Reception

Dr. Office Office Office Office Office Office Stair 6

Anesthesia Tech.

Cleaning Supply

Temp.

Control

Oxygen Storage

Vestibule Vestibule

HAC

Patient Room

Patient Room

Patient Room Patient

Room

Patient Room

Patient Room

Patient Room

Shower Patient Room

Patient Room

Patient Room

Nurse Station

Service LobbyM. Locker

F. Locker

Corridor

RO DI

WaterDe-Gown

Gowning Rm.

De-Con Prep/Pack

HAC

HAC

Office

Office

Storage

Office Conf Rm.

Vendor Drop Off

Cool Down Cart

Steam Equip Rm.

Open Office

Ante Rm/ Clean Exit

Elec

Vasc. Lab Vascular

LabChief Diet.Diet Sec.

Diet Off.

F. Tlt.

Waiting

Exam

Exam

Storage

Lab Machine

Plaster

CAD/CAM

Off.

Elec.

M. Tlt.

Stor.

HAC

Asst. Chief

Pros. Adm.

Asst.

Clos.

Chief Off.

Ward Adm.

Off.

Adm. Asst.

OfficeOffice

Office

Chief PBS

Office Office

Stor.

Stor.

Elec.

Pros. Stor.

Pros. Off.

Stair 2

Stor.

Stor. Asst. Chief Diet.

Corridor

F. Tlt.

M. Tlt.

Stair 1

Stor.

Sig.

Stor.

Tlt.

Vasc. Lab

Elec.

Mech.

Adm. Asst.

Off.

Conf.

Chief of Surgery

Off.

Off.

Off.

Off.

Off.

Off.

Corridor

Off.

Physician Review

Linen Clos.

Nurse Off.

Soil Utility

Equip. Stor.

HVAC

Elec.

Sig.

Clean Supply

Vasc. Lab

HAC HAC

Lounge

Tlt.M. Lock.

Female Locker

Soc. Wrk.

Respiratory Therapy

Conference Room

Pharm.

On Call

Tlt.

Patient Advocate

Off.

Stair 5

Off. Off.

Off. Off.

Corridor

Elect.

ClassroomNurse Educator

Stor.

Office Office Conf.

Off. Off. Lounge Asst. Ch. Asst. Ch. Adm. Off. Word Proc. Off.

Chief Nurse

Research Off.

Off.

Sig.

Elec.

Stair 3

Nursing Conf.

F. Tlt.

Stor.

Eq. Stor.

Res. Stor.

Stor.

Classroom

Office

Off.

Off.Off.Off.

Stor.

Classroom

Work Area

Stor.

Stor.

Stor.

Stair 4

Stor.

Corridor Learning Exchange

Work Area

Work Area

Elec.

Pat. Dining

Family Waiting

Reception Office

Consult

Break Rm.

Patient Tlt.

PACU

Ophthamology Optometry Office Acute Care

Storage

Corridor

Patient Rm. Patient Rm Patiet Rm

Meds.

Clean Supp.

Patient Rm.

Patient Rm.

Patient Rm.Patient Rm.

Patient Tlt.

Patient Rm.Patient Rm.Patient Rm.

Patient Rm.

Patient Rm.

EMS

Off.

Clean Stretcher

Stor.

Anaesthetics

SoilStorageHAC

Electrical

Family Wtng.

Tele

Lactation

Grieve Consult

ICU Dir.

Off.

Tlt.

Corridor

Adm. Asst.

Stor.

Tlt.

Stair 9

HAC

Db. Wtr

Tlt.

Tr. Ch.

Stair 8

A/C Shaft A/C Shaft

A/C Shaft

Elec

Linen Clost.

Corridor

Corridor

Corridor

Corridor

Corridor

Corridor

Room

Room

THIRD FLOOR PLANS

SCALE:

A341, A342, A343, B307, B307A, B307B, B307C, B307D, B307E 1/8"= 1'-0"

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

06/10/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A103

SCALE:

C304A, C304B, C304E 1/8"= 1'-0"

SCALE:

EXISTING THIRD FLOOR PLAN

1/32"= 1'-0"

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

2. NOT USED

3. NOT USED

4. SEAL ALL EDGES OF CEILING TILE.

5. SEAL AROUND EXISTING SPECIMEN CABINETS

Isolation Procedure

Rm.

Fluoro

Procedure Rm.

Corridor

Procedure Rm.

Wash Room Physician

Work Room

Scope Storage

Ante Rm.

Scope Cleaning

Procedure Rm. Procedure

Rm.

Prep/Recovery Rm.

Clean Supply

Isolation Prep/Recovery

Rm.

Prep/Recovery Rm.

Prep/Recovery Rm.

Isolation Prep/Recovery

Rm.

Prep/Recovery Rm.

Prep/Recovery Rm.

Prep/Recovery Rm.

Staff Break Rm.

Staff Toilet

Patient Toilet Rm.

Signal Clos.

SPD Case Cart

. 1 cove

Nurse Station

Soiled Utility

Pat. Tlt.

Cleaning Supply

HAC

Linen Clost.

Corridor

Corridor

C3034

C3014

C3016A

C3016

C3017

C3023C3024

DN

Patient Room

Patient Room

Patient Room

Patient Room

Linen Clos.

Nurse Off.

Soil Utility

Equip. Stor.

Elec.

Sig.

Clean Supply

Lounge

Tlt.

Soc. Wrk.

Respiratory Therapy

Conference Room

Pharm.

Lactation

Grieve Consult

Tlt.

Tlt.

Corridor

Nursing

F. Tlt.

Stor.

Eq. Stor.

Res. Stor.

Stor.

Classroom

Off.

Stor.

Classroom

Work Area

Stor.

Stor.

Stor.

A/C Shaft

6'-0" +/-

Nursing

F. Tlt.

Stor.

Eq. Stor.

Res. Stor.

Stor.

Classroom

Off.

Stor.

Classroom

Work Area

Stor.

Stor.

A/C Shaft

6'-0" +/-

5"

CONT. BACKSPLASH

Nursing

F. Tlt.

Stor.

Eq. Stor.

Res. Stor.

Stor.

Classroom

Off.

Stor.

Classroom

Work Area

Stor.

Stor.

A/C Shaft

ANCHORS, MIN. 3 PER JAMB, MAX

2'-0" O.C., ONE WITHIN 1'-0" OF FLOOR &

WIDTH VARIES - (HEAD SIM.)

5/8" GYP. BD. ON MTL. STUDS

ONE WITHIN 1'-0" OF FRAME TOP

MIN 20 GA. MTL. STUDS

1/2"

1/2"

GLASS STOP

GLASS AS SCHEDULED

2"

3'-2"

2"

3'-2"

2"

6'-10"8"

THIRD FLOOR PLANS

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

06/10/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A103B

SCALE:

C3012, C3013, C3014, C3016, C3016A, C3017, C3024, C3023. C3034

1/8"= 1'-0" SCALE:

A387A, A387K, A397 1/8"= 1'-0"

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

2. EXISTING AUTOMATIC SLIDING DOOR.

CONTRACTOR TO PROVIDE NEOPRENE SEAL

AROUND PERIMETER OF DOOR LEAF

3. REMOVE EXISTING CEILING SYSTEM AND

REPLACE GRID AND CEILING TILE.

4. REMOVE PORTION OF EXISTING PARTITION AS

REQUIRED FOR NEW WINDOW.

5. REMOVE EXISTING WINDOW AND DISPOSE OFF

SITE.

6. REMOVE EXISTING PARTITION AND DISPOSE OFF

SITE. PATCH ALL AREAS DISTURBED BY

REMOVAL TO MATCH EXISTING CONDITIONS

7. NEW SOLID SURFACE COUNTERTOP BRACKET

SUPPORT AT 3'-0" O.C.

8. NEW WINDOW, SEE ELEVATIONS

SCALE:

B320, B320A, B320C 1/8"= 1'-0"

SCALE:

B320, B320A, B320C 1/8"= 1'-0"

PARTIAL FLOOR PLAN PARTIAL FLOOR PLAN PARTIAL DEMOLITION PLAN

PARTIAL NEW WORK FLOOR PLAN

SCALE:

CASEWORK SECTION

1-1/2"= 1'-0"

SCALE:

B320, B320A, B320C 1/8"= 1'-0"

PARTIAL RCP PLAN

SCALE:

WINDOW DETAIL

1"= 1'-0"

SCALE:

WINDOW ELEVATION

1"= 1'-0"

DNUP

t Toilet

Infusion

Tlt.

Stair 5

Exam

Elec.Stor.

Soil. Util.

CL. Lin.

Exam

Exam 2

Exam 4

Exam 6

Exam 8

Exam 10Exam 9

Exam 7

Exam 5

Exam 3

Exam 1

Exam

KIT.

Supp.

HAC

Waiting

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

A/C Shaft

DN

DN

UP DNUP

DN

UP

DN

UP

UP

DN

Reception Interview

Interview

Reception Interview

HAC

Stor.

Med Room

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Stor.

Elec.

Stor.Staff Tlt.

HSRD

Office

Dr's Off.

HSRD

Off.

Oncology Pharmacy Sattelite

Chemo Prep.

IRM Office

Stair 2

HSRD

Off.

Comp.

Training

Comp.

Specialist

Off.

Service Lobby

IRM

Network

Operation Center

Comp.

Programmer

Off.

Computer Off.

Chief Rm.

Res. Off.

Stair 1

IRM

Storage (Hdwr)

Elec. Toilet Toilet

IRM

Storage (Comm)

Infusion

Tlt.

Stair 5

Sub. Lab.

Pharm.

Exam

Elec. Stor.

S.B. Tlt. D.B.

Proc.

Nurse Station

Lab.

ExamExamExamExam

Elec.Stor.

Soil. Util.

CL. Lin.

Exam

Exam 2

Exam 4

Exam 6

Exam 8

Exam 10Exam 9

Exam 7

Exam 5

Exam 3

Exam 1

Exam

KIT.

Supp.

HAC

Waiting

GCRC

Corridor

Tlt.

Tlt.

Waiting

Trash Chute

Stor.

Elec.

Comp. Rm.

Stor.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Corridor

HSRD

Off.

HSRD

Off.

Common Area

Dir.

Off. Dr's

Off.

Social

Worker

Tlt.

HSRD

Off.

HSRD

Off.

Neuro.

Res.

Corridor

Elec.

Stor.

Stor.

Stor.

Stor.

Stor.

Stor.

Tlt.

Tlt.

Staff Physician

Neuro Office

Regular E.E.G

E.E.G.

Control &

Observation

F. Tlt.M. Tlt.

Auto-Clave

Dishwasher

HACElec.

LAB.

Procedure

Rm

W. Lab.

Ram Lab.

Tissue Culture

Office

Stair 4

Electrophoresis Core

RAM Lab.

Corridor

Infectious Disease

Lab Cold Rm. Freez.

Sig. Clos.

Elec.

Stair 3

Research Adm. Off.

Adm. Off.

CFBRE Off. Conf.

Clos.

Office

Associate Chief of

Staff/Research

Office

Office

HAC

Refrig.

Elec.

Lab

Tissue Culture

Mic Rotomy

Microscope Core

OfficeEvoked Potential

Lab

Copier Room

Corridor

Director's Office

A/C ShaftA/C Shaft

A/C Shaft

Mech Room

Hazardous Compounding

Non-Hazardous CompoundingAnte Room

Work Station AreaHazardous

Storage

UPDN

HAC

Stor.

Med Room

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Exam Rm.

Stor.

Elec.

Stor.Staff Tlt.

HSRD

Office

Stair 2

Comp.

Training

Comp.

Specialist

Off.

Tlt.

Stor.

Stor.

Stor.

Stor.

Stor.

Stor.

A/C Shaft

FOURTH FLOOR PLANS

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

06/10/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A T

E OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A104

SCALE:

A449, A463, A464, A473, A474, A476

1/8"= 1'-0" SCALE:

EXISTING FOURTH FLOOR PLAN

1/32"= 1'-0"

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

PARTIAL FLOOR PLAN

SCALE:

A406, A407, A416, A417

Clean Supply

Storage

Storage

Nourishment

Clean Linen

Staff Toilet

Nurse Station

Single Room - Bariatric

Single Room - Bariatric

Single Room - Bariatric

Single Room - Bariatric

Single Room -

Negative Pressure

Single Room -

Negative Pressure

Single Room

Single Room -

Negative Pressure

Single Room - Bariatric Negative Pressure

Signals

Elec.

HAC

Meds

Toilet Toilet Toilet

Toilet

ToiletToilet

Toilet

Toilet

Toilet

Corridor

Anteroom Anteroom

Stair #11

Exam 4

Exam 3

Exam 2

Exam 1

Staff Physician

Tlt.

Cor

Tlt.

DNUP

Exam Room 5

Clos.

Exam Room 4

Surgery Office

Procedure Room

Procedure RoomExamWaiting

AreaClerk fice

Supp.

sst.

Elec.

Tele

Soil

HAC Stor.

Pain Nurse

Telesurgery Office

Tlt.

Skin and Wound

Care Clinic

Waiting Area

ClosetStor.

Stair 5

Closet

Corridor

Rolling Storage

IV

Ante-Room IV Prep IV Buff

Closet

Dispensing Area

Office

Corridor

Cart Stor.

Compound Picking

Unit Dose

DN UP DNUP

DN UP

DN

UP

DN

A/C Shaft

A/C ShaftA/C Shaft

Clean Supply

Storage

Storage

Nourishment

Single Room

Clean Linen

Staff Toilet

Nurse Station

Single Room - Bariatric

Single Room - Bariatric

Single Room - Bariatric

Single Room - Bariatric

Single Room -

Negative Pressure

Single Room -

Negative Pressure

Single Room

Single Room -

Negative Pressure

Single Room - Bariatric Negative Pressure

Signals

Elec.

HAC

Family Lounge

HUC

Physical Therapy

Consult

Staff Lounge

Telem.

Office

Meds

Staff Tlt

Toilet Toilet Toilet

Toilet

ToiletToilet

Toilet

Toilet

Toilet

Corridor

Anteroom Anteroom

Stair #11

Corridor

Bath

Clean Supply

D.R.D.R.

S.R. Neg.

Pressure

S.R. Neg.

Pressure

Elec.

Soil. Util.

Elec.

D.R.D.R.S.R.

D.R.

D.R.

S.R.

D.R.

Storage

Clean Linen D.R.

D.R.

Nurse Manager

Bath

Bath

Bath

Bath

Bath

Bath

Bath

Bath

Bath

Stair 2

Bath

Bath

Bath

Tr. Ch.

HAC

Service Lobby

Elec.

Work Room

Stor

Stor

HAC

Bath Exam

Room 5

Clos.

Exam Room 4

Surgery Office

Procedure Room

Procedure RoomExamWaiting

AreaClerk

Class Rm.

Exam 7

Exam 6

Exam 5Exam 4

Exam 3

Exam 2

Exam 1

Staff Physician

Office

Pgm. Supp.

Asst.

Elec.

Tele

Soil

HAC Stor.

Pain Nurse

Stor.

Stor.

Supp ClosTlt.

Tlt.

Corridor

Telesurgery Office

Tlt.

Skin and Wound

Care Clinic

Waiting Area

Toilet

ClosetStor.

Stair 5

Stair 1

Medical Service Office

Medical Service

Office

Chief Office

Adm. Asst.

Adm Asst.

Chief Med.

Svc.

Sig. Clos.

Work Rm.

Dirty Equipment

Db. Wtr.

Storage

Clean Supply

Oxygen Storage

Equipment Room

Office

Med Svc

Office

Office

Conferece Room

Cleric

Rolling Storage

IV

Ante-Room IV Prep IV Buff

Closet

Tlt.

Storage

Conference Rm.

Office

Office

Office

Office Office

Office

Office

Office

Office

Office

Storage

Closet

Dispensing Area

Office

Stair 3

Storage

Sig. Clos.

Office

Corridor

Office

Tlt.

Elec. HAC Stor.

Staff Tlt.

Stor.

Elec.

Cart Stor.

Narc. Vault Chief

Compound Picking

Unit Dose

Corridor

Closet

Elec.

Tlt.

MICU

Penthouse

Fan Room

Stair 4

Corridor

Corridor

FIFTH FLOOR PLANS

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

06/10/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A105

SCALE:

A5088, A5089, A5091, A5092, A5093 1/8"= 1'-0"

SCALE:

B526A, B526B 1/8"= 1'-0"

SCALE:

A551, A555, A557A, A557C, A557D, A558 1/8"= 1'-0"

SCALE:

EXISTING FIFTH FLOOR PLAN

1/32"= 1'-0"

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

PARTIAL FLOOR PLAN

Research Pulmonary

Lab.

HHN Off.

lt.

Pulmonary Func. LAB

DN UP DNUP

DN UP

DN

UP

Nurse Station

Nurse Man.

Staff Tlt.

Conf. Rm.D.R.

Storage

HAC

S.R.

(Neg. Pres.)

CL. Supp.

S.R.

D.R.D.R.

S.R.

Clinical Pat.

Support

S.R.

(Neg. Pres.)

Elec.

Soiled Utility

Elec.

CL. Lin.

D.R.S.R.

S.R.

(Neg. Pres.)D.R.

D.R.

S.R.

(Neg. Pres.)

CL. Supp.

D.R.

Stair 2

Oxygen Storage D.R.

Nourish.

D.R.

Service Lobby

Elec.

Medical Conf.

Tlt.

Phys.

Work Rm.

LKRS.

HAC

DB. Wtr.

Research Pulmonary

Lab.

HHN Off.

Chief Medical

Res.

Waiting Room

Stair 1

Elec.

Equip. Stor. D.R.

Nourish.

D.R.

Stair 5

D.R.

Cl. Supp.

Nurse Station

S.R.

(Neg. Pres.)

D.R.

D.R.S.R.

(Neg. Pres.)D.R.

D.R.

Elec.

Elec.

Soil. Util.

S.R.

(Neg. Pres.)

Nurse Man.

Tlt.

Tlt.

S.R.

D.R.D.R.

S.R

Sterile Supplies

S.R.

(Neg. Pres.)

CL. Lin.

HAC

Nurse Conf.

Rm.Office

Tlt.

Tlt.

Tlt.

Tlt.Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt. Tlt.

Tlt.

Trash Chute

Medical Conf.

Meeting Room

Sig. Clos.

Tlt. Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Toilet

Tlt.

Tlt.Tlt.

Tlt.

Tlt.

Tlt.

Corridor

Off.

Elec.

Soiled

Echo.

Storage

IV Tech.

Off.

Conf. Rm.

Stair 3

Exam

Exam

Office

Exam

Exam Exam

Exam

Toilet

Exam

Toilet

Exam

Exam

Secretary

Elec.

Sig. Clos.

Tlt.

Tlt.

Adm. Asst.

Social

Work Off. Phys. Conf. Room

Chief Admn. Asst.

Chief Phys.Phys.Phys.Phys.Phys.

Clos.

Corridor

Stor.

Stor.

Ward Stor.

Pulmonary Func. LAB

HAC

Tlt.

Corridor

Exam

Closet

Storage

A/C Shaft

A/C Shaft

A/C Shaft

SIXTH FLOOR PLANS

SCALE:

A640, A640B, B636 1/8"= 1'-0"

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

03/19/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A106

SCALE:

EXISTING SIXTH FLOOR PLAN

1/32"= 1'-0"

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

DN UP

Soil. Util.

Tele.

Elec.

S.R.

Clean Linen

Stair 2

Nurse Station Meds

Stor.

Nurse Station

Co

A/C Shaft

DN UP DNUP

DN UP

DN

UP

Bath

Soil. Util.

Tele.

Elec.

S.R.

Clean Linen

S.R.S.R.Bed Room Ex. Group

Bath

Bed Room

Q.R.

T.L.T.

T.L.T.

T.L.T.

Ante

Dining/Group Room

Nurse Station

S.R.

Bath

Bath

T.R.T.R.

Bath

Bath

Ante

Obser.

S.R.

Exist.

Seclusion

Stair 2

Nurse Station Meds

Stor.

Nurse Station

Nurse Station

Work/Conference Break Room

Corridor

Storage Waiting Office #14 Office #13

Stair 5

Sensory Therapy Room

Storage

Bath

Interview Room Nurse Off. Chief Nurse

Off. Exam Rm. Office #18 Reception

Training (6)

Stor. S. Office #11A

S. Office #11A

Office #12

Group #2 (10-12)

Office #10Tlt.Office #9Office #8Office #7Office #6

Elec.

Elec.

HAC

Ante

Office

Office #5

Office #5A

Office #5B

Group #1 (12-20)

Office

Office #2

Office #3

Testing

Vis. BathCopy Rm.

Staff Office

Lockers Service Elev. Lobby

Laundry

Trash Chute

Staff Tlt. Sig. Clos.

Stair 1

HAC

Stor.

Elec.

Occupational Therapy

Corridor

DB Wtr.Storage Social Worker

Group Room

Elec.

Soc.

Worker

O/T Off.

Stor.

Social Worker

Psych. Res.

Stor.

Waiting

Stat.

Nurse Man.

Soc.

Worker

Intake Coor.

Off. Off.

HAC

Stor.

Stor.Reception

Elec

Break Room

Staff Tlt.

Signal Closet

Stair 3

Office

Office

Office

Office

Tobacco & Acohol

Research Center

Group Rm.

Off.

Off.

Off.

Off.

Off.

Off.

Off. Off. Off. Off.

Group Room

Off.Off.

Wash Room

Off.

KLT

Adm. Asst. Stor.

Stor.Stor.Elec.

Group Room

Stor.

Off.

Tlt.

Closet

Clos.

A/C Shaft

A/C Shaft

A/C Shaft

Office Office

Soc.

WorkerStor.

Social Worker

Psych. Res.

Stor.

Off. Off.

HAC

Stor.

Stor.

Elec

Off.

Off.

Off. Off. Off. Off.

Group Room

Off.Off.

Wash Room

Off.

KLT

Adm. Asst. Stor.

Stor.Stor.Elec.

Group Room

Stor.

Tlt.

SEVENTH FLOOR PLANS

SCALE:

A724 1/8"= 1'-0"

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

03/19/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A107

SCALE:

EXISTING SEVENTH FLOOR PLAN

1/32"= 1'-0"

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

2. REMOVE EXISTING TOILET FIXTURES AND

DISPOSE OFF SITE. CAP WATER AND SANITARY

AND SEAL OPENING FLUSH TO FLOOR AND WALL

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

SCALE:

PARTIAL FLOOR PLAN AREA B

DNUP

DN UP

Staff Tlt.Tlt.

rash hute

Stor.

Stor.

Off.

Kit.

Day Room / Dining

Stair 5

Lndry

Clos.

Addict.

Ther.

Showe Tlt.

Elec.

Sig. Clos.

Stor.

HAC

Stor.

f. Service Lobby

Elec.

Stair 1

A/C Shaft

UP

UP

DN UP DNUP

DN UP

DN

A/O Office

Elec.

Soil Util.

Surgery

Soiled Utility

Equipment Mech Room

Group Room #1

Stor.

Charting Room

Staff Tlt.

Phys. Off.ExamOff.Psych. Off.Off.

Off.

Off.

Stor.

Off.

Off.

Group Rm.

QI

Research Director

Off.

Bath

Off.

ANT

Elec.

Counsel Off.

Group Room #2

Stair 2

HAC

Stor. Off.

Direc. Off. Coor. Off.

Off.

Off.

Clos.

Tlt.

Clos.

Stor.

Lin. Chute

Tlt.

Tlt.

Tlt.

Tlt.

Tlt.

Corridor Tlt.

Trash Chute

Nurses Station

Stor.

Stor.

Off.

Kit.

Day Room / Dining

Stair 5

Lndry

Clos.

Addict.

Ther.

Shower / Tlt.

Music / Quiet Room

Group Room

Thera Off.Thera. Off.

Head Nurse

OfficeOff.

Elec.

Elec.

HAC

Cl. Lin.

Off.

3 Bed Room

6 Bed Rm.6 Bed Rm.

3 Bed Rm

Hndcap S.R.

Group Room

Women Bath

Restroom

SPS

Storage

Clean Supply

Closet

Opteratory

Stair 3

Reception

Special Needs

Operatory

X-Ray

Dermatology

Waiting

Conf.

Sig. Clos.

Stor.

HAC

Stor.

Corridor

Corridor

Tech. Off. Service Lobby

Off.

Stat. Off.

Off.

Alcohol Research

Research Lab

Elec.

Omnicell

Elec.

Stair 1

A/C Shaft A/C Shaft

EIGHTH FLOOR PLANS

SCALE:

A846A, A849 1/8"= 1'-0"

BW/VP VP/EM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

IMPROVE EXHAUST SYSTEMS

CINCINNATI, OH

539-18-101

Chief Engineer

Revisions: Date:

Cincinnati V.A.

Medical

Center

03/19/2020

SCHEMATIC DESIGN SUBMITTAL 04/05/2019

CONSTRUCTION DOCUMENTS 09/20/2019

DESIGN DEVELOPMENT SUBMITTAL 06/28/2019

95% OWNER REVIEW 08/09/2019

BID DOCUMENTS 03/19/2020

JASON REEVES

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

JAMES

W.

WILLIAMS

James W. Williams, License #9266 Expiration Date 12/31/2021

A108

SCALE:

EXISTING EIGHTH FLOOR PLAN

1/32"= 1'-0"

KEY NOTES

1. REMOVE DOOR LEAF AND ASSOCIATED

HARDWARE AND REPLACE WITH NEW DOOR

LEAF AND HARDWARE WITH COMPLETE SEALS.

REUSE EXISTING FRAME.

DOORS TO REMAIN

NEW DOORS

LEGEND

A. WORK TO PROVIDE COMPLETE PLUMBING,

MECHANICAL, AND ELECTRICAL SYSTEMS SHALL

OCCUR BEYOND EXTENT OF WORK LINE, AS

REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF

WORK LINE DUE TO INSTALLATION OF SUCH

SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &

ELECTRICAL DRAWINGS).

B. PATCH EXISTING WALLS & FLOORS WHERE NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW

WORK.

C. ALIGN NEW WORK WITH EXISTING.

D. FILL ALL SLAB/WALL OPENINGS RESULTING

FROM PLUMBING, ELECTRICAL, MECHANICAL,

OR OTHER REMOVALS. CONTRACTOR TO

MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS.

E. UNLESS NOTED OTHERWISE, ALL WORK IN

OCCUPIED AREAS OF THE BUILDING, OR WORK

THAT REQUIRES SHUTDOWN OF SYSTEMS,

SHALL TAKE PLACE AT NIGHT (GENERALLY

BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -

COORDINATE WITH COR.

F. REPLACEMENT OF DOORS CAN OCCUR DURING

THE DAY WITH CONCURRENCE OF STAFF

MANAGER OVER THAT ROOM. COORDINATE

WITH COR PRIOR TO PROVIDING WORK IN

THOSE AREAS.

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

WALLS TO REMAIN

WITHIN LIMIT OF WORK

TYPE MAT. TYPE MATERIAL

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .