This solicitation package provides information for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation will be released on or around August 10, 2020 for project 539-20-211 to correct deficiencies at the Veterans Administration Cincinnati VAMC. The work includes improvements to exhaust systems. The contract value is estimated between $500,000 and $1,000,000. The solicitation is set aside as a 100% small business opportunity under NAICS code 238220 with an estimated size standard of $16.5 million. The opportunity has a service-disabled veteran-owned small business preference. Interested small businesses must be registered in the Vendor Information Pages and SAM databases. The performance period is 180 calendar days from notice to proceed. The solicitation will require payment and performance bonds and safety/environmental compliance documentation. The deadline for responses will be included in the full solicitation package on SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Improve Exhaust System 539-18-101, newest first.
File Type Posted
539-18-101 Addendum 3 Dwgs.pdf PDF
36C25020B0068 0003.docx DOCX document
539-18-101 ADDENDUM 3 WRITE UP.pdf PDF
Addendum 2 Specifictions Revisons write up.pdf PDF
Corbin Russwin Locksets Sole Source Justification Redacted.pdf PDF
S04 Site Visit Sign in Sheet.pdf PDF
01 00 00 ADDENDUM 2.pdf PDF
Revise Bid Schedule Statement of Bid Items.docx DOCX document
Addendum 2 Drawings Revisions are clouded.pdf PDF
Location of temporary door storage.pdf PDF
36C25020B0068 0001.docx DOCX document
539-18-101 CD Bid Drawings (8-21-2020).pdf PDF
S02 Contractor EMR Certification Form.docx DOCX document
Wage Determination OH20200082.pdf PDF
S02 RFI Form.docx DOCX document
36C25020B0068.docx DOCX document
539-18-101 CD Bid Specifications (8-21-2020).pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Improve Exhaust System- Project 539-18-101, VA Medical Center at Cincinnati, OH RFI questions updated 9/22/2020

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 09-24-2020 539-20-3-6905-0084 539-18-101 539/90C Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati OH 45219 Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E.

University Avenue Cincinnati OH 45219 To all Offerors/Bidders

36C25020B0068 08-24-2020

X X X

The purpose of this amendment is to:

-Post the Government's response to the RFI's. This information can be found on the continuation page of the amendment.

-Post the site visit sign-in sheets (see attachment)

-Post the revised drawings - (see attachments with explanations) -Post the revised specification sections (see attachment) -Post the revised specification section 01 00 00 General Requirements - the only change is to the Statement of Bid ite ms (see attachment) -Post the revised bid schedule (Statement of Bid items). All bidders must utilize this form when submitting their bid.

-Post the temporary location of the door storage and the sole source justification for the Corbin Russwin Locksets.

-The attached revised drawings and specifications will replace all previously published.

Ronald T. Heidemann Contract Specialist

CONTINUATION PAGE

#
Question

RFI 001

1
What is the dimension from the door to the back wall of the elevator we can use?

Answer: Service Elevator (8 ft from door to back wall of elevator)

2
Will we be allowed to use an electric lift in the building?

Answer: Coordinate with COR on access

3
What is the maximum floor to steel height ?

Answer: floor to floor height varies between 11’-0” to 11’-11” Above ceiling work in 3rd floor area C is higher as it is the last floor in this area -approx. 16’-2”

4
Will the areas be clear so we can weld and get the lifts into to work from?

Answer: Phasing to be coordinated with COR.

RFI via email 8/31/2020

5
Sealing edges of ceiling tiles in on plan A102B. How does the VA want this done? Please provide a detail.

Answer: Ceiling gasketing 1/4-inch x 1/8 inch open cell foam tape shall be precut to the exact size and installed in continuous pieces (corner to corner) and in straight lines along existing ceiling grid flange. Apply gasket to the backside (horizontal edge) of the tees Apply foam tape continuously at each flange of the grid system, overlapping in corners if necessary.

6
On A103 how does the VA want to note 5 done? Does the VA have a detail to go by?

Answer: Infill gaps between the wall and the cabinets with backer rod (07 92 00 -2.3) and provide continuous sealant per specification 07 92 00 to create an air tight seal.

7
What finished need to be provide for note 2 on plan A107 where the plumbing fixture is removed?

Answer: No finishes are required for this work. Contractor to cap the existing pipes flush with the wall and floor once fixture is removed

8
What is the basis of design brand for the doors?

Answer: The intent is to match existing. Existing finish is Birch veneer rotary cut “RA100” by Algoma Hardwoods

9
What is the basis of design brand for the hardware?

Answer: VA Cincinnati existing lockset and keying is Corbin Russwin (see attached J & A)

10
Who holds the roof warranty on each roof that work is to be conducted on? Please provide a plan as to what kind of roofing is on each roof to be worked on.

Answer: 98% of the roofs are BUR Tremco Roofs. There is no active roof warranty for the work on building 1 except for the ambulatory care tower. The intent is to maintain roof integrity.

11
Please provide structural steel drawings for the support of the mechanical equipment.

Answer: The only upgrade to existing building structure that is required is for new duplex plume fan 1-DPF1. Structural steel drawing for this is Sheet S101.

12
Is quick frame engineered structural supports allowable for structural support of the fans?

Answer: It is unclear which fan(s) this question is referring to. QuickFrames are not acceptable for support of 1-DPF1, which shall comply with Sheet S101. If this is referring to other fans, please specify fan(s) in question.

13
Please provide a plan by plan list of what work can be done at night or during the day as it is not clear in these drawings.

Answer: All work in occupied areas of the building that blocks normal traffic flows or disturbs normal business in the hospital by shutting down active systems or creating excessive noise or dust, shall be performed at night or on weekends. The exception is Inpatient areas of the building, which need to be performed during the day, so as not to disturb sleeping patients at night. Inpatient areas are as follows: Rooms A501-A528, A5083-A5100, A600-A631, A647-A675, A704-A726. All work above 9th floor ceiling west of the main elevator bank shall be scheduled with COR well in advance, to avoid disturbing daytime sleep studies.

14
Has a NESHAP Survey been conducted of the work area for lead and asbestos? If so, is there any present or is any abatement needed?

Answer: Survey was conducted, and hazardous materials are present requiring abatement as part of this project, per General Note #25 on Sheet M001. Refer to spec 02 82 11 for estimated quantities, locations, and type.

15
Is any of the duct to be replaced stainless or any other metal than galvanized steel?

Answer: No

16
Will there be adequate power for the aeroseal work? It requires (5) 20-amp outlets.

Answer: It is unclear whether the 5 outlets all need to be in the same location, whether they all need to be on different circuits, etc. There should be plenty of 20-amp outlets throughout the building.

17
On drawing 1-M1SB note 4 is this duct to be welded? What is the need for such heavy gauge? Is this duct running 10” wc negative pressure?

Answer: This duct does not need to be welded. The duct is located near the slab in a location that is traveled frequently, so the existing duct is crushed. The new duct is not running 10” wc but is specified as heavy gauge to protect it from similar physical damage in the future.

18
What brand is the basis of design for these fans?

Answer: Strobic for 1-DPF1; Greenheck for all others.

19
On drawing 1-M1SB will the basis of design fan 1-EF1 fit through the existing doors?

Answer: One existing framed gyp wall will be removed to install this fan, and fan type has been revised to fit through other existing door openings – refer to Addendum #2.

20
Who is responsible for removing the existing sensors in the duct for the aeroseal process?

Answer: Infill shall match existing construction, per the note on the drawings – contractor to field verify existing construction. The exterior side of the wall at this location is brick.

21
Is the entire exhaust system to be re-balanced?

Answer: It is unclear which exhaust fan/system this question is referring to. All new fans shall be balanced, which includes rebalancing of the entire system (fan, ducts, air devices/exhaust terminals, hoods, etc.). There are many exhaust fans that are existing to remain with no work under this project, included in the drawing set for reference only, that do not require rebalancing.

22
Will sound and vibration testing be required on each fan?

Answer: Yes.

23
On plan 1-M100B note 13, what type of finish and infill is the wall supposed to have?

Answer: Infill shall match existing construction, per the note on the drawings – contractor to field verify existing construction. The exterior side of the wall at this location is brick.

24
Please provide the total CFM by system and static pressure for each duct system to be sealed in order to price the aeroseal work correctly

Answer: This information is shown in the fan schedule on Sheet M601.

25
Please provide the total estimated leakage for each system to be sealed

Answer: Total existing leakage is unknown. Leakage requirement for the sealed ducts shall be less than 1% of rated airflow, which has been achieved for multiple systems at this campus via Aeroseal in the past.

26
Will any of the hoods require new certification?

Answer: Yes – refer to Addendum #2 for listing of hoods.

27
On 1-M100C for the exhaust fan to be removed per note 2 what is the type of finish and infill is the wall supposed to have?

Answer: Infill shall match existing construction, per the note on the drawings – contractor to field verify existing construction. The exterior side of the wall at this location is poured concrete.

28
What brand is the basis of design for the critical system controls?

Answer: Phoenix.

29
On drawing 1-M100D will the places where the duct is removed need to be patched back? If so what type of wall is there?

Answer: This condition occurs many times throughout the building as part of this project (duct removed through existing wall or other building element that is to remain). Openings shall be infilled in accordance with General Notes #5 & #7 on Sheet M001. Contractor shall field verify and match existing construction for each instance

30
Is a new arc flash study for the new electrical and equipment required?

Answer: No new electrical distribution equipment is required for this project.

31
Are Alerton DDC controls acceptable?

Answer: Per 23 09 23 (1.1-A), the new controls shall be tied into the existing Hospital Automated Logic Controls Building Automation System or Johnson Controls Metasys Building Automation System, including all graphics, trends, alarms, etc. All new graphics provided under this contract shall match existing graphics.

RFI 003 - Email received 9/4/2020

32
Drawing A107 where existing toilet fixtures are to be removed with walls and floors patched to match existing, will you please advise what the existing material is, tile size, color, etc?

Answer: No finishes are required for this work. Contractor to cap the existing pipes flush with the wall and floor once fixture is removed as indicated in keynote #2

33
What kind of door hardware is on the doors

Answer: Intent is for door hardware to match existing. See drawings A601; hardware specification 087100

34
what do they mean when it says to seal around the edges of ceiling tiles

Answer: Ceiling gasketing 1/4 inch x 1/8 inch open cell foam tape shall be precut to the exact size and installed in continuous pieces (corner to corner) and in straight lines along existing ceiling grid flange. Apply gasket to the backside (horizontal edge) of the tees Apply foam tape continuously at each flange of the grid system, overlapping in corners if necessary.

35
What are the walls made of that we are patching?

Answer: Walls are metal stud partition with gypsum wall board

36
is there going to be a place for storage there are 135 doors that have to be replaced??

Answer: GC will coordinate with COR for staging area inside the VA campus (see attachment drawing – this area is subject to change)

RFI - EMAIL RECEIVED 9/14/2020

37
Can the VA tell us where on the project there are hard ceilings?

Refer to the noting on the drawings – any work on this project that is required above hard ceilings, a new access panel was added to accomplish the work, which is clear on the drawings. Other rooms with hard ceilings (typically very small closets that had exhaust air that is being removed), we avoided working above the ceiling in these spaces by capping ducts at walls & ceilings and abandoning duct above the hard ceiling – this is also clearly noted and shown on the drawings.

JC, STAN Engineers 9/14/2020

Bid opening remains 9-30-2020 @ 1:00 PM EST.

All other terms and conditions remain unchanged See attached document: S04 Site Visit Sign in Sheet.

See attached document: Addendum 2 Drawings Revisions are clouded.

See attached document: Addendum 2 Specifictions Revisons write up.

See attached document: 01 00 00 ADDENDUM 2.

See attached document: Revise Bid Schedule Statement of Bid Items.

See attached document: Location of temporary door storage.

See attached document: Corbin Russwin Locksets Sole Source Justification Redacted.

Page 1 of