Addendum 2 Drawings Revisions are clouded.pdf
PDF 18 MB Posted
- Attached to
- Z1DA--Improve Exhaust System 539-18-101 Federal contract opportunity
- Solicitation number
- 36C25020B0068
About this file
This document provides details on a federal contract solicitation for improvements to an exhaust system at a Veterans Affairs medical center. The solicitation will seek bids to correct deficiencies at the Cincinnati VA Medical Center under project number 539-20-211, with a project magnitude between $500,000 and $1,000,000. The work must be completed within 180 calendar days of notice to proceed. The solicitation will be set aside exclusively for small businesses with a preference for service-disabled veteran-owned small businesses, registered in the Vendor Information Pages and System for Award Management databases. Bidders must demonstrate no more than three serious or one repeat/willful Occupational Safety and Health Administration or Environmental Protection violations in the past three years, and an experience modification rate of 1.0 or less. The solicitation is expected to be released on or around August 10, 2020 under solicitation number 36C25020B0068.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 539-18-101 ADDENDUM 3 WRITE UP.pdf | ||
| 36C25020B0068 0003.docx | DOCX document | |
| 539-18-101 Addendum 3 Dwgs.pdf | ||
| Corbin Russwin Locksets Sole Source Justification Redacted.pdf | ||
| S04 Site Visit Sign in Sheet.pdf | ||
| 01 00 00 ADDENDUM 2.pdf | ||
| Revise Bid Schedule Statement of Bid Items.docx | DOCX document | |
| 36C25020B0068 0002.docx | DOCX document | |
| Location of temporary door storage.pdf | ||
| Addendum 2 Specifictions Revisons write up.pdf | ||
| 36C25020B0068 0001.docx | DOCX document | |
| 36C25020B0068.docx | DOCX document | |
| 539-18-101 CD Bid Specifications (8-21-2020).pdf | ||
| Wage Determination OH20200082.pdf | ||
| S02 RFI Form.docx | DOCX document | |
| 539-18-101 CD Bid Drawings (8-21-2020).pdf | ||
| S02 Contractor EMR Certification Form.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chief Office
Prog. Asst.
HAC
Vestibule
Patient Waiting
Treatment
Isolation One
Patient Toilet
Isolation Two
Nurse Station
Soiled Holding
Patient ToiletMeds/Nutrition
Clean Linen
Corridor
Clean Supply
SPS
Storage Staff Toilet
Exam Room
Triage
Stor.
Heart Exam
Heart Exam 2 Restroom Heart Exam
Employee Health
Conference Room
OfficeExam
Exam
PEC
PEC PEC
Corridor
Clerk
Room
Exam Room
HAC
PEA
Exam Exam
Exam Exam
Tlt
Stor Corridor
Office
UP
UP
DN DN
DN
DN
UP
UP
UP
UP
DN
UP
UP
DN
DN
DN
DN DN
UPDN UP
DN
DN UP
DN
UP
DN
DN
Mens Restroom
Dir.
Conference
Room
Office
Office
Secretary Office
Associate Dir. Office
Director's Office
Chief of Staff
Sec. Chief of Staff
Adm Asst.
HAC
Adm Asst.
QA
Manager
Sec. & Waiting
Risk Management
Asst Chief Social Work S.W. Off. S.W. Off.
Staff Dir.
Asst.
Stor
Public Affairs
Adm. Asst.
Chief Soc.
Work
Tele
Director Public Affairs Office
Med Staff Coor.
Staff Dir.
Asst.
Clos
Elec.
Clos
Office
Office ExamSCI
Pharmacy
SCI Social Worker
Office
Toilet
Exam
Stor
Storage Exam
Stair 4
Exam Waiting
Area
Corridor
Stor
Tele Clos
Secretary
Off.
Off.
Off.
Off.
Off.
Occ.
Therapy
Kit.
Multi-Purpose
Off.
Off.
Group Rm.
Group Room
Adm. Asst.
Office
Stor.
Stor. Stor.
Men's Restroom
Stair 2
Quality Assurance AACOS
F. Tlt.
Service Lobby
KIT.
Food Service
Volunteer
Dry StorageWalk-In Ref.
Walk-In Ref.
HAC
Trash Chute
Corridor
Elec.
Dry Stor.
Pizza Shop
Canteen Dining
HAC
Retail Store
Mech.
Office Clerical
Elec.
Stockroom
Vending
Audiology Clinic
F. Tlt.
Tlt.
Tele.
RN Intake
Oxygen Physical
Therapy/Occupational Therapy
Speech Pathology
Speech Pathology Neuropsychology
Electrical Closet
Nave Vestry
Stor
Chancel
Chap. Clin.
Pastoral
Education
Chaplain Assistant Chief Chaplain Chaplain
Corridor
Corridor
Pharmacy SpecialistStorageNP / ExamSocial WorkPhysician/ExamReceptionWaiting Storage
Stor.
SVC.
Officer
SVC.
Officer
SVC.
Officer
SVC.
Officer
SVC.
Officer
SVC.
Officer
Waiting Room
Audiology
Corridor
Corridor
Off.Adm. Asst.Off.Off.Off.Procedure Receiving
Pharmacy
Off. Secure Dispensing
Vault
Waiting Consult
Elec.Pharmacy
Dispensing
Sec.
Voluntary Service Office
Storage
Agent Cashier
Agent Cashier
Agent Cashier
Transport
Voluntary Service
Corridor
Volunteer Office
Volunteer Office
Sig.
Stair 1
Decedent Affairs Conf. Room
Nurse Pract.
Nurse Pract.
Eligibility Off.
Clos
Clos.
F. Tlt.
Personnel Health
Personal Health
Person.
Hlth.
Off. Off.
Social Work
SVC
Off.
Exam
Signal
Tele.
Stair 5
M. Tlt.
Nursing Lounge
Elec.
HAC
F. Tlt.
Phys.
Phys.
Phys.
Phys.
Nurse Manager
Chief Nurse OfficeChief Office
Prog. Asst.
Waiting
Physician Office
Phys.
Stor.
Elec.
Tlt.
Stair 9
On Call
Tlt.
Sig.
Cl. Stor.
Cl. Lin.
Pub. Tlt.
Emergency
Secl. Secl.
Minor Surgery
Triage
Chief Off.
Soil. Util.
PCMM
Coordinator
Quality Manager
Squad Stor.
Heart Exam
Heart Exam 2 Restroom Heart Exam
Corridor
M. Tlt.
F. Tlt.
Employee Health
Conference Room
OfficeExam
Exam
Police
Employee I.D.
Off.
Off.
Lkrs.
Tlt Evidence
Armory
Stor.
Waiting
PEC
PEC PEC Off. PEC
Holding M. Tlt.F. Tlt.
Holding
Corridor
Stair 6
Clerk
Waiting Room
Exam Room
HAC
PEA
Exam Exam
Elec.
Exam
Alcove
Exam
ExamExam Exam
Tlt
Stor Corridor
PIV
Registrar Pain School
Elec.
Elec.
Compund
Stair 7
Tlt.
Work Rm.
Clinical Pharm.
RN
Exam
Exam
Exam
Exam
Exam
Exam
Exam
Exam
Exam
Meds
Exam
Exam
Exam
Office
Clinicians Break Rm.
Women's Lockers F. Tlt.
Men's Lockers
M. Tlt.
Program Assistant
Care Coordination
Pharmacist Counselor
Changing Room-MRI
Reception
Social Worker
RN
Tlt.
Office
Exam
Wrk. St.
HAC
Exam
Neg. Press.
Exam
Exam
Exam
Neg. Press.
Exam
Exam
Exam
Ante
Procedure
Elec.
Stor.
Tele.
Neg. Press.
Soiled Utility
Exam
Exam
Exam
Exam
Exam
Office
Exam
Exam
Exam
Procedure
Office
Office
Storage
Work Area
Pharmacist Counselor
Reception
Clinical Pharm.
RN
Nutrition
Office
Exam
Work St.
Tlt.
Exam
Elec.
Exam
Exam
Exam
Exam
Exam
Exam
Meds
Elec.
Exam
Linen
Procedure
HAC
Exam
Tele.
Exam
Stor.
Voluntary ServiceMech.
ATM
Break Room
OfficeOfficeOfficeExamExamExam
Exam
Exam
Tlt.
Office Office Exam
Office
Work Area
Clos.
InfoOffice
F. Tlt.
Storage
Blood Draw Rm.
RN Work Area Intake
Exam
Exam
Exam Corridor
Waiting Room
Entry
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Vestibule
Stair 10
Kit.
Corridor
Waiting Area
Waiting Room
Stair 3
Corridor
Sig
Storage
Recreation
Stor.
Office
Conference
Blessed Sacrament
Office
Interview Room
Storage
Entry
M. Med.
Stor.
Elec.
M. Med.
Stor.
M. Med.
Stor.
Stor.
Med. Media
Toilet
Storage Film Room
Medical Illust.
Closet
Storage
Entry
HAC
Stair 11
Stair 8
Clerical
Decon Trailer
Water Treatment
Shared Office
Office
PEC PEC
Closet
Volunteer Storage
Trailer
Desk
Corridor
Corridor
Corridor
Corridor
Corridor
Pharmacist Counselor
PIV
Registrar
Closet
Consult/Conference Office
Office
Office
Office
Volunteer Lounge
Office
Corridor
Vestibule
Patient Waiting
Treatment
Isolation One
Patient Toilet
Isolation Two
Nurse Station
Soiled Holding
Patient ToiletMeds/Nutrition
Clean Linen
Corridor
Womens Locker
Mens Locker
Electric Room
Signal Closet
Staff Toilet
Staff Lounge
Equipment Repair
Corridor
Office
Clean Supply
SPS
Storage Staff Toilet
Exam Room
FIRST FLOOR PLANS
BW/VP VP/EM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F ile
P a th
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE EXHAUST SYSTEMS
CINCINNATI, OH
539-18-101
Chief Engineer
Revisions: Date:
Cincinnati V.A.
Medical
Center
07/22/2020
SCHEMATIC DESIGN SUBMITTAL 04/05/2019
CONSTRUCTION DOCUMENTS 09/20/2019
DESIGN DEVELOPMENT SUBMITTAL 06/28/2019
95% OWNER REVIEW 08/09/2019
BID DOCUMENTS 03/19/2020
JASON REEVES
S
T A
TE
OF OH
IO
R E G
IS
TERED ARC
HI
T
E C T
JAMES
W.
WILLIAMS
James W. Williams, License #9266 Expiration Date 12/31/2021
ADDENDUM #2 09/22/2020
A101
SCALE:
A1006, A1004 1/8"=1'-0"
SCALE:
C107, C108 1/8"=1'-0"
SCALE:
EXISTING FIRST FLOOR PLAN
1/32"=1'-0"
DOORS TO REMAIN
NEW DOORS
LEGEND
A. WORK TO PROVIDE COMPLETE PLUMBING,
MECHANICAL, AND ELECTRICAL SYSTEMS SHALL
OCCUR BEYOND EXTENT OF WORK LINE, AS
REQUIRED. GENERAL CONTRACTOR TO REPAIR
ANY EXISTING AREAS BEYOND EXTENT OF
WORK LINE DUE TO INSTALLATION OF SUCH
SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &
ELECTRICAL DRAWINGS).
B. PATCH EXISTING WALLS & FLOORS WHERE NEW
WORK OCCURS, OR AREAS ADJACENT TO NEW
WORK.
C. ALIGN NEW WORK WITH EXISTING.
D. FILL ALL SLAB/WALL OPENINGS RESULTING
FROM PLUMBING, ELECTRICAL, MECHANICAL,
OR OTHER REMOVALS. CONTRACTOR TO
MAINTAIN ALL EXISTING FIRE AND SMOKE
RATINGS.
E. UNLESS NOTED OTHERWISE, ALL WORK IN
OCCUPIED AREAS OF THE BUILDING, OR WORK
THAT REQUIRES SHUTDOWN OF SYSTEMS,
SHALL TAKE PLACE AT NIGHT (GENERALLY
BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -
COORDINATE WITH COR.
F. REPLACEMENT OF DOORS CAN OCCUR DURING
THE DAY WITH CONCURRENCE OF STAFF
MANAGER OVER THAT ROOM. COORDINATE
WITH COR PRIOR TO PROVIDING WORK IN
THOSE AREAS.
GENERAL NOTES
C212 DOOR TAG -SEE DOOR SCHEDULE
WALLS TO REMAIN
WITHIN LIMIT OF WORK
KEY NOTES
1. REMOVE DOOR LEAF AND ASSOCIATED
HARDWARE AND REPLACE WITH NEW DOOR
LEAF AND HARDWARE WITH COMPLETE SEALS.
REUSE EXISTING FRAME.
2. ENVELOPE/DOOR IMPROVEMENTS TO THIS ROOM,
SHALL OCCUR PRIOR TO FAN BEING RELOCATED
UNDER A SEPARATE PROJECT - COORDINATE
SCHEDULING WITH COR. SEE MECHANICAL
DRAWINGS FOR ADDITIONAL WORK IN THIS AREA
3. EXISTING AUTOMATIC SLIDING DOOR.
CONTRACTOR TO PROVIDE NEOPRENE SEAL
AROUND PERIMETER OF DOOR LEAF
PARTIAL FLOOR PLAN
PARTIAL FLOOR PLAN
DN
CAT Scan Room
Gamma Camera
Uptake Prep Bay
Uptake Area
Uptake Prep Room
PET/CT
Scanner m
Cath Lab
Stor.
I.V. Prep Rm.
Elec.
Control Room
Tlt.
Tele.
G.P.
Storage
Stair 5
Reading Room
Gamma Camera
Hot Lab
Stor.
X-Ray Room
Clos
Pat. Rm.Pat. Rm.Pat. Rm.
Grieve/ Consult.
G.P.Trans.
Prep Rm.
Control
Cardiac Cath Lab
Tlt. Waiting
Stor.
Lockers
Hemo Stor.
Off.
Break Rm.
HAC
Off.Off.Off.Off.Off.
Stor.
ExamEKG Rm.Tlt.
Scope Wash
Soil Ut.
Clean Linen Observ.
Transfer
Radiology Spec Rm.
Scrub Area
Cath Lab Control
Equip
Prep Mon
Sterile Supply
Vestibule
Control Rm.
Bone Density Lab
Tlt.
Tlt.
CT Scanner
Closet
Occupational Therapy
CT Room #2
Stair 11
Clean Supply
Storage S.P. Control
Special Procedures
MRI
Component
CT Control
Adm.
Equip.
CT Room #1
S.P.
Equipment
CT Prep
Toilet Storage
Office
CT Office
Stair 10
Elec.
Work Rm.
HAC
Exam
Intake
Exam
Stor.
Exam
Stor.
Exam
Exam
Exam
Exam
Exam
Waiting Alcove Exam
Exam
Exam Tlt.Gas Stor
Lin.Supply
Staff Tlt.Soil
Exam Exam
ExamExam
ExamExam
ExamExam
Work Alcove
Work Alcove
ExamExam
ExamLinBreak Rm.
Corridor ception iting
Storage
SECOND FLOOR PLANS
BW/VP VP/EM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F ile
P a th
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE EXHAUST SYSTEMS
CINCINNATI, OH
539-18-101
Chief Engineer
Revisions: Date:
Cincinnati V.A.
Medical
Center
07/22/2020
SCHEMATIC DESIGN SUBMITTAL 04/05/2019
CONSTRUCTION DOCUMENTS 09/20/2019
DESIGN DEVELOPMENT SUBMITTAL 06/28/2019
95% OWNER REVIEW 08/09/2019
BID DOCUMENTS 03/19/2020
JASON REEVES
S
T A
TE
OF OH
IO
R E G
IS
TERED ARC
HI
T
E C T
JAMES
W.
WILLIAMS
James W. Williams, License #9266 Expiration Date 12/31/2021
ADDENDUM #2 09/22/2020
A102B
SCALE:
C205, C210, C211, C212, C214B, C216A, C216F C216H, C216L C216O, C221, C225 1/8"= 1'-0"
DOORS TO REMAIN
NEW DOORS
LEGEND
A. WORK TO PROVIDE COMPLETE PLUMBING,
MECHANICAL, AND ELECTRICAL SYSTEMS SHALL
OCCUR BEYOND EXTENT OF WORK LINE, AS
REQUIRED. GENERAL CONTRACTOR TO REPAIR
ANY EXISTING AREAS BEYOND EXTENT OF
WORK LINE DUE TO INSTALLATION OF SUCH
SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &
ELECTRICAL DRAWINGS).
B. PATCH EXISTING WALLS & FLOORS WHERE NEW
WORK OCCURS, OR AREAS ADJACENT TO NEW
WORK.
C. ALIGN NEW WORK WITH EXISTING.
D. FILL ALL SLAB/WALL OPENINGS RESULTING
FROM PLUMBING, ELECTRICAL, MECHANICAL,
OR OTHER REMOVALS. CONTRACTOR TO
MAINTAIN ALL EXISTING FIRE AND SMOKE
RATINGS.
E. UNLESS NOTED OTHERWISE, ALL WORK IN
OCCUPIED AREAS OF THE BUILDING, OR WORK
THAT REQUIRES SHUTDOWN OF SYSTEMS,
SHALL TAKE PLACE AT NIGHT (GENERALLY
BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -
COORDINATE WITH COR.
F. REPLACEMENT OF DOORS CAN OCCUR DURING
THE DAY WITH CONCURRENCE OF STAFF
MANAGER OVER THAT ROOM. COORDINATE
WITH COR PRIOR TO PROVIDING WORK IN
THOSE AREAS.
GENERAL NOTES
C212 DOOR TAG -SEE DOOR SCHEDULE
WALLS TO REMAIN
WITHIN LIMIT OF WORK
KEY NOTES
1. REMOVE DOOR LEAF AND ASSOCIATED
HARDWARE AND REPLACE WITH NEW DOOR
LEAF AND HARDWARE WITH COMPLETE
SEALS. REUSE EXISTING FRAME.
2. REMOVE AND REPLACE EXISTING WINDOW SEALS
3. NOT USED
PARTIAL FLOOR PLAN
SCALE:
A2013, A2014, A2015, A2016 1/8"= 1'-0"
PARTIAL FLOOR PLAN
SCALE:
C2009, C2025, C2031, C2033 1/8"= 1'-0"
PARTIAL FLOOR PLAN
SCALE:
NOT USED
1/8"= 1'-0"
4. SEAL ALL EDGES OF CEILING TILE WITH CEILING GASKETING
1/4"X1/8" OPEN CELL FOAM TAPE. INSTALL CONTINUOUSLY
ALONG EXISTING CEILING GRID FLANGE
Clean Supply
Storage
Storage
Nourishment
Clean Linen
Staff Toilet
Nurse Station
Single Room - Bariatric
Single Room - Bariatric
Single Room - Bariatric
Single Room - Bariatric
Single Room -
Negative Pressure
Single Room -
Negative Pressure
Single Room
Single Room -
Negative Pressure
Single Room - Bariatric Negative Pressure
Signals
Elec.
HAC
Meds
Toilet Toilet Toilet
Toilet
ToiletToilet
Toilet
Toilet
Toilet
Corridor
Anteroom Anteroom
Stair #11
Exam 4
Exam 3
Exam 2
Exam 1
Staff Physician
Tlt.
Cor
Tlt.
DNUP
Exam Room 5
Clos.
Exam Room 4
Surgery Office
Procedure Room
Procedure RoomExamWaiting
AreaClerk fice
Supp.
sst.
Elec.
Tele
Soil
HAC Stor.
Pain Nurse
Telesurgery Office
Tlt.
Skin and Wound
Care Clinic
Waiting Area
ClosetStor.
Stair 5
Closet
Corridor
Rolling Storage
IV
Ante-Room IV Prep IV Buff
Closet
Dispensing Area
Office
Corridor
Cart Stor.
Compound Picking
Unit Dose
DN UP DNUP
DN UP
DN
UP
DN
A/C Shaft
A/C ShaftA/C Shaft
Clean Supply
Storage
Storage
Nourishment
Single Room
Clean Linen
Staff Toilet
Nurse Station
Single Room - Bariatric
Single Room - Bariatric
Single Room - Bariatric
Single Room - Bariatric
Single Room -
Negative Pressure
Single Room -
Negative Pressure
Single Room
Single Room -
Negative Pressure
Single Room - Bariatric Negative Pressure
Signals
Elec.
HAC
Family Lounge
HUC
Physical Therapy
Consult
Staff Lounge
Telem.
Office
Meds
Staff Tlt
Toilet Toilet Toilet
Toilet
ToiletToilet
Toilet
Toilet
Toilet
Corridor
Anteroom Anteroom
Stair #11
Corridor
Bath
Clean Supply
D.R.D.R.
S.R. Neg.
Pressure
S.R. Neg.
Pressure
Elec.
Soil. Util.
Elec.
D.R.D.R.S.R.
D.R.
D.R.
S.R.
D.R.
Storage
Clean Linen D.R.
D.R.
Nurse Manager
Bath
Bath
Bath
Bath
Bath
Bath
Bath
Bath
Bath
Stair 2
Bath
Bath
Bath
Tr. Ch.
HAC
Service Lobby
Elec.
Work Room
Stor
Stor
HAC
Bath Exam
Room 5
Clos.
Exam Room 4
Surgery Office
Procedure Room
Procedure RoomExamWaiting
AreaClerk
Class Rm.
Exam 7
Exam 6
Exam 5Exam 4
Exam 3
Exam 2
Exam 1
Staff Physician
Office
Pgm. Supp.
Asst.
Elec.
Tele
Soil
HAC Stor.
Pain Nurse
Stor.
Stor.
Supp ClosTlt.
Tlt.
Corridor
Telesurgery Office
Tlt.
Skin and Wound
Care Clinic
Waiting Area
Toilet
ClosetStor.
Stair 5
Stair 1
Medical Service Office
Medical Service
Office
Chief Office
Adm. Asst.
Adm Asst.
Chief Med.
Svc.
Sig. Clos.
Work Rm.
Dirty Equipment
Db. Wtr.
Storage
Clean Supply
Oxygen Storage
Equipment Room
Office
Med Svc
Office
Office
Conferece Room
Cleric
Rolling Storage
IV
Ante-Room IV Prep IV Buff
Closet
Tlt.
Storage
Conference Rm.
Office
Office
Office
Office Office
Office
Office
Office
Office
Office
Storage
Closet
Dispensing Area
Office
Stair 3
Storage
Sig. Clos.
Office
Corridor
Office
Tlt.
Elec. HAC Stor.
Staff Tlt.
Stor.
Elec.
Cart Stor.
Narc. Vault Chief
Compound Picking
Unit Dose
Corridor
Closet
Elec.
Tlt.
MICU
Penthouse
Fan Room
Stair 4
Corridor
Corridor
FIFTH FLOOR PLANS
BW/VP VP/EM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F ile
P a th
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE EXHAUST SYSTEMS
CINCINNATI, OH
539-18-101
Chief Engineer
Revisions: Date:
Cincinnati V.A.
Medical
Center
07/22/2020
SCHEMATIC DESIGN SUBMITTAL 04/05/2019
CONSTRUCTION DOCUMENTS 09/20/2019
DESIGN DEVELOPMENT SUBMITTAL 06/28/2019
95% OWNER REVIEW 08/09/2019
BID DOCUMENTS 03/19/2020
JASON REEVES
S
T A
TE
OF OH
IO
R E G
IS
TERED ARC
HI
T
E C T
JAMES
W.
WILLIAMS
James W. Williams, License #9266 Expiration Date 12/31/2021
ADDENDUM #2 09/22/2020
A105
SCALE:
A5088, A5089, A5091, A5092, A5093 1/8"= 1'-0"
SCALE:
B526A, B526B 1/8"= 1'-0"
SCALE:
A551, A555, A557A, A557C, A557D, A558 1/8"= 1'-0"
SCALE:
EXISTING FIFTH FLOOR PLAN
1/32"= 1'-0"
DOORS TO REMAIN
NEW DOORS
LEGEND
A. WORK TO PROVIDE COMPLETE PLUMBING,
MECHANICAL, AND ELECTRICAL SYSTEMS SHALL
OCCUR BEYOND EXTENT OF WORK LINE, AS
REQUIRED. GENERAL CONTRACTOR TO REPAIR
ANY EXISTING AREAS BEYOND EXTENT OF
WORK LINE DUE TO INSTALLATION OF SUCH
SYSTEMS (SEE ALL PLUMBING, MECHANICAL, &
ELECTRICAL DRAWINGS).
B. PATCH EXISTING WALLS & FLOORS WHERE NEW
WORK OCCURS, OR AREAS ADJACENT TO NEW
WORK.
C. ALIGN NEW WORK WITH EXISTING.
D. FILL ALL SLAB/WALL OPENINGS RESULTING
FROM PLUMBING, ELECTRICAL, MECHANICAL,
OR OTHER REMOVALS. CONTRACTOR TO
MAINTAIN ALL EXISTING FIRE AND SMOKE
RATINGS.
E. UNLESS NOTED OTHERWISE, ALL WORK IN
OCCUPIED AREAS OF THE BUILDING, OR WORK
THAT REQUIRES SHUTDOWN OF SYSTEMS,
SHALL TAKE PLACE AT NIGHT (GENERALLY
BETWEEN 7 PM AND 5 AM) OR ON WEEKENDS -
COORDINATE WITH COR.
F. REPLACEMENT OF DOORS CAN OCCUR DURING
THE DAY WITH CONCURRENCE OF STAFF
MANAGER OVER THAT ROOM. COORDINATE
WITH COR PRIOR TO PROVIDING WORK IN
THOSE AREAS.
GENERAL NOTES
C212 DOOR TAG -SEE DOOR SCHEDULE
WALLS TO REMAIN
WITHIN LIMIT OF WORK
KEY NOTES
1. REMOVE DOOR LEAF AND ASSOCIATED
HARDWARE AND REPLACE WITH NEW DOOR
LEAF AND HARDWARE WITH COMPLETE SEALS.
REUSE EXISTING FRAME.
2. ENVELOPE/DOOR IMPROVEMENTS TO THIS ROOM,
SHALL OCCUR PRIOR TO FAN BEING RELOCATED
UNDER A SEPARATE PROJECT - COORDINATE
SCHEDULING WITH COR. SEE MECHANICAL
DRAWINGS FOR ADDITIONAL WORK IN THIS AREA
3. NOT USED
4. SEAL ALL EDGES OF CEILING TILE WITH CLEANROOM
CEILING GASKETING 14"X1
8" OPEN CELL FOAM TAPE.
INSTALL CONTINUOUSLY ALONG EXISTING CEILING
GRID FLANGE.
PARTIAL FLOOR PLAN
PARTIAL FLOOR PLAN
PARTIAL FLOOR PLAN
DOOR
TRAP
ROOF
3RD FLR.
TRANSFORM/ ELECTRIC ROOM ROOF
EMERGENCY GENERATOR ROOF
A/C SHAFT
A/C SHAFT A/C SHAFT
1ST FLR. ROOF
2ND FLR. ROOF
4TH FLR. ROOF
3RD FLR. ROOF
2ND FLR. ROOF
1ST FLR. ROOF
3RD FLR. ROOF
3RD FLR. ROOF
3RD FLR. ROOF 3RD FLR. ROOF
1ST FLR. ROOF
CHAPEL ROOF
ELEVATOR
8TH FLR. ROOF8TH FLR. ROOF
ROOF
3RD FLR. ROOF
5TH FL.
LOADING DOCK ROOF
CANTEEN ROOF
2ND FLOOR ROOF
1ST. FLR. ROOF
7TH FLR. ROOF
8TH FLR. ROOF
8TH FLR. ROOF
9TH FLR. ROOF
9TH FLR. ROOF
10TH FLR. ROOF
11TH FLR. ROOF
9TH FLR. ROOF
7TH FLR. ROOF
KITCHEN ROOF
4TH FLR. ROOF
5TH FL. ROOF
5TH FL. ROOF
2ND FLR. ROOF
752.87'
742.12'
764.67'
764.67'
740.98'
749.92'
809.35'820.81'
855.00'
831.81'
730.41'
761.42'
763.17'763.17'
820.81' 809.35'
846.25'
857.48'
835.25'
4TH FLR. ROOF
AHU #3 AHU #2
1st Floor Canopy
AHU #4
AHU #1
Intake AHU-12
Intake AHU-10
Intake
Intake AHU-21
Intake AHU-25
Intake AHU-23
Intake AHU-24
Intake AHU-22
Intake AHU-26,27
Intake AHU-32
Intakes
AHU-15
AHU-13
AHU-14
Intake
Intake
Intake
Intake
LOWER ROOF LOWER ROOF
LOWER ROOF
6TH FLR.
ROOF
DOOR
TRAP
AHU 40,41, 42 & 43 Intake
AHU #28
AHU #29
SPECIFIED
SEALANT TAPE AS
16 GA. MIN. FRAME
INSULATED CURB, SEE MEP
FASTENER 8'' O.C.
FASTENED 18'' O.C.
COUNTERFLASHING
SPECIFED BASE
FLASHING ADHERED
TWO-PLY STRIPPING
GRAVEL SURFACING
SPECIFIED BUR
INSULATION
SEE STRUCTURAL FOR
STEEL MEMBERS
WITH GASKETED
FASTENERS MINIMUM
TWO PER SIDE
SPECIFED BASE
SPECIFIED CANT
MEMBRANE
ROOF PLAN
BW/VP VP/EM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F ile
P a th
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE EXHAUST SYSTEMS
CINCINNATI, OH
539-18-101
Chief Engineer
Revisions: Date:
Cincinnati V.A.
Medical
Center
07/22/2020
SCHEMATIC DESIGN SUBMITTAL 04/05/2019
CONSTRUCTION DOCUMENTS 09/20/2019
DESIGN DEVELOPMENT SUBMITTAL 06/28/2019
95% OWNER REVIEW 08/09/2019
BID DOCUMENTS 03/19/2020
JASON REEVES
S
T A
TE
OF OH
IO
R E G
IS
TERED ARC
HI
T
E C T
JAMES
W.
WILLIAMS
James W. Williams, License #9266 Expiration Date 12/31/2021
ADDENDUM #2 09/22/2020
A130
SCALE:
EXISTING ROOF PLAN
1/32"= 1'-0"
ROOF TOP
EQUIPMENT - SEE
MECHANICAL,
ELECTRICAL
DRAWINGS FOR
SCOPE OF WORK
LEGEND
ALIGN NEW WORK WITH EXISTING.
WORK TO PROVIDE COMPLETE PLUMBING, MECHANICAL, AND
ELECTRICAL SYSTEMS SHALL OCCUR BEYOND EXTENT OF WORK
LINE, AS REQUIRED. GENERAL CONTRACTOR TO REPAIR ANY EXISTING
AREAS BEYOND EXTENT OF WORK LINE DUE TO INSTALLATION OF SUCH
SYSTEMS (SEE ALL PLUMBING, MECHANICAL, & ELECTRICAL DWGS.).
PATCH EXISTING ROOF AND MAINTAIN A WATER TIGHT ENVELOPE
FILL ALL SLAB/WALL OPENINGS RESULTING FROM ELECTRICAL,
MECHANICAL, OR OTHER REMOVALS. CONTRACTOR TO MAINTAIN ALL
EXISTING FIRE AND SMOKE RATINGS
B.
D.
C.
A.
GENERAL NOTES
EXISTING ROOF TO
REMAIN
KEY NOTES ROOF
1. CONTRACTOR TO PROVIDE NEW SUPPORT AND CURB
FOR NEW MECHANICAL EQUIPMENT. SEE
STRUCTURAL AND MECHANICAL DRAWINGS.
2. PROVIDE ALL ROOFING PENETRATION, REPAIR AND
REINFORCEMENT IN THE EXISTING BUILDING FOR
INSTALLATION OF THE NEW MECHANICAL
EQUIPMENT. THE EXISTING TREMCO ROOFING
MEMBRANE AND INSULATION SHALL BE CUT,
REMOVED, AND RESTORED AS REQUIRED TO ATTAIN
A WATERTIGHT CONDITION. THE ROOFING
SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER
FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING
ROOF INTEGRITY.
3. EXISTING ROOF CURB TO REMAIN. SEE MEP
DRAWINGS FOR NEW WORK. CONTRACTOR TO
PROTECT EXISTING TREMCO ROOF AND MAINTAIN
WATERTIGHT CONDITION.
4. REMOVE EXISTING EQUIPMENT SUPPORTS. SEE
MECHANICAL AND STRUCTURAL DRAWINGS FOR
EXTEND OF WORK. THE EXISTING TREMCO ROOFING
MEMBRANE AND INSULATION SHALL BE CUT,
REMOVED, AND RESTORED AS REQUIRED TO ATTAIN
A WATERTIGHT CONDITION. THE ROOFING
SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER
FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING
ROOF INTEGRITY.
5. EXISTING EQUIPMENT SUPPORTS TO REMAIN. SEE
MECHANICAL DRAWINGS FOR EXTEND OF REMOVAL.
THE EXISTING TREMCO ROOFING MEMBRANE AND
INSULATION SHALL BE CUT, REMOVED, AND
RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT
CONDITION AFTER MECHANICAL WORK IS COMPLETE.
THE ROOFING SUB-CONTRACTOR SHALL BE A
CERTIFIED INSTALLER FOR SUCH INSTALLATION TO
MAINTAIN THE EXISTING ROOF INTEGRITY.
6. EXISTING EQUIPMENT TO REMAIN
7. NEW EQUIPMENT SUPPORT. SEE MECHANICAL
DRAWINGS THE EXISTING TREMCO ROOFING
MEMBRANE AND INSULATION SHALL BE CUT,
REMOVED, AND RESTORED AS REQUIRED TO ATTAIN
A WATERTIGHT CONDITION. THE ROOFING
SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER
FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING
ROOF INTEGRITY
8. EXISTING EPDM BALLASTED ROOF EXISTING ROOF
CURB TO REMAIN. SEE MEP DRAWINGS FOR NEW
WORK. CONTRACTOR TO PROTECT EXISTING EPDM
BALLASTED ROOF AND MAINTAIN WATERTIGHT
CONDITION.
9. REMOVE EXISTING CURB AND REPLACE WITH NEW
MECHANICAL CURB FOR NEW EQUIPMENT. SEE
MECHANICAL DRAWING. ROOF TO ATTAIN A WATER
TIGHT CONDITION AGTER MECHANICAL WORK IS
COMPLETE.
SCALE:
ROOF DETAIL AT MECHANICAL CURB
N.T.S
BUR EXISTING TREMCO
BUILT UP ROOF
BUR
BUR
BUR
BUR
BUR
BUR
BUR
BUR
BUR
BUR
BUR
BUR
BUR
BUR
BUR
TYPE MAT. TYPE MATERIAL
W H
A004B A004B AUTOPSY D 4' - 0" 7' - 0" SCW EXISTING HM - - 4 A004B
A022 A022 SUBSISTENCE B PR(3' - 0") 7' - 0" SCW EXISTING HM X SMK 9E A022 DEDUCT ALTERNATE #1
A022C A022C STORAGE B PR(3' - 0") 7' - 0" SCW EXISTING HM X SMK 9E A022C DEDUCT ALTERNATE #1
C019 C019 STORAGE A 3' - 0" 7' - 0" SCW EXISTING HM - SMK 3 C019
C026 C026 CLEAN SUPPLIES A 3' - 0" 7' - 0" SCW EXISTING HM - SMK 3 C026 DEDUCT ALTERNATE #1
C028 C028 STORAGE A 3' - 0" 7' - 0" SCW EXISTING HM - SMK 3 C028 DEDUCT ALTERNATE #1
A1004 1004 ISOLATION ONE J 5' - 7" 7' - 0" SCW EXISTING HM - - 2 A1004
A1006 1006 ISOLATION TWO EXISTING ALUM EXISTING ALUM - - 1 A1006 SLIDING DOOR
A1006B 1006B ISOLATION TWO EXISTING ALUM EXISTING ALUM - - 1 A1006B SLIDING DOOR
C107 C107 EXAM A 3' - 8" 7' - 0" SCW EXISTING HM - - 7 C107
C108 C108 EXAM A 3' - 8" 7' - 0" SCW EXISTING HM - - 7 C108
A203 A203 DIGITAL CHEST ROOM A 3' - 6" 7' - 0" SCW EXISTING HM X - 12 A203 LEAD LINED
A222E A222E SOILED RECEIVING & DECONTAMINATION A 3' - 6" 7' - 0" SCW EXISTING HM X - 7 A222E
A223 A223 ANTE ROOM A 3' - 8" 7' - 0" SCW EXISTING HM X SMK 3 A223
A235A A235A ANTE A 3' - 8" 7' - 0" SCW EXISTING HM X 3 A235A
A236A A236A DISPATCH AREA A 4'-0" 7' - 0" SCW EXISTING HM X 3 A236A
A2013 A2013 CT ROOM K 5' - 6" 7' - 0" ALUM EXISTING ALUM 45 13 A2013 LEAD LINED
A2014A A2014 CT CONTROL A 3' - 0" 7' - 0" SCW EXISTING HM X 12 A2014A LEAD LINED
A2014B A2014 CT CONTROL A 3' - 0" 7' - 0" SCW EXISTING HM X 12 A2014B LEAD LINED
A2015 A2015 SPECIAL PROCEDURES J PR(3' - 0") 7' - 0" SCW EXISTING HM X 45 14 A2015 LEAD LINED
A2016 A2016 CT ROOM K 5' - 6" 7' - 0" ALUM EXISTING ALUM 45 13 A2016 LEAD LINED
B201 B201 CLEAN SUPPLIES A 4'-0" 7' - 0" SCW EXISTING HM X SMK 5B B201 PROVIDE DOOR SCOPE
B208A B208A ETO. ROOM A 3' - 0" 7' - 0" SCW EXISTING HM X 4 B208A
B210B B210B MICRO LAB A 3' - 0" 7' - 0" SCW EXISTING HM X - 4 B210B
B210C B210C LAB B2 3' - 0" 7' - 0" SCW EXISTING HM X - 4 B210C
B210D B210D TB/ MYC. Lab C 3' - 0" 7' - 0" SCW EXISTING HM X - 7 B210D
B210E B210E ISO F2 3' - 0" 7' - 0" SCW EXISTING HM X - 9E B210E
S24 S*2*4 STAIR 4 B2 3'-8" 7'-0" FRP EXISTING HM 90 11 S24 1-7/8" FIBERGLASS DOOR
B211 B211 LAB SUITE ENTRANCE B2 3' - 0" 7' - 0" SCW EXISTING HM X - 3 B211 ACCESS CONTROL
B215 B215 PATH GROSS ROOM A 3' - 0" 7' - 0" SCW EXISTING HM X - 4 B215
B217 B217 SPECIAL TRAINING B2 3' - 0" 7' - 0" SCW EXISTING HM X - 5 B217
B218 B218 HISTOLOGY PROCESSING E 3' - 0" 7' - 0" SCW EXISTING HM X - 5 B218
C205 C205 GAMMA CAMERA B2 3' - 7" 7' - 0" SCW EXISTING HM X - 12 C205 LEAD LINED
C205B C205B GAMMA CAMERA B2 3' - 9" 7' - 0" SCW EXISTING HM X - 12 C205B LEAD LINED
C210 C210 GAMMA CAMERA A 3' - 1" 7' - 0" SCW EXISTING HM X - 12 C210 LEAD LINED
C211 C211 BONE DENSITY LAB J 5' - 0" 7' - 0" SCW EXISTING HM X - 9B C211
C212 C212 HOT LAB A 3' - 10" 7' - 0" SCW EXISTING HM X - 3 C212
C214 C214 PREP ROOM A 4' - 0" 7' - 0" SCW EXISTING HM X - 12 C214 LEAD LINED
C214B C214B CT SCANNER A 4' - 0" 7' - 0" SCW EXISTING HM X - 12 C214B LEAD LINED
C214B1 C214B CT SCANNER A 3' - 0" 7' - 0" SCW EXISTING HM X - 12 C214B1 LEAD LINED
C216A C216A SCOPE WASH A 3' - 0" 7' - 0" SCW EXISTING HM X - 4 C216A DEDUCT ALTERNATE #2
C216F C216F RADIOLOGY A 3' - 6" 7' - 0" SCW EXISTING HM X - 12 C216F LEAD LINED
C216H C216H CATH LAB B1 PR(3'-0") 7' - 0" SCW EXISTING HM X - 9A C216H LEAD LINED
C216L C216L STERILE SUPPLY A 3' - 0" 7' - 0" SCW EXISTING HM X - 3 C216L DEDUCT ALTERNATE #1
C216O C216O CATH LAB K 5' - 6" 7' - 0" SCW EXISTING HM X - 13 C216O LEAD LINED
C221A C221 STOR A 3' - 0" 7' - 0" SCW EXISTING HM X - 6 C221A DEDUCT ALTERNATE #2
C221B C221 STOR A 3' - 0" 7' - 0" SCW EXISTING HM X - 6 C221B DEDUCT ALTERNATE #2
C225 C225 HEMO STOR A 4'-0" 7' - 0" SCW EXISTING HM X - 3 C225 DEDUCT ALTERNATE #1
C2009 C2009 EXAM A 3' - 8" 7' - 0" ALUM EXISTING HM - 7B C2009
C2025 C2025 EXAM A 3' - 0" 7' - 0" ALUM EXISTING HM - 7B C2025 DEDUCT ALTERNATE #1
C2031 C2031 LINEN A 3' - 0" 7' - 0" SCW EXISTING HM X 3 C2031
C2033 C2033 SUPPLY A 3' - 0" 7' - 0" SCW EXISTING HM X 3 C2033
A341 A341 GOWNING ROOM A 3'-0" 7' - 0" SCW EXISTING HM X - 3 A341
A341A A341 GOWNING ROOM A 3'-0" 7' - 0" SCW EXISTING HM X - 3 A341A
A341B A341 GOWNING ROOM A 3' - 4" 7' - 0" SCW EXISTING HM X - 3 A341B
A342 A342 DE-GOWN A 3' - 0" 7' - 0" SCW EXISTING HM X - 3 A342
A342A A342 DE-GOWN A 3' - 0" 7' - 0" SCW EXISTING HM X - 3 A342A
A343 A343B RO DI WATER A 4' - 0" 7' - 0" SCW EXISTING HM X - 3 A343
A387A A387A PATIENT ROOM K 7' - 0" 7' - 0" ALUM SF1 ALUM - - 9D A387A
A387K A387K PATIENT ROOM K 7' - 0" 7' - 0" ALUM SF1 ALUM - - 9D A387K
A397 A397 CLEAN SUPPLY B3 3' - 0" 7' - 0" SCW EXISTING HM X 45 3 A397 DEDUCT ALTERNATE #1
A397A A397 CLEAN SUPPLY A 3' - 8" 7' - 0" SCW EXISTING HM X 45 3 A397A DEDUCT ALTERNATE #1
A397B A397 CLEAN SUPPLY A 3' - 8" 7' - 0" SCW EXISTING HM X 45 3 A397B DEDUCT ALTERNATE #2
B303 B303 DE-CON A 2(3'-0") 7' - 0" SCW EXISTING HM X - 5 B303
B303A B303A HAC A 3' - 4" 7' - 0" SCW EXISTING HM X - 3 B303A
B307 B307 ANTE RM/ CLEAN EXIT A 2(3'-0") 7' - 0" SCW EXISTING HM X - 5 B307
B307A B307A STEAM EQUIP ROOM A 3' - 0" 7' - 0" SCW EXISTING HM X - 3 B307A
B307 B307B COOL DOWN CART A 3' - 4" 7' - 0" SCW EXISTING HM X - 3 B307
B307E B307E PREP/PACK A 3' - 4" 7' - 0" SCW EXISTING HM X - 3 B307E
B307D B307D HAC A 3' - 4" 7' - 0" SCW EXISTING HM X - 3 B307D
B320A B320A WORK AREA A 2'-6" 7' - 0" SCW 1 HM - - 3 B320A
C304A C304A PATIENT ROOM H 7' - 0" 7' - 0" SCW EXISTING HM X - 9C C304A
C304B C3004B PATIENT ROOM H 7' - 0" 7' - 0" SCW EXISTING HM X - 9C C304B
C3034 C3034 SPD Case Cart B3 4' - 0" 7' - 0" SCW EXISTING HM X - 3 C3034
C3012 C3012 ISOLATION PREP/RECOVERY RM. L 6' - 2" 7' - 0" ALUM SF1 ALUM - - 2 C3012
C3013 C3013 ISOLATION PREP/RECOVERY RM. L 6' - 2" 7' - 0" ALUM SF1 ALUM - - 2 C3013
C3014 C3014 CLEAN SUPPLY A 3' - 0" 7' - 0" SCW EXISTING HM X - 3 C3014 DEDUCT ALTERNATE #1
C3016 C3016 ANTE ROOM B2 3'-0" 7' - 0" SCW EXISTING HM X - 8 C3016 DEDUCT ALTERNATE #2
C3016A C3016A SCOPE CLEANING C 3' - 0" 7' - 0" SCW EXISTING HM X - 5 C3016A
C3017 C3017 SCOPE STORAGE B2 3' - 0" 7' - 0" SCW EXISTING HM X - 6 C3017 DEDUCT ALTERNATE #1
C3023 C3023 FLUORO PROCEDURE ROOM J PR(3' - 0") 7' - 0" SCW EXISTING HM X - 9B C3023
C3024 C3024 ISOLATION PROCEDURE ROOM A 3'-8" 7' - 0" SCW EXISTING HM X - 7 C3024
C3034 C3034 SPD CASE CART A 4'-0" 7' - 0" SCW EXISTING HM X - 5 C3034 DEDUCT ALTERNATE #1
RATING
HARDWARE
SET
DOOR
MARK REMARKSDEDUCT ALTERNATEDOOR SIZE
DOOR DESCRIPTION
DOOR SCHEDULE - EXHAUST
FRAMEDOOR
MARK
ROOM
NUMBER ROOM NAME
ARMOR
PLATE
MB-0B-BASEMENT
MB-2-SECOND FLOOR
MB-1-FIRST FLOOR
MB-3-THIRD FLOOR
TYPE MAT. TYPE MATERIAL RATING
HARDWARE
SET
DOOR
MARK REMARKSDEDUCT ALTERNATEDOOR SIZE
DOOR DESCRIPTION
DOOR SCHEDULE - EXHAUST
FRAMEDOOR
MARK
ROOM
NUMBER ROOM NAME
ARMOR
PLATE
A406 A406 EXAM RM 2 A 3'-8" 7' - 0" SCW EXISTING HM X - 7 A406
A407 A407 EXAM RM 4 A 3'-8" 7' - 0" SCW EXISTING HM X - 7 A407
A416 A416 EXAM RM 3 A 3'-8" 7' - 0" SCW EXISTING HM X - 7 A416
A417 A417 EXAM RM 1 A 3'-8" 7' - 0" SCW EXISTING HM X - 7 A417
A449A A449 INFUSION B2 3' - 0" 7' - 0" SCW EXISTING HM X - 7 A449A DEDUCT ALTERNATE #2
A449B A449 INFUSION B2 4' - 0" 7' - 0" SCW EXISTING HM X - 7 A449B DEDUCT ALTERNATE #2
A463 A63 EXAM A 3'-8" 7' - 0" SCW EXISTING HM X - 7 A463
A464 A464 EXAM 2 A 3'-8" 7' - 0" SCW EXISTING HM X - 7 A464
A473 A473 EXAM 1 A 3'-8" 7' - 0" SCW EXISTING HM X - 7 A473
A474 A474 EXAM A 3'-8" 7' - 0" SCW EXISTING HM X - 7 A474
A476 A476 SUPP. A 3' - 8" 7' - 0" SCW EXISTING HM X - 10 A476 DEDUCT ALTERNATE #1
A551 A551 SKIN AND WOUND CARE CLINIC A 2' - 6" 7' - 0" SCW EXISTING HM X - 6 A551 DEDUCT ALTERNATE #1
A555 A555 EXAM ROOM 5 A 3' - 10" 7' - 0" SCW EXISTING HM X - 7 A555 DEDUCT ALTERNATE #1
A557A A557A EXAM ROOM 4 A 3' - 10" 7' - 0" SCW EXISTING HM X - 7 A557A DEDUCT ALTERNATE #1
A557C A557C PROCEDURE ROOM A 3' - 10" 7' - 0" SCW EXISTING HM X - 7 A557C DEDUCT ALTERNATE #1
A557D A577D PROCEDURE ROOM A 3' - 8" 7' - 0" SCW EXISTING HM X - 7 A557D DEDUCT ALTERNATE #1
A558 A558 EXAM ROOM A 3' - 8" 7' - 0" SCW EXISTING HM X - 7 A558 DEDUCT ALTERNATE #1
A5088 A5088 SINGLE ROOM NEGATIVE PRESSURE A 3' - 8" 7' - 0" SCW EXISTING HM X - 8 A5088
A5089 A5089 SINGLE ROOM NEGATIVE PRESSURE A 3' - 8" 7' - 0" SCW EXISTING HM X - 8 A5089
A5091 A5091 ANTEROOM I 4' - 6" 7' - 0" SCW EXISTING HM X - 9B A5091
A5091B A5091B SINGLE ROOM NEGATIVE PRESSURE I 4' - 6" 7' - 0" SCW EXISTING HM X - 9B A5091B
A5092 A5092 ANTEROOM H 6' - 2" 7' - 0" SCW EXISTING HM X - 9B A5092
A5092B A5092B SINGLE ROOM BARIATRIC NEGATIVE PRESSURE H 6' - 2" 7' - 0" SCW EXISTING HM X - 9B A5092B DEDUCT ALTERNATE #1
A5093 A5093 CLEAN SUPPLY A 4' - 1" 7' - 0" SCW EXISTING HM X - 6 A5093
B526A B526A IV PREP A 3' - 8" 7' - 0" SCW EXISTING HM X - 4 B526A
B526B B526B IV BUFF A 3' - 5" 7' - 0" SCW EXISTING HM X - 4 B526B AUTOMATIC DOOR
A640 A640 RESEARCH PULMONARY LAB A 3' - 8" 7' - 0" SCW EXISTING HM X SMK 4 A640 DEDUCT ALTERNATE #2
A640B A640 RESEARCH PULMONARY LAB A 3' - 6" 7' - 0" SCW EXISTING HM X - 5 A640B
B636 B636 PULMONARY FUNC. LAB A 3' - 8" 7' - 0" SCW EXISTING HM X - 4 B636 DEDUCT ALTERNATE #2
A724 A724 STORAGE A 3' - 8" 7' - 0" SCW EXISTING HM X SMK 3 A724 DEDUCT ALTERNATE #1
A846A A846A STORAGE A 3' - 0" 7' - 0" SCW EXISTING HM X - 3 A846A DEDUCT ALTERNATE #1
A849 A849 CLOSET A 2' - 6" 7' - 0" SCW EXISTING HM X - 3 A849 DEDUCT ALTERNATE #1
MB-4-FOURTH FLOOR
MB-5-FIFTH FLOOR
MB-7-SEVENTH FLOOR
MB-8-EIGHTH FLOOR
MB-6-SIXTH FLOOR
S-M101
SITE PLAN - REMOVALS AND NEW
WORK SITE
SCALE: 1/32" = 1'-0"
SITE PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE EXHAUST SYSTEMS
CINCINNATI, OH
539-18-101
Chief Engineer
Revisions: Date:
Cincinnati V.A.
Medical Center
08/20/2020
SCHEMATIC DESIGN SUBMITTAL 04/05/2019
CONSTRUCTION DOCUMENTS 09/29/2019
DESIGN DEVELOPMENT SUBMITTAL 06/28/2019
95% OWNER REVIEW 08/09/2019
BID DOCUMENTS 03/19/2020
JASON REEVES
ADDENDUM #2 09/22/20201
JAC GEH
E
S H
I E
L D
S
S T
P U
B L
I C
R W
V
IN
E
S T
P U
B L
IC
R /W
1-DPF1
2 3
A. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
B. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
1. NOTE DELETED.
2. APPROXIMATE LOCATION OF CRANE FOR INSTALLATION OF 1-DPF1.
3. CRANE LIFT SHALL TAKE PLACE OVER A WEEKEND. COORDINATE
ARRIVAL AND SETUP WITH COR.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE EXHAUST SYSTEMS
CINCINNATI, OH
539-18-101
Chief Engineer
Revisions: Date:
Cincinnati V.A.
Medical Center
08/20/2020
SCHEMATIC DESIGN SUBMITTAL 04/05/2019
CONSTRUCTION DOCUMENTS 09/29/2019
DESIGN DEVELOPMENT SUBMITTAL 06/28/2019
95% OWNER REVIEW 08/09/2019
BID DOCUMENTS 03/19/2020
JASON REEVES
ADDENDUM #2 09/22/20201
1-M1SB
SUB-BASEMENT FLOOR PLAN -
REMOVALS & NEW WORK 01
SCALE: 1/8" = 1'-0"
PARTIAL SUB-BASEMENT FLOOR PLAN
JAC GEH
SUB BASEMENT KEY PLAN
NO SCALE
UP
UP
UP
UP
UP
Tank Room
SB06
Pipe Shop
SB08
Foreman
SB09
Storage
SB07
Tlt.
SB08A
Areaway
SB10
Elevator Pit
SB05
Elevator Pit
SB04
Storage
SB02
Corridor
C*SB*01
Stair 1
S*SB*1
Elevator Pit
SB03
Crawl
Space
CS*SB*010
Crawl
Space
CS*SB*011
1-SF1
1-EF1
x x x x
T x
1-EF1
1-SF1
1. REMOVE EXISTING FAN AND REPLACE WITH NEW INLINE FAN.
2. THOROUGHLY CLEAN EXISTING MESH HARDWARE CLOTH TO
REMOVE ALL DIRT & DEBRIS.
3. REMOVE EXISTING PNEUMATIC CONTROL DAMPERS AND REPLACE
WITH NEW DDC CONTROL DAMPERS. FIELD VERIFY DUCT SIZES
(APPROXIMATE SIZES NOTED). REMOVE ASSOCIATED PNEUMATIC
TUBING BACK TO POINT OF ACTIVE MAIN AND CAP.
4. REMOVE AND REPLACE DAMAGED SECTION OF EXISTING DUCT
WITH SAME SIZE, HEAVY GAUGE DUCT (MIN. 16 GAUGE).
APPROXIMATE EXTENTS OF DAMAGED DUCT AND APPROXIMATE
DUCT DIMENSIONS ARE INDICATED - FIELD VERIFY.
5. REMOVE EXISTING DUCT TRANSITION AND ACCESS DOOR AS
REQUIRED TO CONNECT NEW FAN OUTLET DUCT TO EXISTING
EXHAUST DUCT. TRANSITION NEW EXHAUST DUCT TO CONNECT
TO EXISTING. PROVIDE NEW DUCT ACCESS DOOR NEAR
FOUNDATION WALL, FOR FIRE DAMPER ACCESS.
6. MOUNT NEW INLINE FAN IN HORIZONTAL AIRFLOW POSITION
(UNDUCTED INLET, DUCTED OUTLET) WITH MOTOR POSITIONED ON
BOTTOM OF FAN. SUSPEND FAN FROM EXISTING SLAB ABOVE WITH
VIBRATION ISOLATORS, AND PROVIDE FLEXIBLE DUCT CONNECTION
AT FAN OUTLET.
7. PROVIDE NEW DDC THERMOSTAT FOR CONTROL OF FAN
INDICATED. REFER TO SHEET M701 FOR CONTROLS.
8. REMOVE EXISTING ABANDONED ENERGY RECOVERY COIL AND ALL
ASSOCIATED EXPOSED PIPING, SUPPORTS, ACCESSORIES, INLINE
PUMP, ETC. AT SUB-BASEMENT LEVEL.
9. REMOVE AND DISPOSE OF EXISTING METAL STUD AND GYPSUM
WALL PARTITION IN ITS ENTIRETY, INCLUDING DOOR FRAME, METAL
DOOR AND HARDWARE.
PLAN NOTES
A. EXHAUST FAN DESIGNATIONS WITH "E" SUFFIX ARE FOR
REFERENCE ONLY, TO ASSIST IN IDENTIFYING FANS DURING
REMOVAL WORK. NEW DESIGNATIONS (FOR NEW FANS AND FOR
EXISTING FANS TO REMAIN) HAVE THE FOLLOWING NAMING
FORMAT: "1-EF_".
B. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE EXHAUST SYSTEMS
CINCINNATI, OH
539-18-101
Chief Engineer
Revisions: Date:
Cincinnati V.A.
Medical Center
08/20/2020
SCHEMATIC DESIGN SUBMITTAL 04/05/2019
CONSTRUCTION DOCUMENTS 09/29/2019
DESIGN DEVELOPMENT SUBMITTAL 06/28/2019
95% OWNER REVIEW 08/09/2019
BID DOCUMENTS 03/19/2020
JASON REEVES
ADDENDUM #2 09/22/20201
1-M101A
FIRST FLOOR PLAN AREA A -
REMOVALS & NEW WORK 01
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN (AREA A)
JAC GEH
FIRST FLOOR KEY PLAN
NO SCALE
1. EXISTING AIR DEVICE TO REMAIN - BALANCE TO CFM INDICATED.
2. REMOVE EXISTING FAN AND REPLACE WITH NEW.
3. EXISTING ROOF CURB TO REMAIN. REMOVE EXISTING DUCTWORK
TO BELOW ROOF LEVEL AND PROVIDE DUCT TRANSITION IN
VERTICAL TO CONNECT EXISTING DUCTWORK TO INLET OF NEW
FAN. PROVIDE INSULATED CURB ADAPTER AS REQUIRED TO
SECURE NEW EXHAUST FAN TO EXISTING ROOF CURB.
4. REMOVE EXISTING FAN AND ASSOCIATED SUPPORTS, DUCTWORK,
CONTROLS, ACCESSORIES, ETC.
5. EXISTING LOUVER TO REMAIN. PROVIDE DOUBLE WALL INSULATED
SHEETMETAL BLANK-OFF PANEL ON BACK SIDE OF LOUVER
(APPROXIMATE SIZE INDICATED), AND ENSURE WEATHERTIGHT
SEAL.
6. REMOVE EXISTING DUCTWORK TO THIS POINT, CAP AND SEAL
AIRTIGHT.
7. PROVIDE POLYMER PARTICLE SEALANT APPLIED FROM THE INSIDE
OF THE DUCT, FOR THIS ENTIRE EXISTING DUCT SYSTEM
(ASSOCIATED FAN INDICATED), INCLUDING VERTICAL RISERS, ALL
HORIZONTAL MAINS & BRANCHES, ETC. BLOCK ALL FANS, AIR
DEVICES, AND OTHER DUCT-MOUNTED EQUIPMENT &
ACCESSORIES DURING SEALING PROCESS. APPLICATION OF
INTERNAL SEALANT SHALL TAKE PLACE AFTER ALL DUCTWORK
DEMOLITION FOR THIS SYSTEM IS COMPLETE, BUT PRIOR TO FAN &
DUCT SYSTEM AIR BALANCE. PROVIDE COMPUTER GENERATED
ANALYSIS SUMMARIZING THE RESULTS.
8. PROVIDE CRITICAL SPACE MONITOR FOR ROOM INDICATED. REFER
TO SHEET M701 FOR CONTROLS.
9. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK,
ACCESSORIES, ETC.
10. EXISTING KITCHEN HOOD TO REMAIN.
11. REMOVE EXISTING SIDEWALL AIR DEVICE. PROVIDE SHEETMETAL
CAP OVER OPEN END OF ACTIVE EXHAUST DUCT, INSTALLED FLUSH
WITH WALL, AND ENSURE AIRTIGHT SEAL.
12. REMOVE EXISTING AIR DEVICE INSTALLED IN PLASTER CEILING.
PROVIDE SHEETMETAL COVERPLATE OVER CEILING OPENING.
13. REMOVE EXISTING AIR DEVICE INSTALLED IN PLASTER CEILING.
PROVIDE SHEETMETAL CAP OVER OPEN END OF ACTIVE EXHAUST
DUCT, INSTALLED FLUSH WITH CEILING, AND ENSURE AIRTIGHT
SEAL.
14. INFILL EXISTING EXTERIOR WALL OPENING TO MATCH EXISTING.
15. EXISTING SINGLE DUCT REHEAT AIR TERMINAL UNIT TO REMAIN.
CONVERT FROM VARIABLE VOLUME CONTROL TO CONSTANT
VOLUME CONTROL WHERE APPLICABLE, AND REPROGRAM
TERMINAL UNIT AIRFLOW TO CFM INDICATED.
16. EXHAUST FAN SERVING THIS ISOLATION ROOM (AND ASSOCIATED
TOILET ROOM AS APPLICABLE) IS BEING RELOCATED AS PART OF A
SEPARATE ONGOING CONSTRUCTION PROJECT. ENVELOPE
IMPROVEMENTS TO THIS ROOM, INSTALLATION OF CRITICAL SPACE
MONITOR, AND REBALANCING OF EXISTING EXHAUST FAN SHALL
OCCUR PRIOR TO FAN BEING RELOCATED UNDER SEPARATE
PROJECT - COORDINATE SCHEDULING WITH COR. REFER TO
ARCHITECTURAL DRAWINGS FOR ROOM ENVELOPE
IMPROVEMENTS.
PLAN NOTES
A. EXHAUST FAN DESIGNATIONS WITH "E" SUFFIX ARE FOR
REFERENCE ONLY, TO ASSIST IN IDENTIFYING FANS DURING
REMOVAL WORK. NEW DESIGNATIONS (FOR NEW FANS AND FOR
EXISTING FANS TO REMAIN) HAVE THE FOLLOWING NAMING
FORMAT: "1-EF_".
B. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
UP
DN
UP
DN
DN
UP
Dir.
Conference
Room
A102
Office
A103
Office
A104
Secretary
Office
A105
Associate
Dir. Office
A106
Director's
Office
A107
Chief of
Staff
A108
Sec. Chief of Staff
A109
Adm Asst.
A110
HAC
A111
Adm Asst.
A112
QA
Manager
A113
Sec. &
Waiting
A114
Risk
Management
A115
Asst Chief
Social Work
A116
S.W. Off.
A117
S.W. Off.
A118
Staff Dir.
Asst.
A119
Stor
A120
Public
Affairs
A118A
Adm. Asst.
A114A
Chief Soc.
Work
A115A
Tele
A119A
Director
Public
Affairs
Office
A113A
Med Staff
Coor.
A112A
Staff Dir.
Asst.
A119C
Clos
A105A
Elec.
A111A
Clos
A102A
Men's
Restroom
A121
Stair 2
S*1*2
Quality
Assurance
A123
AACOS
A124
F. Tlt.
A125
Service
Lobby
A126
KIT.
A127
Service
A128
Volunteer
A1035
Dry Storage
A127B
Walk-In
Ref.
A127C
Walk-In
Ref.
A127D
HAC
A126B
Trash
Chute
A126A
Corridor
C*1*2
Dry Stor.
A127A
Dining
A130
Corridor
C*1*5
Pharmacy
Agent
Cashier
C162F
Agent
Cashier
C162G
Corridor
C*1*1
Volunteer
Office
A1039
Volunteer
Office
A1038
Sig.
A141A
Stair 1
S*1*1
Decedent
Affairs
A144
Conf. Room
A144A
Nurse
Pract.
A144B
Nurse
Pract.
A144C
Eligibility
Off.
A140
Clos
A139
Clos.
A140A
F. Tlt.
A139A
Personnel
Health
A139B
Personal
Health
C132A
Person.
Hlth.
C132B
Off.
C130D
Off.
C130C
Social Work
SVC
C130
Off.
C130A
Exam
C130B
Stair 5
S*1*5
M. Tlt.
A174 Nursing
Lounge
A158
Elec.
A161A
F. Tlt.
A161
Phys.
A162
Phys.
A163
Phys.
A164
Phys.
A165
Nurse
Manager
A166
Chief Nurse
Office
A167
Chief Office
A168
Prog. Asst.
A169
Waiting
A170
Physician
Office
A171
Phys.
A172
Stor.
A173
Elec.
A143
On Call
A155
Tlt.
A155A
Corridor
C*1*3
Storage
C162H
HAC
A1028
Stair 11
S*1*11
Water
Treatment
A101B
Shared
Office
A1030
Volunteer
Storage
A1036
Desk
A175C
Corridor
C*1*21
Corridor
C*1*9
Consult/Conference
A1027
Office
A1026
Office
A1032
Office
A1031
Office
A1033
Volunteer
Lounge
A1037
Office
A1034
Corridor
A1001
Vestibule
A1001A
Patient
Waiting
A1002
Treatment
A1003
Isolation
One
A1004
Patient
Toilet
A1005
Isolation
Two
A1006
Nurse
Station
A1007
Soiled
Holding
A1008
Patient
Toilet
A1009
Meds/Nutrition
A1010
Clean Linen
A1011
Corridor
A1012
Womens
Locker
A1013
Mens
Locker
A1014
Electric
Room
A1015
Signal
Closet
A1016
Staff Toilet
A1017
Staff
Lounge
A1018
Equipment
Repair
A1019
Corridor
A1020
Office
A1021
Clean
Supply
A1022
SPS
Storage
A1023
Staff Toilet
A1024
Exam
Room
A1025
HAC
A160
Elec.A126C
EF-162E
M A
T C
H
L
I N
E
MATCH LINE
EF-176E
10"x6"
12"x8"
16"x8"
10"x8" x x
Up to
1-EF72
14"x12" 12"x12"
12"x8" x
Ø
Up to
1-EF52
1-EF3
Riser
18"x12"
36"x10" x x
1 55
Up to
1-EF39
Up to
1-EF40
Up to
1-EF99
8"x6" x
21"x9"
19"x9"
10"x8" x
12"x8"
21"x8"
1-EF57
2 3
60"x16"
Dn. to
Bsmt.
Up to
2nd
36"x24" Down
Transition to
28"x24" in Vert.
7 1-EF3
1-EF3
A1006
A1004
Up to
Makeup
Air Unit
1-EF3 Riser
15"x8"
10"x8" x x
10"x5" x
7"x5"
N
N
A1006
A1004
Up to
1-EF98
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE EXHAUST SYSTEMS
CINCINNATI, OH
539-18-101
Chief Engineer
Revisions: Date:
Cincinnati V.A.
Medical Center
08/20/2020
SCHEMATIC DESIGN SUBMITTAL 04/05/2019
CONSTRUCTION DOCUMENTS 09/29/2019
DESIGN DEVELOPMENT SUBMITTAL 06/28/2019
95% OWNER REVIEW 08/09/2019
BID DOCUMENTS 03/19/2020
JASON REEVES
ADDENDUM #2 09/22/20201
1-M101C
FIRST FLOOR PLAN AREA C -
REMOVALS & NEW WORK 01
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN (AREA C)
JAC GEH
FIRST FLOOR KEY PLAN
NO SCALE
1. EXISTING SINGLE DUCT REHEAT AIR TERMINAL UNIT TO REMAIN.
CONVERT FROM VARIABLE VOLUME CONTROL TO CONSTANT
VOLUME CONTROL WHERE APPLICABLE, AND REPROGRAM
TERMINAL UNIT AIRFLOW TO CFM INDICATED.
2. EXISTING AIR DEVICE TO REMAIN - BALANCE TO CFM INDICATED.
3. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK,
ACCESSORIES, ETC.
4. REMOVE EXISTING FAN AND REPLACE WITH NEW.
5. REMOVE EXISTING DUCTWORK TO THIS POINT, CAP AND SEAL
AIRTIGHT.
6. TRANSITION DUCT TO FULL SIZE OF FAN INLET, AND INSTALL
GRAVITY BACKDRAFT DAMPER FURNISHED BY FAN
MANUFACTURER. INSULATE DUCTWORK PER 23 07 11.
7. PROVIDE POLYMER PARTICLE SEALANT APPLIED FROM THE INSIDE
OF THE DUCT, FOR THIS ENTIRE EXISTING DUCT SYSTEM
(ASSOCIATED FAN INDICATED), INCLUDING VERTICAL RISERS, ALL
HORIZONTAL MAINS & BRANCHES, ETC. BLOCK ALL FANS, AIR
DEVICES, AND OTHER DUCT-MOUNTED EQUIPMENT &
ACCESSORIES DURING SEALING PROCESS. APPLICATION OF
INTERNAL SEALANT SHALL TAKE PLACE AFTER ALL DUCTWORK
DEMOLITION FOR THIS SYSTEM IS COMPLETE, BUT PRIOR TO FAN &
DUCT SYSTEM AIR BALANCE. PROVIDE COMPUTER GENERATED
ANALYSIS SUMMARIZING THE RESULTS.
PLAN NOTES
A. EXHAUST FAN DESIGNATIONS WITH "E" SUFFIX ARE FOR
REFERENCE ONLY, TO ASSIST IN IDENTIFYING FANS DURING
REMOVAL WORK. NEW DESIGNATIONS (FOR NEW FANS AND FOR
EXISTING FANS TO REMAIN) HAVE THE FOLLOWING NAMING
FORMAT: "1-EF_".
B. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
UP
DN
DN
DN
UP
UP
UP
DN
DN
DN
DN
DN
DN
Mens
Restroom
Neuropsychology
B146
Vestry
B163B
Stor
B163C
Chaplain
B163L
Pharmacy
Specialist
B156
Storage
B157
NP / Exam
B158
Stor.
B150A
SVC.
Officer
B147
SVC.
Officer
B148
SVC.
Officer
B148A
SVC.
Officer
B150B
SVC.
Officer
B149
SVC.
Officer
B149A
Waiting
Room
B150
Corridor
C*1*14
Off.
C134A
Adm. Asst.
C134B
Off.
C134C
Off.
C134D
Off.
C134E
Pharmacy
C140
Off.
C129
Secure
Dispensing
C133
Vault
C143
Dispensing
C125B
PIV
Registrar
B156A
Pain School
B156B
Elec.
B155
Elec.
B155A
Compund
C140A
Stair 7
S*1*7
Office
C1012
Work Rm.
C1013
Clinical
Pharm.
C1014
RN
C1015
Exam
C1018
Exam
C1019
Exam
C1020
Exam
C1021
Exam
C1022
Exam
C1023
Exam
C1024
Exam
C1025
Exam
C1026
Meds
C1027
Exam
C1028
Exam
C1029
Exam
C1030
Office
C1032
Clinicians
Break Rm.
C1033
Women's
Lockers
C1033A
F. Tlt.
C1033B
Men's
Lockers
C1033C
M. Tlt.
C1033D
Program
Assistant
C1017
Care
Coordination
C1013A
Pharmacist
Counselor
C1034
Changing
Room-MRI
C1035
Reception
C1036
Social
Worker
C1037
RN
C1038
Tlt.
C1039
Office
C1040
C1041
Wrk. St.
C1042
HAC
C1043
Exam
C1044
Neg. Press.
C1045
Exam
C1046
C1047
Exam
C1048
C1049
Exam
C1050
Exam
C1051
Exam
C1052
Procedure
C1054
Stor.
C1057
Tele.
C1059
Neg. Press.
C1061
Soiled
Utility
C1063
Exam
C1000
Exam
C1001
Exam
C1002
Exam
C1003
Exam
C1004
Office
C1005
Exam
C1006
Exam
C1007
Exam
C1008
Procedure
C1009
Office
C1010
Office
C1011
Storage
B153
Work Area
C1038A
Pharmacist
Counselor
C165
Reception
C167
Clinical
Pharm.
C168
RN
C169
Nutrition
C170
Office
C171
Exam
C172
Work St.
C173
Tlt.
C174
Exam
C175
Elec.
C176
Exam
C177
Exam
C178
Exam
C179
Exam
C180
Exam
C181
Exam
C182
Meds
C183
Elec.
C184
Exam
C185
Linen
C186
Procedure
C187
HAC
C188
Exam
C189
Tele.
C190
Exam
C191
Stor.
C192
Voluntary
Service
C147
Mech.
C149
ATM
C150
Break
Room
C151
Office
C152
Office
C153
Office
C154
Exam
C155
Exam
C156
Exam
C157
Exam
C158
Exam
C159
Tlt.
C160
Office
C161
Office
C162
Exam
C163
Office
C164
Work Area
C164A
Clos.
C163A
Info
C166A
Office
C166
F. Tlt.
C146
Storage
C195
Blood Draw
Rm.
C193
RN
C194
Work Area
C169A
Intake
C196
Exam
C197
Exam
C198
Exam
C199
Corridor
C*1*12
Waiting
Room
C145
Entry
C-1-10L
Corridor
C*1*15
Corridor
C*1*19
Corridor
C*1*16
Corridor
C*1*17
Corridor
C*1*18
Corridor
C*1*20
Vestibule
C144
Stair 10
S*1*10
Kit.
B152
Corridor
C*1*23
Waiting
Area
C100
Waiting
Room
C100D
Recreation
B151
Stor.
B151L
M. Med.
Stor.
B151E
Elec.
B151K
M. Med.
Stor.
B151D
M. Med.
Stor.
B151C
Stor.
B151B
Med. Media
B151A
Toilet
B151I
Storage
B151F
Film Room
B151G
Medical
Illust.
B151H
Closet
B163F
Entry
C151A
Stair 8
S*1*8
Office
C1005A
Corridor
C*1*10
Pharmacist
Counselor
C145
Ante
C1053
Elec.
C1055
Neg. Press.
Neg. Press.
Exam
12"x6" UP
Up to
1-EF29
M A
T C
H
L
I N
E
MATCH LINE
x x
12"x8"
10"x8"
24"x6"
2 255
Up to
1-DPF1
Up to
1-EF30
Up to
1-EF33
1-EF78
x x
6"x6"
12"x10"
SG1-6x6
6"Ø6"Ø
6"x6"
CG1-24x12
6"Ø
10"x8"
Dn to
Bsmt
2 2 170
255 2
2 30
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE EXHAUST SYSTEMS
CINCINNATI, OH
539-18-101
Chief Engineer
Revisions: Date:
Cincinnati V.A.
Medical Center
08/20/2020
SCHEMATIC DESIGN SUBMITTAL 04/05/2019
CONSTRUCTION DOCUMENTS 09/29/2019
DESIGN DEVELOPMENT SUBMITTAL 06/28/2019
95% OWNER REVIEW 08/09/2019
BID DOCUMENTS 03/19/2020
JASON REEVES
ADDENDUM #2 09/22/20201
1-M102A
SECOND FLOOR PLAN AREA A -
REMOVALS & NEW WORK 01
SCALE: 1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN (AREA A)
JAC GEH
SECOND FLOOR KEY PLAN
NO SCALE
1. EXISTING AIR DEVICE TO REMAIN - BALANCE TO CFM INDICATED.
2. REMOVE EXISTING FAN AND ASSOCIATED SUPPORTS, DUCTWORK,
CONTROLS, ACCESSORIES, ETC.
3. REMOVE EXISTING EXHAUST FAN AND REPLACE WITH NEW.
4. REMOVE EXISTING EXTERIOR DUCT INSULATION & JACKETING IN
ITS ENTIRETY, AND REPLACE WITH NEW RIGID INSULATION &
ALUMINUM JACKETING - REFER TO SPECS.
5. EXISTING EQUIPMENT SUPPORT ROOF CURB TO REMAIN - SECURE
NEW FAN TO EXISTING CURB. ADD SUPPORT MEMBERS AS
REQUIRED, REPLACE EXISTING SHEETMETAL CURB CAP AND
ENSURE WEATHERTIGHT CONDITION.
6. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK,
ACCESSORIES, ETC.
7. PROVIDE DOUBLE WALL STAINLESS STEEL INSULATED BLANK OFF
PANEL TO COVER ALL UNUSED PORTIONS OF EXISTING WINDOW
OPENING. ENSURE WEATHERTIGHT SEAL.
8. EXISTING DUCT THROUGH WINDOW OPENING TO REMAIN.
9. REMOVE EXISTING DUCTWORK TO THIS POINT, CAP AND SEAL
AIRTIGHT.
10. EXISTING LOUVER TO REMAIN. PROVIDE DOUBLE WALL INSULATED
SHEETMETAL BLANK-OFF PANEL ON BACK SIDE OF LOUVER
(APPROXIMATE SIZE INDICATED), AND ENSURE WEATHERTIGHT
SEAL.
11. REMOVE EXISTING AIR DEVICE INSTALLED IN PLASTER CEILING.
PROVIDE SHEETMETAL COVERPLATE OVER CEILING OPENING,
PAINTED TO MATCH EXISTING CEILING.
12. REMOVE EXISTING DUCT-MOUNTED AIR DEVICE, PROVIDE
SHEETMETAL CAP AT ACTIVE MAIN AND ENSURE AIRTIGHT SEAL.
13. PROVIDE DOUBLE WALL STAINLESS STEEL INSULATED BLANK OFF
PANEL OVER ENTIRE FACE OF LOUVER. ENSURE WEATHERTIGHT
SEAL.
14. PROVIDE CRITICAL SPACE MONITOR FOR ROOM INDICATED. REFER
TO SHEET M701 FOR CONTROLS.
15. PROVIDE POLYMER PARTICLE SEALANT APPLIED FROM THE INSIDE
OF THE DUCT, FOR THIS ENTIRE EXISTING DUCT SYSTEM
(ASSOCIATED FAN INDICATED), INCLUDING VERTICAL RISERS, ALL
HORIZONTAL MAINS & BRANCHES, ETC. BLOCK ALL FANS, AIR
DEVICES, AND OTHER DUCT-MOUNTED EQUIPMENT &
ACCESSORIES DURING SEALING PROCESS. APPLICATION OF
INTERNAL SEALANT SHALL TAKE PLACE AFTER ALL DUCTWORK
DEMOLITION FOR THIS SYSTEM IS COMPLETE, BUT PRIOR TO FAN &
DUCT SYSTEM AIR BALANCE. PROVIDE COMPUTER GENERATED
ANALYSIS SUMMARIZING THE RESULTS.
16. REMOVE EXISTING SIDEWALL AIR DEVICE. PROVIDE SHEETMETAL
CAP OVER OPEN END OF ACTIVE EXHAUST DUCT, INSTALLED FLUSH
WITH WALL, AND ENSURE AIRTIGHT SEAL.
17. PROVIDE 1" VALVED & CAPPED PIPE STUBS FOR FUTURE
CONNECTION.
PLAN NOTES
A. EXHAUST FAN DESIGNATIONS WITH "E" SUFFIX ARE FOR
REFERENCE ONLY, TO ASSIST IN IDENTIFYING FANS DURING
REMOVAL WORK. NEW DESIGNATIONS (FOR NEW FANS AND FOR
EXISTING FANS TO REMAIN) HAVE THE FOLLOWING NAMING
FORMAT: "1-EF_".
B. COORDINATE AND SCHEDULE (MINIMUM 3 WEEKS NOTICE) IN
ADVANCE WITH COR, DOWNTIME OF ALL UTILITIES REQUIRED FOR
PERFORMANCE OF THIS WORK.
C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, AND
ADDITIONAL GENERAL NOTES.
GENERAL NOTES
DN UP DN
DN UP
UP
Recep.
A202
Imaging
Recep.
A201
Stor.
A202A
Digital
Chest Rm.
A203
Dressing
Rm.
A203A
Speech
Pathlgy.
A204
Rehab Care
Line
A205
Man Rehab
Care Line
A206
Staff
A207
Occupational
Therapy
A208
EMG Lab
A209
Rehab
Exam
A210
Rehab
Exam
A211
Elec.
A212
HAC
A213
Staff Tlt.
A214
PT Storage
A215
Hydrotheraphy
A216
Exam/Treatment
/ Exercise
Room
A217
Physical
Ther.
Supervisor
A218
Adl. Clinic
A208A
EMG Lab
A209A
Elec.
A217A
Corridor
C*2*2
Light Box
Room
A215B
SCI Exam
A215A
Stor.
A218A
Stair 2
S*2*2
Oxygen
Storage
A221
Therapy
Supervisor
A222
Ante Room
A223
Stor.
A210A
Dirty Room
A222A
Equip Wash
A222B
Mechanical
Room
A222C
Compressor
Room
A222D
Soiled
Receiving &
Decontamination
A222E
Equipment
Storage and Testing
A228A
Storage
A228B
Office
A230
Dressing
Rm.
A227B
Office
A231
LKRS.
A227A
Shower
A227
Elec.A225B
Service
Lobby
A225
Trash
Chute
A225A
Lounge
A226
Training
Room
A224
HAC
A225C
Office
A232
Nuclear
Med. Sec.
C200
Waiting
C201
Reading
C202
Work Rm.
C203
CAT Scan
Room
C204
Gamma
Camera
C205
Uptake
Prep Bay
C204A
I.V. Prep
Rm.
C207
Room
C204E
Tlt.
C204F
Tele.
Chief Off.
C200C
Break
Room
A240
Stair 1
S*2*1
Signal
Closet
A239
M. Tlt.
A236
Tlt.
A235
G.P.
Radiography
A242
Control
A243
Storage
A243A
Stair 5
S*2*5
Clos
A243B
Clos
A243C
Ultrasound
A266
Corridor
C*2*1
Corridor
C*2*3
Viewing
A256
Reading
Room
A257
Reading
Room
A258
Adm.
A259
Chief
Radiology
A260
Adm. Asst.
A261
Off.
A262
Resident
Reading
Room
A263
Reading
Room
A264
Reading
Room
A262A
Tlt.
A260A
Pat. Tlt.
A266B
Ultrasound
A265
Stor
A255
Tlt.
A253B
Break Rm.
A253
Elec.
A253A
HAC
A254
Control
F. Lkrs.
A271
Conf.
A272
Ante
A235A
Area
A236A
Elec.
A239A
Corridor
C*2*25
CT Room
#2
A2013
Stair 11
S*2*11
Clean
Supply
A2011
Storage
A2010
PACS Read
A2008
S.P. Control
A2009
Special
Procedures
A2015
MRI
Component
A2007
MRI Room
A2001A
MRI
A2001
Equipment
Storage
A2023
MRI
Equipment
A2001B
Storage
A2025
Corridor
C*2*15
Waiting
A2000
Dressing
Room
A2002
Chage Area
A2002A
Toilet
A2002B
Elec.
A2006
Signal
A2005
Men Staff
A2004
Women
Staff
A2003
CT Control
A2014
Adm.
Equip.
A2016A
CT Room
#1
A2016
S.P.
Equipment
A2021
CT Prep
A2017
Toilet
A2018
Storage
A2020
Office
A2022
IR Reading
A2024
Office
A208A
CT Office
A2019
Toilet
A2024A
HAC
A2026
A/C Shaft
A/C Shaft
Up to
3rd
Down to 1st
1-EF65
discharge up & down
EF-80E
EF-83E
EF-84E
MAU
EF-86E
EF-153E
Up to
1-EF73
Up to
1-EF63
Up to
1-EF64
Up to
EF-143E
Up to
1-EF71
Up to
1-EF58
AHU RELIEF AIR
Up to
1-EF99
Up to
1-EF98
Up to
1-EF52
Up to
1-EF61
Up to
1-EF59
Up to
1-EF60
M A
T C
H
L I N
E
MATCH LINE
1-EF39
1-EF40
44"x14"
1 125
1 80
EF-181E
14"x6" x
OPEN TO
CEILING PLENUM
18"x10" x x x
42"x14"
36"x8" x x x
10"x8"
8"x8" x
OPEN TO
CEILING PLENUM
x x x
22"x12"
10"x8"
22"x12"
22"x10"
Ø
Ø
6"Ø x
22"x10"
23"x10"
19"x8" x
19"x12"
6"Ø
60"x24" x
CG1-24x12
10"x8"
8"Ø
10"x6"
32"x16"
10"x4"
Up to
1-EF68
1-EF3
1-EF3
1-EF3
1-EF3
A203
A2016
A2013
A2015
C205
14 A236A
N
P
P
N
N
N
C H
S
C H
R
CHS
CHR
Up to
1-EF50
8"Ø
P
14 A222A
P
A2…
This is the start of the file's text. The full file is on GovTribe.