5343VL25 A004 CDRL_Hydrostatic_Test_Report_Material_Test - Signed.pdf

PDF 190 KB Posted

Attached to
Demineralizer
Solicitation number
N4523A26Q4033
Issued by

About this file

This is a Contract Data Requirements List (CDRL) form (DD Form 1423-1) that specifies contractual deliverables for a demineralizer procurement.

The contractor must deliver a single data item: a Test/Inspection Report (Data Item A004) documenting a Hydrostatic Test Report for equipment designated 5343VL25. The report is required under Technical Specification Sheet paragraph 3.4.1 as referenced in contract DI-NDTI-80809B*. The requiring office is PSNS & IMF, Code 2305.3. The final Hydrostatic Test Report must be submitted to the Government within 15 working days after government acceptance of the draft report and prior to shipment of the demineralizer. The contractor shall first submit a draft report to the PSNS & IMF Contract Representative for evaluation and approval, with the Government providing written acceptance or rejection within five working days of receipt. The final report must be delivered in electronic PDF format via email to PSNSINF-MATERIAL.FCT@NAVY.MIL with the subject line beginning with the contract/PR number. A hard copy of the final report shall also be included with each demineralizer shipment. Distribution requirements specify two copies to PSNS & IMF C2305.3 and one copy to PSNS & IMF C2310.3. The form was prepared on March 27, 2026, and approved on March 30, 2026.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

a. ADDRESSEE

b. COPIES

8. APP CODE

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

Reg Repro

16. REMARKS

15. TOTAL ▬▬▬▬►

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages

A CONTRACT LINE ITEM NO: TBD
B EXHIBIT: A
D SYSTEMITEM: Demineralizer
E CONTRACTPR NO: TBD
F CONTRACTOR: TBD
1 DATA ITEM NO: A004
2 TITLE OF DATA ITEM: Test/Inspection Report*
3 SUBTITLE: Hydrostatic Test Report

5343VL25

17 PRICE GROUP:
4 AUTHORITY Data Acquisition Document No: DI-NDTI-80809B*
5 CONTRACT REFERENCE: Technical Specification Sheet para. 3.4.1
6 REQUIRING OFFICE: PSNS & IMF Code 2305.3
7 DD 250 REQ: XX
8 APP CODE: A
9 DIST STATEMENT REQUIRED: A
10 FREQUENCY: ASREQ*
12 DATE OF FIRST SUBMISSION: ASREQ*
11 AS OF DATE: N/A
H DATE: 3/27/2026
a ADDRESSEE16 REMARKS: PSNS & IMF C2305.3
Draft16 REMARKS: 0
Reg16 REMARKS: 2
Repro16 REMARKS: 0
a ADDRESSEE16 REMARKS_2: PSNS & IMF C2310.3
Draft16 REMARKS_2: 1
Reg16 REMARKS_2: 1
Repro16 REMARKS_2: 0
a ADDRESSEE16 REMARKS_3:
Draft16 REMARKS_3:
Reg16 REMARKS_3:
Repro16 REMARKS_3:
a ADDRESSEE16 REMARKS_4:
Draft16 REMARKS_4:
Reg16 REMARKS_4:
Repro16 REMARKS_4:
a ADDRESSEE16 REMARKS_5:
Draft16 REMARKS_5:
Reg16 REMARKS_5:
Repro16 REMARKS_5:
a ADDRESSEE16 REMARKS_6:
Draft16 REMARKS_6:
Reg16 REMARKS_6:
Repro16 REMARKS_6:
a ADDRESSEE16 REMARKS_7:
Draft16 REMARKS_7:
Reg16 REMARKS_7:
Repro16 REMARKS_7:
a ADDRESSEE16 REMARKS_8:
Draft16 REMARKS_8:
Reg16 REMARKS_8:
Repro16 REMARKS_8:
a ADDRESSEE16 REMARKS_9:
Draft16 REMARKS_9:
Reg16 REMARKS_9:
Repro16 REMARKS_9:
a ADDRESSEE16 REMARKS_10:
Draft16 REMARKS_10:
Reg16 REMARKS_10:
Repro16 REMARKS_10:
a ADDRESSEE16 REMARKS_11:
Draft16 REMARKS_11:
Reg16 REMARKS_11:
Repro16 REMARKS_11:
a ADDRESSEE16 REMARKS_12:
Draft16 REMARKS_12:
Reg16 REMARKS_12:
Repro16 REMARKS_12:
a ADDRESSEE16 REMARKS_13:
Draft16 REMARKS_13:
Reg16 REMARKS_13:
Repro16 REMARKS_13:
a ADDRESSEE16 REMARKS_14:
Draft16 REMARKS_14:
Reg16 REMARKS_14:
Repro16 REMARKS_14:
a ADDRESSEE16 REMARKS_15:
Draft16 REMARKS_15:
Reg16 REMARKS_15:
Repro16 REMARKS_15:
a ADDRESSEE16 REMARKS_16:
Draft16 REMARKS_16:
Reg16 REMARKS_16:
Repro16 REMARKS_16:
a ADDRESSEE16 REMARKS_17:
Draft16 REMARKS_17:
Reg16 REMARKS_17:
Repro16 REMARKS_17:
a ADDRESSEE16 REMARKS_18:
Draft16 REMARKS_18:
Reg16 REMARKS_18:
Repro16 REMARKS_18:
a ADDRESSEE16 REMARKS_19:
Draft16 REMARKS_19:
Reg16 REMARKS_19:
Repro16 REMARKS_19:
a ADDRESSEE16 REMARKS_20:
Draft16 REMARKS_20:
Reg16 REMARKS_20:
Repro16 REMARKS_20:
a ADDRESSEE16 REMARKS_21:
Draft16 REMARKS_21:
Reg16 REMARKS_21:
Repro16 REMARKS_21:
a ADDRESSEE16 REMARKS_22:
Draft16 REMARKS_22:
Reg16 REMARKS_22:
Repro16 REMARKS_22:
a ADDRESSEE16 REMARKS_23:
Draft16 REMARKS_23:
Reg16 REMARKS_23:
Repro16 REMARKS_23:
a ADDRESSEE16 REMARKS_24:
Draft16 REMARKS_24:
Reg16 REMARKS_24:
Repro16 REMARKS_24:
a ADDRESSEE16 REMARKS_25:
Draft16 REMARKS_25:
Reg16 REMARKS_25:
Repro16 REMARKS_25:
a ADDRESSEE16 REMARKS_26:
Draft16 REMARKS_26:
Reg16 REMARKS_26:
Repro16 REMARKS_26:
a ADDRESSEE16 REMARKS_27:
Draft16 REMARKS_27:
Reg16 REMARKS_27:
Repro16 REMARKS_27:
a ADDRESSEE16 REMARKS_28:
Draft16 REMARKS_28:
Reg16 REMARKS_28:
Repro16 REMARKS_28:
a ADDRESSEE16 REMARKS_29:
Draft16 REMARKS_29:
Reg16 REMARKS_29:
Repro16 REMARKS_29:
Draft15 TOTAL: 1
Reg15 TOTAL: 3
J DATE: 3/30/2026
18 ESTIMATED TOTAL PRICE:
Repro15 TOTAL: 0
Pages: 1
Page: 1
2026-03-27T08:46:37-0700
DRUSCHKE.KARL.E.1161638567
2026-03-30T09:42:53-0700
FLORES.MANUEL.B.1161645229
13 DATE IF SUBSEQUENT SUBM: N/A
Remarks: BLOCK 4: The contractor is only required to provide data associated with the selected portions of DI-NDTI-80809B in conjunction with the contract.

BLOCK 10 & 12: The final Hydrostatic Test Report shall be provided to the Government within 15 working days after government acceptance of the draft prior to shipment of the Demineralizer procured under this contract.

BLOCK 14: The Government requires at least five working days for evaluation and acceptance of the (draft) Hydrostatic Test Report. The Hydrostatic Test Report shall be evaluated and approved by PSNS & IMF prior to the contractor beginning shipment of the Demineralizer. Government acceptance of the (draft) Hydrostatic Test Report fulfills the contract reference requirements delineated herein.

The contractor shall provide the (draft) Hydrostatic Test Report to the PSNS & IMF Contract Representative; the government will evaluated the draft and provide acceptance/rejection via reply-to-all with in five working days of receipt.

The final copy of the Hydrostatic Test Report shall be submitted in PSNS & IMF in electronic (PDF) format using the email address below. Ensure the email subject title and its attached files begin with the "CONTRACT/PR NO." (BLOCK E).

PSNSIMF-MATERIAL.FCT@NAVY.MIL

A hard copy of the (final) Hydrostatic Test Report shall also be included with each Demineralizer shipment under this contract.

DOCUMENT NO: 5343VL25

C CATEGORY TDP TM OTHER: NDTI
TM:
TDP: