526-21-120_100BD-STAMPED_DRAWINGS-P1-COMBINED.pdf

PDF 17 MB Posted

Attached to
Y1AZ--Renovate SCI for Negative Pressure Project 526-21-120
Solicitation number
36C24226B0024
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

New rt.-P resbyw9ap/,!lllen

Ho/ital

�'):;., tj, "<"(, ti,� y., s

1.0 t

<,:, 11,.,, s, "".?15,� .r, •91� St

.f ,f

E �'4.r, F

River q -.¢ <$f

VA FORM 08- 6231

1 2 3 4 5 6

• • e ar en

0 eterans airs

JAMES J. PETERS DVA MEDICAL CENTER

130 WEST KINGSBRIDGE ROAD,

BRONX, NY 10468

PROJECT #526-21-120

MODIFY SCI FOR NEGATIVE PRESSURE AND EPVA CORRECTIONS

PROJECT LOCATION MAP

PS 310

a:

', ,., t-; ,g, 11 f ii

S1 t.:f .r ,., W J,9;;,-ll'IS:

-0

.ff rJ

.i, Strong St

1-\1 :!Jsu, St

JAMES J. PETERS VA t--'---1<

MEDICAL CENTER

�-f il'I::'!' 1--:

J;j ,.,11 lar\-,.os J Peters \IA M�ical Center f � ,!j

GS BRIDGE

HEIGHTS

1'

.,,.;:..rO ,., If' ..

,e

'r.

.-f!, 11,, _,.t

:$0._ <:' ., ,.,, .r, .::;

,_f o#'.

E,,�Pt

� l,;;'1 '9st riag�

•" d h� �-- 4.�

,i! J> ,f T �f!J :.,il "' " ;§,'"<· lg<. Q

'1t'J s, I'.

,P....,., FORDHAM-BEDF

-8'

JI

�d' _f, �,-'b b

�,$ St " I!'

Fo,dham I L.J�d�ng.

Playgro<Jnd

. �6- 11'" o'�

L_

¾:� t� �

Devoe Parle W Foi<lha;n Rd

.,c, -l l, ,f �

- '!b,6Monroe College J:/

Timothy :§' Dwight

"<' School�.

'"0 'oham y,\\

§' �16s, c,o:c:=!--, -· &;.l.t.;;�·

EN Gi1""��

NT

LLC

(502)890-221·0:..* WE-STPOIN:r:ENGINE�S:.COM 1941 a,sfifOPLAN-e r sfE.'4oo*lt:_outSVJLLE,'<\kv 40218

PROJECT SITE MAP SIGNATURE BLOCK

HOSPITAL DIRECTOR

CHIEF, ENGINEERING

PARALYZED VETERANS OF Al•AERICA (PVA) ARCHITECT

CHIEF, SCI

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP /'1 ,, 1"l Jo-<, .,-vf NE....._0�

Drawing Title

DATE

DATE

DATE

DATE

W Er·!;i•,:;--=�� I NT ENG lc�1E E-R�l?LLC 11•

<o () i

,,.11oL V, JAMES J. PETERS

VETERANS AFFAIRS

'MEDICAL CENTER

COVER SHEET

Revisions: Date:

1 2 3 4

( 502)890,2210" WESTPc>INtENGINEERS.COMI ../ r,,r,c1._ 1941 B.l§HQl''LA�E, STE.AQ:Q/·L,_OUl,i;vu;lE'$Y 40218

'* fi.J � � ;;. :5 .i'lii �.d)� . -

VA

U.S. Department of Veterans Affairs

Approved Pio)ect Director

I

8 9 10

DRAWING INDEX

DRAWING NO. DESCRIPTION

GENERAL

GI001 COVER SHEET

Gl002 ABBREVIATIONS AND SYMBOLS, ICRA ASSESSMENT

GI003 ENLARGED PARTIAL INFECT ION CONTROL - FIRST FLOOR PLAN

GI004 ENLARGED PARTIAL INFECTION CONTROL - FIRST FLOOR PLAN

GI005 FIRST FLOOR PHASING PLAN

LS-001 FIRST FLOOR LIFE SAFETY PLAN

A RCHITECTURAL

A0101 OVERALL DEMOLITION FIRST FLOOR PLAN

A0102 ENLARGED PARTIAL DEMOLITION FIRST FLOOR PLAN

A0103 ENLARGED PARTIAL DEMOLITION FIRST FLOOR PLAN

AD110 ENLARGED DEMO REFLECTED CEILING FIRST FLOOR PLAN

AE101 ENLARGED PARTIAL NEW WORK FIRST FLOOR PLAN

AE102 ENLARGED PARTIAL NEW WORK FIRST FLOOR PLAN

AE103 REFERENCE ENLARGED FIRST FLOOR PLAN AT MODIFIED ROOMS

AE110 ENLARGED FIRST FLOOR REFLECT ED CEILING PLAN AT AOL BEDROOM

AE201 AOL BEDROOM CONCEPT MODEL

AE202 INTERIOR ELEVATIONS

AE601 DOOR TYPES, SCHEDULE, DETAILS, AND PARTITION TYPE

AE701 CASEWORK DETAILS

MECHANICAL

FX-001 MECHANICAL GENERAL NOTES AND SYMBOLS

FXD101 FIRE PROTECTION PARTIAL FIRST FLOOR DEMOLITION PLAN - D

FX-101 FIRE PROTECTION PARTIAL FIRST FLOOR PLAN - D

FX-501 FIRE PROTECTION DETAILS

M-001 MECHANICAL GENERAL NOTES AND SYMBOLS

M-101 MECHANICAL PART !AL FIRST FLOOR PLAN - D

M-102 MECHANICAL PARTIAL INT ERST IT IAL FLOOR PLAN - D

M-501 MECHANICAL DETAILS

PLUMBING

P-001 PLUMBING GENERAL NOTES AND SYMBOLS

PD101 PLUMBING PARTIAL FIRST FLOOR DEMOLITION PLAN - D

PD102 PLUMBING PARTIAL FIRST FLOOR DEMOLITION PLAN - E

P-101 PLUMBING PARTIAL FIRST FLOOR PLAN - D

P-102 PLUMBING PARTIAL FIRST FLOOR PLAN - E

P-501 PLUMBING DETAILS

ELECTRICAL

EG001 ELECTRICAL LEGEND, GENERAL NOT ES AND ABBREVIATIONS

ED101 PARTIAL FIRST FLOOR PLAN· ELECTRICAL AND TELECOMMUNICATIONS DEMO LIT ION

EL101 PARTIAL FIRST FLOOR PLAN - LIGHTING PLAN AND DETAILS - D

EP101 ELECTRICAL PARTIAL FIRST FLOOR PLAN· D

EP102 ELECTRICAL PARTIAL FIRST FLOOR PLAN - E

E-101 PARTIAL FIRST FLOOR PLAN - TELECOMMUNICATIONS, FIRE ALARM NEW WORK- D

E-500 ELECTRICAL SCHEDULES AND DETAIL

GENERAL

GR101 SITE REFERENCE PHOTOS

Phase Pro1ect Title Project Number

100% BID DOCUMENTS MODIFY SCI

526-21-120

B

Location JAMES J. PETERS VA MEDICAL CENTER

130 IV KINGSBRIDGE ROAD. BRONX, NY 10468

Issue Dale

24-MAR-2025

Checked

BVG

Drawn

SCM

Building Number

Drawing Number

GI001

A

B

C

D

E

F

B I

C I

D I

E

F

1 I 2 I 3

ABBREVIATIONS

AB

ABV

AC

ACT

AD

ADA

ADD'L

II ADJ

ADL

NE

AFF

AFG

AFS

AGG

AL, ALUM

ALT

ANOD

AP

APP'D

APPROX

ASPH

ARCH

ASB

AVG

Ii

BIB

I I

BIG

BD

BIF

BIT

BLDG

BLKG

BP

BRK

BRG

BSMT

BTWN

BUR

BW

(j:_

CAB

CAC

CB

GEM

CH

CJ

II CKBD

CLG

CLR

CMP

CMU

co

COL

COMB

COMP

CONG

CONN

CONST

CONST JT

CONT

CONTR

COR

COORD

CORR

CRS

CSK

II CT

CTR

cu

ANCHOR BOLT

ABOVE

ACOUSTICAL/AIR CONDITIONING

ACOUSTICAL CEILING TILE

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

ADDITIONAL

ADJACENT, ADJOINING. OR ADJUSTABLE

ACTIVITIES OF DAILY LIVING

ARCHITECT/ENGINEER

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

AGGREGATE

ALUMINUM

ALTERNATE

ANODIZE

ACCESS PANEL

APPROVED.APPLIED

APPROXIMATE

ASPHALT

ARCHITECT

ASBESTOS

AVERAGE

BASELINE

BACK TO BACK

BOTTOM OF CURB

BOARD

BOTTOM OF FOOTING

BITUMINOUS

BUILDING

BLOCKING

BASE PLATE

BRICK

BEARING

BASEMENT

BETWEEN

BUILT-UP ROOFING

BOTH WAYS

CENTERLINE

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENT

CABINET HEATER

CONSTRUCTION JOINT OR CONTROL JOINT

CHALKBOARD

CEILING

CLEAR

CORRUGATED METAL PIPE

CONCRETE MASONRY UNIT

CLEANOUT

COLUMN

COMBINATION, COMBINED

COMPONENT

CONCRETE

CONNECT

CONSTRUCTION

CONSTRUCITON JOINT

CONTINUE

CONTRACTOR

CONTRACTING OFFICER REPRESENTATIVE

COORDINATE

CORRIDOR

COURSE

COUNTER SUNK

CERAMIC TILE

CENTER CONTOUR

CUBIC

I 4

D DEEP GA

DES DESIGN GAL

DET DETAIL GALV

DF DRINKING FOUNTAIN GC

DIA DIAMETER GEN

DIAG DIAGONAL DIAGRAM GL

DIP DUCTILE IRON PIPE GMP

DL DEAD LOAD GM

DMPF DAMPPROOFING GOVT

DN DOWN GR

DR DOOR GRAN

DS DOWNSPOUT GRBM

DT DRAIN TILE GRD

DS DOVETAIL ANCHOR GUT

DWG DRAWING GYP

GWB

EB EXPANSION BOLT

EF EACH FACE H

EG EDGE WALL GUARD HB

EIFS EXTERIOR INSULATION AND FINISH SYSTEM HCP

EJ EXPANSION JOINT HD

ELEC ELECTRIC HDR

ELEV ELEVATOR HDW

EMG EN ERG ENCY HM

ENCL ENCLOSURE HORIZ

ENGR ENGINEER HP

ENVIR ENVIRONMENT HR

E/P EDGE OF PAVEMENT HT

EQ EQUAL HTG

EQUIP EQUIPMENT HW

ES EMERGENCY SHOWER HWD

ESEW EMERGENCY SHOWER AND EYE WASH

EST ESTIMATE ID

ETC AND SO FORTH OR ET CETERA IF

EW EACH WAY IN

EWC ELECTRIC WATER COOLER INFO

EWS EYE WASH STATION INSUL

EXH EXHAUST INT

EXIST EXISTING

EXP EXPANSION OR EXPOSED J

EXT EXTERIOR JAN

JF

FAS FASTEN(ER) JT

FB FACE BRICK

FD FLOOR DRAIN KD

FDN FOUNDATION KO

FE FIRE EXTINGUISHER KIP

FEC FIRE EXTINGUISHER CABINET KPL

FF FINISH FLOOR, FINISH FACE

FFE FINISH FLOOR ELEVATION L

FFL FINISH FLOOR LINE LAB

FH FIRE HYDRANT LAM

FHC FIRE HOSE CABINET LAV

FHR FIRE HOSE RACK LB

FIN FINISH LF

FIN FLR FINISH FLOOR LH

FIN GR FINISH GRADE LL

FL FENCE LINE LLH

FLG FLASHING LLV

FIG FACE OF CONCRETE LP

FIF FACE TO FACE, FLOOR TO FLOOR LTG

FIM FACE OF MASONRY LTWT

FIS FACE OF STUD LW

FLR FLOOR

FLR FIN FLOOR FINISH M

FP FIREPROOFING MAS

FR FRAME MAT

FT FOOT MAX

FTG FOOTING MB

FUR FURRING MECH

MEZZ

5 I 6 I 7

GAUGE MFR MANUFACTURER RM ROOM VIR

GALLON MFR REC MANUFACTURER'S RECOMMENDATION RND ROUND VTR

GALVANIZED MGT MANAGEMENT RO ROUGH OPENING vwc

GENERAL CONTRACTOR MH MANHOLE PJW RIGHT OF WAY

GENERAL OR GENERA TOR MIN MINIMUM RPM REVOLUTIONS PER MINUTE w

GLASS MISC MISCELLANEOUS RS ROUGH SAWN WI

GALVANIZED METAL PIPE MIT MITER RT RIGHT W/0

GAS METER MLWK MILLWORK RV ROOF VENT WARR

GOVERNMENT MM MILLIMETER RVS REVERSE WBL

GRADE MO MASONRY OPENING RWD REDWOOD WC

GRANULAR MOD MODEL, MODIFY OR MODULE RWL RAIN WATER LEADER WD

GRADE BEAM MR MOISTURE RESISTANT WG

GROUND MTD MOUNTED SAN SANITARY WH

GUTTER MTG MOUNTING SCH SCHOOL WL

GYPSUM MTL METAL SCWD SOLID CORE WOOD DOOR WM

GYPSUM WALLBOARD MULL MULLION SECT SECTION W/0

MUNT MUNTIN SF SQUARE FOOT (FEET) WP

HIGH SGT STRUCTURAL GLAZED TILE WSCT

HOSE BIBB NIA NOT APPLICABLE SH SHOWER WWF

HANDICAPPED NA NEAR FACE SHT SHEET

HEAVY DUTY NEUT NEUTRAL SIM SIMILAR YD

HEADER NIC NOT IN CONTRACT SJ SAW JOINT

HARDWARE NO NUMBER SK SKETCH

HOLLOW METAL NOM NOMINAL SL SLEEVE

HORIZONTAL NS NARROW STILE SPC SPECIAL

HIGH POINT NTS NOT TO SCALE SPEC SPECIFICATION

HOUR, HANDRAIL SPKLR SPRINKLER

HEIGHT oc ON CENTER SQ SQUARE HEATING OD OUTSIDE DIAMETER ss SANITARY SEWER OR SERVICE SINK

HEADWALL O.F.C.I. OWNER FURNISHED CONTRACTOR INSTALLED STA STATION

HARDWALL OH OVERHANG STD STANDARD

010 OUT TO OUT STL STEEL

INSIDE DIAMETER OPHD OPPOSITE HAND STLJ STEEL JOIST

INSIDE FACE OPNG OPENING STRUCT STRUCTURAL

INCH OPP OPPOSITE SUSP SUSPEND

INFORMATION SUSP CLG SUSPENDED CEILING

INSULATION I!. PROPERTY LINE SW SWITCH

INTERIOR PAV PAVING SYM SYMMETRY, SYMMETRICAL

PFN PRE-FINISHED

JOIST PKG PACKAGE T TREAD

JANITOR PL PROPERTY LINE T&B TOP & BOTTOM

JOINT FILLER PLAM PLASTIC LAMINATE TB TOP OF BEAM

JOINT PLAS PLASTER OR PLASTIC TIC TOP OF CONCRETE, TOP OF CURB

PLBG PLUMBING TICOL TOP OF COLUMN

KNOCKDOWN PLYWD PLYWOOD TCA TILE COUNCIL OF AMERICA

KNOCKOUT PLAS PLASTIC, PLASTER TD TRENCH DRAIN

KILO-POUND PNL PANEL TECH TECHNICAL

KICKPLATE PRF PRE-FORMED TEL TELEPHONE

PROP PROPERTY TEMP TEMPERATURE OR TEMPORARY

ANGLE, LONG PSF POUNDS PER SQUARE FOOT TERR TERRAZZO

LABORATORY PSI POUNDS PER SQUARE INCH THD THREAD

LAMINATE PT PAINT THERM THERMAL

LAVATORY PTW PRESSURE TREATED WOOD THK THICKNESS

POUND T/J TOP OF JOIST

LINEAR FEET (FOOT) QT QUARRY TILE TKBD TACKBOARD

LEFT HAND QTY QUANTITY TIM TOP OF MANSONRY

LIVE LOAD TIS TOP OF SLAB

LONG LEG HORIZONTAL R RADIUS OR RISER T/W TOP OF WALL

LONG LEG VERTICAL RBT RABBET TYP TYPICAL

LOW POINT RCP REFLECTED CEILING PLAN

LIGHTING RD ROOF DRAIN UC UNDERCUT

LIGHTWEIGHT REF REFERENCE UG UNDERGROUND

LONG WAY REFR REFRIGERATOR UL UNDERWRITERS LABORATORIES

REINF REINFORCE UNO UNLESS NOTED OTHERWISE

METER REOD REQUIRED UR URINAL

MASONRY RES RESILIENT

MATERIAL REV REVISION VAR VARIES

MAXIMUM RFG ROOFING VPRD VAPOR RETARDER

MAIL BOX RF\ REQUEST FOR INFORMATION VCT VINYL COMPOSITION TILE

MECHANICAL RFP REQUEST FOR PROPOSAL VERT VERTICAL

MEZZANINE RL ROOF LEADER VEST VESTIBULE

INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION

STEP #1: SELECT ACTIVITY TYPE BELOW:

CONSTRUCTION ACTIVlTY TYPES:

TYPE A

INSPECTION AND NON-INVASIVE ACTIVITIES

INCLUDES, BUT NOT LIMITED TO:

• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE

PER 50 SQUARE FEET.

PAINTING (BUT NOT SANDINGj

WALL COVERING

ELECTRICAL TRIM WORK

MINOR PLUMBING

ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VlSUAL INSPECTION

TYPE B

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST

INCLUDES, BUT NOT LIMITED TO

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING

ACCESS TO CHASE SPACES

• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE

CONTROLLED

TYPE C

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES

DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

�Cl.UOES, BUT NOT LIMITED TO:

SANDING OF WALLS FOR PAINTING OR WALL COVERING

• REMOVAL OF FLOOR COVERING, CEILING TILES ANO CASEWORK

• NEW WALL CONSTRUCTION

MINOR DUCT WORK OR ELECTRICAL 'A'ORK ABOVE CEILINGS

MAJOR CABLING ACTIVITIES

ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE 'NORK

SHIFT

TYPE O

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT NOT LIMITED TO:

ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS

REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CABLING SYSTEM.

NEW CONSTRUCTION

Revisions:

VA FORM 08- 6231

STEP #2 SELECT RISK GROUP BELOW AND MARK BOTTOM OF COLUMN

A) INFECTION CONTROL RISK GROUPS

LOW: OFFICE AREAS:

MEDIUM: CARDIOLOGY, ECHOCARDIOGRAPHY, ENDOSCOPY, NUCLEAR MEDICINE,

PHYSICAL THERAPY, RADIOLOGY/MR\, RESPIRATORY THERAPY

HIGH RISK: CCU, EMERGENCY ROOM, LABORATORIES, OUTPATIENT SURGERY,

PHARMACY, POST ANESTHESIA CARE UNIT, SURGICAL UNITS

HIGHEST RISK: ANY AREA CARING FOR IMMUNOCOMPROMISED PATIENTS,

CARDIAC GATH LAB, CENTRAL SUPPLY, INTENSIVE CARE UNITS, MEDICAL

UNITS, NEGATIVE AIRFLOW ROOMS, ONCOLOGY, OPERATING ROOMS

STEP #3 DETERMINE CLASS OF PRECAUTIONS USING MATRIX BELOW:

CONSTRUCTION ACTIVITY/ INFECTION CONTROL MATRIX TO DETERMINE CLASS

" ICN MUST BE CONSUL TED WHEN THE ASSESSMENT INDICATS THAT

CLASS II, Ill, IV PRECAUTIONS ARE REQUIRED.

RISK LEVEL TYPE 'A' TYPE 'B' TYPE 'C' TYPE 'D'

GROUP1 II II Ill I IV

GROUP2 II Ill IV

GROUP3 II 1111 IV IV

GROUP4 II Ill I IV Ill/IV IV

CONSTRUCTION TYPE I RISK GROUP

C MEDIUM

RISK ASSESSMENT:

IV

PROJECTED UTILITY OUTAGES IMPACTING INFECTION CONTROL

ELECTRICAL I POTABLE WATER

YES YES

HVAC

YES

MEDICAL VACUUM

YES

SEWER

YES

CONSULTANT

Date:

2 3

STEP #4 COMPLETE THE INFECTION CONTROL CONSTRUCTION PERMIT:

CLASS I - DURING CONSTRUCTION PROJECT

1. EXECUTE WORK BY METHOD TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION

CLASS 11- DURING CONSTRUCTION PROJECT

1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING

3. SEAL UNUSED DOORS WITH DUCT TAPE

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CLASS 111- DURING CONSTRUCTION PROJECT

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, 1.E SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR

TO EXID BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED AIR

FILTRATION UNITS,

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORTATION IN TIGHTLY COVERED

CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID IS USED.

CLASS IV - DURING CONSTRUCTION PROJECT

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS, I.E , SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

, COVERING & SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR

TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING HEPA-EQUIPPED AIR

FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE All PERSONNEL TO PASS THROUGH THIS ROOM SO

THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR

THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE

THE WORK SITE.

6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE

COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY

SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY ENVIRONMENTAL

MANAGEMENT.

1. CLEAN WORK UPON COMPLETION OF TASK

CLASS II - UPON COMPLETION OF PROJECTS

1. WIPE WORK SURFACES WITH DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

3. WET MOP &/OR VACUUM BEFORE LEAVING WORK AREA.

4. REMOVE ISOLATION OF HVAC SYSTEM IN AREA WHERE WORK IS BEING PERFORMED.

CLASS Ill - UPON COMPLETION OF PROJECTS

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED

BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY CLEANED BY

ENVIRONMENTAL MANAGEMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS

ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.

4. WET MOP WITH DISINFECTANT.

5. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CLASS IV - UPON COMPLETION OF PROJECTS

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT & DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHn Y COVERED CONTAINERS.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.

5. WET MOP WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

ARCHITECT/ENGINEER OF RECORD STAMP � 0 :i ' F Ne: JAMES J. PETERS 0�

�LVA

'*,:,,Wi''i_�, 'Ji[ ,..,0"¾'1-l VETERANS AFF Al RS

Drawing Title

ABBREVIATIONS AND SYMBOLS,

ICRA ASSESSMENT

WEST POINT

ENGINEERS PLLC � 15 � �I.ii MEDICAL CENTER

�.X:<P ApproveiE--P,oject Director

1'

·-:;;;;;_z�--.,- 1 -

(502)890-2210 • WESTPOINTENGINEERS.COM

1941 BISHOP LANE SUITE 400 • LOUISVILLE, KY 40218

4 5

'o.e-... -... lA."�;,,.-y' t{,IJJ,,- If. IL,-../ I VA

U.S. Department of Veterans Affairs

<l

VERIFY IN FIELD

VENT THROUGH ROOF

VINYL WALL COVERING

WIDE OR WEST

WITH

WITHOUT

WARRANTY

WOOD BLOCKING

WATER CLOSET

WOOD

WALL GUARD

WALL HYDRANT

WIND LOAD

WATER METER

WITHOUT

WATERPROOFING

WAINSCOT

WELDED WIRE FABRIC

YARD

SYMBOLS

u

DETAIL NUMBER --

I I

SH�ETWhEREDRAWill J I I

F1

2'-0" " ' 1 1

TITLE

1/4" = 1'-0"

�0�

4----� "-../

I N

ROOM NAME

4' 8' 16' -----aD

NOTE:

THIS LEGEND IS COMPRISED OF

STANDARD SYMBOLS AND ABBREVIATIONS

AND APPLIES TO THIS SET OF DRAWINGS

TO THE EXTENT APPLICABLE.

CENTER LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

CONTRACT LIMIT LINE

EXISTING TO REMAIN LINE

HIDDEN FEATURES LINE

MATCHLINE

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION INDICATORS,

BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DIMENSION LINE

DRAWING BLOCK TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR,

MULTIPLE VIEW

ELEVATION INDICATOR, INTERIOR,

SINGLE VIEW

BUILDING SECTION INDICATOR

COLUMN GRID

NORTH ARROW

ROOM NAME AND NUMBER

GRAPHIC SCALE, ½"=1 '-0"

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

DOOR INDICATOR

WINDOW TYPE

Phase Project Tttle Project Number

100% BID DOCUMENTS

MODIFY SCI

Location JAMES J. PETERS VA MEDICAL CENTER

130 W KINGSBRIJCl': ROAD, BRONX, NY 10468

Issue Date

03-24-2025

Checked

BVG

Drawn ws

526-21-120 Building Number

Drawing Number

GI002

A

B

C

D

C

D

E

F

1 2 3 4 5 6

INFECTION AND DUST CONTROL PLAN LEGEND

NOTE: ALL SYM BOLS M AY NOT BE USED

EXISTING PARTITION TO

REMAIN

EXISTING PARTITION TO BE

REMOVED

EXISTING DOOR & FRAME TO BE

REMOVED

==I '== l@

EXISTING DOOR & FRAME TO

REMAIN

EXISTING DOOR. FRAME &

PARTITION TO BE REMOVED

KEYNOTE

WALK-OFF STICKY MAT

(4'-0" X 4'-0" MIN.) AREA NOT IN CONTRACT � ==

� r= :::=;f___

2 BED

ROOM -■■-

PROVIDE TEMPORARY INFECTION

CONTROL / DUST CONTROL

BARRIERS AT THIS LOCATION.

REMOVE AFTER CONSTRUCTION IS

COMPLETED.

FE e

CONTRACTOR PROVIDE FIRE

EXTINGUISHER - - �::;----- �

-a= r":'.'--"' r-

I I

½

�� -=-:::::==---�f-

,, I 10-104 I

SHARED

BATHROOM

" • • ', t.!I!'

• SCI· !DENT

. Cl:NTER.

JiP'l�I

E�i ,Ji!OOM l1D-104AI

-P -� _;:;:. r--

-� - >::------ ½ C \I

I\

"'° eoo, I\

::::; f--

\I

I \ ""

"""'"°' I

10\00 I \

=" ,c> >::----- � 1, , 1 ,.

1, '°,, Im

, 1

, r-- \I

I I eo I I Im M<eeoo,\\ �

\ I

C:, ----- ½ C

I I

I \ I I seAf<l'O eoo, I I -\OS I O•rn"" \\

I I \

\I

I \ , "8\ seMeo \ \ MrnSOOM I »uo I \ I .\ I I

Ws-. _ \ I.••

I I , , •••••• :;,,�··� \ ,. � / !, I

"°' \ \ I'""' I '°'"" \\ \ I \ j \..

'3' 1111!

\ SOO

'"""° \\ h 0\ ,e.

\ I

' ��1�tl'i�ct�o!::'li

' �g::o \ \ I '"' � I "

\I

I '

' I ''

BATHROOM 1

I \

.,-• "��I'<

I 1-0-,MI

\ I

•••• \ I

\ \ Cl�, AOL

\ -,\ ADL

KITCHEN

I \ BATHROOM

I 10-109 I

.. 00 HiJlll!l!JI!!!

c- ___

C.-coea,oo, 'd ' \ I --

I "" I

\.- -\ 11 D-109AI

\ \ I� J I

_j \ \ 'J.;_...t.---

I

----- I I

I ..

WJ ; �

if/, 1/Li· -

,.,- - IF,IMENT

S1'.0IWlE JijfJit I I 10-j:g I

' ' ...-7 \. ,{i) -------------

� �\ I t � .. \\ f\f\' of:_.DROO \ :

• DAY I"",\)\.. O

I

I I 10-114 I I \ ,,I"' � I

,CYSTOSCO!'Y'

\..��LG,) RooM \ 0u I\ St:- \ 1

I 1 ------ I

I ___ __...- )

L------

"' llu /

:/:S,'.''. •• •• ·111,;,1-, f:PVA i:lfftc, \n#�\�G ?\-\�s

c. CORRIDOR

I C1-30 I -- ____ ct.-

,✓ r -

�- r-::::: - _; 7t;. " -r,?'; :,;'£.

--·---:!!" •I •

._-�r-- 1' u. •

'STA� ..

ELEC

R, 110-153 I

• 1:1rum1·

----- raw�

---"' I""

P.\ V$1f""'\

CLEAN

I I 2 1-----

""°' -- \ I .. •••••••

� -----V/W/,1$,/i,\ I 1D-132 I

�':f. •• J. ).,' •• --�

----" ' P.\ VllflP""'.

I 3

1,.----4 C • a sw,e, I

I I r;,�_..,.-••-

I \ \ I �

BATHROOM I

\ I

II

I , '"''"

CORRIDOR

I C1-31 I

, \ 0 \\

I\

\ I ,a,o

'""" ' Se \ \

I\ �™'"" ,oo: \ \ ,,.,., ----' -"'4-, I I

�,•r� ......... r-\ I , , - \ SHAl{c:.U , , l1D-134A] - • ,_ ,, , \�\ • .\. ( 3 )-1 \ I BATHROOM I I \ I

\ \ l1D-130A] \ I I \

I I 2 BED I 1.-. I I

lFn12>12§Al] 1 \ I ROOM '-I \

• .. ,,,,, ..... , •. J I 2 BED \ \ l1D-130J \I

--� ROOM \I \ I r--- \ l1D-128I I I \ I

I \ ra"""'\.�.-=- = .. 41.•" . •• I I

I .= . , ..

SHARED I . - . � •• ..

ATHROOM

_l10-12sAI r -

�\ f" :t !l

\ re9t---0 • •

... -... l' ,.., STORAGE

110-1401

----�-�---- � - -I

I -- -

1 ENLARGED INFECTION CONTROL PARTIAL 1ST FLOOR PLAN D WING - PHASE 1 -t-

.GI003 118" = 1'-0"

I I I I

PMO

OJ£

.NURSe

.:&TATION

f 10:;1a I. .

� I s;t

::::i I 8 GI c3 !;:1

••• II'

=== r-------

2E

RO

SHARED

BATHROOM

l1E-102AI

DI

----7

I I

A-l-::i

• • 11 'WR ,l1!1 ICHAll:\r • t- - - -- 'tNS I

I I I

MECH

• SH. DA

SPl

CQ

INJURY

OUTPA'

Cl.IMC

CT

1�, 1� '··• . � -., '�

I

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP I q � 0 2 f Drawing Title

VA FORM 08 - 6231 1

Revisions: Date:

2 3 4

WEST P □ INT

ENGINEERS PLLC

(502)890-2210 • WESTPOINTENGINEERS.COM

1941 BISHOP LANE SUITE 400 • LOUISVILLE, KY 40218

f NE *L vA.

I * M-0.,; r li "'�

' 0875J\J -- �Ees�(

� ·11v

JAMES J. PETERS

VETERANS AFFAIRS

MEDICAL CENTER

-,-,A 1-u�S:-Department V � of Veterans Affairs

ENLARGED PARTIAL INFECTION CONTROL

FIRST FLOOR PLAN

Approvea: Project Director

8 9 10

GENERAL INFECTION CONTROL PLAN NOTES

FOR THE PURPOSE OF THE RENOVATION, THE CONSTRUCTION WORK IS CONSIDERED LOW RISK. THE DUST CONTROL PLAN SHALL BE DISTRIBUTED AND REVIEWED

BY ALL CONTRACTORS PERFORMING WORK ON THIS CONSTRUCTION PROJECT

A EXTERNAL DEMOLITION ANO CONSTRUCTION ACTIVITIES

I. DETERMINE If THE IMPACTED AREAS Of THE FACILITY CAN OPERATE

TEMPORARILY ON RECIRCULATED AIR: IF FEASIBLE SEAL Off

ADJACENT AIR INTAKES.

2. IF THIS IS NOT POSSIBLE OR PRACTICAL. CHECK THE LOW·EFFICIENCY

FILTER BANKS FREQUENTLY AND REPLACE AS NEEDED TO AVOID

BUILDUP OF PARTICULATE.

3. SEAL WINDOWS AND REDUCE WHEREVER POSSIBLE OTHER SOURCES

OF OUTSIDE AIR INTRUSION (OPEN DOORS IN STAIRWELLS AND

CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.

B. INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST ANO DEBRIS

CONTROL

1. BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT

REQUIRES. SMALL, SHORT DURATION PROJECTS GENERATING

MINIMAL DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD

BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2·FOOT

OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT

PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID,

DUST-PROOF, AND FIRE-RATED BARRIER WALLS (E.G., DRYWALL) WITH

CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING.

SEAL OFF AND BLOCK RETURN AIR VENTS IF RIGID BARRIERS ARE

USED FOR CONTAINMENT. LARGE DUSTY PROJECTS NEED AN ENTRY

VESTIBULE FOR CLOTHING CHANGES AND TOOL STORAGE AND TIGHT

SEALS SHOULD BE MAINTAINED AT THE FULL PERIMETER OF WALLS

AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST BARRIER

(MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE

RIGID IMPERVIOUS BARRIER IS BEING CONSTRUCTED. ANY DUST

SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE

CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION

PROJECT DUST BARRIERS SHALL BE REMOVED CAREFULLY TO

MINIMIZE SPREADING Of DUST AND THE CONTRACTOR SHALL HAVE

TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A

PERMANENT BARRIER. CONTRACTOR PERSONNEL SHALL MONITOR

AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE

SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST

EVIDENCED BY FOOTPRINTS, OPENED DOORSNRNDOWS EVIDENCED

BY PRESENCE OF INSECTS AND FLIES, WET CEILING TILES. ETC.

2. TRAFFIC CONTROL DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHOULD BE FREE OF DEBRIS:

DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED

TIMES; AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO

ENTER THE CONSTRUCTION ZONE SIGNAGE SHOULD DIRECT

PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA ANO

MATERIALS.

3. DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS. USING DESIGNATED TRAFFIC ROUTES.

EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHOULD BE REMOVED DAILY ANO AT TIMES SPECIFIED BY THE

VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH

EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR

MACHINES SHOULD BE USED, AND THE CHUTE OPENING SHOULD BE

SEALED WHEN NOT IN USE. Fil TERS SHOULD BE BAGGED AND SEALED

BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION AREA.

THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT·CARE

AREAS WITHOUT PRIOR APPROVAL OF THE VAMC.

4. EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

C. VENTILATION ANO ENVIRONMENTAL CONTROLS

I. AIR SYSTEM FLOW DETERMINE WHETHER THE CONSTRUCTION AREA

USES FRESH/OUTSIDE OR RECIRCULATED AIR; FILTERS SHOULD BE

ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER

MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS .

2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA

MUST BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND

WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE Of

THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO

REMOVE OUST SHOULD PASS AIR THROUGH AN INDUSTRIAL GRADE,

PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800

CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE

OUTSIDE If APPROVED BY VAMC. CONTRACTOR MUST EXHAUST AIR

TO THE OUTSIDE, A PRE·FIL TER AND HEPA FILTER SHOULD BE USED

BEFORE EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.

3. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

INTACT CEILING SHOULD BE VERIFIED DAILY

4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR W!Ll VERIFY AND MAINTAIN PROPER RATES IN CRITICAL

AREAS NEAR CONSTRUCTION ACTIVITY ANO ENSURE AIR IS NOT BEING

RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION

AREA ELSE'vVHERE. VAMC WILL MAKE DETERMINATION ON PROVIDING

FOR THE ACCOUNTABILITY AND FREQUENCY OF TESTING AIR

PRESSURE THROUGHOUT THE PROJECT

D. CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS

I. WORKSITE CLOTHING CONTRACTOR PERSONNEL CLOTHING SHOULD

BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE

CONSTRUCTION AREA IF PROTECTIVE APPAREL IS NOT WORN (E.G.,

COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM

SHOULD BE USED TO REMOVE OUST FROM CLOTHING BEFORE

LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE

CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR

CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA).

ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC.

TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE

FROM OUST ANO MOISTURE BY VACUUMING AND WET WIPING BEFORE

THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

2. CONTRACTOR CLEANING THE CONSTRUCTION ZONE SHOULD BE

MAINTAINED IN A CLEAN MANNER BY CONTRACTORS AND SWEPT OR

HEPA-VACUUMED DAILY OR MORE FREQUENTLY AS NEEDED TO

MINIMIZE DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE

CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE

FREQUENTLY AS NEEDED. WALK·OFF STICKY MATS WITH TACKY OR

ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING Of

HEAVY DIRT AND DUST FROM CONSTRUCTION AREAS.

E. INFECTION CONTROL ASSESSMENT SCREENING (ICAS):

THE CONTRACTOR WILL CONDUCT AN ICAS BEFORE THE START OF THE

CONSTRUCTION AND DEMOLITION ACTIVITIES. THE ICAS FOCUS WILL BE ON

POTENTIAL INFECTION CONTROL RISKS. THE CONTRACTOR WILL DOCUMENT ALL

FINDINGS AND REQUIRED CONTROL MEASURES IN THE ICRA LOG MAINTAINED BY

THE INFECTION CONTROL PLAN (ICP). THE CONTRACTOR WILL INTEGRATE

REQUIRED CONTROL MEASURES INTO THE CONSTRUCTION SPECIFICATIONS.

F. INFECTION CONTROL RISK ASSESSMENT CLASSIFICATION:

TYPE C-IV REFER TO INFECTION CONTROL RISK ASSESSMENT GUIDELINES AND

SHEET GI002 FOR DEFINITION Of TYPE OF CONSTRUCTION PROJECT ACTIVITY

('.C") ANO INFECTION CONTROL CONSTRUCTION PERMIT

FOR CLASS 1•1V') PRECAUTIONS.

0 INFECTION CONTROL PLAN KEY NOTES

Phase

100% BID DOCUMENTS

1. WALK-OFF STICKY MAT, INSTALL ON EACH SIDE OF ICRA BARRIER WALL ENTRANCE DOOR.

2. ICRA LEVEL IV HARDWALL WITH DOOR DUST BARRIER SYSTEM. BASIS OF DESIGN: STARC

ICRA IV BARRIER SYSTEM . INSTALL AT THE BEGINNING OF CONSTRUCTION AT EACH

AREA . COORDINATE WITH COR FOR AVAILABILITY OF ROOMS AND SEQUENCING. REMOVE

AT THE END OF CONSTRUCTION OF EACH AREA.

3. FIRE EXTINGUISHER PROVIDED BY CONTRACTOR TO BE LOCATED IN EACH ANTE ROOM

DURING CONSTRUCTION.

D '; ·,,, �c--

_L'"'" ____ ____-..., ,-.....___·� 1-� I

----. � I\ / / /--

J

\ I._ �" t

� 1, ' I.-'

I

L I -, ..--J'

----- J

L

Project Title

I

A' KEY PLAN

, NOT TO SCALE

MODIFY SCI

Location JAMES J. PETERS VA MEDICAL CENTER

130 W KNGSElflDQE FIOAD, BRONX, NY 10468

Issue Dafe

03-24-2025

Checked

BVG

Drawn ws

0-i- Project Number

526-21-120 Suilding Number

Drawing Number

GI003

A

B

C

D

C

D

E

F

I

I I

�RED I

IROOM I

104AI I

I I�

(") I � 01-0 .....I w Itw <(

(/) I �

2 3 4

--------1, = ��

I

I I

--- -,, -= c:,-._ �= �

II�' , ,

,.r-------c:<= -

I ' "' '"" , , --. �--'.o'= = -

5 6 7

INFECTION AND DUST CONTROL PLAN LEGEND

NOTE: ALL SYMBOLS MAY NOT BE USED

t, ='

EXISTING PARTITION TO

REMAIN

EXISTING PARTITION TO BE

REMOVED

EXISTING DOOR & FRAME TO BE

REMOVED

WALK-OFF STICKY MAT

(4'-0" X 4'-0" MIN.)

PROVIDE TEMPORARY INFECTION

CONTROL/ DUST CONTROL

BARRIERS AT THIS LOCATION.

REMOVE AFTER CONSTRUCTION IS

COMPLETED.

d'-=

/",., ==I '= =

FE e

EXISTING DOOR & FRAME TO

REMAIN

EXISTING DOOR, FRAME &

PARTITION TO BE REMOVED

KEYNOTE

AREA NOT IN CONTRACT

CONTRACTOR PROVIDE FIRE

EXTINGUISHER

: I, .. ___ _JI ·t1C.16

-" ,oo, , , '" -----z� ""' -r '°' I ' '

SH«eo , '"

,, a.rneoo, I '' eoo, ,, S "-:CC'>, acs_

' lae-,w, I ' , I"'" I ' '""'" " '"'° , , "

, ,r- -" --.. z-"°;' '¾ -

I

---i -= :co-...

I I I I

, OMSSOOM,, '"Mm , , ' , ' ,f' --C.' = =-

' I

' ,e,wJ,,a,rnsoo,, 1"i'?oo1 /' '"'° ,, /,' , ----,z� '¾_

I ----71 I

1/ " "·'"" , • • ' SOO,

.:::- "sacs -s " ------ --o ' •

I ,e.rn, , ' '°°' " '""'° '"'° , , IL Jl _ .. � � •• ..,. 7"''1:!';,-@. •• / ;c'Pt1/..,._ ___ ..., i

I I

••• """rneoOM ! "'°" , , ""' , ' , , rSOKEI? IEQUIP• .

�l:)'102

MEOS I

ROOM

o;o:10,1 I

IID!I •

OFFICE.

PMO

! 10-13 i

RE<$PTloN r 3ri'!4 t

OFFICE

1ili-?4AI l;!

�!!-, I� i' ,, , , • "' .... ' " '>t" '

I"·.,, I , , '°°' , , ' ' ' ' ' r-" -""-.,!I_ ll / • ' ' ' ' ' , · i,s-" I ' '""" ' ' • em ' ' f1E'1-Ss'j "" 0

Lr.-\1 ----

� •7 7"'07.

/Cflit,1/ ---, '

, '"·"",, ·,: .,o,J ' SOOM , , 2BED

1"=

"-I

1/

½ 1

2 It 2 ,-..,_-f.'1..,,}', Q I 3 I J

3 p It

I i1E-116 It

ROOM I

I

I Rmooe l1E 11s1

1 o

CO

HARE

-• ' " o

""" O r-"

,- ' t, ' 0 , f-32 I n1

I , ,,, 1,rnol ----_j L ' I , L.-!IL..½f�-�.., ........... , '1 ,r-lJ.l-.::..'.:_"'-,-fri

I , ,,;:;:,,ir,:,._,'f(�j , • •

OFFICE,

r 7

/ � "f 7"'07.�

, ...... ,.., 1 -4/1,J

I

•-a.oo,, 2 / /

I I "-·.'_, .. , .. ,i//' • IIEj I 7,S:,'71

1111 ·Jh::·01';�� , ',-, c

J i\.!;:J;

r--�

CORRIDOR

__, c.. _ _ _ Ma, I ,.- ·-: ··;!:�- •

""'''.:IL r,;;;;;.i_ Tl

I "·" I

I • •- .. ,C--

,.,c

1 • tr:,-: • •

I t

L.1£:� = •

- j 1f.im . SUPPLIES

EQUIPMEN

I

• --�li;l D� I 1E-115i w

. I

• ' � -.i

CORRIDO'

.. , I C1-29 I

II

--- • !1E-113I

· STORAGE

OFFICE

liE-•�l

-I :1 I I

I I• I I Ii

I

I

I

C'Jfih YJ:

C1 ·,'- .•

I i

.....I

II

LllllQTRfPTOR [1f32 1

!,TRETCHER

.EQUIPMENT

:f Je-[3 1

MEctMCAL

SHAFT

['1�1·

JE .. .... �

SPIIW.

(:OR!)

.INJURY

OOTPA11ENT

CLINIC

111,-01 I

).. .!.!i-•-· c:jllltt'J • lfilimt

I � _ _.::....::..:....__L__j

EXAM

WHEEL

.·CHAIR

STORAGE

BEiJil

ROOM:

113 •

116,:0ftl

ROOM

#2

I 1A-07B I

,��� P fi

RECREA

THERAPi Lifil ,RAM·· • ™ri;�i

EMEN ,,.,.::

G1

-- r. . .; .

/� d:

"I r-- --__--.'llii CLEAN

CORRIDOR

r---- -J ', ,

• I cm I

- ' I "-•�

/ ED .._,

, ••../. J..

l

OFFICE

pe-1?§1

�TOR

SlORC.

1 jl!-12

OllNICAL DfETITWi l 1E-123 I

I

/ l1E-134AI

/2

[,,"�/ / .............. F=f: I / � fli!I/JJ

I l ' ' if '---,-;,c , -;:-,-,,...,4 L,,.� l/-,1'~•-- , ,OeO , , ,1

''-'-••-> /4' \2r / / ,.._, .._, ........ "./.L/ o-o· --

- " , , , ' " ,rn

'O •

"°'' , '"'" ' rn n , ,, ooo

:1 ,,,_,�, ', , , I ,,_ •" '" mO " '""' I , "'"

- I/Jl!/JiJl.1 ---�.

- SiRooA,f PffAs • I I I

U '" '"' • eoo, , ' ,em

L -"" o

� ;ILET 1t , ' f',J ],e.,ai ,'' S�<

7--,,_,., •• i L

, ' 1 -,.,,. I •

VI ,,

, J,_.

I I /(11 I &

-• c_ , , ' , ,1 '---,_1, ..__

7,!Pi<:_ ------------�--~-"-a-,, •-, '

,, ,1 ''""'" l•

C , , , , ' soo,, "I "'°'"'°

•• --ece;;;-cd C

''!:"�,,', I'"" ' "'"" '

--�,-= C

0 "' ·

I l1E-171I

-- ¾CC;;;-;c, ,___ ·--,,e.-,M,,'

A

,.,,.._ __ --.J L.. I I.

. t!J �- ----'fl!i.l. �

• :!!!!ll!!,�-

.,,__""'rttiJ. .,� _,, � ,, b

STAIRS

I 7 I

PATIENT

COMPUTER

ROOM

I 1E-12d !

"1ECHANICAI.

EQUIPMENT

ROOM

11e:112 I

1 \ ENLARGED INFECTION CONTROL PARTIAL 1ST FLOOR PLAN (EWING) -PHASE 2 -z__

GI004/ 1/8" = 1'-D"

CONSULTANT

Revisions: Date:

ARCHITECT/ENGINEER OF RECORD

WEST POINT

ENGINEERS PLLC

(502)890-2210 'WESTPOINTENGINEERS.COM

1941 BISHOP LANE SUITE 400 • LOUISVILLE, KY 40218

STAMP I ! _,I;!�,; r i,,<"0, N/211, .� "".,,,..,...,..,.__i1...-

/0'· r I'--- / C> , (!l\-�

JAMES J. PETERS

VETERANS AFFAIRS

MEDICAL CENTER

VA

U.S. Department of Veterans Affairs

Drawing Title

ENLARGED PARTIAL INFECTION CONTROL

FIRST FLOOR PLAN

Appioved: Project Director

VA FORM 08 � 6231

1 2 3 4 5 6 7

8 9 10

GENERAL INFECTION CONTROL PLAN NOTES

FOR THE PURPOSE Of THE RENOVATION, THE CONSTRUCTION WORK IS CONSIOEREO LOW RISK. THE OUST CONTROL PLAN SHALL BE DISTRIBUTED AND REVIEWED

BY ALL CONTRACTORS PERFORMING WORK ON THIS CONSTRUCTION PROJECT.

A EXTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES

1. DETERMINE If THE IMPACTED AREAS OF THE FACILliY CAN OPERA TE

TEMPORARILY ON RECIRCULATED AIR; IF FEASIBLE SEAL OFF

ADJACENT AIR INTAKES.

2, IF THIS IS NOT POSSIBLE OR PRACTICAL, CHECK THE LOW-EFFICIENCY

FILTER BANKS FREQUENTLY AND REPLACE AS NEEDED TO AVOID

BUILDUP OF PARTICULATE.

3. SEAL 1/'i'INOOWS AND REDUCE Vv'HEREVER POSSIBLE OTHER SOURCES Of OUTSIDE AIR INTRUSION (OPEN DOORS IN ST.slRWELLS AND

CORRIDORS) ESPECIALLY IN PROTECTIVE ENVIRONMENT (PE) AREAS.

B. INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS

CONTROL

1. BARRIER SYSTEMS: THE AREA SHOULD BE ISOLATED, AS THE PROJECT

REQUIRES. SMALL, SHORT DURATION PROJECTS GENERATING

MINIMAL DUST MAY USE FIRE-RATED PLASTIC SHEETING, BUT SHOULD

BE SEALED AT FULL CEILING HEIGHT WITH AT LEAST 2-FOOT

OVERLAPPING FLAPS FOR ACCESS TO ENTRY. PROJECTS THAT

PRODUCE MODERATE TO HIGH LEVELS OF DUST REQUIRE RIGID,

DUST-PROOF, AND FIRE-RATED BARRIER WALLS (E.G., DRYWALL) WITH

CAULKED SEAMS FOR A TIGHT SEAL EXTENDING FLOOR TO CEILING.

SEAL Off AND BLOCK RETURN AIR VENTS If RIGID BARRIERS ARE

USED FOR CONTAINMENT. LARGE DUSTY PROJECTS NEED AN ENTRY

VESTIBULE FOR CLOTHING CHANGES AND TOOL STORAGE AND TIGHT

SEALS SHOULD BE MAINTAINED AT THE FULL PERIMETER OF WALLS

AND WALL PENETRATIONS. AN INTERIM PLASTIC DUST BARRIER

(MINIMUM 4-MIL) MAY BE REQUIRED TO PROTECT THE AREA WHILE THE

RIGID IMPERVIOUS BARRIER IS BEING CONSTRUCTED. ANY DUST

SHALL BE IMMEDIATELY CLEANED If TRACKED OUTSIDE OF THE

CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION

PROJECT DUST BARRIERS SHALL BE REMOVED CAREFULLY TO

MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE

TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A

PERMANENT BARRIER. CONTRACTOR PERSONNEL SHALL MONITOR

AND PERFORM BARRIER MAINTENANCE AND BE EDUCATED TO NOTICE

SIMPLE CLUES SUCH AS ACCUMULATIONS OF VISIBLE DUST

EVIDENCED BY FOOTPRINTS, OPENED DOORS/WINDOWS EVIDENCED

BY PRESENCE Of INSECTS AND FLIES, WET CEILING TILES, ETC.

2. TRAFFIC CONTROL DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHOULD BE FREE Of DEBRIS;

DESIGNATED ELEVATORS SHOULD BE USED DURING SCHEDULED

TIMES; AND ONLY AUTHORIZED PERSONNEL SHOULD BE ALLOWED TO

ENTER THE CONSTRUCTION ZONE SIGNAGE SHOULD DIRECT

PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA ANO

MATERIALS.

3. DEMOLITION DEBRIS: DEBRIS SHOULD BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS. USING DESIGNATED TRAFFIC ROUTES .

EFFORTS SHOULD BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHOULD BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE

VAMC. If CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH

EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR

MACHINES SHOULD BE USED, AND THE CHUTE OPENING SHOULD BE

SEALED WHEN NOT IN USE. Fil TERS SHOULD BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT Of THE CONSTRUCTION AREA.

THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE VAMC.

4. EXTERIOR WINDOWS: WINDOWS SHOULD BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

C. VENTILATION AND ENVIRONMENTAL CONTROLS

1. AIR SYSTEM FLOW: DETERMINE WHETHER THE CONSTRUCTION AREA

USES FRESH/OUTSIDE OR RECIRCULATED AIR; FILTERS SHOULD BE

ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER

MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.

2. NEGATIVE AIR PRESSURE THE AIR WITHIN THE CONSTRUCTION AREA

MUST BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND

WITH NO DISRUPTION Of AIR SYSTEMS OF ADJACENT AREAS. USE Of

THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO

REMOVE DUST SHOULD PASS AIR THROUGH AN INDUSTRIAL GRADE,

PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATES OF 300-800

CUBIC FEET PER MINUTE (FTJ/MIN). OR EXHAUST AIR DIRECTLY TO THE

OUTSIDE IF APPROVED BY VAMC. CONTRACTOR MUST EXHAUST AIR

TO THE OUTSIDE, A PRE-FILTER AND HEPA FILTER SHOULD BE USED

BEFORE EXHAUST TO PREVENT CONTAMINATION Of THE DUCTS.

3. ADJACENT AREAS: THE STATUS Of SEALED PENETRATIONS AND

INTACT CEILING SHOULD BE VERIFIED DAILY.

4. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS VAMC AND

CONTRACTOR WILL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL

AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE .'ilR IS NOT BEING

RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION

AREA ELSEWHERE. VAMC WILL MAKE DETERMINATION ON PROVIDING

FOR THE ACCOUNTABILITY AND FREQUENCY Of TESTING AIR

PRESSURE THROUGHOUT THE PROJECT

D CONTAMINATION Of PATIENT ROOMS, SUPPLIES. EQUIPMENT AND RELATED AREAS

1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHOULD

BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE

CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G ,

COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM

SHOULD BE USED TO REMOVE DUST FROM CLOTHING BEFORE

LEAi/iNG THE BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED THE

CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR

CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA)

ALL EQUIPMENT, TOOLS, TOOL CARTS, MATERIALS, ETC.

TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE

FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE

THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

2 CONTRACTOR CLEANING: THE CONSTRUCTION ZONE SHOULD BE

MAINTAINED IN A CLEAN MANNER BY CONTRACTORS fo.ND SWEPT OR

HEPA-VACUUMED DAILY OR MORE FREQUENTLY AS NEEDED TO

MINIMIZE DUST. ADJACENT AREAS THAT MAY BE IMPACTED BY THE

CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE

FREQUENTLY AS NEEDED. WALK-OFF STICKY MATS WITH TACKY OR

ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING Of

HEAW DIRT AND DUST FROM CONSTRUCTION AREAS.

E. INFECTION CONTROL ASSESSMENT SCREENING (ICAS):

THE CONTRACTOR WILL CONDUCT AN ICAS BEFORE THE START Of THE

CONSTRUCTION AND DEMOLITION ACTIVITIES. THE ICAS FOCUS WILL BE ON

POTENTIAL INFECTION CONTROL RISKS. THE CONTRACTOR WILL DOCUMENT ALL

FINDINGS AND REQUIRED CONTROL MEASURES IN THE ICRA LOG MAINTAINED BY

THE INFECTION CONTROL PLAN (ICP). THE CONTRACTOR WILL INTEGRATE

REQUIRED CONTROL MEASURES INTO THE CONSTRUCTION SPECIFICATIONS.

f. INFECTION CONTROL RISK ASSESSMENT CLASSIFICATION

TYPE C-IV. REFER TO INFECTION CONTROL RISK ASSESSMENT GUIDELINES AND

SHEET GIOD2 FOR DEFINITION Of TYPE OF CONSTRUCTION PROJECT ACTIVITY

{"C") AND INFECTION CONTROL CONSTRUCTION PERMIT

FOR CLASS ('IV") PRECAUTIONS.

0 INFECTION CONTROL PLAN KEY NOTES

Phase

100% BID DOCUMENTS

1. WALK-OFF STICKY MAT, INSTALL ON EACH SIDE OF ICRA BARRIER WALL ENTRANCE DOOR.

2. ICRA LEVEL IV HARDWALL WITH DOOR DUST BARRIER SYSTEM. BASIS OF DESIGN: ST ARC

ICRA IV BARRIER SYSTEM. INSTALL AT THE BEGINNING OF CONSTRUCTION AT EACH

AREA. COORDINATE WITH COR FOR AVAILABILITY OF ROOMS AND SEQUENCING. REMOVE

AT THE END OF CONSTRUCTION OF EACH AREA

3. FIRE EXTINGUISHER PROVIDED BY CONTRACTOR TO BE LOCATED IN EACH ANTE ROOM

DURING CONSTRUCTION.

ss ___ _________ E I_ �� __J_-----r- J f\ rJ r----1------ \' \, I ,----- \ 11 -------- \ r--' ' c--

,,, ,___,_ \ \ __ ...\ ---- -:J

~7__ ___ \ ___ .-r\ \..-------r-------- I

------ � -----._,..____._j

-----.. ____ '---.i---�

A

KEYPLAN

NOT TO SCALE

Project Title

MODIFY SCI

Location JAMES J. PETERS VA MEDICAL CENTER

130 W KINGSBRIOOE ROAD, BRONX. NY 10468

lssue-Oate

03-24-2025

Checked

BVG

Drawn ws

0-z__

Project Number 526-21-120

Building Number

Drawing Number

GI004

A

B

C

D

B

C

D

E

F

VA FORM 08 - 6231 1

2 3 4 5 6 7 8 9 10

GENERAL PHASING PLAN NOTES PHASING PLAN NOTES

COORDINATE WITH SCI FOR AVAILABILITY OF ROOMS AND SEQUENCING TO CONSTRUCT AROUND PATIENT OCCUPANCY AND PATIENT CARE.

A. REFER TO SHEET GI001 FOR LEGEND, ABBREVIATIONS, AND OTHER GENERAL NOTES RELATED TO THIS

PROJECT.

B. THIS SHALL SERVE AS A GENERAL GUIDELINE ONLY. UNLESS OTHERWISE DIRECTED BY THE VAMC COR, THE WORK DESCRIBED IN THIS CONTRACT IS TO BE PERFORMED BETWEEN THE HOURS OF 8:00 AM AND

4:30 PM DURING THE WEEKDAYS. WEEKENDS TO BE COORDINATED WITH THE VA.

C. CONSTRUCTION TRAFFIC THROUGH THE FACILITY SHALL BE COORDINATED WITH THE VAMC COR. ALL

CONSTRUCTION WORKERS, MATERIALS AND CLOTHING WILL BE TRANSPORTED THROUGH THE

HOSPITAL DUST FREE. ANY DUSTY, ODOROUS, OR WET MATERIALS SHALL BE TRANSPORTED IN SEALED

CLEAN BAGS. TRAFFIC ROUTES WILL BE AT THE DISCRETION OF THE VAMC COR.

D. PROTECT WORK DONE IN PRIOR PHASES.

E. COORDINATE TEMPORARY EGRESS OF BUILDINGS WITH VA.

F. ALLOW 10 DAYS FROM START TO FINISH FOR INSTALLATION OF POURED EPOXY FLOORS.

G. CONTRACTOR IS RESPONSIBLE FOR CLEANING EFFECTED AREAS AND HEPA FILTERS ACCORDING TO

HIPPA STANDARDS.

H. CONTRACTOR TO DISCUSS POSSIBLE STAGING AREA LOCATIONS WITH VA.

I. REFER TO AD-SERIES SHEETS FOR ARCHITECTURAL DEMOLITION AND NEW WORK PLANS.

J. REPLACE ALL CEILING TILES AT THE END OF EACH SHIFT. IF TILES CANNOT BE REPLACED COORDINATE WITH THE VA FOR DIRECTION, SOME AREAS MAY REQUIRE A 1-HOUR SEPARATION BETWEEN OCCUPIED

SPACES BECAUSE THIS MAY INTERRUPT SPRINKLER SERVICE.

PHASING PLAt,l LEGEND

NOTE: ALL SYMBOLS MAY NOT BE USED

ROOM BOUNDARY:

REMOVE INFECTION CONTROL I I

DUST CONTROL BARRIERS k I AFTER CONSTRUCTION IS • •

AREA NOT IN CONTRACT

COMPLETED.

D-WING PATIENT BATHROOM PHASE:

D -WING PATIENT BATHROOM PHASE CONSISTS OF APPLYING AN ICRA LEVEL IV ZIPPER DOOR DUST BARRIER SYSTEM WITH WALK-OFF STICKY MATS AT EACH PATIENT BEDROOM ENTRY, THE DEMOLITION OF EXISTING PATIENT BATHROOM DOORS. THE INSTALLATION OF NEW PATIENT BATHROOM DOORS WITH DOOR OPENING

DEVICES.

A REMOVE AND SALVAGE ALL PATIENT BATHROOM SLIDING DOORS, ASSOCIATED TRACK AND

HARDWARE, TURN OVER TO THE VA. PATCH AND REPAIR WALLS AND DOOR OPENING AS NEEDED.

PREP AREA TO RECEIVE NEW SLIDING DOORS AND NEW DOOR OPENING DEVICES.

B. INSTALL NEW PATIENT BATHROOM DOORS, ASSOCIATED TRACK WITH HARDWARE AND DOOR OPENING

DEVICES. PATCH AND PAINT WALLS TO MATCH EXISTING CONDITIONS.

ADL BEDROOM PHASE:

ADL BEDROOM PHASE CONSISTS OF APPL YING AN ICRA LEVEL IV ZIPPER DOOR DUST BARRIER SYSTEM WITH WALK-OFF STICKY MATS AT DOORS ENTERING 1D-114 DAY ROOM, 1D-109 AOL KITCHEN AND 1D-140 STORAGE FOR THE CREATION OF A NEW AOL BEDROOM WITHIN THE EXISTING DAY ROOM AND THE DEMOLITION

REQUIRED FOR THE NEW SPACE.

A. DEMO EXISTING AOL KITCHEN WALL TO RECEIVE NEW DOOR INTO NEW ADL BEDROOM.

B. REMOVE EXISTING SINK AND CASEWORK IN AREA OF NEW ADL BEDROOM TO BE RELOCATED IN

EXISTING DAY ROOM. COORDINATE EXISTING PLUMBING FOR RELOCATED SINK CONNECTION.

C. INSTALLATION OF NEW CONTINUOUSLY HINGED MANUALLY OPERATED PARTITION WALL SYSTEM.

DEMO AREA OF EXISTING DAY ROOM CEILING FOR THE CONSTRUCT OF NEW CEILING SOFFIT FOR

PARTITION WALL TRACK. INSTALL NEW 2 X 4 LIGHTS FOR ADL BEDROOM. CONSTRUCTION OF

PARTITION WALL CLOSET IN THE ADJACENT STORAGE ROOM. WALL FINISHES ON THE DAY ROOM SIDE TO MATCH ADJACENT EXISTING DAY ROOM WALLS. WALL FINISHES ON THE STORAGE ROOM SIDE TO

MATCH ADJACENT EXISTING STORAGE ROOM SIDE.

D. INSTALLATION OF NEW PATIENT LIFT SYSTEM. CONTRACTOR TO COORDINATE WITH COR FOR CONTRACTOR FURNISHED, CONTRACTOR INSTALLED (CFCI), BASIS OF DESIGN SUREHANDS 2810 L CEILING LIFT WITH TRAVERSE RAIL CEILING TRACK SYSTEM. COORDINATE SHOP DRAWINGS AND INSTALLATION WITH MANUFACTURER AND COR TO ENSURE FINAL INSTALLATION MEETS MANUFACTURER'S WARRANTY.

E-WING PATIENT BATHROOM PHASE:

E-WING PATIENT BATHROOM PHASE CONSISTS OF APPL YING AN ICRA LEVEL IV ZIPPER DOOR DUST BARRIER SYSTEM WITH WALK-OFF STICKY MATS AT EACH PATIENT BEDROOM ENTRY, THE DEMOLITION OF EXISTING PATIENT BATHROOM DOORS AND THE REMOVAL OF THE PATIENT BATHROOM SINKS WITH VANITIES. THE INSTALLATION OF NEW PATIENT BATHROOM DOORS WITH DOOR OPENING DEVICES. THE INSTALLATION OF NEW PATIENT BATHROOM LAVATORIES WITH VANITIES AT A LOWER LEVEL. THE RELOCATION OF THE EXISTING

PATIENT TOILETS FOR A NEW PLUMBING BUMP-OUT.

A. REMOVE AND SALVAGE ALL PATIENT BATHROOM SLIDING DOORS, ASSOCIATED TRACK AND HARDWARE, TURN OVER TO THE VA. PATCH AND REPAIR WALLS AND DOOR OPENING AS NEEDED. PREP AREA TO

RECEIVE NEW DOORS AND NEW AUTO DOOR OPENERS.

B. REMOVE THE EXISTING PATIENT BATHROOM LAVATORIES WITH VANITIES. REMOVE PATIENT BATHROOM TILE AS REQUIRED FOR THE NEW LOWER HEIGHT LAVATORIES WITH VANITIES. RELOCATION OF EXISTING ASSOCIATED WATER AND DRAIN PIPES. PATCH AND REPAIR WALLS AND TILE. PREP AREA TO RECEIVE NEW LAVATORY WITH VANITY AT NEW HEIGHT PER ELEVATION SHOWN ON SHEET AE1D2.

C. REMOVE AND SALVAGE EXISTING SOAP DISPENSER OVER PATIENT BATHROOM VANITY THAT IS TO BE LOWERED. PATCH, REPAIR AND REPLACE ANY TILE THAT IS DAMAGED DURING REMOVAL. PREP AREA

TO RECEIVE RELOCATED SOAP DISPENSER.

D. REMOVE EXISTING PATIENT TOILETS. PATCH, REPAIR AND REPLACE ANY TILE THAT IS DAMAGED DURING REMOVAL. RELOCATION OF EXISTING ASSOCIATED WATER AND DRAIN PIPES. PREP AREA TO

RECEIVE NEW BUMP-OUT AND RELOCATED TOILET, REFER TO AE103.

E. INSTALL NEW PATIENT BATHROOM DOORS, ASSOCIATED TRACK WITH HARDWARE AND DOOR OPENING

DEVICES. PATCH AND PAINT WALLS TO MATCH EXISTING CONDITIONS.

F. INSTALL NEW LAVATORIES WITH VANITIES AT NEW HEIGHT PER ELEVATION SHOWN ON AE102. ATTACH RELOCATED WATER AND DRAIN PIPES. REPLACE ANY WALL TILES THAT HAVE BEEN DAMAGED DURING

REMOVE OR INSTALL.

G. INSTALL EXISTING SOAP DISPENSER OVER PATIENT BATHROOM VANITY AT NEW HEIGHT PER ELEVATION SHOWN ON AE102. REPLACE ANY SOAP DISPENSER THAT HAS BEEN DAMAGED DURING

REMOVAL OR INSTALLATION.

H. CONSTRUCT NEW BUMP-OUT WITH WALL TILE AND EDGING TO MATCH EXISTING D-WING TOILET BUMP-OUTS, RELOCATED WATER AND DRAIN PIPES, REFER TO AE103. RELOCATE EXISTING TOILET TO NEW LOCATION. IF TOILET IS DAMAGED THE CONTRACTOR IS TO REPLACE WITH NEW MATCHING

MODEL.

RESTROOM PHASE:

RESTROOM PHASE CONSISTS OF APPLYING AN ICRA LEVEL IV ZIPPER DOOR DUST BARRIER SYSTEM WITH WALK-OFF STICKY MATS AT LOCKER ROOM 1E-124, THE DEMOLITION OF THE EXISTING SHOWER STALL, SINK AND VANITY. THE INSTALLATION OF A NEW RESTROOM WITH A NEW TOILET AND NEW WALL HUNG SINK WITH

NEW BATHROOM ACCESSORIES. REFER TO SHEETS AE103 AND AE202.

A. REMOVE EXISTING SHOWER STALL AND ALL ASSOCIATED SHOWER PIPING AND FLOOR DRAIN. DEMO EXISTING WING WALL, REFER TO SHEET AD103. RECESSED FLOOR AND DEMO FLOOR TO BE INFILLED WITH CONCRETE, SLOPE TO MATCH EXISTING. PATCH AND REPAIR FLOOR, WALLS AND CEILING AND

PREP TO RECEIVE NEW WORK.

B. REMOVE THE EXISTING LAVATORY, VANITY, MIRROR, SOAP AND PAPER TOWEL DISPENSERS, ROBE

HOOK AND ANY OTHER WALL MOUNTED ACCESSORIES. REMOVE TILE AS REQUIRED FOR THE

PLACEMENT OF THE NEW TOILET AND NEW WALL HUNG LAVATORY. RELOCATION OF EXISTING

ASSOCIATED PIPES AND DRAINS FOR NEW FIXTURES. PREP AREA TO RECEIVE NEW WORK, REFER TO

SHEET AE202 FOR MOUNTING HEIGHTS AND LOCATIONS OF NEW WALL MOUNTED ACCESSORIES.

C. PATCH, PAINT AND PREP WALLS AND CEILING TO RECEIVE NEW PAINT WALL TILE. NEW WALL TILE AND

ALL PAINTED SURFACES TO MATCH EXISTING.

D. FLOOR TO BE FINISHED WITH RESINOUS FLOORING TO MATCH EXISTING, NEW BASE TO BE RESINOUS

BASE TO MATCH EXISTING.

---1

-------"'-Ir=------- 1 1:-- • f

- I I

I' :----=------�.:._-, -��. 1 r - _ -....'-.>Ii, I

! J ---, .._ce-;..

------"'-. I I r--

,1

--------'\.., II

I I

- f -- I I

I I

. ------"'-. I I 1\ ' ' r-- \I

\ I \I

. ------"'-1 \\ I I

I I

. ------"'-.f I I

I I \

II

I I j'

__ -:c-----,J \\ I I

\\ I '

I r- ,, \\ " \\ ,, ,-- c----

\1 \I

11 \

,1

I I I I

I I , \ I _J

I I

I I J\..---i.

J 1..----

\I \ I 1--- \...----- -------

,, 1\

\ I \I

11 _,.I

I I J\..---i.

J 1..

1 1 --- \. ---

1 I I I ,.I _....-, I J

1..

c.£'

,._ ----- '\ D-\N\�G �'r\f>.-Q \

Revisions:

___ , r- 'L.---� ,-- I I

I

\ I I

----i. __ 1 'I I

_-,.-- I I \ I

,- 11 1' \

I

,I 11

\ I

• I

. 11 \ 11 11

. 11 11

11 11

1\ 11 1\

I I � I I

I I I \ I

I

� •k C °"'

\ I I _ _.l1 ��, • • • •

�t:.

F1 ) FIRST FLOOR PHASING PLAN

NOT TO SCALE

CONSULTANT

Date:

2 3

I.,. i I

I __________ _-

I

.J

\ \:;-c �f_DROO"J:�-��-i

I \ r,\.J _....--------

I

I ,..------ I

J

I

I c:::;::...

1..-------- ----=Fl

\...�l� •r

I

I I I I '"I

ARCHITECT/ENGINEER OF RECORD

WEST P □.,I NT

ENGINEERS PLLC

(502)890-2210 * WESTPOINTENGINEERS.COM

1941 BISHOP LANE SUITE 400 • LOUISVILLE, KY 40218

STAMP 1�02�

oF Ne11, (/, 't·' \;1E.L V,i-1, 0 (;-

• 0* -� ''- . ,, Ir -- "- ""'·" , - . - ¾� \�

'p

-�◊,:-..._ 'IV""\�"#

·.'fl' i

, , 1,-r----=---,, ,, I/ I/

-, ,J----�--c"O-.

, , /J

/ J 1,.r----�-

J

I t J

It t1

-,,r --.;_--

,, ,, I ,, ,, ,, ,,;-----=~

L

----.1 ,__ __ • r--

_ -11. _ _ 1, -, ,r --� __

- ---.J -, , , I.. ,, -----1,__ r---

-1L_

, , 1

---J --7 ,, JAMES J, PETERS

VETERANS AFFAIRS

MEDICAL CENTER

VA

U.S. Department of Veterans Affairs

Drawing Title

I

-�I r-----

I i, I.._ I / It

I/ -----1 l. r----lL

I J

I r----�---- - - - J -7 /

I ----t

' r--__ _

_J£-W1NGpHAs[7 '-----Jl_

'lfi I

I r---J , , -7

" L r-----

1 // ---;r---J fr-----7 -,✓-J/REsrRo_ O'fvJ

IJ

I I It ,...._ -----�

/ /,' /; --�c--

!C I I I,'

1 1

) ,' j

l. ,, //

��""" 1 -- ,, �-"""-----I' 1 , , ,', • � -.;;;._---1 L ,._l I h

Phase

I I-

,,,,JJ

-.,,_ _, iLL... �

Project Title iI

FIRST FLOOR PHASING PLAN 100% BID DOCUMENTS MODIFY SCI

Approved: Project Director

7 8

Location JAMES J. PETERS VA MEDICAL CENTER

130 W KINGSEIAIJGE ROAD, BRONX, NY 10468

Issue Date

03-24-2025

Checked

BVG

Drawn

AB

Project Number 526-21-120

Building Number

Drawing Number

GI005

A

B

C

D

A I

C

D

E

F

VA FORM 08-6231

1 2 3 4

LIFE SAFETY PLAN LEGEND

NOTE: All SYMBOLS MAY NOT BE USED

= FEC i FIRE EXTINGUISHER CABINET/ FIRE EXTINGUISHER' -

I EXIT SIGN

Ii HE I HORIZONTAL EXIT

� - - - • I EGRESS PATH (COMMON PATH)

tf I EMERGENCY BATTERY WALL PACK LIGHT

LIFE SAFETY LINE TYPES

----<i♦�s---

++-rn- - -

+-3:i- - -sw--

- - --<♦• SR--- -

MEANS OF EGRESS

NO, OF EXITS PROVIDED

LEVEL 1

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

FIRE-RATED, FIRE BARRIER LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 30 MIN

NON-RATED, SUITE LINE, (SMOKE RESISTIVE)

NON-RATED SMOKE RESISTIVE

NOTE:

All SYMBOLS MAY NOT BE USED EXISTING

RATED WALLS SHOWN AS HALF-TONE

7 8

BUILDING CODE AND GUIDELINES

AMERICAN SOCIETY OF HEATING, REFRIGERATING, AND AIR-CONDITIONING ENGINEERS (ASHRAE)

170 VENTILATION OF HEALTH CARE FACILITIES 2021

ASH RAE 62, 1 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY 2022

CODE OF FEDERAL REGULATIONS (CFR), TITLE 40, AUGUST 2023

DEPARTMENT OF VETERANS AFFAIRS (DVA) NATIONAL CAD STANDARD APPLICATION GUIDE

INTERNATIONAL BUILOING CODE, 2024

INTERNATIONAL CODE COUNCIL, INTERNATIONAL CODES, STANDARDS, GUIDELINES, 2023

INTERNATIONAL MECHANICAL CODE - 2021 EDITION

INTERNATIONAL PLUMBING CODE - 2011 EOITION

NATIONAL ELECTRICAL CODE (NEC), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 70 - 2023

NFPA 1 FIRE CODE - 2024, NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS - 2022, NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS - 2022, NFPA 72 NATIONAL FIRE ALARM AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .