This is a revised Statement of Work (SOW) for renovation and modification of the Spinal Cord Injury (SCI) Unit in Wing 1E of the James J. Peters Veterans Affairs Medical Center located at 130 West Kingsbridge Road, Bronx, New York 10468. The contract number is 526-21-120, and work is expected to be completed within 400 calendar days following receipt of the Notice to Proceed. The project requires compliance with design drawings developed by West Point Engineers and adherence to Paralyzed Veterans of America (PVA) standards, SCI/Disorder (SCI/D) specifications, and Americans with Disabilities Act (ADA) accessibility guidelines. All trade work must be performed by certified professionals (master plumbers, master electricians, etc.) in 8-hour increments to maintain fire safety standards, with contractors required to follow FDNY protocols and provide dust protection plans. Work is not considered complete until a sanitation ticket for construction debris is provided, and no wiring, pipes, or debris may be abandoned.

The specific scope includes: modification of 24 patient bathroom doors to automatic power-operated systems; installation of 12 toilet bump-outs; lowering and modification of 11 vanity sinks by 6 inches; renovation of Activities for Daily Living (ADL) space to include a bedroom; and conversion of Shower Room 1E-124B into a fully functional bathroom with toilet facilities. An amended scope adds two items under an $80,000 "Add Allowance" for Line Item II: investigation and repair of a bathroom drainage issue in Room 1D-138 including potential pipe replacement and installation of a Stryker Sage Traptex Plumbing Protection System, and investigation and modification of the 1E Staff Locker Room 1E-124 to add toilet facilities through selective demolition and ceiling modification. The contractor is subject to inspection by the VA Contracting Officer's Representative (COR/POC) upon completion, with no invoices processed until inspection approval. Any work not expressly authorized or modifications not approved in writing by the contracting officer will be considered inclusive with no additional compensation.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (REVISED) James J Peters Veterans Affairs Medical Center

Modify SCI for Negative Pressure and PVA Corrections 526-21- 120

Note: Revisions, including additions to this SOW are highlighted yellow below:

Background: The Main Building, of the James J. Peters Veterans Affairs Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468, is currently seeking modification and renovation of our Spinal Cord Injury Suite. This work involves following the 100% stamped design drawings provided by the Architectural Firm West Point Engineers. This work will include a modification of the existing wing 1E to include provisions that follow ADA guidelines, PVA standards, and SCI/D specifications.

The intention is for the contractor to perform all work necessary to renovate patient bathrooms and Activities for Daily Living (ADL) spaces to meet current accessibility and usability standards. All work shall be executed in accordance with the architectural drawings, design narratives, and specifications prepared by the architectural firm.

All trade work must be done by a certified master plumber, master electrician, etc. and work must be completed in 8-hour increments to ensure fire safety standards. FDNY fire safety protocols must be followed, and the contractor is responsible for creating a protection plan for dust protection for pedestrians and office workers.

Work is not considered complete unless a sanitation ticket is provided for the construction debris.

No wiring, pipes, or construction debris is to be left abandoned.

2 2/10/2026 A. Scope of Work:

Project Overview

This project involves renovations of the Spinal Cord Injury (SCI) Unit located in the 1E-Wing of the James J Peters Medical Center. The work is focused on increasing compliance with the Paralyzed Veterans of America (PVA) guidelines, Spinal Cord Injury/Disorder (SCI/D) requirements, and Americans with Disabilities Act (ADA) standards. The previously awarded AE firm has completed design development based on site visits and a stamped schematic design review. Any numbers provided in the scope of work below are an estimate, but the final numbers to be constructed and completed are in the design drawings.

1. Specific Scope of Work

The renovation work includes, but is not limited to, the following:

Bathroom Door Modifications

• Modify a total of 24 patient bathroom doors located in the 1E-Wing to be automatic, low-energy, power-operated doors.

• Door systems must comply with PVA, SCI/D, and ADA accessibility standards.

• Installation shall follow the door types and hardware as detailed in the architectural design documents.

Toilet Bump-Out Installations

• Install 12 toilet bump-outs in designated 1E-Wing patient bathrooms, per the architectural design specifications.

• Bump-outs must be constructed to meet accessibility clearances and maneuvering space per PVA, SCI/D, and ADA standards.

Vanity Sink Modifications

• Lower and modify 11 patient vanity sinks in select 1E-Wing bathrooms of the SCI Center by 6 inches, as identified in the design documents.

• Modified sinks must meet reach and usability standards in accordance with ADA and PVA requirements.

Activities for Daily Living (ADL) Space Renovation

• Modify existing ADL space to include a bedroom, compliant with the functional needs of SCI/D patients.

• Design must follow the architectural layout provided and applicable accessibility codes.

Shower Room Conversion

• Convert Shower Room 1E-124B into a fully functional bathroom with toilet facilities, as added in the schematic design modification.

• Plumbing, finishes, and fixtures shall be installed per design documents. Plumbing work to be done by certified master plumbers.

3 2/10/2026

2. Design Coordination and Compliance

• The Architectural firm has performed a total of four (4) site visits to inform design development, including one general investigation and one electrical follow-up.

• Contractor must follow all design drawings, narratives, and specifications exactly as provided. Clarifying questions or small-scale changes must be agreed upon by the AE and must not incur any additional cost.

• No substitutions or deviations shall be made without written approval from the Contracting Officer, Contracting Officer’s Representative, or the Architect Firm.

3. Applicable Standards

All modifications must be fully compliant with the following standards and guidelines:

• Paralyzed Veterans of America (PVA) Design Standards

• Spinal Cord Injury/Disorder (SCI/D) Design Recommendations

• Americans with Disabilities Act (ADA) Accessibility Guidelines

• Federal building and health codes

B. Safety Requirements

The Contracting Officer or his/her designee will notify the contractor of any noncompliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all and any part of the work and hold the Contractor in default.

C. Period of Performance

A period of performance is required for the specific work done. The work shall take 400 calendar days following the receipt of the NTP.

D. Place of performance

The site for the work to be performed will be the Main building (Building 100) Wing 1E in the James J Peters Veterans Affairs Medical Center.

E. Inspection

If inspection services are required for equipment or a performed task, then an inspection shall be done by the VA COR/POC upon completion. Upon completion of the maintenance service, the COR/POC will perform the inspection in the presence of the contractor

4 2/10/2026 personnel, prior to the contractor personnel leaving the facility. This inspection will ensure that all equipment is returned to full-functioning conditions. No invoices will be processed for payment prior to the completion of POC inspection. If the service is routine and/or performance based, then inspections may not occur for every service date but may occur periodically as part of a Quality Assurance Surveillance Plan (QASP). If this is the case, then a QASP will need to be provided as a separate document.

F. Drawings, and Other Attachments

See attached AE drawings.

G. Government Furnished Property

N/A

H. Other Related Services (Not Included in the Scope of Work)

Any services not expressly stated in this statement of work are not authorized. Services such as inspection, Original Equipment Manufacturer (OEM) required maintenance, or other maintenance and repair vital to the continued functioning of the systems may be added only after written modification from the contracting officer, unless they are inclusive to the requested services. No other person, including the COR or any other VA personnel are authorized to request additional work be performed by the contractor. Any additional services performed that are not authorized by the contracting officer will be considered inclusive.

NOTE: ADDED SCOPE AS PER THIS AMENDMENT IS DESCRIBED BELOW:

1. Contractor shall investigate existing issue with bathroom located in 1D area, Room

1D-138 Restroom. Work will include snaking the existing line, using camera device to investigate whether piping is intact, needs replacement, and or locate obstruction and make repairs to ensure that the bathroom toilet is functional and free of obstruction. Work may include replacement of piping that connects to main. Contractor shall install a Stryker Sage Traptex Plumbing Protection System device to prevent non-flushable items from entering the pipes, causing clogs. (https://www.stryker.com/us/en/sage/products/sage-traptex.html)

2. Contractor shall investigate modifying and extending the 1E Staff Locker Room, 1E-124 to include a toilet. Work will include selective demolition of corridor wall (sheetrock), modification of ceiling grid and light fixtures) Currently, there is a shower stall and sink in this Locker area restroom. Using service requests a toilet for staff use. See below photos of existing Locker Room:

https://www.stryker.com/us/en/sage/products/sage-traptex.html

5 2/10/2026

6 2/10/2026

The anticipated cost for this additional work will be included as an “Add Allowance” of $80,000.00 for Line Item II of the revised Bid Sheet provided as an attachment to this amendment.

3. This additional work is not included in the design drawings or specifications provided for the solicitation. Contractors are encouraged to bid accordingly.

END OF SECTION