525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf

PDF 30 KB Posted

Attached to
Repair, Upgrade, and Motorization of Two Existing JIB Cranes
Solicitation number
ITB 25-073
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This document is a State of Florida Department of Transportation (FDOT) Program Management LAP Certification of Current Capacity form, specifically a two-page template designed for pre-qualified FDOT contractors to verify their current contract capacity and uncompleted work status. The form requires contractors to certify that their proposed bid does not exceed their maximum capacity rating by detailing their total uncompleted work. The certification follows specific timing rules: if the letting is before the 25th of the month, it reflects uncompleted work as of the 15th of the preceding month; if after the 25th, it reflects work in progress as of the 15th of the current month. All new contracts and subcontracts awarded within five days of the letting date must be included and counted against the total rating.

The document provides a structured "Status of Contracts on Hand" worksheet where contractors must comprehensively list all current projects, including owner details, contract amounts, subcontracted amounts, and remaining work to be completed, both as a prime and subcontractor. The form requires precise financial reporting, with amounts rounded to the nearest $100. Contractors may consolidate smaller contracts that individually do not exceed 3% of their total work and collectively represent less than 20% of their total contract value. The form is marked as confidential under Chapter 337.14(1) of Florida Statutes and is designed to provide FDOT with a transparent view of a contractor's current workload and capacity.

View the file

Other files

File Type Posted
Repair,_Upgrade,_and_Motorization_of_Two_Existing_JIB_Cranes.pdf PDF
[B]_Local_MBE_Form.pdf PDF
BABA_Form.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
287.138_Affidavit.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
North_and_South_JIB_Everythingv2.pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
Human_Trafficking_Affidavit_.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
Notice_of_Award.docx DOCX document
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
E-Verify_Affidavit.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
North_and_South_JIB_Crane_Rebuild.xlsx XLSX spreadsheet
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
2_CFR_Part_200_app_II_(up_to_date_as_of_4-28-2025).pdf PDF
w37503083_(3).docx DOCX document
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

525-010-46

09/20

STATE OF FLOR DA DEPARTMENT OF TRANSPORTATION

PROGRAM MANAGEMENT LAP CERTIFICATION OF CURRENT CAPACITY

CONFIDENTIAL per Ch 337.14(1) F.S.

Fill in your FDOT Vendor Number For bids to be received on

(Letting Date) VF

(Only applicable to FDOT pre-qualified contractors)

CERTIFICATE

I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).

The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $

I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:

1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.

2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.

3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.

I certify that the information above is correct. NAME OF FIRM

Sworn to and subscribed this of , 20 day By:

Title

525-010-46

PROGRAM MANAGEMENT

STATUS OF CONTRACTS ON HAND 09/20

(Furnish complete information about all your contracts, whether prime or subcontracts;

whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)

1 2 3 4 5 6

PROJECTS

OWNER, LOCATION AND DESCRIPTION

CONTRACT (OR

SUBCONTRACT)

AMOUNT

AMOUNT

SUBLET

TO OTHERS

BALANCE OF

CONTRACT

AMOUNT

UNCOMPLETED AMOUNT TO BE DONE

BY YOU

AS PRIME

CONTRACTOR

AS

SUBCONTRACTOR

NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.

TOTALS $0.00 $0.00

TOTAL UNCOMPLETED WORK ON

HAND TO BE DONE BY YOU

(TOTAL COLUMNS 5 AND 6)

$0.00

File details come from the government source that posted it. Updated .