525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf

PDF 30 KB Posted

Attached to
ROWTP Production Wellfield Expansion, Grant Funded
Solicitation number
RSQ 25-083
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This document is a Florida Department of Transportation (FDOT) Program Management LAP Certification of Current Capacity form, which is a confidential document per Chapter 337.14(1) of Florida Statutes. The form is designed for FDOT pre-qualified contractors to certify their current contracting capacity before participating in a bid letting. Contractors must complete this two-page document, which includes a certificate attesting that their proposed bid does not exceed their current capacity rating and a detailed "Status of Contracts on Hand" report that inventories all existing and awarded contracts.

The form requires precise documentation of the contractor's existing contract portfolio, with specific instructions for calculating uncompleted work based on the letting date. Contractors must list all projects, including prime and subcontracts, showing contract amounts, amounts sublet to others, balance of contract amounts, and uncompleted work to be performed. The document provides guidelines for consolidating smaller contracts and requires amounts to be rounded to the nearest $100. While the specific example form is blank, it serves as a critical financial transparency mechanism for contractors bidding on FDOT projects, ensuring they have sufficient capacity to undertake new work.

View the file

Other files

File Type Posted
ROWTP_Production_Wellfield_Expansion,_Grant_Funded_(Addendum_#2_Revision).pdf PDF
ROWTP_Production_Wellfield_Expansion,_Grant_Funded.pdf PDF
[D]_Byrd_Anti-LobbyingCertification.pdf PDF
[X]_DRAFT_CONTRACT-ROWTP-Production-Wellfield-Expansion-Grant-Funded_(2).pdf PDF
Local_MBE_Form.pdf PDF
287.138_Affidavit.pdf PDF
[A]_Local_Preference_Affidavit_(7)_(1).pdf PDF
Human_Trafficking_Affidavit_.pdf PDF
E-Verify_Affidavit.pdf PDF
2_CFR_Part_200_app_II_(up_to_date_as_of_4-28-2025).pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
BABA_Form.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
Notice_of_Award.docx DOCX document
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
Local_Preference_Affidavit.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
w37503083_(3).docx DOCX document
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

525-010-46

09/20

STATE OF FLOR DA DEPARTMENT OF TRANSPORTATION

PROGRAM MANAGEMENT LAP CERTIFICATION OF CURRENT CAPACITY

CONFIDENTIAL per Ch 337.14(1) F.S.

Fill in your FDOT Vendor Number For bids to be received on

(Letting Date) VF

(Only applicable to FDOT pre-qualified contractors)

CERTIFICATE

I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).

The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $

I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:

1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.

2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.

3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.

I certify that the information above is correct. NAME OF FIRM

Sworn to and subscribed this of , 20 day By:

Title

525-010-46

PROGRAM MANAGEMENT

STATUS OF CONTRACTS ON HAND 09/20

(Furnish complete information about all your contracts, whether prime or subcontracts;

whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)

1 2 3 4 5 6

PROJECTS

OWNER, LOCATION AND DESCRIPTION

CONTRACT (OR

SUBCONTRACT)

AMOUNT

AMOUNT

SUBLET

TO OTHERS

BALANCE OF

CONTRACT

AMOUNT

UNCOMPLETED AMOUNT TO BE DONE

BY YOU

AS PRIME

CONTRACTOR

AS

SUBCONTRACTOR

NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.

TOTALS $0.00 $0.00

TOTAL UNCOMPLETED WORK ON

HAND TO BE DONE BY YOU

(TOTAL COLUMNS 5 AND 6)

$0.00