154-WPC_593_303_1_-_A.pdf
PDF 143 KB Posted
- Solicitation number
- 52050PR260000256
About this file
This document is a technical drawing for a Fast Response Cutter Sewage Control System prepared by the Office of Naval Engineering. The drawing depicts two schematic diagrams showing the system's piping and component layout: the forward auxiliary space (3-3-D-E) and the generator room (3-36-D-E).
The primary system component is the vacuum collecting unit panel, which serves as the central collection point for the sewage system. The diagram illustrates multiple connections from various sources flowing into this main panel, including discharge lines from different compartments. Oil drain and collection boxes are shown connected to the system via designated piping routes. The system includes loader connections positioned at multiple points to facilitate maintenance and operational needs. The design incorporates vacuum pump installations (noted as "D-32-D-F-28") that support the system's operational requirements. Component specifications reference documentation standards (USC REF-6) and include detailed notations for pipe routing, valve placement, and structural integration points. The schematic layout demonstrates the interconnected nature of the sewage management system across multiple ship spaces, with clear identification of connection points and component relationships necessary for proper system functionality and maintenance access.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .