SOW BLACKTIP Engine Room CO2 Galley APC Inspections.pdf

PDF 115 KB Posted

Attached to
52000QR260000304 USCGC BLACKTIP ENGINE ROOM CO2 AND GALLEY APC INSPECTION
Solicitation number
52000QR260000304
Issued by

About this file

This Statement of Work (SOW) details the inspection, testing, and recertification requirements for the U.S. Coast Guard Cutter BLACKTIP's Engine Room CO2 and Galley APC Systems. The work must be performed by trained personnel and comply with specific Coast Guard MPC references, including system inspections for the Engine Room CO2 and Galley APC systems. Additional requirements include cleaning the Galley Hood vent system to remove all grease, oil, and debris buildup from the ducting.

The performance period is requested for 24-28 November 2025, with the work to be conducted onboard CGC BLACKTIP located at 180 Meals Avenue in Valdez, Alaska. The Cutter Point of Contact is EMC David Leahy (Engineer Petty Officer), and the Contracting Officer Technical Representative (COR) is Jason Devin. Contractors must have trained personnel and follow the specified Coast Guard guidelines for system inspection, testing, and recertification.

View the file

Other files

File Type Posted
DC_R-S-8844.pdf PDF
DC_R-S-1646.pdf PDF
87-WPB_N33005.D.pdf PDF
DC_R-S-1570.pdf PDF
Smart Matrix SAP CM FFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) For the inspection, testing and recertification of CGC BLACKTIP’s Engine Room CO2 & Galley APC

Systems

1. Background and Current Observed Issues

CGC BLACKTIP is requesting inspection, testing and recertification of their Engine Room CO2 & Galley APC Systems.

2. REFERENCES

CG MPC N33005.D, Tractor Fire System CG MPC R-S-1570, Installed Fixed CO2 System CG MPC R-S-1646, CO2 Flooding System Pressure Switch CG MPC R-S-8844, R-102 Galley Fire Suppression System

3. REQUIREMENTS

Entity completing the work will have trained personnel. Contractor must inspect, test and recertify the installed Engine Room CO2 and Galley APC systems IAW CG MPC N33005.D, which include the above references. The contractor must also clean the Galley Hood vent system, removing all grease/oil/debris buildup from ducting.

4. PERIOD OF PERFORMANCE

The period of the performance is requested to be completed between 24 – 28 November 2025.

5. PLACE OF PERFORMANCE

The primary place of performance shall be onboard CGC BLACKTIP located at below address:

180 Meals Avenue Valdez, AK 99686

Cutter Point of Contact:

EMC David Leahy, Engineer Petty Officer Work: (630) 677-0990 Email: David.c.leahy@uscg.mil

Contracting Officer Technical Representative (COR):

Jason Devin Cell: (651) 600-0525 Office: (757) 628-4623 Email: Jason.m.devin2@uscg.mil mailto:David.c.leahy@uscg.mil mailto:Jason.m.devin2@uscg.mil